W9127821R0051 AM03.pdf

PDF 1 MB Posted

Attached to
FY-21 Airman Leadership School Facility, Eglin Air Force Base, Florida
Solicitation number
W9127821R0051
Issued by

View the file

Other files

File Type Posted
W9127821R0051 JA for Trane HVAC Chillers at Airman Leadership School Eglin AFB FL (Final)_Redacted.pdf PDF
W9127821R0051 AM07.pdf PDF
W9127821R0051 AM07 DRAWINGS.pdf PDF
W9127821R0051 AM06 DRAWINGS.pdf PDF
W9127821R0051 AM06.pdf PDF
W9127821R0051 AM05 DRAWINGS.pdf PDF
W9127821R0051 AM05.pdf PDF
W9127821R0051 AM04.pdf PDF
W9127821R0051 AM03 DRAWINGS.pdf PDF
W9127821R0051 Site Visit Sign In Sheet 06-18-21.pdf PDF
W9127821R0051 AM02 DRAWINGS.pdf PDF
W9127821R0051 AM02.pdf PDF
W9127821R0051 AM01.pdf PDF
VOL3.PDF PDF
VOL1.PDF PDF
EM 385-1-1.pdf PDF
RTA DRAWINGS.pdf PDF
VOL2.PDF PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127821R0051-0003 2 JULY 2021 MHF20005

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127821R0051

9B. DATED (SEE ITEM 11)

9 JUNE 2021

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: AIRMAN LEADERSHIP SCHOOL FACILITY, EGLIN AIR FORCE BASE, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0003

NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO BLOCK 13.A OF THE ENCLOSED SF1442.

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051

EGLIN AIR FORCE BASE, FLORIDA MHF20005

SF 30 Page 2 W9127821R0051-0003

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

SF1442 Revised Block 13.A as indicated herein.

00 11 00 Revised Paragraph 4.3 and Attachment 3 as indicated herein.

01 00 00 Revised Paragraph 1.2 as indicated herein.

PART II - NOTE: Revised, replacement and added drawings are listed below.

These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

SHT

REF. TITLE OF DRAWINGS

COVER SHEET

C-003 PROJECT LEGEND

C-006 CONSTRUCTION DETAILS

CD101 DEMOLITION PLAN

CS101 SITE PLAN

CS502 CIVIL DETAILS SIDEWALK ACCESS DRIVE AND PARKING

BUMPER

CS503 CIVIL DETAILS PAVEMENT MARKING AND SIGNAGE

CG501 DRAINAGE DETAILS

S-301 FOUNDATION SECTIONS

S-501 TYPICAL STRUCTURAL DETAILS

FX001 FIRE SUPPRESSION LEGEND

P-601 PLUMBING SCHEDULES

M-701 SYSTEM 1 – CHILLED WATER SYSTEM – AIR COOLED CHILLER

W/ VARIABLE PRIMARY PUMPING

Encl as stated Revised pages of the specifications as indicated in Part I.

13 Revised drawing as indicated in Part II.

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127821R0051

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

9 JUNE 2021

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

MHF20005

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S. ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

109 SAINT JOSEPH STREET

MOBILE, AL 36628-0001

SAME AS BLOCK 7

9. FOR INFORMATION

CALL : Eli Couch

Kimberly Brackett

A. NAME

Elisha.Couch@usace.army.mil Kimberly.L.Brackett@usace.army.mil

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 251-690-3354 251-441-5170

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

CONSTRUCT FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY EGLIN AIR FORCE BASE, FLORIDA

* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.

**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.

11. The Contractor shall begin performance within _8____ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.

This performance period is mandatory, negotiable. (See _ __ .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 12 16 JULY 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

Revised by Amendment No. W9127821R0051-0003

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 BACK (REV. 4-85)

CONSTRUCT FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051

SECTION 00 11 00

00 11 00

4.3 Volume II - Factor 2 – Key Management Personnel Experience and Qualifications. Key Management Personnel Experience and Qualifications. The Offeror shall include only resumes for the Key Management Personnel listed below. Key Management Personnel shall provide a resume to demonstrate project experience for their assigned role for the contract, clearly demonstrating duties performed supporting their assignment. Key Management Personnel shall emphasize experience with recent design-bid-build projects on military installations of scope magnitude and complexity to that of the solicitation.

Each resume shall be limited to two-pages in length.

For each person listed provide a resume of experience. If a time requirement for experience is noted, assure that the listed project experience duration when totaled meets or exceeds the minimum years of experience requirement.

Attachment 4 the end of this section may be used. At a minimum provide, all the information listed on the form.

(1) Construction Project Manager (person responsible for all construction operations): The Construction Project Manager shall have at a minimum a Bachelor’s Degree in Engineering, Building Science, Architecture, or Construction Management from an accredited University, and a minimum of at least 5 years “relevant” experience, within the past 10 years, as construction project manager. The resume shall demonstrate specific experience as a Construction Project Manager with on-site for the duration of construction operations experience.

(2) On-site Superintendent (person in charge of all on-site operations):

minimum experience requirement for the on-site superintendent is at least 7 years “relevant” experience, within the past 10 years, as an on-site superintendent, managing multiple trades and subcontractors.

CONSTRUCT FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051

SECTION 00 11 00

(Attachment 1)

PROPOSAL DATA SHEET

Also include the required, completed and signed SF 1442 in addition to this Proposal Data Sheet. Place a copy of this Proposal Data Sheet at the beginning of both Volumes I and II.

1. Name of Solicitation:

2. Offering Firm’s Name As Appears on the SF 1442:

Offering Firm’s DUNS number as it appears on the SF 1442:

Offering Firm’s Lead Design Firm Name and DUNS number:

2.a. If applicable, Offering Firm’s Joint Venture (JV) Individual Member Information (applies for Offeror and/or Lead Design Firm):

JV Member 1 Name & DUNS:

JV Member 2 Name & DUNS:

3. Mailing Address:

4. Telephone Number:

5. Fax Number:

6. E-mail Address to use for all correspondence:

7. AUTHORIZED NEGOTIATORS. Far 52.215-11. The Offeror represents that the following person(s) are authorized to negotiate on its behalf with the Government in connection with this solicitation.

List name(s), title, and telephone numbers of authorized negotiator(s).

Name of Person(s) Authorized to Negotiate:

Negotiator’s Address:

Negotiator’s Telephone:

Negotiator’s E-mail:

End of Attachment 1

(Note: The remainder of the section is unchanged by this amendment.)

AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051

01 00 00

01 00 00

1.2 LIQUIDATED DAMAGES – CONSTRUCTION

(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay to the Government as liquidated damages, the sum of $2,500.00 $1,503.00 for each calendar day of delay.

(b) If the Government terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Government in completing the work.

(c) If the Government does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.

(Note: The remainder of the section is unchanged by this amendment.)

SF30
LINEUP
Sf1442_AM03
00 11 00_AM03
01 00 00_AM03

File details come from the government source that posted it. Updated .