W9127821R0048 AM03 DRAWINGS.pdf
PDF 2 MB Posted
- Attached to
- Construct Munitions Maintenance Facility and Igloos - Eglin Air Force Base, Florida Federal contract opportunity
- Solicitation number
- W9127821R0048
About this file
This solicitation requests proposals for the construction of a Munitions Maintenance Facility and igloos at Eglin Air Force Base in Florida. The scope of work includes constructing a multi-bay munitions research, development, test and evaluation facility with offices, latrines, labs, storage and mechanical spaces. Proposals are due on a best value source selection basis under North American Industry Classification System code 236220, which is a total small business set-aside. The plans and specifications are available exclusively through the System for Award Management website. All prospective contractors must register in SAM prior to downloading bid documents or submitting proposals. Site visit information and a process for submitting requests for information will be included in the solicitation package.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127821R0048 JA for Trane HVAC_Redacted.pdf | ||
| W9127821R0048 Site Visit Sign In Sheet.pdf | ||
| W9127821R0048 AM03.pdf | ||
| W9127821R0048 AM02.pdf | ||
| W9127821R0048 AM01.pdf | ||
| W9127821R0048 Solicitation Vol 4.pdf | ||
| W9127821R0048 Solicitation Vol 3.pdf | ||
| W9127821R0048 Solicitation Vol 1.pdf | ||
| W9127821R0048 EM_385-1-1 Safety Manual Link.pdf | ||
| W9127821R0048 Solicitation Vol 2.pdf | ||
| W9127821R0048 RTA DRAWINGS.pdf | ||
| W9127821R0048 RTA DRAWINGS- BID OPTION.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers®
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE, AL 36602
MUNITIONS MAINTENANCE FACILITY AND IGLOOS.
EGLIN AIR FOCE BASE, FLORIDA
MOBILE DISTRICT PROJECT CODE : MHF20006
RFP NUMBER : W9127821R0048
JUNE 2021
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
FACILITIES PLANNING, DESIGN AND
CONSTRUCTION.
AMENDMENT NO. 0003
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
G-002
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
PR
O
JE
C T/
C O
N
TR
AC
T
D
ES
C R
IP
TI
O N
ID
EN
TI
FI
ER
PR
O
JE
C T/
C O
N
TR
AC
T
ID
EN
TI
FI
ER
IF
N
EE
D
ED
M O
BI
LE
D
IS
TR
IC
T D es ig ne r
Au th or
C he ck er
M M
M M
M M
M M
M Y
YY
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-G
-C M
.rv t
M H
F2
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
SH
EE
T
IN
D
EX
M
AR
K D
AT
E
SHEET INDEX
SHEET
NUMBER SHEET TITLE
A-601 PARTITION TYPES
A-602 SECURITY/SOUND ISOLATION DETAILS
A-603 DOOR SCHEDULE AND DETAILS
A-604 DOOR DETAILS
A-605 INTERIOR DOOR DETAILS
A-606 OVERHEAD COILING DOOR DETAILS
I-101 COMPOSITE FURNITURE PLAN AND FURNITURE SCHEDULE
I-111 COMPOSITE FINISH SIGNAGE PLANS
I-601 ROOM FINISH PLAN AND DETAILS
I-602 SIGNAGE SCHEDULE AND DETAILS
FIRE PROTECTION
FL100 LIFE SAFETY ANALYSIS
FL101 EGRESS PLANS
FX001 FIRE SUPPRESSION NOTES AND DETAILS
FX101 FIRE SUPPRESSION PLAN
FX701 FIRE PUMP LAYOUT
FA001 FIRE ALARM & MASS NOTIFICATION LEGEND
FA101 FIRE ALARM & MASS NOTIFICATION PLAN
FA501 FIRE ALARM & MASS NOTIFICATION DETAILS AND DIAGRAM
PLUMBING
P-001 PLUMBING LEGEND
P-101 DOMESTIC WATER FLOOR PLAN
P-102 SANITARY AND VENT FLOOR PLAN
P-103 COMPRESSED AIR FLOOR PLAN
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 DOMESTIC AND COMPRESSED AIR 3D VIEW
P-902 SANITARY AND VENT 3D VIEW
MECHANICAL
M-001 HVAC LEGEND
M-101 HVAC FLOOR PLAN
M-301 HVAC BUILDING SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-700 HVAC CONTROLS
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
M-703 HVAC CONTROLS
M-704 HVAC CONTROLS
M-705 HVAC CONTROLS
M-900 HVAC ISO
ELECTRICAL
E-001 ELECTRICAL LEGEND
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES501 ELECTRICAL PRIMARY DETAILS
ES502 ELECTRICAL SECONDARY DETAILS
ES601 ELECTRICAL SITE RISER DIAGRAM
EG101 GROUNDING PLAN
EG102 CATENARY LIGHTNING PROTECTION PLAN
EG201 CATENARY LIGHTNING PROTECTION ELEVATIONS
EG501 GROUNDING DETAILS
EG502 CATENARY LIGHTNING PROTECTION DETAILS
EC501 CATHODIC PROTECTION DETAILS
EC502 CATHODIC PROTECTION DETAILS
EC503 CATHODIC PROTECTION DETAILS
EL101 LIGHTING PLAN & SCHEDULES
EL501 LIGHTING DETAILS
EL601 LIGHTING CONTROLS SCHEDULE & DIAGRAMS
EP101 POWER PLAN & ELECTRICAL CIRCUIT SCHEDULE
EP501 POWER DETAILS
EP601 POWER RISER
EP602 ELECTRICAL PANEL SCHEDULES
EP603 ELECTRICAL PANEL SCHEDULES
EP604 ELECTRICAL PANEL SCHEDULES
EP605 ELECTRICAL PANEL SCHEDULES
EY001 ELECTRONIC SYSTEMS LEGEND
EY101 ELECTRONIC SYSTEMS PLAN
EY501 ACCESS CONTROL SYSTEM DETAILS & RISER
EY502 INTRUSION DETECTION SYSTEM DETAILS & RISER
TELECOM
T-001 TELECOMMUNICATION LEGEND
TS101 TELECOMMUNICATIONS SITE PLAN
TS102 TELECOMMUNICATIONS SITE PLAN
TS103 TELECOMMUNICATIONS SITE PLAN
TS501 TELECOMMUNICATIONS OSP DETAILS
TS601 TELECOMMUNICATIONS SITE RISER DIAGRAM
TN101 TELECOMMUNICATION PLAN
TN501 TELECOMMUNICATION DETAILS
TN502 TELECOMMUNICATION DETAILS
TN503 TELECOMMUNICATION DETAILS
TN601 TELECOMMUNICATION RISER
SHEET INDEX
SHEET
NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
CIVIL
C-001 LOCATION/VICINITY MAP
C-002 ABBREVIATIONS
C-003 LEGEND
C-004 GENERAL NOTES
C-005 HAUL ROUTE AND CONSTRUCTION STAGING AREA
C-006 TRAFFIC CONTROL DETAILS
C-110 PROJECT OVERVIEW AND KEY MAP BASE BID MUNITIONS MAINT. FACILITY
AND BID OPTION IGLOO STORAGE MODULE SITE
V-101 SURVEY MONUMENTATION
VF100 SHEET INDEX MUNITIONS AND IGLOO FACILITIES UTILITY SURVEY
VF101 EXISTING CONDITIONS (1 OF 9)
VF102 EXISTING CONDITIONS (2 OF 9)
VF103 EXISTING CONDITIONS (3 OF 9)
VF104 EXISTING CONDITIONS (4 OF 9)
VF105 EXISTING CONDITIONS (5 OF 9)
VF106 EXISTING CONDITIONS (6 OF 9)
VF107 EXISTING CONDITIONS (7 OF 9)
VF108 EXISTING CONDITIONS (8 OF 9)
VF109 EXISTING CONDITIONS (9 OF 9)
CD101 DEMOLITION PLAN MUNITIONS MAINT. FACILITY
CD102 BID OPTION DEMOLITION PLAN IGLOO STORAGE MODULES
CS101 SITE PLAN MUNITIONS MAINT. FACILITY
CS102 BID OPTION SITE PLAN IGLOO STORAGE MODULES
CS501 FE-6 SECURITY FENCE DETAILS
CS502 DUMPSTER ENLARGEMENT PLAN AND APRON DETAILS
CS503 MUNITIONS MAINT. FACILITY ACCESS RAMP ENLARGMENT PLAN AND RAIL
DETAILS
CS504 MUNITIONS MAINT. FACILITY RAMP WITH RAIL DETAILS
CP101 GEOMETRIC LAYOUT RDT&E MUNITIONS SITE
CP102 BID OPTION GEOMETRIC LAYOUT IGLOO STORAGE MODULES
CP201 PROJECT PROFILE MUNITIONS ACCESS DRIVE
CP301 TYPICAL PAVEMENT SECTIONS
CP302 TYPICAL PAVEMENT SECTIONS
CP401 JOINT LAYOUT PLAN RDT&E MUNITIONS FACILITY
CP402 BID OPTION JOINT LAYOUT PLAN IGLOO STORAGE MODULES
CP403 ENLARGEMENT OF APRON RAMPS MUNITIONS MAINT. FACILITY
CP501 PAVEMENT DETAILS
CP502 PAVING DETAILS
CP503 PAVEMENT MARKING DETAILS
CP504 SPECIAL PAVEMENT DETAILS
CG101 GRADING PLAN RDT&E MUNITIONS FACILITY SITE
CG102 BID OPTION GRADING PLAN IGLOO STORAGE MODULES
CG301 BID OPTION DRAINAGE SECTION IGLOO STORAGE MODULES
CG302 DRAINAGE SECTIONS
CG401 JOINT GRADING PLAN MUNITIONS MAINT. FACILITY
CG402 BID OPTION JOINT GRADING PLAN IGLOO STORAGE MODULE
CG403 STOMRWATER MANAGEMENT FACILITY MUNITIONS MAINT. FACILITY
CG404 RAMP ELEVATION PLAN MUNITIONS MAINT. FACILITY
CG501 DRAINAGE DETAILS
CG701 BMP PLAN MUNITIONS MAINT. FACILITY SITE
CG702 BMP PLAN MUNITIONS MAINT. CONTRACTOR STAGING AREA
CG703 BID OPTION BMP PLAN IGLOO STORAGE MODULES
CG704 VEGETATION PLAN MUNITIONS MAINT. FACILITY
CG705 BID OPTION VEGETATION PLAN IGLOO STORGE MODULES
CG801 BMP PROJECT DETAILS
CU101 OVERALL UTILITY LAYOUT
CU201 GRAVITY SEWER PROFILE
CU501 WATER DETAILS
CU502 WATER DETAILS
CU503 FIRE WATER DETAILS
CU504 SEWER DETAILS
CU505 LIFT STATION DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES DESIGN LOADS & ABBREVIATIONS
S-101 FOUNDATION AND SLAB PLAN
S-102 BRIDGE CRANE FRAMING PLAN
S-103 ROOF FRAMING PLAN
S-201 FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS
S-302 ROOF FRAMING SECTIONS
S-500 TYPICAL STRUCTURAL DETAILS
S-501 TYPICAL STRUCTURAL DETAILS
S-502 TYPICAL STRUCTURAL DETAILS
ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS
A-002 AIR BARRIER FLOOR PLAN
A-101 COMPOSITE FLOOR PLAN
A-102 DIMENSION PLAN
A-103 REFLECTED CEILING PLAN
A-104 ROOF PLAN
A-201 NORTH AND SOUTH ELEVATIONS
A-202 EAST AND WEST ELEVATIONS
A-301 BUILDING CROSS SECTION
A-302 BUILDING LONGITUDINAL SECTION
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-320 WALL DETAILS
A-400 ENLARGED RESTROOM PLANS AND ELEVATIONS
A-401.1 RESTROOM DETAILS (REPLACED)
A-402 ENLARGED BREAKROOM PLANS
A-510 ROOF DETAILS
MECHANICAL SPECIALTIES FLOOR PLAN & SCHEDULEMS101
k5en9jbm Line k5en9jbm Line k5en9jbm Polygon
D E
S C
R I P
T I O
N M
A R
K D
A T
E
US Army Corps of Engineers
SHEET ID
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
S I Z
E
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C T
N
O
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
A N
S I
D
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
P R
O J E
U M
B E
R
F I L
E
N
A M
E
S
A I N
T
J O
S E
P H
R
E E
T
E G
L I
A
R
F
R
B
S
E
F
L
M U
N I T
I O
M
I N
T E
N A
N C
E
F
A C
I L
I T
Y
G
L O
O S
I S
S U
E
D
A T
M y
- - M H
F
GENERAL NOTES
1. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY EGLIN
AFB SECURITY POLICE WHEN ENTERING THE WORK AREA AND MAY
EXPERIENCE DELAYS. ALL VEHICLES ENTERING THE WORK AREA MUST HAVE
CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND
CURRENT/VALID DRIVERS LICENSE FOR THE OPERATOR.
2. THE CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY
PAINTED SIGN, MEETING COR APPROVAL, AT THE CONSTRUCTION
ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE.
3. ALL CONSTRUCTION EQUIPMENT AND CONTRACTOR CONSTRUCTION
VEHICLES SHALL BE MARKED WITH COMPANY PAINTED DESIGNS, INSIGNIAS
OR OTHER COMPANY MARKINGS, WHICH ARE CLEARLY VISIBLE.
4. THE CONTRACTOR CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
5. THE CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE
PROJECT IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL
EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY
VEHICLE RESPONSE TIME.
6. THE CONTRACTOR'S STAGING AREA SHALL BE SUBJECT TO APPROVAL BY
COR. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITY, THE
CONTRACTOR'S CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
PARKED IN THE CONTRACTOR'S STAGING AREA.
7. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
OF EXISTING SITE, SUBJECT TO THE APPROVAL OF THE COR.
8. THE CONTRACTOR SHALL COORDINATE WITH COR REGARDING ANY
GOVERNMENT-OWNED EQUIPMENT REQUIRING RELOCATION TO COMPLETE
WORK.
9. THROUGHOUT CONSTRUCTION, WEEKLY BRIEFINGS SHALL BE CONDUCTED
BY THE CONTRACTOR WITH THE COR, FOR THE PURPOSE OF COORDINATING
CONSTRUCTION ACTIVITIES AND SCHEDULING NEARBY.
10. THE BASE COMMANDER AND/OR THE ACO SHALL HAVE THE AUTHORITY TO
IMMEDIATELY SUSPEND AUTHORIZATION TO WORK FOR SECURITY
REASONS.
11. THE CONTRACTOR IS REQUIRED TO SURVEY ALL UTILITY LINES AND
APPURTENANCES IMMEDIATELY AFTER INSTALLATION FOR UPDATING
RED-LINE AS-BUILT DRAWINGS MAINTAINED ON-SITE BY THE CONTRACTOR.
USING THE FLORIDA NORTH STATE PLANE COORDINATE SYSTEM FOR THE
HORIZONTAL DATUM AND NAVD 88 FOR THE VERTICAL DATUM.
12. EGLIN AFB HAS NO DESIGNATED SPOIL AREAS. CONTRACTOR IS TO REMOVE
NON-COMBUSTIBLE MATERIALS, WASTE AND UNSUITABLE MATERIAL OFF
BASE AND DISPOSE OF PROPERLY.
13. THE CONTRACTOR IS TO SUBMIT TRAFFIC CONTROL PLAN TO THE COR.
TRAFFIC CONTROL SHALL CONFORM TO THE MOST CURRENT MUTCD AND
FDOT DESIGN STANDARD.
14. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UTILITIES
(UNDERGROUND AND ABOVE) WITHIN THE PROJECT LIMITS PRIOR TO
BEGINNING OF CONSTRUCTION.
15. TEMPORARY POWER, SEWER AND WATER SHALL BE PROVIDED BY
CONTRACTOR. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS
FOR TEMPORARY UTILITY RATES FOR PAYMENTS RENDERED TO THE
GOVERNMENT.
COORDINATION NOTES
1. THE CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT,
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL BE
PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING
HOURS WHILE JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO
SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
APPROVED ALTERNATE REPRESENTATIVE SHALL BE PROVIDED.
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CORDON OFF THE
WORK AREAS AND STREET CROSSINGS BY USING BARRICADES APPROVED
BY THE COR, AS NEEDED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF THE PROJECT
AND THE EXPENSE THEREOF. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO ENSURE THAT NO IMPROVEMENTS ARE CONSTRUCTED
OUTSIDE THE PROJECT LIMITS.
EROSION CONTROL NOTES
1. BMPS SHOWN ON THE PLAN ARE NOT FINAL AND SHALL BE ADJUSTED PER
SITE CONDITIONS AT THE TIME OF CONSTRUCTION. CONTRACTOR IS NOT
LIMITED TO THE BMPS DETAILED IN THE PLAN SET AND MAY USE ADDITIONAL
BMPS AS APPROVED BY THE COR.
2. THE CONTRACTOR HAS THE SOLE RESPONSIBILITY TO DESIGN THE EROSION
CONTROL PLAN AND IS RESPONSIBLE FOR ADHERING TO FEDERAL, STATE
AND LOCAL PERMITS FOR EROSION CONTROL. PRELIMINARY ERSOION
CONTROL PLANS HAVE BEEN PROVIDED IN THE CIVIL PLAN SET FOR
CONTRACTOR REFERENCE ONLY. FINAL DESIGN AND LAYOUT IS THE
RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL OBTAIN AN
FDEP NPDES PERMIT FOR CONSTRUCTION ACTIVITIES AT BOTH PROJECT
SITES. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES AND
APPLICATION PREPARATION. ALL FDEP PERMITS SHALL BE COORDINATED
THROUGH THE COR AND APPROPRIATE SIGNATURES AS REQUIRED BY EGLIN
OFFICIALS SHALL BE ROUTED THROUGH THE CES GROUP THROUGH THE
COR.
3. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY
DISTURBANCE.
4. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND
ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND
SEDIMENT DISCHARGE.
5. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
ITS MOVEMENT BY WIND FORCES.
6. LIMITS OF CONSTRUCTION IS DEFINED AS THOSE AREAS AFFECTED BY THE
CONTRACTOR'S OPERATIONS INVOLVING EXCAVATION, EMBANKMENT AND
FINAL GRADING REQUIRED TO COMPLETE THE WORK.
7. THE CONTRACTOR SHALL UTILIZE FDOT EROSION AND SEDIMENT CONTROL
MANAGEMENT MANUAL. FOR ADDITIONAL RESOURCES AND GUIDANCE
BEYOND WHAT IS SHOWN IN THIS PLAN SET.
8. CONSTRUCTION ENTRANCES SHALL BE LOCATED TO MINIMIZE IMPACT ON
LOCAL TRAFFIC CONDITIONS AND SHALL BE MAINTAINED FOR THE LIFE OF
THE PROJECT.
9. FOR INFORMATION ON REQUIRED FDEP CONSTRUCTION PERMIT AND BMP
PLAN SEE SECTION 01 57 19, "TEMPORARY ENVIRONMENTAL CONDITIONS".
EXCAVATION AND TRENCHES NOTES
1. OPEN TRENCHES, EXCAVATIONS, AND DEMOLITION AREAS WITHIN THE
CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE
FENCING OR OTHER MEANS ACCEPTABLE TO THE COR.
2. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL LOCATE ALL UTILITIES.
ANY UTILITY ADJUSTMENTS, EXISTING OR PROPOSED, REQUIRED TO
COMPLETE CONSTRUCTION UNDER THIS CONTRACT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR. THIS ITEM INCLUDES, BUT IS NOT
LIMITED TO THE TEMPORARY RELOCATION OF EXISTING OVERHEAD POWER
LINES. ALL WORK PERFORMED IN THE VICINITY OF OVERHEAD POWER LINES
SHALL CONFORM TO OSHA REQUIREMENTS AND ANY OTHER APPLICABLE
(LOCAL) SAFETY REQUIREMENTS. THE CONTRACTOR IS TO REPAIR ALL
DAMAGES TO EXISTING UTILITIES THAT ARE TO REMAIN IN SERVICE
IMMEDIATELY AT NO ADDITIONAL COSTS OR EXPENSE TO THE
GOVERNMENT.
3. ALL WORK PERFORMED ADJACENT TO OR ON EXISTING ROADWAYS SHALL
COMPLY WITH CURRENT FDOT STANDARDS FOR TRAFFIC CONTROL AND
SAFETY. ALL WORK IN AND ADJACENT TO STREETS OR ROADS SHALL BE
COORDINATED WITH THE COR. THE CONTRACTOR SHALL PROVIDE THE COR
WITH A ONE-WEEK ADVANCE NOTICE PRIOR TO BEGINNING OF WORK
ADJACENT TO RANGE ROAD. NO WORK ADJACENT TO OR ON EXISTING
ROADS SHALL BE INITIATED WITHOUT PRIOR APPROVAL FROM THE COR.
4. THE CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS TO PERFORM
UNDERGROUND WORK.
5. THE CONTRACTOR SHALL PROVIDE WATER DIVERSIONS AS REQUIRED TO
LIMIT RAIN WATER FROM ENTERING SITE EXCAVATED AREAS. FOR
DE-WATERING REQUIREMENTS SEE SECTION 31 00 00.
SAFETY AND SECURITY REQUIREMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION OSHA
REGULATIONS AND USACE SAFETY MANUAL EM385-1-1.
2. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS WILL NOT BE
ALLOWED IN THE 96TH CEG MUNITIONS COMPLEX AREA. A HOT WORK
PERMIT FROM THE EGLIN AFB FIRE DEPARTMENT WILL BE REQUIRED
OUTSIDE THE CONTROLLED PERIMETER AREA.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY FENCING OR
OTHER SECURITY MEASURES REQUIRED TO PROTECT WORK AREA OR
EQUIPMENT DURING CONSTRUCTION. ORANGE SAFETY FENCE SHALL BE
INSTALLED PRIOR TO INITIATING ANY DEMO WORK.
4. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE IF THE
REQUIRED CONSTRUCTION CAN BE PERFORMED WITHIN THE AREA
PROVIDED AND COMPLY WITH REQUIREMENTS OF THE SAFETY AND HEALTH
REGULATIONS OSHA FOR CONSTRUCTION PROJECTS OF THIS TYPE. ANY
SAFETY MEASURES OR METHOD OF CONSTRUCTION THAT IS NECESSARY IN
THE CONSTRUCTION OF THIS PROJECT TO COMPLY WITH THESE
REGULATIONS IS THE CONTRACTOR'S RESPONSIBILITY.
SURVEYORS NOTES
1. THE SURVEY DEPICTED HEREON WAS PREPARED IN ACCORDANCE WITH THE
PERTINENT SECTIONS OF EM-1110-1-1000 PHOTOGRAMMETRIC MAPPING,
EM-1110-1-1002 SURVEY MARKERS AND MONUMENTATION, EM-1110-1-1003
NAVSTAR GLOBAL POSITIONING SYSTEM SURVEYING, EM-1110-1-1005
ENGINEERING AND DESIGN: CONTROL AND TOPOGRAPHIC SURVEYING,
EM-1110-1-2909 GEOSPATIAL DATA AND SYSTEMS, A/E/C TRI-STAR CADD
STANDARDS, AND MINIMUM TECHNICAL STANDARD MTS REQUIREMENTS AS
DEFINED BY THE FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND
MAPPERS.
2. NO ENVIRONMENTAL JURISDICTIONAL LINES HAVE BEEN DETERMINED BY
FLORABAMA GEOSPATIAL SOLUTIONS, LLC.
3. APPARENT USES ARE AS SHOWN. NO APPARENT USES WERE DETERMINED.
THIS IS NOT A BOUNDARY SURVEY.
4. HORIZONTAL AND VERTICAL CONTROL USED IN THIS SURVEY WERE
DETERMINED FROM A SITE CALIBRATED GPS NETWORK. THE CONTROL
POINTS AND VALUES ARE IN THE TABLE ABOVE.
5. THE ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET AND TENTHS
(NAVD88).
6. THIS PARCEL LIES IN FLOOD ZONE X NO MINIMUM AS DETERMINED BY SCALE
FROM FEMA PANEL 12091C 0457H, DATED 12/06/202, AND FURNISHED BY FEMA
MAP SERVICE CENTER.
7. THE SURVEY MAP AND SURVEY REPORT ARE NOT FULL & COMPLETE
WITHOUT THE OTHER.
8. UTILITIES SHOWN ON THE SURVEY ARE FIELD LOCATED WITH THE
EXCEPTION OF THE SECONDARY UNDERGROUND ELECTRICAL WHICH IS
DERIVED FROM A SHAPE FILE PROVIDED BY EGLIN AFB AND IS NOT SURVEY
GRADE. ANY SECONDARY ELECTRICAL LINES THAT CONNECT THE LIGHTNING
PROTECTION SYSTEM WERE NOT IN THE PROVIDED SHAPE FILE.
9. SEE TABLE BELOW FOR PROJECT SPECIFIC MONUMENTATION CONTROL.
SEE SHEET VF-100 FOR ADDITIONAL BENCHMARKS AND SURVEY NOTES.
DEMOLITION NOTES
1. ALL MATERIAL REMOVED SHALL BE DISPOSED OF IN AN APPROVED LANDFILL
OFF GOVERNMENT PROPERTY.
ENVIRONMENTAL RESOURCES NOTES
1. THE INCLUDED AF FORM 813 SIGNED 30 MAY 2017 USES A CATEGORICAL EXCLUSION
(CATEX) THAT IS FOR STUDY EFFORTS THAT INVOLVE NO COMMITMENT OF
RESOURCES OTHER THAN PERSONNEL AND FUNDING ALLOCATIONS. ANOTHER AF
FORM 813 MUST BE SUBMITTED TO ADDRESS THE ACTUAL PROPOSED ACTION AND
ALTERNATIVES.
2. IN ACCORDANCE WITH THE COASTAL ZONE MANAGEMENT ACT (CZMA), A
DETERMINATION OF THE PROPOSED ACTION WAS REVIEWED BY THE FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP). THEIR CONCURRENCE
WITH OUR CZMA DETERMINATION WAS RECEIVED 17 JUNE 2014. THE CZMA
DOCUMENT DESCRIBES GUIDELINES UNDER WHICH THE PROJECT MUST BE
COMPLETED TO MAINTAIN CONSISTENCY WITH FLORIDA'S STATUTES AND
REGULATIONS. A COPY OF THIS DOCUMENT IS CAN BE PROVIDED BY EMAIL IF
REQUESTED. FOR QUESTIONS CONTACT RODNEY FELIX, 96 CEG/CEIEA,THROUGH
THE COR.
3. PER CONVERSATION WITH STATE CLEARINGHOUSE 20 MAY 2019, IT WAS AGREED
THIS NEGATIVE DETERMINATION FOR RCS 14-172 REMAINS APPLICABLE AND NO NEW
CONSISTENCY DETERMINATION IS NEEDED PROVIDED PREVIOUSLY ESTABLISHED
CONSERVATION MEASURES WILL BE ADHERED-TO.
4. PRIOR TO ANY TREE REMOVALS FOR THIS PROJECT, CONTACT PHIL CARTER, 96
CEG/CEIEA, 850-883-1129 OR AL SUTSKO, 96 CEG/CEIEA, 850-883-1126, THROUGH THE
COR TO VERIFY ALL ENVIRONMENTAL CONCERNS ARE ADDRESSED PRIOR TO
CONSTRUCTION. PREVIOUS ASSESSMENTS OF THE PROJECT SITE(S) INDICATED NO
DESIRABLE TREES FOR SALVAGE.
5. REFER TO THE PROJECT’S REVISED FORM 813, LOG # 57560, RCS# 21-186 FOR
DOCUMENTED ENVIRONMENTAL CONCERNS OF THE SITE. GOPHER TORTOISE
BURROWS MIGHT BE PRESENT ON SITE, BUT THE RELOCATION OF ANY TORTOISES
WILL BE EXECUTED BY BASE ENVIRONMENTAL PERSONNELL.
POC THROUGH THE COR IS RODNEY FELIX, 96 CEG/CEIEA, OR WAYNE PITTMAN, 96
CEG/CEIEA.
6. THERE ARE NO CULTURAL RESOURCES CONCERNS ANTICIPATED WITH THIS
PROJECT. HOWEVER, IF UNEXPECTED DISCOVERIES, SUCH AS NATIVE AMERICAN
GRAVES OR LOST HISTORIC CEMETERIES ARE ENCOUNTERED, GUIDELINES SET
FORTH IN CHAPTER 872, FLORIDA STATUTE (FLORIDA'S UNMARKED BURIAL LAW)
MUST BE FOLLOWED. IF HUMAN REMAINS OR ARCHAEOLOGICAL MATERIALS ARE
ENCOUNTERED DURING CONSTRUCTION, WORK SHOULD CEASE IMMEDIATELY AND
THE AREA SECURED. CONTACT THE EGLIN AFB CULTURAL RESOURCES OFFICE WITH
LYNN SHREVE OR BEN AUBUCHON, THROUGH THE COR WITHIN 24 HOURS.
7. CUT VEGETATION FROM LAND CLEARING MUST NOT BE PUT INTO THE REFUSE
SOLID WASTE STREAM FOR LANDFILL DISPOSAL. CONTRACTOR SHALL REMOVE
VEGETATION TO A SECURE, PERMITTED DISPOSAL SITE OR COLLECTED AND
TRANSPORTED FOR APPROVED RECYCLING/REUSE. COORDINATE ALL DISPOSALS
WITH MR.STEVE KAUFFMAN AT 96 CEG/CEIEC, THROUGH THE COR.
8. THIS PROJECT WILL REQUIRE A GENERAL ERP STORMWATER ENVIRONMENTAL
RESOURCE PERMIT PURSUANT TO CHAPTER 62-330 FAC AS THE PROJECT INCLUDES
MORE THAN 4,000 SQ FT OF IMPERVIOUS OR SEMI-IMPERVIOUS SURFACES SUBJECT
TO VEHICULAR TRAFFIC, 9,000 SQ FT OF TOTAL IMPERVIOUS SURFACES, AND OR
MORE THAN 1 ACRE OF PROJECT AREA AND IS PART OF A LARGER COMMON PLAN
OF DEVELOPMENT. THE CONTRACTOR IS NOT REQUIRED TO OBTAIN THIS PERMIT,
HOWEVER THE CONTRACTOR WILL NEED TO COORDINATE WITH THE COR IF
CONSTRUCTION TIME EXCEEDS THE PERMIT ALLOTTED TIME FRAME.
9. THE CONTRACTOR MUST OBTAIN AN NPDES STORMWATER CONSTRUCTION PERMIT,
AS THE PROJECT DISTURBS A TOTAL OF ONE ACRE OR MORE OF SOIL, FROM FDEP
PURSUANT TO CHAPTER 62-621 FAC. CONTACT TIM C. LANGLEY FOR PERMIT
CONSULTATION, 96CEG/CEIEC, THROUGH THE COR.
VEGETATION NOTES
1. PROVIDE SOLID SOD ON ALL AREAS DESIGNATED TO RECEIVE SOD.
2. PROVIDE SEEDING ON ALL GRADED, SCARRED OR DISTURBED AREAS AS
INDICATED ON THE VEGETATIVE PLANS.
3. THE SITE IS CONSIDERED TO HAVE NO TOPSOIL PRESENT. ALL TOPSOIL
SHALL BE BROUGHT IN FROM AN OFFSITE COMMERCIAL SOURCE FOR
PROJECT USE.
SPECIAL PROJECT SITE ACCESS NOTES
1. THE CONTRACTOR SHALL NOTE THAT BOTH PROJECT SITES, THE IGLOO
FACILITY AND THE MUNITIONS FACILITY, BEING PROPOSED TO BE
CONSTRUCTED ARE LOCATED WITHIN THE 96TH CEG MUNITIONS COMPLEX
WHICH IS A CONTROLLED AND SECURE LOCATION ON EGLIN AIR FORCE
BASE. ESCORT WITHIN THE COMPLEX WILL BE REQUIRED THROUGHOUT
EACH SITES CONSTRUCTION TIME FRAME. TO MITIGATE ESCORT, THE 96TH
CEG GROUP HAS AGREED TO ALLOW THE INSTALLATION OF A TEMPORARY
SECURITY CONSTRUCTION FENCE AROUND THE MUNITIONS SITE TO
TEMPORARILY ESTABLISH A PERIMETER FENCE BOUNDARY THAT WOULD
ALLOW FOR THE MAJORITY OF THE FACILITY SITE TO BE CONSTRUCTED
WITHOUT ESCORT. THE CONTRACTOR WILL COORDINATE WITH THE COR
AND THE 96TH CEG REPRESENTATIVE FOR A FINAL APPROVED TEMPORARY
FENCE LOCATION. THE CONTRACTOR SHALL NOTE THAT THE TEMPORARY
SECURITY CONSTRUCTION FENCE IS OPTIONAL AND NOT REQUIRED TO
CONSTRUCT FOR EITHER FACILITY. SEE CD101 FOR SUGGESTED
TEMPORARY FENCING LOCATION. A FINAL FE-6 SECURITY FENCE WILL BE
REQUIRED TO RE-ESTABLISH THE COMPLEX PERIMETER POST
CONSTRUCTION. PERMANENT FE-6 FENCING LOCATION CAN BE FOUND IN
THE CIVIL PLANS.
2. THE ROADWAY BETWEEN THE MSA GATE 4 AND PERIMETER ROAD IS USED
FOR EMERGENCY INGRESS/EGRESS AND SHALL NOT BE BLOCKED OR
OBSCURED.
GENERAL PROJECT PHASING NOTES:
PHASE I:
· ESTABLISH CONTRACTOR STAGING AREA
· ESTABLISH MOT (MAINTENANCE OF TRANSPORTATION) ALONG PEREMITER ROAD, AND
WITHIN THE 96TH CEG MUNITIONS COMPLEX AS REQUIRED. COORDINATE ALL MOT PLANS
WITH COR PRIOR TO IMPLEMENTATION.
· CONSTRUCT APPROVED TEMPORARY SECURITY FENCE AT RDT&E MUNITIONS SITE
· INSTALL CONSTRUCTION ENTRANCE AND TEMPORARY CONSTRUCTION AGGREGATE ACCESS
ROAD AS NECESSARY FOR IMPROVED SITE ACCESS
· INSTALL BEST MANAGEMENT PRACTICES AS INDICATED IN THIS CONSTRUCTION PLAN SET
AND AS NECESSARY TO MEET STATE AND FEDERAL REQUIREMENTS
· BEGIN SITE DEMOLITION, CLEARING AND GRUBBING
PHASE II
· BEGIN CONSTRUCTION OF RDT&E MUNITIONS FACILITY
· ESTABLISH CONTRACTOR STAGING AREA AT IGLOO SITE
· BEGIN CONSTRUCTION OF IGLOO SITE
PHASE III:
· PAVE AND STRIPE MUNITIONS SITE AND ESTABLISH PERMANENT VEGETATION
· DECONSTRUCT TEMPORARY SECURITY FENCE, INSTALL PERMANENT SECURITY FENCE
· COMPLETE CONSTRUCTION OF IGLOO SITE
· STABILIZE IGLOO SITE WITH PERMANENT VEGETATION AS REQUIRED
· RESTORE CONTRACTOR STAGING AREAS TO PRE-EXISTING CONDITIONS
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
FACILITIES PLANNING, DESIGN AND
CONSTRUCTION.
J D
E F
A L C
O
K K
I R
B Y
J L O
N G
P O
C
O N
N O
R
G E
N E
R A
L
N
O T
E S
M H
F
C d w g
C-004
AM
D
: M
IS
C
EL
L A
N
EO
U S
R
EV
IS
IO
N S
JU
LY
ADDENDUM 0003
REFLECTED CEILING PLAN NOTES
1. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILING AT
LOCATIONS REQUIRING MAINTENANCE ACCESS TO
PLUMBING,MECHANICAL, AND ELECTRICAL COMPONENTS.
2. PROVIDE BATT INSULATION ABOVE THE CEILING IN ROOMS; 111
ELECTRICAL AND 112 COMMUNICATIONS.
3. SEE STRUCTURAL FOR ADDITIONAL PEMB INFORMATION.
4. COORDINATE LOCATIONS OF MECHANICAL AND ELECTRICAL
EQUIPMENT WITH MECHANICAL AND ELECTRICAL DRAWINGS.
GWB CEILING
EXIT SIGN LOCATION
(REFER TO FA/FL DWGS )
2' x 4' DOWNLIGHT SEE
ELECTRICAL DRAWINGS
3" X 4' PENDANT SEE ELECTRICAL
DRAWINGS
DIFFUSER SEE
MECHANICAL DRAWINGS
EXHAUST SEE MECHANICAL
DRAWINGSCEILING HEIGHT, ABOVE FINISH FLOOR
6" x 6" RECESSED DOWNLIGHT
SEE ELECTRICAL DRAWINGS
ACT CEILING
A.F.F.1'-0"
EXPOSED TO STRUCTURE ABOVEETS
CEILING LEGEND
RETURN SEE MECHANICAL
DRAWINGS
PRE-FINISHED
METAL SOFFIT
1' 3" x 3' 8" PENDANT SEE
ELECTRICAL DRAWINGS
ETS
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0" A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0" A.F.F.10' - 0"
A.F.F.10' - 0"
ETS ETS
ETS
ETS
ETS
BRIDGE
CRANE
TYP.
BRIDGE
CRANE
TYP.
BRIDGE
CRANE
TYP.
BRIDGE
CRANE
TYP.
CEILING
ACCESS
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
A-103
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S M
O
BI
LE
D
IS
TR
IC
T
J.
C
ET
KO
SK
Y
J.
C
ET
KO
SK
Y
K.
ED
W
AR
D S
J.
SC
AR
BR
O U
G H
M
AY
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-A
R C
H
.rv t
M H
F2
ADDENDUM 0003
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
PLAN NORTH
1/8" = 1'-0"1 REFLECTED CEILING PLAN
SCALE:
0 8'
1/8" = 1' - 0"
4' 16'
M
AR
K D
AT
E
AM
D
: M
IS
C
EL
L A
N
EO
U S
R
EV
IS
IO
N S
JU
LY
CONSTRUCTION SHALL BE IN ACCORDANCE WITH ICD/ICS 705
VERSION 1.5 TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION
FACILITIES AND UFC-4-010-05 SENSITIVE COMPARTMENTED
INFORMATION FACILITIES PLANNING, DESIGN AND CONSTRUCTION.
A-400
A-400
A-400 4 5
6B
DF 3'-
1"
2'-8" 2'-7" 2'-8"
'-8
12'-3"
5'-0" CLEAR
7'-
3'-0"
3'- 6"
7'-8"
3'-6"8'-5"
3'- 0"
5'-2" 3'-2"
PTDWR
SDSD
PTDWR
SDSDEHD
EHD
7'-8"
GB GB
GB
GB
SND SND
TTD TTD
TTD
TTD
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
4'-3"
8'-5"
5'-0" CLEAR5'-
3"
5'-2" 3'-0"
SC
SC
SC
SC
SC
SC
4"+ CHASE
CLEAR
3'-0"CL
EA
R
3'- 0"
7'-1"
4'- 6"
3'- 6"
SLOPE TO
DRAIN
SLOPE TO
DRAIN
A-401.1
SLOPE TO
DRAIN
MG
TP
MG 1
SLOPE TO
DRAIN
SLOPE TO
DRAIN
TTD
40 DIA GB
40 DIA GB
BOT./MIRROR
PTDWR
MIRROR
SND
MG
3' - 5" MAX
4' - 6" MAX
4" 1'
6"
1' - 6"
3' - 6"
1'
7" A
D A
M
AX
MIN.
8"
1'
3" M
IN
4' - 6"
1'
0"
2' - 0"
3'
0" 3'
4"
3'
3"
2'
3'
4" M
AX
2'
5"
1'
7"
MIN
8"
VINYL KNEE
BURN GUARD
11"
SD
3'
0"
ADA BACK WALL ADA SIDE
WALL
2' - 0"
1'
3"
GRAB BAR -
SHOWER
HORIZONTAL
(GB3)
FOLDING
SHOWER SEAT
(FSS)
SHOWER CURTAIN
ROD (SCR) W/
SHOWER CURTAIN
(SC)
TRANSFER SHOWER
GRAB BARS
(GB3)
MAX.
1' - 3"
SHOWER SIDE WALL
CONTROLS
MIN.
3' - 0" CLEAR
1' - 6"
TOILET ROOM ACCESSORIES LEGEND AND MOUNTING HEIGHTS
REACH
HEIGHTS FOR
ACCESSORIES15
"-4 8"
MG
1' - 6"
4'
0" 1'
6"
MG MG
SD SD
PTDWR
URNURNURN
LIGHT FIXTURE SEE ELEC.
CEILING AS SCHEDULED
TILE
2'-
2'- 5"
6'- 3"
1'- 5"
TILE
REMOVABLE
UNDER-SINK
PANEL - ADA
2'- 0"
MG MG
SD SD
LIGHT FIXTURE SEE ELEC.
CEILING AS SCHEDULED
TILE
2'- 5" 2'-
6'- 3"
PTDWR EHD
TILE
REMOVABLE
UNDER-SINK
PANEL - ADA
LIGHT
FIXTURE SEE
ELEC.CEILING AS
SCHEDULED
LIGHT
FIXTURE
SEE ELEC.
SC
TILE
SHOWER BEYOND
TILE CONTINUED BEYOND
ACCESSORY LEGEND:
DF DRINKING FOUNTAIN
EHD ELECTRICAL HAND DRYER
FSS FOLDING SHOWER SEAT
GB GRAB BAR
MG MIRROR, GLASS
PTDWR PAPER TOWEL DISPENSER/ WASTE RECEPTACLE
SD SOAP DISPENSER
SH SOAP HOLDER RECESSED
SC SHOWER CURTAIN
SND SANITARY NAPKIN DISPOSER
TP TOWEL PIN
TTD TOILET TISSUE DISPENSER
URN URINAL
GENERAL NOTES:
1. APPLY A CONTINUOUS BEAD OF SEALANT AROUND ALL FIXTURES WHERE
FIXTURE INTERFACES WITH THE FLOOR OR WALL
2. CONTRACTOR SHALL PROVIDE BLOCKING FOR MOUNTING / INSTALLING OF
ACCESSORIES, MATCH FRAMING MEMBER SIZE.
3. CONTRACTOR SHALL INSTALL ADEQUATE BLOCKING TO SUPPORT ALL FIXTURES,
AND ENSURE SUPPORT MEETS FIXTURE MANUFACTURER REQUIREMENTS.
4. REFER TO THIS SHEET FOR EQUIPMENT MOUNTING HEIGHTS AND DIMENSIONS
5. REFER TO SHEET A-601 FOR PARTITION TYPES.
6. REFER TO PLUMBING DRAWINGS FOR TOILET/FIXTURE TYPES
DIMENSION PLAN NOTES
1. ALL DIMENSIONS ARE FROM FACE OF CONCRETE OR
FACE OF STUD.
2. EXTERIOR DIMENSIONS ARE FROM FACE OF PRECAST
SPLITFACE THINSET.
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
A-400
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S M
O
BI
LE
D
IS
TR
IC
T
J.
C
ET
KO
SK
Y
J.
C
ET
KO
SK
Y
K.
ED
W
AR
D S
J.
SC
AR
BR
O U
G H
M
AY
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-A
R C
H
.rv t
M H
F2
ADDENDUM 0003
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
EN
LA
R G
ED
R
ES
TR
O O
M P
LA
N
S
AN
D E
LE
VA
TI
O
N S
1/2" = 1'-0"1 ENLARGED RESTROOM PLAN
1/2" = 1'-0"2 ENLARGED ELEVATION
1/2" = 1'-0"3 ENLARGED ELEVATION 2
1/2" = 1'-0"4 ENLARGED ELEVATION 3
M
AR
K D
AT
E
AM
D
: M
IS
C
EL
L A
N
EO
U S
R
EV
IS
IO
N S
JU
LY
SCALE:
0 2'
1/2" = 1' - 0"
1' 4'
CONSTRUCTION SHALL BE IN ACCORDANCE WITH ICD/ICS 705
VERSION 1.5 TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION
FACILITIES AND UFC-4-010-05 SENSITIVE COMPARTMENTED
INFORMATION FACILITIES PLANNING, DESIGN AND CONSTRUCTION.
2" 2"
CAST TERRAZZO ACCESSIBLE
SHOWER PAN WITH
ADA COMPLIANT ROLL-IN,
FRONT TRENCH, RECEPTOR
DRAIN PIPE, SEE
PLUMBING
REMOVABLE STAINLESS
STEEL TRENCH PLATE
1/ 2"
CONT. SEALANT AROUND
RECEPTOR PERIMETER
REINFORCED 2"
SETTING BED
FLOOR TILE AS
SCHED.
GALVANIZED METAL
STUDS AS SCHED.
VAPOR BARRIER- EXTEND
OVER FLANGE OF SHOWER
RECEPTOR
CEMENTITIOUS BOARD
GALVANIZED METAL
STUD RUNNER
TRACK
WALL TILE AS SCHEDULED
3' - 1"
ADA COMPLIANT SLOPE TO DRAIN
SLOPE TO DRAIN
NOTE:
SEE TILE COUNCIL OF AMERICA (TCNA)
DETAIL NOS. B412 & F114
UNLESS OTHERWISE NOTED
RECESSED CONC SLAB
A-401.1
0'
2" 0'
1/ 2"
CAST TERRAZZO ADA
COMPLIANT SHOWER
RECEPTOR SLOPE TO
DRAIN
CONT. SEALANT AROUND
SHOWER RECEPTOR
REINFORCED
SETTING BED
GALVANIZED METAL
STUDS SPACED AS
SCHED.
MEMBRANE WATER BARRIER -
EXTEND OVER RECEPTOR
FLANGE
CEMENTITIOUS BOARD
GALVANIZED METAL
STUD RUNNER TRACK
WALL TILE AS SCHEDULED
GAP AS REQ'D BY SHOWER
RECEPTOR MFR
TILE CONTROL JOINT
0'
2"
REINFORCED
RECESSED SLAB
FLOOR TILE AS SCHED.
MORTAR BED
CONC. SLAB,
SEE STRUCT
SLOPE FLOOR TO DRAIN
MTL STUDS AS
SCHED.
WATERPROOF
MEMBRANE
5/8" CEMENTITIOUS
BACKER BOARD
WALL TILE AS SCHED.
BOND COAT
REINFORCED RECESSED SLAB
BASE TILE AS SCHED.
NOTE:
SEE TILE COUNCIL OF AMERICA (TCNA)
DETAIL NO. F121 FOR FLOORS AND W244C FOR WALLS
UNLESS OTHERWISE NOTED
FLOOR TILE AS
SCHED.
MORTAR BED
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
A-401.1
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S M
O
BI
LE
D
IS
TR
IC
T
J.
C
ET
KO
SK
Y
J.
C
ET
KO
SK
Y
K.
ED
W
AR
D S
J.
SC
AR
BR
O U
G H
M
AY
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-A
R C
H
.rv t
M H
F2
ADDENDUM 0003
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
R
ES
TR
O
O M
D
ET
AI
LS
SCALE:
0 2"
6" = 1' - 0"
1" 4"
CONSTRUCTION SHALL BE IN ACCORDANCE WITH ICD/ICS 705
VERSION 1.5 TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION
FACILITIES AND UFC-4-010-05 SENSITIVE COMPARTMENTED
INFORMATION FACILITIES PLANNING, DESIGN AND CONSTRUCTION.
6" = 1'-0"1 SHOWER FLR SECTION - ADA ACCESSIBLE
6" = 1'-0"2 SHOWER FLR TO WALL - ADA ACCESSIBLE
6" = 1'-0"4 TILE CONTROL JOINT
6" = 1'-0"3 TILE COVE DETAIL
M
AR
K D
AT
E
AM
D
: R
EP
LA
C
ED
D R
AW
IN
G
JU
LY
DN
DISPATCH
MAN ROOM
TOOL ROOM
CREW CHIEFS
NCOIC
TDY ROOM
CONFERENCE
BREAKROOM
MENS
WOMENS
JANITOR
MECH
SECUR COMM
COMM
FIRE ROOM
MAINTENANCE
BAY
MAINTENANCE
BAY
MAINTENANCE
BAY
MAINTENANCE
BAY
ELEC. ROOM
CORRIDOR
CH1
T1
CH1
CH1
CH1
CH1
TB1
CH1
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
WS1
CH1
WS1
CH1
WS1
CH1
WS1
CH1
TB2
CH3
CH3
CH3
CH3
CH3
CH3
TB2
CH3
CH3
CH3
CH3
CH3
CH3
D1CH1
WS1
CH1
CH1
WS1
CH1
TB3
C4C4
TB3
C4
C4
TB3
C4
C4
D1
CH
S1
S1 S1
S1
S1
S1
S2 S2 S2 S2
S2 S2 S2 S2
CH
CH
CH
CH
CH
S1 S1
CH
TB3
C4C4
TB3
C4C4
TB3
C4C4
CH1
CH1
CH1
CH1
CH1
CH1
CH1
CH1
CH1
A3
A3
A3
A5
WS1
A3
A4
A1
COORDINATE IN-WALL BLOCKING WITH
WALL-MOUNTED TVS
COORDINATE IN-WALL BLOCKING WITH
WALL-MOUNTED TVS
T1
COORDINATE IN-WALL BLOCKING WITH
WALL-MOUNTED TVS
COORDINATE IN-WALL
BLOCKING WITH WALL-
MOUNTED TVS
FURNITURE LEGEND
MARK DESCRIPTION
C CHAIRS (CID)
A EQUIPMENT AND ACCESSORIES (CID)
D DESKING (CID)
TC TRASH AND WAST RECEPTACLE
S STORAGE
TB TABLES (CID)
WS WORKSTATIONS (CID)
NOTE: SEE THE CID BINDER FOR BASIS OF DESIGN FOR
INTERIOR FURNITURE AND SAMPLES
COMPREHENSIVE INTERIOR DESIGNCID
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
I-101
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S M
O
BI
LE
D
IS
TR
IC
T
L.
C
AS
H
M
AN
J.
C
ET
KO
SK
Y
K.
ED
W
AR
D S
J.
SC
AR
BR
O U
G H
M
AR
C H
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-IN
TR
.rv t
M H
F2
ADDENDUM 0003
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
C O
M
PO
SI
TE
F U
R N
IT
U
R E
PL
AN
A N
D F
U R
N
IT
U R
E
SC
H
ED
U
LE
1/8" = 1'-0"1 FURNITURE FLOOR PLAN
PLAN NORTH
SCALE:
0 8'
1/8" = 1' - 0"
4' 16'
M
AR
K D
AT
E
AM
D
: M
IS
C
EL
L A
N
EO
U S
R
EV
IS
IO
N S
JU
LY
ROOM SCHEDULE
Number Name
100 CORRIDOR
101 MAN ROOM
102 TOOL ROOM
103 CREW CHIEFS
104 DISPATCH
105 NCOIC
106 TDY ROOM
107 CONFERENCE
108 BREAKROOM
109 WOMENS
110 MENS
111 JANITOR
112 MECH
113 SECUR COMM
114 COMM
115 FIRE ROOM
116 MAINTENANCE BAY
117 MAINTENANCE BAY
118 MAINTENANCE BAY
119 MAINTENANCE BAY
120 ELEC. ROOM
122 MEN SHOWER
123 WOMENS SHOWER
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
RC1
T2
| Sheet A-103.pdf |
| Sheets |
| A-103 - REFLECTED CEILING PLAN |
| Sheet A-400.pdf |
| Sheets |
| A-400 - ENLARGED RESTROOM PLANS AND ELEVATIONS |
| Sheet A-401.1.pdf |
| Sheets |
| A-401.1 - RESTROOM DETAILS |
| Sheet I-101.pdf |
| Sheets |
| I-101 - COMPOSITE FURNITURE PLAN AND FURNITURE SCHEDULE |
File details come from the government source that posted it. Updated .