W9127821R0048 RTA DRAWINGS.pdf
PDF 35 MB Posted
- Attached to
- Construct Munitions Maintenance Facility and Igloos - Eglin Air Force Base, Florida Federal contract opportunity
- Solicitation number
- W9127821R0048
About this file
This solicitation is for the construction of a Munitions Maintenance Facility and Igloos at Eglin Air Force Base in Florida. The project involves constructing a multi-bay explosive operating facility with reinforced concrete foundation, walls, and roof deck. Functional areas will include munitions inspection and maintenance labs/bays, receiving room, parts storage, administrative offices, latrines, support/tool room, and mechanical equipment room.
The North American Industry Classification System code for this project is 236220. This is a total small business set-aside defined as having average annual receipts of less than $39,500,000 for the past three years. The solicitation number is W9127821R0048 and is a request for proposal best value source selection issued by the Department of the Army Corps of Engineers Engineering District Mobile. Proposals are due via the System for Award Management website and critical path method network analysis is required. The solicitation includes bid options that may not be awarded.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127821R0048 JA for Trane HVAC_Redacted.pdf | ||
| W9127821R0048 Site Visit Sign In Sheet.pdf | ||
| W9127821R0048 AM03.pdf | ||
| W9127821R0048 AM03 DRAWINGS.pdf | ||
| W9127821R0048 AM02.pdf | ||
| W9127821R0048 AM01.pdf | ||
| W9127821R0048 Solicitation Vol 3.pdf | ||
| W9127821R0048 Solicitation Vol 2.pdf | ||
| W9127821R0048 RTA DRAWINGS- BID OPTION.pdf | ||
| W9127821R0048 Solicitation Vol 4.pdf | ||
| W9127821R0048 Solicitation Vol 1.pdf | ||
| W9127821R0048 EM_385-1-1 Safety Manual Link.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers®
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE, AL 36602
MUNITIONS MAINTENANCE FACILITY AND IGLOOS.
EGLIN AIR FOCE BASE, FLORIDA
MOBILE DISTRICT PROJECT CODE : MHF20006
RFP NUMBER : W9127821R0048
JUNE 2021
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
FACILITIES PLANNING, DESIGN AND
CONSTRUCTION.
US Army Corps of Engineers
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
PR
O
JE
C
T N
U M
BE
R
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
D
ES
C R
IP
TI
O N
G-002
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
PR
O
JE
C T/
C O
N
TR
AC
T
D
ES
C R
IP
TI
O N
ID
EN
TI
FI
ER
PR
O
JE
C T/
C O
N
TR
AC
T
ID
EN
TI
FI
ER
IF
N
EE
D
ED
M O
BI
LE
D
IS
TR
IC
T D es ig ne r
Au th or
C he ck er
M M
M M
M M
M M
M Y
YY
Y
W
8-
XX
-X
-X
XX
X
W
8-
XX
-X
-X
XX
X
M H
F2
-G
-C M
.rv t
M H
F2
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
SA
IN
T
JO
SE
PH
S
TR
EE
T
M O
BI
LE
A L
SH
EE
T
IN
D
EX
M
AR
K D
AT
E
SHEET INDEX
SHEET
NUMBER SHEET TITLE
A-601 PARTITION TYPES
A-602 SECURITY/SOUND ISOLATION DETAILS
A-603 DOOR SCHEDULE AND DETAILS
A-604 DOOR DETAILS
A-605 INTERIOR DOOR DETAILS
A-606 OVERHEAD COILING DOOR DETAILS
I-101 COMPOSITE FURNITURE PLAN AND FURNITURE SCHEDULE
I-111 COMPOSITE FINISH SIGNAGE PLANS
I-601 ROOM FINISH PLAN AND DETAILS
I-602 SIGNAGE SCHEDULE AND DETAILS
FIRE PROTECTION
FL100 LIFE SAFETY ANALYSIS
FL101 EGRESS PLANS
FX001 FIRE SUPPRESSION NOTES AND DETAILS
FX101 FIRE SUPPRESSION PLAN
FX701 FIRE PUMP LAYOUT
FA001 FIRE ALARM & MASS NOTIFICATION LEGEND
FA101 FIRE ALARM & MASS NOTIFICATION PLAN
FA501 FIRE ALARM & MASS NOTIFICATION DETAILS AND DIAGRAM
PLUMBING
P-001 PLUMBING LEGEND
P-101 DOMESTIC WATER FLOOR PLAN
P-102 SANITARY AND VENT FLOOR PLAN
P-103 COMPRESSED AIR FLOOR PLAN
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 DOMESTIC AND COMPRESSED AIR 3D VIEW
P-902 SANITARY AND VENT 3D VIEW
MECHANICAL
M-001 HVAC LEGEND
M-101 HVAC FLOOR PLAN
M-301 HVAC BUILDING SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-700 HVAC CONTROLS
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
M-703 HVAC CONTROLS
M-704 HVAC CONTROLS
M-705 HVAC CONTROLS
M-900 HVAC ISO
ELECTRICAL
E-001 ELECTRICAL LEGEND
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES501 ELECTRICAL PRIMARY DETAILS
ES502 ELECTRICAL SECONDARY DETAILS
ES601 ELECTRICAL SITE RISER DIAGRAM
EG101 GROUNDING PLAN
EG102 CATENARY LIGHTNING PROTECTION PLAN
EG201 CATENARY LIGHTNING PROTECTION ELEVATIONS
EG501 GROUNDING DETAILS
EG502 CATENARY LIGHTNING PROTECTION DETAILS
EC501 CATHODIC PROTECTION DETAILS
EC502 CATHODIC PROTECTION DETAILS
EC503 CATHODIC PROTECTION DETAILS
EL101 LIGHTING PLAN & SCHEDULES
EL501 LIGHTING DETAILS
EL601 LIGHTING CONTROLS SCHEDULE & DIAGRAMS
EP101 POWER PLAN & ELECTRICAL CIRCUIT SCHEDULE
EP501 POWER DETAILS
EP601 POWER RISER
EP602 ELECTRICAL PANEL SCHEDULES
EP603 ELECTRICAL PANEL SCHEDULES
EP604 ELECTRICAL PANEL SCHEDULES
EP605 ELECTRICAL PANEL SCHEDULES
EY001 ELECTRONIC SYSTEMS LEGEND
EY101 ELECTRONIC SYSTEMS PLAN
EY501 ACCESS CONTROL SYSTEM DETAILS & RISER
EY502 INTRUSION DETECTION SYSTEM DETAILS & RISER
TELECOM
T-001 TELECOMMUNICATION LEGEND
TS101 TELECOMMUNICATIONS SITE PLAN
TS102 TELECOMMUNICATIONS SITE PLAN
TS103 TELECOMMUNICATIONS SITE PLAN
TS501 TELECOMMUNICATIONS OSP DETAILS
TS601 TELECOMMUNICATIONS SITE RISER DIAGRAM
TN101 TELECOMMUNICATION PLAN
TN501 TELECOMMUNICATION DETAILS
TN502 TELECOMMUNICATION DETAILS
TN503 TELECOMMUNICATION DETAILS
TN601 TELECOMMUNICATION RISER
SHEET INDEX
SHEET
NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
CIVIL
C-001 LOCATION/VICINITY MAP
C-002 ABBREVIATIONS
C-003 LEGEND
C-004 GENERAL NOTES
C-005 HAUL ROUTE AND CONSTRUCTION STAGING AREA
C-006 TRAFFIC CONTROL DETAILS
C-110 PROJECT OVERVIEW AND KEY MAP BASE BID MUNITIONS MAINT. FACILITY
AND BID OPTION IGLOO STORAGE MODULE SITE
V-101 SURVEY MONUMENTATION
VF100 SHEET INDEX MUNITIONS AND IGLOO FACILITIES UTILITY SURVEY
VF101 EXISTING CONDITIONS (1 OF 9)
VF102 EXISTING CONDITIONS (2 OF 9)
VF103 EXISTING CONDITIONS (3 OF 9)
VF104 EXISTING CONDITIONS (4 OF 9)
VF105 EXISTING CONDITIONS (5 OF 9)
VF106 EXISTING CONDITIONS (6 OF 9)
VF107 EXISTING CONDITIONS (7 OF 9)
VF108 EXISTING CONDITIONS (8 OF 9)
VF109 EXISTING CONDITIONS (9 OF 9)
CD101 DEMOLITION PLAN MUNITIONS MAINT. FACILITY
CD102 BID OPTION DEMOLITION PLAN IGLOO STORAGE MODULES
CS101 SITE PLAN MUNITIONS MAINT. FACILITY
CS102 BID OPTION SITE PLAN IGLOO STORAGE MODULES
CS501 FE-6 SECURITY FENCE DETAILS
CS502 DUMPSTER ENLARGEMENT PLAN AND APRON DETAILS
CS503 MUNITIONS MAINT. FACILITY ACCESS RAMP ENLARGMENT PLAN AND RAIL
DETAILS
CS504 MUNITIONS MAINT. FACILITY RAMP WITH RAIL DETAILS
CP101 GEOMETRIC LAYOUT RDT&E MUNITIONS SITE
CP102 BID OPTION GEOMETRIC LAYOUT IGLOO STORAGE MODULES
CP201 PROJECT PROFILE MUNITIONS ACCESS DRIVE
CP301 TYPICAL PAVEMENT SECTIONS
CP302 TYPICAL PAVEMENT SECTIONS
CP401 JOINT LAYOUT PLAN RDT&E MUNITIONS FACILITY
CP402 BID OPTION JOINT LAYOUT PLAN IGLOO STORAGE MODULES
CP403 ENLARGEMENT OF APRON RAMPS MUNITIONS MAINT. FACILITY
CP501 PAVEMENT DETAILS
CP502 PAVING DETAILS
CP503 PAVEMENT MARKING DETAILS
CP504 SPECIAL PAVEMENT DETAILS
CG101 GRADING PLAN RDT&E MUNITIONS FACILITY SITE
CG102 BID OPTION GRADING PLAN IGLOO STORAGE MODULES
CG301 BID OPTION DRAINAGE SECTION IGLOO STORAGE MODULES
CG302 DRAINAGE SECTIONS
CG401 JOINT GRADING PLAN MUNITIONS MAINT. FACILITY
CG402 BID OPTION JOINT GRADING PLAN IGLOO STORAGE MODULE
CG403 STOMRWATER MANAGEMENT FACILITY MUNITIONS MAINT. FACILITY
CG404 RAMP ELEVATION PLAN MUNITIONS MAINT. FACILITY
CG501 DRAINAGE DETAILS
CG701 BMP PLAN MUNITIONS MAINT. FACILITY SITE
CG702 BMP PLAN MUNITIONS MAINT. CONTRACTOR STAGING AREA
CG703 BID OPTION BMP PLAN IGLOO STORAGE MODULES
CG704 VEGETATION PLAN MUNITIONS MAINT. FACILITY
CG705 BID OPTION VEGETATION PLAN IGLOO STORGE MODULES
CG801 BMP PROJECT DETAILS
CU101 OVERALL UTILITY LAYOUT
CU201 GRAVITY SEWER PROFILE
CU501 WATER DETAILS
CU502 WATER DETAILS
CU503 FIRE WATER DETAILS
CU504 SEWER DETAILS
CU505 LIFT STATION DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES DESIGN LOADS & ABBREVIATIONS
S-101 FOUNDATION AND SLAB PLAN
S-102 BRIDGE CRANE FRAMING PLAN
S-103 ROOF FRAMING PLAN
S-201 FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS
S-302 ROOF FRAMING SECTIONS
S-500 TYPICAL STRUCTURAL DETAILS
S-501 TYPICAL STRUCTURAL DETAILS
S-502 TYPICAL STRUCTURAL DETAILS
ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS
A-002 AIR BARRIER FLOOR PLAN
A-101 COMPOSITE FLOOR PLAN
A-102 DIMENSION PLAN
A-103 REFLECTED CEILING PLAN
A-104 ROOF PLAN
A-201 NORTH AND SOUTH ELEVATIONS
A-202 EAST AND WEST ELEVATIONS
A-301 BUILDING CROSS SECTION
A-302 BUILDING LONGITUDINAL SECTION
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-320 WALL DETAILS
A-400 ENLARGED RESTROOM PLANS AND ELEVATIONS
A-401 RESTROOM DETAILS
A-402 ENLARGED BREAKROOM PLANS
A-510 ROOF DETAILS
MECHANICAL SPECIALTIES FLOOR PLAN & SCHEDULEMS101
C-001
LO
C
AT
IO
N A
N D
V
IC
IN
IT
Y M
AP
J.
D
EF
AL
C O
K.
KI
R
BY
J.
LO
N G
P.
O
'C O
N N
O R
M H
F2
C
-0
.d w g
PIV PIV
PI
V
PIV PIV
FLORIDA'S
FT PIERCE
KEY WEST
NAPLES
SARASOTA -
BRADENTON
ST PETERSBURG
FT MYERS
BARTOW
LAKELAND
TAMPA
TURNPIKE
MIAMI
FT LAUDERDALE
WEST
PALM
BEACH
DAYTONA BEACH
MELBOURNE -
COCOA
CHIPLEY
FORT WALTON
PENSACOLA BEACH
CITY
PANAMA
NEW PORT RICHEY
DELAND
ORLANDO
OCALA
GAINESVILLE
TALLAHASSEE
LAKE CITY 295
JACKSONVILLE
ST AUGUSTINE
GRAVEL CONSTRUCTION
ACCESS ROAD (ATC)
NEW ASPHALT
ROAD (ATC)
GRAVEL CONSTRUCTION
ACCESS ROAD (ATC)
FL
OR
ID
A
HW
Y
FLORIDA HWY 189
SUNSET LANE
EG
LI
N P
KW
Y.
EG
LI
N
PK
W Y.
EGLIN PKWY.
12L-30R RUNWAY
19L-10R R
U N
W
AY
OKALOOSA
REGIONAL
AIRPORT
"NORTH GATE" ENTRANCE
"EAST GATE" ENTRANCE
GRIFFIN WAY
LUTON DRIVE
WIZARD WAY
PERIMETER ROAD
"WEST GATE" ENTRANCE
PAQUITO ROAD
MUNITIONS MAIN GATE
PROJECT LOCATION:
IGLOO STORAGE MODULES
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
IS
SU
E D
AT
E:
M
Ay
- - M H
F2
PLAN NORTH
PLAN NORTH
PROJECT LOCATION -
EGLIN AIR FORCE BASE
N.T.S
VICINITY MAP - FLORIDA
N.T.S
NOTES:
1. SEE ENLARGEMENT ON SHEET C-005 FOR CONTRACTOR STAGING AREA AND HAUL
ROUTES.
PROJECT LOCATION:
MUNITIONS MAINTENANCE FACILITY
PROJECT LOCATION
EGLIN AIR FORCE BASE
LATITUDE: 30.488503° N
LONGITUDE: -86.534594° W
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
C-002
AB
BR
EV
IA
TI
O
N S
J.
D
EF
AL
C O
K.
KI
R
BY
J.
LO
N G
P.
O
'C O
N N
O R
M H
F2
C
-0
.d w g
A
@ AT
A/C AMPS INTERRUPTING CAPACITY (SYM
RMS)
AB ANCHOR BOLT
ABT ABOUT
AC ALTERNATING CURRENT
ACSR ALUMINUM CONDUCTOR STEEL
REINFORCED
ACST ACOUSTIC
AD ACCESS DOOR OR AREA DRAIN
AFF ABOVE FINISH FLOOR
AFFF AQUEOUS FILM-FORMING FOAM
AFG ABOVE FINISH GRADE
AGG AGGREGATE
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPS INTERRUPTING CAPACITY (SYM
RMS)
AL ALUMINUM
ALDOT ALABAMA DEPARTMENT OF
TRANSPORTATION
ALT ALTERNATE
AMP AMPERE
AP ACCESS PANEL
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ASWG AMERICAN WIRE GAUGE
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVE AVENUE
AVG AVERAGE
B
B & B BALL AND BURLAP
BM BEGIN BENCH MARK
CONBATT BATTEN INSULATION
BCE BASE CIVIL ENGINEER
BDY BOUNDARY
BIT BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLDG. DIR BUILDING DIRECTORY
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOC BACK OF CURB
BOF BOTTOM OF FOOTING
BOS BOTTOM OF STEEL
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BT BENT
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
C
{ or CL CENTER LINE
C TO C CENTER TO CENTER
C&G CURB & GUTTER
C. or CND CONDUIT (for raceway)
C.I. CAST IRON
C.O.E CORPS OF ENGINEERS
C.O.R CONTRACTING OFFICER REPRESENTATIVE
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
cc:SPF CLOSED CELL SPRAY FOAM INSUL.
CE COVER ELEVATION
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CI CURB INLET
CIR CIRCULAR
CJ CONSTRUCTION JOINT
CKD CHECKED
CKT CIRCUIT
CL CENTER LINE
CL CLEARANCE
CLG CEILING
CLKG CAULKING
CLR CRUSHED LIMEROCK BASE
CLOS CLOSED
CMP CORRIGATED METAL PIPE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNITS
CNTR COUNTER
CO CLEANOUT
COL COLUMN
COM COMMON
COMB COMBINATION
COMB. COMBUSTION
COMM COMMUNICATIONS
COMP COMPRESSIBLE
CONC CONCRETE
CONN CONNECTOR
CONSTR CONSTRUCTION
CONT. CONTINUOUS
COR CONTRACTING OFFICERS
REPRESENTATIVE
CORR CORRIDOR
COV COVERED
CP CONCRETE PIPE
CPL CEMENT PLASTER
CPS or CYCLES PER SECOND
CRES CORROSIVE RESISTANT STEEL
CRG CARRIAGE
CRS COURSE
CSK COUNTERSUNK
CSO COMBINATION SEWER OUTFLOW
CTB CEMENT TREATED BASE
CTR CENTER
CTRL CONTROL
CTU CERAMIC TILE UNGLAZED
CU CONDENSING UNIT
CU YD CUBIC YARDS
CUH CABINET UNIT HEATER
CV CEILING VENT
CW COLD WATER
CWR CHILLED WATER RETURN
CWRR CHILLED WATER REVERSE RETURN
CWS CHILLED WATER SUPPLY
CYL CYLINDER
D d PENNY (as in nail-10d)
D DATUM OR DRYER
D&M DRESSED & MATCHED
D or DBL DOUBLE
D.C.J. DOWELED CONTROL JOINT
D.I. DUCTILE IRON
DA DOUBLE ACTING
DB DRY BULB
DC DIRECT CURRENT
DCJT DUMMY CONTROL JOINT
DCL DOOR CLOSER
DDESB DEFENSE EXPLOSIVE SAFETY BOARD
DEG DEGREE
DEPR DEPRESSION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DIA or ~ DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DIST DISTRIBUTION
DN STR DOWN STREAM
DO DOOR OPENING
DOIM DIVISION OF INFORMATION MANAGEMENT
DOM DOOR OPERATOR MOTOR
DP DAMPPROOFING
DPST DOUBLE POLE SNGL THROW
DR DRAIN
DS DOWN SPOUT
DSYTS DOUBLE SOLID YELLOW TRAFFIC STRIPE
DTL DETAIL
DWD DRINKING WATER DISPENSER
DWG DRAWING
DWLS DOWELS
E
E EAST
EA EACH
EF EXHAUST FAN
EOC EDGE OF CURB
EOP EDGE OF PAVEMENT
EL ELEVATION (GRADE or BLDG)
ELEC ELECTRICAL OR ELECTRIC
EM EMERGENCY
ENCL ENCLOSURE
ENG. ENGINEERING
ENT ENTRANCE
EOC EDGE OF CURB
EOD EXPLOSIVE ORDINANCE DISPOSAL
EP / EOP EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
ERP ENVIRONMENTAL RESOURCE PERMIT
EST ESTIMATE
EW EACH WAY
E.W.C. ELECTRIC WATER COOLER
EXC EXCAVATE
EXIST EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
F
F FAHRENHEIT
FDEP FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FDOT FLORIDA DEPARTMENT OF
TRANSPORTATION
F.P.M. FEET PER MINUTE
F.S. FAR SIDE OR FULL SIZE
FA FRESH AIR
FAC FLORIDA ADMINISTRATIVE CODE
FCU FAN COIL UNIT
FC FOOT CANDLE
FCG FACING
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN. FINISH
FIX. FIXTURE
FL FLOOR
FLASH. FLASHING
FLG FLOORING
FLUOR FLUORESCENT
FOC FIBER OPTIC CABLE
FP FIRE PROTECTION
FPRF FIRE PROOF
FR FRAME OR FIRE RATED
FT FEET OR FINNED TUBE
FTG FOOTING
FURR'G FURRING
G
G GAS
GCAB GRADED CRUSHED AGGREGATE BASE
G.C.O. GROUND CLEANOUT
G.V. GATE VALVE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GCAB GRADED CRUSHED AGGREGATE BASE /
SURFACE
GEN GENERAL
GI GALVANIZED IRON
GL GLASS
GOVT. GOVERNMENT
GPM GALLONS PER MINUTES
GR GRADE
GRND GROUND
GRTG GRATING
GRVL GRAVEL
GTD GRADE TO DRAIN
GWB GYPSUM WALLBOARD
GWT GLAZED WALL TILE
GYP GYPSUM
H
H.PT. HIGH POINT
H.S. HIGH STRENGTH
HB HOSE BIBB
HBD HARDBOARD
HDW HARDWARE
HDR HEADER
HHEP HORIZONTAL ELLIPTICAL PIPE
HMA OT MIX ASPHALT
HOA HHANDS OFF AUTO
HP HORSE POWER
HPW HIGH PRESSURE WASHER
HR HOUR
HSB HIGH STRENGTH BOLT
HSGYP HIGH STRENGTH GYPSUM PLASTER
HT HEIGHT
HTG HEATING
HW HOT WATER
HWH HOT WATER HEATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HYD HYDRAULIC
I
I OR FE IRON
I.D. INSIDE DIAMETER
I.P. IRON PIPE
IAW IN ACCORDANCE WITH
IBC INTERNATIONAL BUILDING CODE
IC INTERCOM
IE INVERT ELEVATION
IES ILLUMINATING ENG. SOCIETY
IESCR INTERUPTING ELECTRICAL SHORT CIRCUIT
RATING
IN INCH
INSUL. INSULATION
INT INTERIOR
INV INVERT
IRH INFRA-RED HEATER
IS INDUSTRIAL SEWER
J
JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JST JOIST
JT JOINT
K
K ALGEBRAIC DIFFERENCE IN
GRADE / LENGTH VERTICAL CURVE
KIT KITCHEN
KL KEY LOCK
KP KICK PLATE
KSF KIPS/SQUARE FOOT
KSI KIPS/SQUARE INCH
KV KILOVOLTS
KVA KILOVOLTS AMPERES
KVAR KILOVOLTS AMPERES REACTIVE
KW KILOWATTS
KWH KILOWATTS HOUR METER
L
L LUMEN
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD LOAD
LDG LOADING
LG LENGTH
LF LINEAR FEET
LIS LAWN IRRIGATION SYSTEM
LLH LONG-LEG HORSZONTAL
LLV LONG-LEG VERTICAL
LNDG LANDING
LNTL LINTEL
LONG LONGITUDIONAL
LP LOW POINT
LPS LIGHT PROOF SHADE
LT LIGHT
LT. WT. LIGHT WEIGHT
LVC LENGTH VERTICAL CURVE
M
M THOUSAND
M & B MATCHED AND BEADED
MAIN. MAINTENANCE
MAN MANUFACTURER
MACH MACHINE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MC MEDICINE CABINET
MCM THOUSAND CIRCULAR MILLS
ME MATCHING EXISTING ELEVATION
MECH MECHANICAL
MES MITERED END SECTION
MET. METAL
MFG MANUFACTURING
MFR MANUFACTURE
MG MOTOR GENERATOR
MH MANHOLE
MHGY MAHOGANY
MIN MINUMUM
ML METAL LATH
MLDG MOULDING
MO MASONRY OPENING
MON MONUMENT
MONO MONOLITHIC
MOT MOTOR OR MAINTENANCE OF
TRANSPORTATION
MSTC MASTIC
MT METAL THRESHOLD
MTD MOUNTED
MTN MOUNTAIN
MUTCD MANUAL FOR UNIFORM TRAFFIC
CONTROL DEVICES
MW MONITORING WELL
N
N NORTH
NEC NATION ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS' ASSOCIATION
NIC NOT IN CONTRACT
NOI NOTICE OF INTENT
NTP NOTICE TO PROCEED
O
OA OUTSIDE AIR
OB WG OBSCURE WIRE GLASS
OBGL OBSCURE GLASS
OBSC OBSCURE
OC ON CENTERS
OD OUTSIDE DIMENSION
OFF. OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPP. HD. OPPOSITE HAND
OPS OPERATIONS
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OSP OUTSIDE PLANT CABLE
OVSCP OVERFLOW SCUPPER
OWS OIL WATER SEPARATOR
P
P POLE
P. LAM. PLASTIC LAMINATE
P/S PRESTRESSED
PA PUBLIC ADDRESS
PAN. B PANIC BOLT
PBS PUSH BUTTON STATION
PCC PORTLAND CEMENT CONCRETE
PD PAVEMENT DRAIN
PERF PERFORATED
PH or 0 PHASE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PL PLATE
PLAS PLASTER
PLATF PLATFORM
PLBG PLUMBING
PLG PILING
PLY WD PLYWOOD
PNL PANEL
PNL BD PANEL BOARD
POL POLISH
PORC PORCELAIN
POB POINT OF BEGINNING
PP POWER POLE
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECTION
PROP PROPOSED
PRPT PARAAPET
PRV PRESSURE REGULATING VALVE
PSF POUND/SQUARE FOOT
PSI POUNDS/SQUARE INCH
PT POINT
PTD PAINTED
PVMT PAVEMENT
Q
QD QUANTITY DISTANCE
4 RD QUARTER ROUND
Q.T. QUARRY TILE
QT QUART
QTERS QUARTERS
R
R RISER
R.D. ROOF DRAIN
R.S. ROOF SCUTTLE
RA RETURN AIR
RAD or R RADIUS
RB RUBBER BASE
RC RADIATOR CONVECTOR
RC REMOTE CONTROL PIPE
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROAD
RD OR ~ ROUND
RECP RECEPTACLE
RECR RECREATION
REF or RE: REFERENCE
REFR REFRIGERATOR
REG REGISTER OF REGULAR
REINF REINFORCEMENT
REM REMOVABLE
REQ'D REQUIRED
REQMTS REQUIREMENTS
REV REVISIONS
RGE RANGE
RGH ROUGH
RM ROOM
ROW RIGHT OF WAY
RUB RUBBER
S
S SOUTH
S.T. SUPPLY DIFFUSER
S.ST. STAINLESS STEEL
S/W SIDEWALK
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SB SPLASH BLOCK
SCHD SCHEDULE
SCP SCUPPER
SCR SCREW
SCUT SCUTTLE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SECY SECRETARY
SEQ SEQUENCE
SFU STRUCTURAL FACING UNIT
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SM SAND SILTY SAND POORLY GRADED
SPA SPACING
SPDT SINGLE POLE DBL THROW
SPEC SPECIFICATIONS
SPF SOUNDPROOF
SPH SPACE HEATER
SPKR SPEAKER
SPL SPECIAL
SQ SQUARE
SQUAD SQUADRON
SR SUPPLY REGISTER
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
SSMR STRUCTURAL STANDING SEAM
METAL
ROOF PANELS
ST STRAND OR STREET
STA STATION
STD STANDARD
STF STIFFENER
STGR STRINGER
STL STEEL
STN STONE
STOR STORAGE
STR STRUCTURAL
STWY STAIRWAY
SU SPARE UNIT
SUB FL SUB FLOOR
SUSP SUSPENDED
SW SWITCH
SWMF STORM WATER MANAGEMENT FACILITY
(POND)
SWPPP STORMWATER POLLUTION PREVENTION
PLAN
SYMM SYMMETRICAL
T
T THREAD
T.O. TOP OF
TA TRAINING AREA
TAB TOP AND BOTTOM
TAN. TANGENT
TAP WATTAGE TAP
TBD TO BE DETERMINED
TBR&R TO BE REMOVED AND REPLACED
TCP TRAFFIC CONTROL PLAN
TEC TERMINAL ENGAGEMENT CENTER
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZI
TERF TERMINAL ENGAGEMENT RESEARCH
FACILITY
TERM TERMINAL
TGL TOGGLE
TH THRESHOLD
THERMO THERMOSTAT
THK THICK
TOC TOP OF CONCRETE
TOIL. TOILET
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TP TEST PIT
TTB TELE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
U
U.S. UNITED STATES
UC UNIT COOLER
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UH UNIT HEATER
UIP USE IN PLACE
UL UNDERWRITERS LABORATORIES
UNCNST UNDER CONSTRUCTION
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPSTR UPSTREAM
USACE UNITED STATES ARMY CORPS OF
ENGINEERS
UT UTILITY
UV UNIT VENTILATOR
V
V VOLT
VB VINYL BASE
VC VINYL WALL COVERING
VCP VITRIFIED CLAY PIPE
VCT VINYL CONPOSITION TILE
VENT VENTILATION OF VENTILATOR
VERT VERTICAL
VFDU VARIABLE FREQUENCY DRIVE
UNIT
VOL VOLUME
VS VENT STACK
VTR VENT THRU ROOF
W
W WEST
W.E. WATER ELEVATION
W.I. WROUGHT IRON
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER
WD WOOD
WF WIDE
WH WALL HYDRANT
WHM WATT HOUR METER
WKS WORK SHOP
WL WATER LINE
WP WEATHER PROOF
WPF WATER PROOF
WPFG WATER PROOFING
WRB WARDROBE
WS WASTE STACK OR
WEATHER STRIPPING
WSA WEAPON STORAGE AREA
WT WEIGHT
WTCM WHITE TRAFFIC CONTROL MARKING
WV WATER VALVE
WWF WELDED WIRE FABRIC
X
XFMR TRANSFORMER
Y
Y.D. YARD DRAIN
YD YARD
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
M
AR
C H
, 2
- - M H
F2
C-002
AB
BR
EV
IA
TI
O
N S
J.
D
EF
AL
C O
K.
KI
R
BY
J.
LO
N G
P.
O
'C O
N N
O R
M H
F2
C
-0
.d w g
M
AY
C-003
LE
G
EN
D
J.
D
EF
AL
C O
K.
KI
R
BY
J.
LO
N G
P.
O
'C O
N N
O R
M H
F2
C
-0
CS
INDEX/LEGEND SHEETS
CIVIL SITE
GI
V- C-
CIVIL DEMOLITION
CG CIVIL GRADING
SURVEY EXISTING CONDITIONS
CP CIVIL SITE PAVING
CU CIVIL SITE UTILITY
TABLE 1: DISCIPLINE DESIGNATOR
WATERLINE
SANITARY SEWER
FIRE HYDRANT
CULVERT
STORM DRAIN
WASTE DRAIN
POST INDICATOR VALVE
CONTOURS
SPOT GRADE ELEVATIONS
SUBDRAIN
SUBDRAIN OUTLET LINE
RAILROAD
DRILL HOLE
PROPERTY LINE MONUMENT
FIRE PROTECTION WATERLINE
GAS
GAS MAIN
MANHOLE SELF EXPLANATORY
DEPENDING ON TYPE OF UTILITY LINE
GATE VALUE & VALVE BOX
OR SERVICE STOP & BOX
UNDERGROUND STEAM SUPPLY GAS METER
2.8
SD
W
SS
WD
PIV
MT
US
G
F
GAS MAIN
N 98.8 E 59.7
NORTHING - EASTING LABEL
CORE BORING LOCATION
CD
CIVIL GENERAL
SILT FENCE BARRIER
OBJECT MARKER
SIGN
CABLE BARRIER
CLEARING AND GRUBBING
CLEARING LIMIT / DEMOLITION LIMIT
TREE LINE
VF
SURVEY MONUMENTATION
W
W
C
GW
COMMUNICATIONS LINE
ELECTRIC CABLE
WATER LINE
MONITORING WELL (GROUND WATER)
WATER VALVE
WATER VALVE VAULT
WATER METER
ELECTRIC TRANSFORMER
AIR CONDITIONING UNIT
COMMUNICATIONS VAULT
FIRE HYDRANT
GUY ANCHOR
POWER POLE AND GUY ANCHOR
AC
TANK OVER FLOW
E
Wx
COMM
SECURITY FENCE
SURVEY CONTROL POINT
TREE LINE
NOTE: SHEET GRID COLUMN AND ROW LOCATION REFER TO THE
LETTERS AND NUMBER WHICH OCCUR ON LEFT SIDE AND TOP
OF BORDER.
CONCRETE VALLEY GUTTER
FENCE DEMOLITION
SPHALT PAVEMENT REMOVAL
GRADED CRUSHED AGGREGATE SURFACING
2-DIGIT DISCIPLINE DESIGNATOR (SEE TABLE 1)
1-DIGIT SHEET TYPE DESIGNATOR (0-9)
2-DIGIT SHEET SEQUENCE (00-99)
DETAIL NUMBER
SHEET NUMBER OF DWG. WHERE
DETAIL IS SHOWN
C-501 X
SCALE:G7DETAIL/SECTION / ELEVATION TITLE
SHEET GRID ROW LOCATION
SHEET GRID COLUMN LOCATION
NEW HOT MIX ASPHALT (HMA) PAVEMENT LIMITS
1. RADII ARE SHOWN AT THE EDGE OF TRAVEL WAY (ETW).
2. DIMENSIONS TO GUTTER ARE MEASURED TO THE EDGE
OF ASPHALT PAVEMENT.
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND
ARE PERTINENT TO THE CONDITIONS ON THIS SET OF DRAWINGS
TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR ANOTHER LEGEND SHEET MAY
APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC
CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
FOR ADDITIONAL SURVEY GRAPHIC SYMBOLS, SEE SHEET VF1000.
STORM DITCH FLOW DIRECTION
BUILDING/STRUCTURES REMOVAL
NEW WORK LEGEND
NEW WORK & PAVEMENTS HATCH LEGEND
SYMBOL IDENTIFICATIONSURVEY / EXISTING CONDITIONS LEGEND
CS101
SHEET NAMING LEGEND
SITE LAYOUT NOTES
GENERAL NOTES
BID OPTION LEGEND
DEMOLITION / REMOVAL LEGEND
SAMPLE SHEET NAME:
X X SILT FENCE
X X X X TEMPORARY SECURITY SAFETY FENCE
CONSTRUCTION
ENTRANCE
TREE PROTECTION
CHECK DAM WATTLE
BMP LEGEND
SIGN
COMMUNICATION PEDESTAL
EXISTING SPOT ELEVATION
CENTERLINE
CP
150.00
LP
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
IS
SU
E D
AY
- - M H
F2
UNREINFORCED PORTLAND CONCRETE CEMENT (PCC) PAVEMENT
DITCH CENTER LINE
X
CENTERLINE
DITCH CENTER LINE
HOT MIX ASPHALT (HMA) MILLING & OVERLAY PAVEMENT
LIMITS
CONSTRUCTION / DEMOLITION LIMITS
UNDERGROUND OR ABOVE GROUND UTILITY REMOVAL
TREE OR SINGLE UTILITY STRUCTURE
(I.E. LIGHT POLE OR SIMILAR) REMOVAL
ASPHALT MILLING, 1.5" DEPTH
TEMPORARY FE-6 SECURITY FENCE
FE-6 SECURITY FENCE
X X X X
X X
CONCRETE REMOVAL PROJECT LIMITS OR DISTURBANCE
DITCH CENTERLINE
BID OPTION 3: IGLOO STORAGE
MODULE 1, CONSTRUCTION LIMITS
BID OPTION 4: IGLOO STORAGE
MODULE 2, CONSTRUCTION LIMITS
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
IS
SU
E D
Ay
- - M H
F2
GENERAL NOTES
1. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY EGLIN
AFB SECURITY POLICE WHEN ENTERING THE WORK AREA AND MAY
EXPERIENCE DELAYS. ALL VEHICLES ENTERING THE WORK AREA MUST HAVE
CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND
CURRENT/VALID DRIVERS LICENSE FOR THE OPERATOR.
2. THE CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY
PAINTED SIGN, MEETING COR APPROVAL, AT THE CONSTRUCTION
ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE.
3. ALL CONSTRUCTION EQUIPMENT AND CONTRACTOR CONSTRUCTION
VEHICLES SHALL BE MARKED WITH COMPANY PAINTED DESIGNS, INSIGNIAS
OR OTHER COMPANY MARKINGS, WHICH ARE CLEARLY VISIBLE.
4. THE CONTRACTOR CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
5. THE CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE
PROJECT IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL
EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY
VEHICLE RESPONSE TIME.
6. THE CONTRACTOR'S STAGING AREA SHALL BE SUBJECT TO APPROVAL BY
COR. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITY, THE
CONTRACTOR'S CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
PARKED IN THE CONTRACTOR'S STAGING AREA.
7. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
OF EXISTING SITE, SUBJECT TO THE APPROVAL OF THE COR.
8. THE CONTRACTOR SHALL COORDINATE WITH COR REGARDING ANY
GOVERNMENT-OWNED EQUIPMENT REQUIRING RELOCATION TO COMPLETE
WORK.
9. THROUGHOUT CONSTRUCTION, WEEKLY BRIEFINGS SHALL BE CONDUCTED
BY THE CONTRACTOR WITH THE COR, FOR THE PURPOSE OF COORDINATING
CONSTRUCTION ACTIVITIES AND SCHEDULING NEARBY.
10. THE BASE COMMANDER AND/OR THE ACO SHALL HAVE THE AUTHORITY TO
IMMEDIATELY SUSPEND AUTHORIZATION TO WORK FOR SECURITY
REASONS.
11. THE CONTRACTOR IS REQUIRED TO SURVEY ALL UTILITY LINES AND
APPURTENANCES IMMEDIATELY AFTER INSTALLATION FOR UPDATING
RED-LINE AS-BUILT DRAWINGS MAINTAINED ON-SITE BY THE CONTRACTOR.
USING THE FLORIDA NORTH STATE PLANE COORDINATE SYSTEM FOR THE
HORIZONTAL DATUM AND NAVD 88 FOR THE VERTICAL DATUM.
12. EGLIN AFB HAS NO DESIGNATED SPOIL AREAS. CONTRACTOR IS TO REMOVE
NON-COMBUSTIBLE MATERIALS, WASTE AND UNSUITABLE MATERIAL OFF
BASE AND DISPOSE OF PROPERLY.
13. THE CONTRACTOR IS TO SUBMIT TRAFFIC CONTROL PLAN TO THE COR.
TRAFFIC CONTROL SHALL CONFORM TO THE MOST CURRENT MUTCD AND
FDOT DESIGN STANDARD.
14. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UTILITIES
(UNDERGROUND AND ABOVE) WITHIN THE PROJECT LIMITS PRIOR TO
BEGINNING OF CONSTRUCTION.
15. TEMPORARY POWER, SEWER AND WATER SHALL BE PROVIDED BY
CONTRACTOR. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS
FOR TEMPORARY UTILITY RATES FOR PAYMENTS RENDERED TO THE
GOVERNMENT.
COORDINATION NOTES
1. THE CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT,
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL BE
PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING
HOURS WHILE JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO
SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
APPROVED ALTERNATE REPRESENTATIVE SHALL BE PROVIDED.
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CORDON OFF THE
WORK AREAS AND STREET CROSSINGS BY USING BARRICADES APPROVED
BY THE COR, AS NEEDED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF THE PROJECT
AND THE EXPENSE THEREOF. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO ENSURE THAT NO IMPROVEMENTS ARE CONSTRUCTED
OUTSIDE THE PROJECT LIMITS.
EROSION CONTROL NOTES
1. BMPS SHOWN ON THE PLAN ARE NOT FINAL AND SHALL BE ADJUSTED PER
SITE CONDITIONS AT THE TIME OF CONSTRUCTION. CONTRACTOR IS NOT
LIMITED TO THE BMPS DETAILED IN THE PLAN SET AND MAY USE ADDITIONAL
BMPS AS APPROVED BY THE COR.
2. THE CONTRACTOR HAS THE SOLE RESPONSIBILITY TO DESIGN THE EROSION
CONTROL PLAN AND IS RESPONSIBLE FOR ADHERING TO FEDERAL, STATE
AND LOCAL PERMITS FOR EROSION CONTROL. PRELIMINARY ERSOION
CONTROL PLANS HAVE BEEN PROVIDED IN THE CIVIL PLAN SET FOR
CONTRACTOR REFERENCE ONLY. FINAL DESIGN AND LAYOUT IS THE
RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL OBTAIN
AN FDEP NPDES PERMIT FOR CONSTRUCTION ACTIVITIES AT BOTH PROJECT
SITES. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES AND
APPLICATION PREPARATION. ALL FDEP PERMITS SHALL BE COORDINATED
THROUGH THE COR AND APPROPRIATE SIGNATURES AS REQUIRED BY EGLIN
OFFICIALS SHALL BE ROUTED THROUGH THE CES GROUP THROUGH THE
COR.
3. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY
DISTURBANCE.
4. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND
ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND
SEDIMENT DISCHARGE.
5. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
ITS MOVEMENT BY WIND FORCES.
6. LIMITS OF CONSTRUCTION IS DEFINED AS THOSE AREAS AFFECTED BY THE
CONTRACTOR'S OPERATIONS INVOLVING EXCAVATION, EMBANKMENT AND
FINAL GRADING REQUIRED TO COMPLETE THE WORK.
7. THE CONTRACTOR SHALL UTILIZE FDOT EROSION AND SEDIMENT CONTROL
MANAGEMENT MANUAL. FOR ADDITIONAL RESOURCES AND GUIDANCE
BEYOND WHAT IS SHOWN IN THIS PLAN SET.
8. CONSTRUCTION ENTRANCES SHALL BE LOCATED TO MINIMIZE IMPACT ON
LOCAL TRAFFIC CONDITIONS AND SHALL BE MAINTAINED FOR THE LIFE OF
THE PROJECT.
9. FOR INFORMATION ON REQUIRED FDEP CONSTRUCTION PERMIT AND BMP
PLAN SEE SECTION 01 57 19, "TEMPORARY ENVIRONMENTAL CONDITIONS".
EXCAVATION AND TRENCHES NOTES
1. OPEN TRENCHES, EXCAVATIONS, AND DEMOLITION AREAS WITHIN THE
CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE
FENCING OR OTHER MEANS ACCEPTABLE TO THE COR.
2. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL LOCATE ALL UTILITIES.
ANY UTILITY ADJUSTMENTS, EXISTING OR PROPOSED, REQUIRED TO
COMPLETE CONSTRUCTION UNDER THIS CONTRACT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR. THIS ITEM INCLUDES, BUT IS NOT
LIMITED TO; THE TEMPORARY RELOCATION OF EXISTING OVERHEAD POWER
LINES. ALL WORK PERFORMED IN THE VICINITY OF OVERHEAD POWER LINES
SHALL CONFORM TO OSHA REQUIREMENTS AND ANY OTHER APPLICABLE
(LOCAL) SAFETY REQUIREMENTS. THE CONTRACTOR IS TO REPAIR ALL
DAMAGES TO EXISTING UTILITIES THAT ARE TO REMAIN IN SERVICE
IMMEDIATELY AT NO ADDITIONAL COSTS OR EXPENSE TO THE
GOVERNMENT.
3. ALL WORK PERFORMED ADJACENT TO OR ON EXISTING ROADWAYS SHALL
COMPLY WITH CURRENT FDOT STANDARDS FOR TRAFFIC CONTROL AND
SAFETY. ALL WORK IN AND ADJACENT TO STREETS OR ROADS SHALL BE
COORDINATED WITH THE COR. THE CONTRACTOR SHALL PROVIDE THE COR
WITH A ONE-WEEK ADVANCE NOTICE PRIOR TO BEGINNING OF WORK
ADJACENT TO RANGE ROAD. NO WORK ADJACENT TO OR ON EXISTING
ROADS SHALL BE INITIATED WITHOUT PRIOR APPROVAL FROM THE COR.
4. THE CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS TO PERFORM
UNDERGROUND WORK.
5. THE CONTRACTOR SHALL PROVIDE WATER DIVERSIONS AS REQUIRED TO
LIMIT RAIN WATER FROM ENTERING SITE EXCAVATED AREAS. FOR
DE-WATERING REQUIREMENTS SEE SECTION 31 00 00.
SAFETY AND SECURITY REQUIREMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS AND USACE SAFETY MANUAL EM385-1-1.
2. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS WILL NOT BE
ALLOWED IN THE 96TH CEG MUNITIONS COMPLEX AREA. A HOT WORK
PERMIT FROM THE EGLIN AFB FIRE DEPARTMENT WILL BE REQUIRED
OUTSIDE THE CONTROLLED PERIMETER AREA.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY FENCING OR
OTHER SECURITY MEASURES REQUIRED TO PROTECT WORK AREA OR
EQUIPMENT DURING CONSTRUCTION. ORANGE SAFETY FENCE SHALL BE
INSTALLED PRIOR TO INITIATING ANY DEMO WORK.
4. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE IF THE
REQUIRED CONSTRUCTION CAN BE PERFORMED WITHIN THE AREA
PROVIDED AND COMPLY WITH REQUIREMENTS OF THE SAFETY AND HEALTH
REGULATIONS (OSHA) FOR CONSTRUCTION PROJECTS OF THIS TYPE. ANY
SAFETY MEASURES OR METHOD OF CONSTRUCTION THAT IS NECESSARY IN
THE CONSTRUCTION OF THIS PROJECT TO COMPLY WITH THESE
REGULATIONS IS THE CONTRACTOR'S RESPONSIBILITY.
SURVEYORS NOTES
1. THE SURVEY DEPICTED HEREON WAS PREPARED IN ACCORDANCE WITH THE
PERTINENT SECTIONS OF EM-1110-1-1000 PHOTOGRAMMETRIC MAPPING,
EM-1110-1-1002 SURVEY MARKERS AND MONUMENTATION, EM-1110-1-1003
NAVSTAR GLOBAL POSITIONING SYSTEM SURVEYING, EM-1110-1-1005
ENGINEERING AND DESIGN: CONTROL AND TOPOGRAPHIC SURVEYING,
EM-1110-1-2909 GEOSPATIAL DATA AND SYSTEMS, A/E/C (TRI-STAR) CADD
STANDARDS, AND MINIMUM TECHNICAL STANDARD (MTS) REQUIREMENTS AS
DEFINED BY THE FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND
MAPPERS.
2. NO ENVIRONMENTAL JURISDICTIONAL LINES HAVE BEEN DETERMINED BY
FLORABAMA GEOSPATIAL SOLUTIONS, LLC.
3. APPARENT USES ARE AS SHOWN. NO APPARENT USES WERE DETERMINED.
THIS IS NOT A BOUNDARY SURVEY.
4. HORIZONTAL AND VERTICAL CONTROL USED IN THIS SURVEY WERE
DETERMINED FROM A SITE CALIBRATED GPS NETWORK. THE CONTROL
POINTS AND VALUES ARE IN THE TABLE ABOVE.
5. THE ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET AND TENTHS
(NAVD88).
6. THIS PARCEL LIES IN FLOOD ZONE X (NO MINIMUM), AS DETERMINED BY
SCALE FROM FEMA PANEL #12091C 0457H, DATED 12/06/202, AND FURNISHED
BY FEMA MAP SERVICE CENTER.
7. THE SURVEY MAP AND SURVEY REPORT ARE NOT FULL & COMPLETE
WITHOUT THE OTHER.
8. UTILITIES SHOWN ON THE SURVEY ARE FIELD LOCATED WITH THE
EXCEPTION OF THE SECONDARY UNDERGROUND ELECTRICAL WHICH IS
DERIVED FROM A SHAPE FILE PROVIDED BY EGLIN AFB AND IS NOT SURVEY
GRADE. ANY SECONDARY ELECTRICAL LINES THAT CONNECT THE
LIGHTNING PROTECTION SYSTEM WERE NOT IN THE PROVIDED SHAPE FILE.
9. SEE TABLE BELOW FOR PROJECT SPECIFIC MONUMENTATION CONTROL.
SEE SHEET VF-100 FOR ADDITIONAL BENCHMARKS AND SURVEY NOTES.
DEMOLITION NOTES
1. ALL MATERIAL REMOVED SHALL BE DISPOSED OF IN AN APPROVED LANDFILL
OFF GOVERNMENT PROPERTY.
ENVIRONMENTAL RESOURCES NOTES
1. THE INCLUDED AF FORM 813 SIGNED 30 MAY 2017 USES A CATEGORICAL
EXCLUSION (CATEX) THAT IS FOR STUDY EFFORTS THAT INVOLVE NO COMMITMENT
OF RESOURCES OTHER THAN PERSONNEL AND FUNDING ALLOCATIONS. ANOTHER
AF FORM 813 MUST BE SUBMITTED TO ADDRESS THE ACTUAL PROPOSED ACTION
AND ALTERNATIVES.
2. IN ACCORDANCE WITH THE COASTAL ZONE MANAGEMENT ACT (CZMA), A
DETERMINATION OF THE PROPOSED ACTION WAS REVIEWED BY THE FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP). THEIR CONCURRENCE
WITH OUR CZMA DETERMINATION WAS RECEIVED 17 JUNE 2014. THE CZMA
DOCUMENT DESCRIBES GUIDELINES UNDER WHICH THE PROJECT MUST BE
COMPLETED TO MAINTAIN CONSISTENCY WITH FLORIDA'S STATUTES AND
REGULATIONS. A COPY OF THIS DOCUMENT IS CAN BE PROVIDED BY EMAIL IF
REQUESTED. FOR QUESTIONS CONTACT RODNEY FELIX, 96 CEG/CEIEA,THROUGH
THE COR.
3. PER CONVERSATION WITH STATE CLEARINGHOUSE 20 MAY 2019, IT WAS AGREED
THIS NEGATIVE DETERMINATION FOR RCS 14-172 REMAINS APPLICABLE AND NO
NEW CONSISTENCY DETERMINATION IS NEEDED PROVIDED PREVIOUSLY
ESTABLISHED CONSERVATION MEASURES WILL BE ADHERED-TO.
4. PRIOR TO ANY TREE REMOVALS FOR THIS PROJECT, CONTACT PHIL CARTER, 96
CEG/CEIEA, 883-1129 OR AL SUTSKO, 96 CEG/CEIEA, 883-1126, THROUGH THE COR
TO DETERMINE TREE VALUE.
5. GOPHER TORTOISE, INDIGO SNAKE, AND REDHEADED WOOD PECKER SURVEY IS
REQUIRED. CONTACT EGLIN NATURAL RESOURCES (JACKSON GUARD) WITHIN 30
DAYS OF GROUND DISTURBING ACTIVITIES TO ARRANGE THE SURVEY. IF TORTOISE
BURROWS ARE FOUND TO CONFLICT WITH THE PROPOSED PROJECT SITE, AND
CANNOT BE AVOIDED, THE TORTOISE(S) MUST BE RELOCATED. **NOTE THAT
TORTOISES CANNOT BE RELOCATED IF THE FORECASTED LOW TEMPERATURE IS
BELOW 50 DEGREES FOR 3 CONSECUTIVE DAYS.** POC: RODNEY FELIX, 96
CEG/CEIEA, OR WAYNE PITTMAN, 96 CEG/CEIEA, THROUGH THE COR.
6. THERE ARE NO CULTURAL RESOURCES CONCERNS ANTICIPATED WITH THIS
PROJECT. HOWEVER, IF UNEXPECTED DISCOVERIES, SUCH AS NATIVE AMERICAN
GRAVES OR LOST HISTORIC CEMETERIES ARE ENCOUNTERED, GUIDELINES SET
FORTH IN CHAPTER 872, FLORIDA STATUTE (FLORIDA'S UNMARKED BURIAL LAW)
MUST BE FOLLOWED. IF HUMAN REMAINS OR ARCHAEOLOGICAL MATERIALS ARE
ENCOUNTERED DURING CONSTRUCTION, WORK SHOULD CEASE IMMEDIATELY AND
THE AREA SECURED. CONTACT THE EGLIN AFB CULTURAL RESOURCES OFFICE
WITH LYNN SHREVE OR BEN AUBUCHON, THROUGH THE COR WITHIN 24 HOURS.
7. CUT VEGETATION FROM LAND CLEARING MUST NOT BE PUT INTO THE REFUSE
SOLID WASTE STREAM FOR LANDFILL DISPOSAL. CONTRACTOR SHALL REMOVE
VEGETATION TO A SECURE, PERMITTED DISPOSAL SITE OR COLLECTED AND
TRANSPORTED FOR APPROVED RECYCLING/REUSE. COORDINATE ALL DISPOSALS
WITH MR.STEVE KAUFFMAN AT 96 CEG/CEIEC, THROUGH THE COR.
8. THIS PROJECT WILL REQUIRE A GENERAL ERP STORMWATER ENVIRONMENTAL
RESOURCE PERMIT PURSUANT TO CHAPTER 62-330 FAC AS THE PROJECT
INCLUDES MORE THAN 4,000 SQ FT OF IMPERVIOUS OR SEMI-IMPERVIOUS
SURFACES SUBJECT TO VEHICULAR TRAFFIC, 9,000 SQ FT OF TOTAL IMPERVIOUS
SURFACES, AND OR MORE THAN 1 ACRE OF PROJECT AREA AND IS PART OF A
LARGER COMMON PLAN OF DEVELOPMENT. THE CONTRACTOR IS NOT REQUIRED
TO OBTAIN THIS PERMIT, HOWEVER THE CONTRACTOR WILL NEED TO COORDINATE
WITH THE COR IF CONSTRUCTION TIME EXCEEDS THE PERMIT ALLOTTED TIME
FRAME.
9. THE CONTRACTOR MUST OBTAIN AN NPDES STORMWATER CONSTRUCTION PERMIT,
AS THE PROJECT DISTURBS A TOTAL OF ONE ACRE OR MORE OF SOIL, FROM FDEP
PURSUANT TO CHAPTER 62-621 FAC. CONTACT TIM C. LANGLEY FOR PERMIT
CONSULTATION, 96CEG/CEIEC, THROUGH THE COR.
VEGETATION NOTES
1. PROVIDE SOLID SOD ON ALL AREAS DESIGNATED TO RECEIVE SOD.
2. PROVIDE SEEDING ON ALL GRADED, SCARRED OR DISTURBED AREAS AS
INDICATED ON THE VEGETATIVE PLANS.
3. THE SITE IS CONSIDERED TO HAVE NO TOPSOIL PRESENT. ALL TOPSOIL
SHALL BE BROUGHT IN FROM AN OFFSITE COMMERCIAL SOURCE FOR
PROJECT USE.
SPECIAL PROJECT SITE ACCESS NOTES
1. THE CONTRACTOR SHALL NOTE THAT BOTH PROJECT SITES, THE IGLOO
FACILITY AND THE MUNITIONS FACILITY, BEING PROPOSED TO BE
CONSTRUCTED ARE LOCATED WITHIN THE 96TH CEG MUNITIONS COMPLEX
WHICH IS A CONTROLLED AND SECURE LOCATION ON EGLIN AIR FORCE
BASE. ESCORT WITHIN THE COMPLEX WILL BE REQUIRED THROUGHOUT
EACH SITES CONSTRUCTION TIME FRAME. TO MITIGATE ESCORT, THE 96TH
CEG GROUP HAS AGREED TO ALLOW THE INSTALLATION OF A TEMPORARY
SECURITY CONSTRUCTION FENCE AROUND THE MUNITIONS SITE TO
TEMPORARILY ESTABLISH A PERIMETER FENCE BOUNDARY THAT WOULD
ALLOW FOR THE MAJORITY OF THE FACILITY SITE TO BE CONSTRUCTED
WITHOUT ESCORT. THE CONTRACTOR WILL COORDINATE WITH THE COR
AND THE 96TH CEG REPRESENTATIVE FOR A FINAL APPROVED TEMPORARY
FENCE LOCATION. THE CONTRACTOR SHALL NOTE THAT THE TEMPORARY
SECURITY CONSTRUCTION FENCE IS OPTIONAL AND NOT REQUIRED TO
CONSTRUCT FOR EITHER FACILITY. SEE CD101 FOR SUGGESTED
TEMPORARY FENCING LOCATION. A FINAL FE-6 SECURITY FENCE WILL BE
REQUIRED TO RE-ESTABLISH THE COMPLEX PERIMETER POST
CONSTRUCTION. PERMANENT FE-6 FENCING LOCATION CAN BE FOUND IN
THE CIVIL PLANS.
2. THE ROADWAY BETWEEN THE MSA GATE 4 AND PERIMETER ROAD IS USED
FOR EMERGENCY INGRESS/EGRESS AND SHALL NOT BE BLOCKED OR
OBSCURED.
GENERAL PROJECT PHASING NOTES:
PHASE I:
· ESTABLISH CONTRACTOR STAGING AREA
· ESTABLISH MOT (MAINTENANCE OF TRANSPORTATION) ALONG PEREMITER ROAD, AND
WITHIN THE 96TH CEG MUNITIONS COMPLEX AS REQUIRED. COORDINATE ALL MOT PLANS
WITH COR PRIOR TO IMPLEMENTATION.
· CONSTRUCT APPROVED TEMPORARY SECURITY FENCE AT RDT&E MUNITIONS SITE
· INSTALL CONSTRUCTION ENTRANCE AND TEMPORARY CONSTRUCTION AGGREGATE ACCESS
ROAD AS NECESSARY FOR IMPROVED SITE ACCESS
· INSTALL BEST MANAGEMENT PRACTICES AS INDICATED IN THIS CONSTRUCTION PLAN SET
AND AS NECESSARY TO MEET STATE AND FEDERAL REQUIREMENTS
· BEGIN SITE DEMOLITION, CLEARING AND GRUBBING
PHASE II
· BEGIN CONSTRUCTION OF RDT&E MUNITIONS FACILITY
· ESTABLISH CONTRACTOR STAGING AREA AT IGLOO SITE
· BEGIN CONSTRUCTION OF IGLOO SITE
PHASE III:
· PAVE AND STRIPE MUNITIONS SITE AND ESTABLISH PERMANENT VEGETATION
· DECONSTRUCT TEMPORARY SECURITY FENCE, INSTALL PERMANENT SECURITY FENCE
· COMPLETE CONSTRUCTION OF IGLOO SITE
· STABILIZE IGLOO SITE WITH PERMANENT VEGETATION AS REQUIRED
· RESTORE CONTRACTOR STAGING AREAS TO PRE-EXISTING CONDITIONS
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
FACILITIES PLANNING, DESIGN AND
CONSTRUCTION.
J.
D
EF
AL
C O
K.
KI
R
BY
J.
LO
N G
P.
O
'C O
N N
O R
G
EN
ER
AL
N O
TE
S
M H
F2
C
-0
.d w g
C-004
12L-30R RUNWAY
EGLIN
C-005
H
AU
L R
O U
TE
A
N D
C O
N
ST
R U
C
TI
O N
ST
AG
IN
G
A R
EA
J.
D
EF
AL
C O
K.
SM
AL
LE
G
AN
J.
LO
N G
P.
O
'C O
N N
O R M H
F2
C
-0
.d w g D
ES
C
R
IP
TI
O
N M
AR
K
D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
M
AY
- - M H
F2
MUNITIONS COMPLEX MAIN GATE
SPECIAL ACCEES IS REQUIRED.
SEE NOTE 5 THIS SHEET AND SPECIAL
ACCESS NOTES ON SHEET C-004.
BID OPTION
CONTRACTOR STAGING /
LAYDOWN AREA
MUNITIONS MAINT. FACILITY
PROJECT SITE
(PHASE I, II, III)
SEE NOTE 11
BASE BID CONTRACTOR
STAGING / LAYDOWN AREA
(SEE CG702 FOR
ADDITIONAL INFORMATION)
BID OPTIONS 3 & 4 IGLOO STORAGE MODULES
PROJECT SITE
(PHASE IV)
SEE NOTE 11
HAUL ROUTE
HAUL ROUTE
PIV PIV
PI
V
PIV PIV
GRAVEL CONSTRUCTION
ACCESS ROAD (ATC)
NEW ASPHALT
ROAD (ATC)
GRAVEL CONSTRUCTION
ACCESS ROAD (ATC)
FL
OR
ID
A
HW
Y
GE
NE
RA
L
BO
ND
B
LV
D.
FLORIDA HWY 189
SUNSET LANE
EG
LI
N P
KW
Y.
EG
LI
N
PK
W Y.
EGLIN PKWY.
12L-30R RUNWAY
19L-10R R
U N
W
AY
OKALOOSA
REGIONAL
AIRPORT
"NORTH GATE" ENTRANCE
SEE NOTES 1 THRU 3
"EAST GATE" ENTRANCE
GRIFFIN WAY
LUTON DRIVE
WIZARD WAY
PERIMETER ROAD
"WEST GATE" ENTRANCE
SEE NOTE 4
PAQUITO ROAD
MUNITIONS MAIN GATE
PROJECT LOCATION:
BID OPTIONS 3 & 4 IGLOO
STORAGE MODULES
PROJECT LOCATION -
EGLIN AIR FORCE BASE
N.T.S
PROJECT LOCATION:
MUNITIONS MAINT. FACILITY
HAUL ROUTE & PROJECT SITE ENLARGEMENT PLAN
N.T.S
GENERAL NOTES:
1. NORTH GATE CONSTRUCTION ACCESS - PRIMARY CONSTRUCTION ENTRANCE GATE. GATE SHALL BE OPEN MON-FRI EXCLUDING HOLIDAYS, 0600-1800. NO SATURDAY OR SUNDAY DELIVERIES ARE ALLOWED UNLESS PRIOR COORDINATION IS MADE THROUGH THE COR. ALL DELIVERY TRUCKS MUST HAVE A BILL OF LADING IDENTIFYING THE CONTRACTOR, CONTRACT NUMBER AND LIST OF MATERIALS. ANY SPECIAL DELIVERIES SHALL BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER 5 DAYS IN ADVANCE, AND SECURITY FORCES SHALL BE NOTIFIED 72 HOURS IN ADVANCE, NOT ALL REQUEST MAY BE GRANTED.
2. CONTRACTOR SUPPLIERS SHALL ENTER BASE THROUGH THE NORTH GATE.
3. ALL CONTRACTOR DELIVERIES MUST BE INSPECTED AT THE NORTH GATE PRIOR TO ARRIVAL AT THE MUNITIONS MAIN GATE.
4. ALL CONSTRUCTION TRAFFIC SHALL EXIT THROUGH THE EXISTING EAST OR WEST GATE AS SHOWN ON THIS SHEET. EAST AND
WEST GATE VISITOR CENTER HOURS OF OPERATION ARE MON-FRI 0600-1400.
5. CAUTION! ALL CONSTRUCTION WORK CONDUCTED WITHIN THE 96TH CEG EGLIN MUNITIONS SECURE AREA WILL REQUIRE
PERSONNEL ESCORTS. ESCORTS WILL ONLY BE AVAILABLE MON.-FRI., 0700-1600 HOURS.
6. THE CONTRACTOR AND USACE CONTRACTING OFFICERS REPRESENTATIVE (C.O.R) SHALL DOCUMENT THE EXISTING CONDITIONS OF THE HAUL ROUTE THROUGH THE BASE PRIOR TO COMMENCEMENT OF CONSTRUCTION. ANY DAMAGES TO THE HAUL ROUTE ROAD(S) SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICERS REPRESENTATIVE AT THE
THE CONTRACTORS EXPENSE.
7. DISPOSAL AREAS FOR RUBBLE, UNSUITABLE EXCESS SOIL MATERIALS, OR OTHER CONSTRUCTION DEBRIS ARE NOT AVAILABLE ON THE BASE FOR THE CONTRACTOR'S USE. DISPOSAL IS THE RESPONSIBILITY OF THE CONTRACTOR AT SITES OFF
GOVERNMENT CONTROLLED LANDS.
8. BORROW SITES ARE NOT AVAILABLE FOR USE BY THE CONTRACTOR ON THE BASE. ALL BORROW MATERIALS, TOPSOIL, OR OTHER SOIL MATERIAL SHALL BE OBTAINED BY THE CONTRACTOR FROM COMMERCIAL SOURCES FROM OFF-SITE LOCATIONS.
9. CONTRACTOR STAGING, STOCKPILE/LAYDOWN AREAS SHALL BE RETURNED TO ORIGINAL CONDITIONS AS APPROVED BY THE
C.O.R. AT THE COMPLETION OF CONSTRUCTION
10. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY POWER, WATER AND SANITARY SEWER FACILITIES. CONTRACTOR SHALL
COORDINATE UTILITY TIE IN WITH THE C.O.R.
11. GENERAL CONSTRUCTION PHASING NOTES FOR THIS PROJECT HAVE BEEN PROVIDED FOR CONTRACTOR INFORMATION ONLY;
SEE SHEET C-004 FOR PROVIDED NOTES. CONTRACTOR SHOULD NOTE THAT THE IGLOO LOCATIONS ARE NOT UNDER BASE BID AND SHALL BE REVIEWED AS BID OPTION 3 & 4. CONTRACTOR SHALL REFER TO BID ITEMS LIST FOR ADDITIONAL INFORMATION.
12. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED AND CLEANED IN ACCORDANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS. PROVIDE DETAILS AND MAINTENANCE PLAN AS PART OF THE STORMWATER
POLLUTION PREVENTION PLAN.
13. ONLY THE CONSTRUCTION CONTRACTORS QUALITY CONTROL MANAGER IS AUTHORIZED TO TAKE PHOTOS OF THE PROJECT SITE. PHOTOS ARE ONLY TO BE TAKEN OF CONSTRUCTION ACTIVITIES. ANYONE ELSE TAKING PHOTOS WILL BE ESCORTED OFF THE BASE AND NOT ALLOWED TO RETURN. CELL PHONE ARE ALLOWED FOR ALL PERSONNEL BUT NO PHOTOS.
14. FIELD MARK LOCATION FOR TEMPORARY SECURITY FENCES FOR APPROVAL BY THE CONTRACTING OFFICER AND EGLIN
RESOURCE PROTECTION PERSONNEL IN THE 96TH SECURITY FORCES SQUADRON.
15. SMOKING SHALL ONLY OCCUR IN DESIGNATED SMOKING AREAS. DESIGNATED SMOKING AREAS SHALL BE DETERMINED PRIOR TO CONSTRUCTION WITH THE COR AND A DESIGNATED REPRESENTATIVE WITH THE 96TH CEG MUNITIONS COMPLEX.
HAUL ROUTE
HAUL ENTRANCE ROUTE
FLAGGER REQUIRED
HAUL "EXIT" ROUTE
HAUL EXIT ROUTE
HAUL EXIT ROUTE
PERIMETER ROAD
PLAN NORTH
PLAN NORTH
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
C-006
TR
AF
FI
C
C O
N
TR
O L
D
ET
AI
LS
J.
D
EF
AL
C O
K.
SM
AL
LE
G
AN
J.
LO
N G
P.
O
C O
N N
O R M
H F2
C -0
.d w g
TRAFFIC CONTROL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ESTABLISHING SAFE WORK ZONES.
CHANNELIZING DEVICE NOTES:
2. CONES ARE FOR ESTABLISHING A TEMPORARY WORK ZONE
AND SHALL:
A. BE USED ONLY IN ACTIVE WORK ZONES WHERE
WORKERS ARE PRESENT.
B. NOT EXCEED 100' IN LENGTH OF USE AT ANY ONE
TIME.
C. BE REFLECTORIZED WITH RETROREFLECTIVE
COLLARS WHEN USED AT NIGHT.
3. FOR BARRIER DELINEATORS, PLACE ON TOP OF UNIT SO
THAT RETROREFLECTIVE SHEETING FACES VEHICULAR
TRAFFIC. COLOR MUST MATCH ADJACENT LONGITUDINAL
PAVEMENT MARKING.
4. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
MARKED WITH COMPANY INSIGNIAS OR OTHER COMPANY
MARKINGS, WHICH ARE CLEARLY VISIBLE.
5. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN
REVERSE.
6. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON
EXISTING PAVEMENT THAT IS TO REMAIN.
7. NON-CONSTRUCTION PEDESTRIAN TRAFFIC SHALL NO BE
ALLOWED INSIDE THE CONSTRUCTION LIMITS.
8. ANY DAMAGE TO ROADS AND PAVEMENT DUE TO
CONSTRUCTION EQUIPMENT OR CONSTRUCTION TRAFFIC
SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION BY THE
CONTRACTOR AT HIS/HER OWN EXPENSE TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
9. CONTRACTOR SHALL PROVIDE 2 FLAGMAN DURING
CONSTRUCTION TO DIRECT TRAFFIC ACROSS THE END OF
THE RUNWAY AS SHOWN ON C-005.
W20-1
W20-1
250' 125' SHOULDER WORK
NOTE:
MAINTAIN A MINIMUM 3.0m TRAVEL LANE
250'
EXISTING EDGE
OF ROADWAY
TRAFFIC FLOW
DIRECTION
OF EXISTING ROAD
WORK WITHIN
RIGHT OF WAY
CHANNELIZING DRUMS
TRAFFIC CONTROL NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR STRICT COMPLIANCE
WITH PART VI OF THE FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD) AND OR FDOT DRAWINGS AND SPECIFICATIONS MOST
CURRENT EDITION.
W20-4
W20-7A
W20-4
W20-7A
EXISTING EDGE
OF ROADWAY
HIGH INTENSITY
FLASHER (TYPE B)
TRAFFIC FLOW DIRECTION
ADVANCE WARNING SIGN
TYPE III BARRICADE
CHANNELIZING CONES
WORK AREA
FLAGMAN
ADVISORY SIGN
TCP LEGEND
N.T.S.
EXISTING ROAD
WORK AREA
300' 300' 50'-100'
300' 300'
EXISTING EDGE
OF ROADWAY
50'
18" Diameter lb s
TUBULAR NON-FIXED
MARKER TO BE USED
DURING DAYLIGHT ONLY
CONES
PLASTIC
DRUMS
M in
RETROREFLECTIVE
SURFACE
ONE LANE CLOSURE PLAN
CONSTRUCTION WITH MINOR ENCROACHMENT
CL
10' (M
IN)
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
M
AR
C H
, 2
- - M H
F2
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND
ARE PERTINENT TO THE CONDITIONS ON THIS SET OF DRAWINGS
TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR ANOTHER LEGEND SHEET MAY
APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC
CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
FACILITIES PLANNING, DESIGN AND
CONSTRUCTION.
M
AY
E
CC
C
C
C
C
CP
CPCPCP
CP
CP
CP
CP
CP
CP
CP
CP
CP
COMM
CP
CP
CP CP CP
CP CP
CP
CP
C O
M M
C O
M M
COMMCOMM
H
M M
M
M
M
M
M
M
M
M
M
M
ES ES
ES
ES ES ES ES
ES
ES
ESES
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
WW
W
W
W
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
SSx
SSx
SSx
SSx
SSx
COMM COMM COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
COMM COMM COMM
C O
M M
COMM
COMMCOMM
E
ES
ES
ES
ES
ES
ES
E E E E E E E E E E E E E E E E E E
E E
E E E E E E E E E E E E
ESESESESESES
E
W
W W W W W W W W W W
W
W
W W
W
WWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
WWW
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
COMM
COMM
C O
M M
COMM
COMM COMM
COMM
COMM
COMM
C O
M M
COMM
COMM
C O
M M
C O
M M
C O
M M
COMM
COMM COMM COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
ES ES ES ES ES
EEEEEEEE
E E E E E E
E E E E E E E E E E E E E
E E
ES ES ES ES
ES
ES
ES
ES
ES
ES
ES
ES
ES ES
ESESES
ES ES ES
ESESESESESESESES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES ES ES ES ES ES
ES
ES
ES
ES ES ES ESESES
SSx
SSx
SSx
SSx
SSx
Wx
E E
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
1256 BUILDING
BUILDING
BUILDING
CORE 06-20
CORE 08-20
CORE 09-00
CORE 10-20
H
H
H
H
H
H
H H
-1 .93
-1
.86
BLOCK
BUILDING
16.30'
.0
0'
F1-59B N:547580.643 E:1327231.920
EL:75.428
X X
X
X X
X
BUILDING
BUILDING
BUILDING
BUILDING
F1-1T N:546702.707 E:1326915.517
EL:95.818
AS
PH
AL
T
R O
AD
AS
PH
AL
T R
O
AD
AS
PH
AL
T
R O
AD
AS
PH
AL
T
R O
AD
ASPHALT ROAD
ASPHALT ROAD ASPHALT ROAD
ASPHALT ROAD
ASPHALT ROAD
ASPHALT ROAD
AS
PH
AL
T
R O
AD
CO
NC
RE
TE
ASPHALT
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
J
UP
UP
UPUP
UPUPUPUP
P
P
P
P
P P
P
P P
P
P
P
P
P
P
P
P
P
LP-3
LP-4
G
X
X
X X
X X
X X
C-110
PR
O
JE
C
T O
VE
R
VI
EW
A N
D K
EY
M
AP
BA
SE
B
ID
M
U N
IT
IO
N S
M
AI
N T.
F
AC
IL
IT
Y
AN
D
BI
D O
PT
IO
N
IG
LO
O
S
TO
R
AG
E M
O D
U
LE
S
IT
E
J.
D
EF
AL
C O
K.
SM
AL
LE
G
AN
J.
LO
N G
P.
O
'C O
N N
O R
M H
F2
C
-1
.d w g D
ES
C
R
IP
TI
O
N M
AR
K
D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
M O
BI
LE
D
IS
TR
IC
T
M O
BI
LE
, A
LA
BA
M
A C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
SA
IN
T
JO
SE
PH
S
TR
EE
T
EG
LI
N A
IR
F
O R
C E
BA
SE
, F L
M U
N
IT
IO
N
S M
AI
N
TE
N
AN
C
E
FA
C
IL
IT
Y
IG
LO
O
S
IS
SU
E D
AY
- - M H
F2
CD-101
CS-101
CP-101
CG-101
CG-701
CG-705
SCALE:
100' 200'1000
1"=100'
PLAN NORTH
KEYED SHEET NOTES
BASE BID MUNITIONS MAINT. FACILITY PROJECT OVERVIEW SUMMARY
NEW (4) FOUR BAY RDT&E MUNITIONS FACILITY
NEW FE-6 SECURITY FENCE
IMPROVED FLEXIBLE PAVEMENT ACCESS DRIVE AND GOV
PARKING
RIGID PAVEMENT
SUPPORTING DRAINAGE FEATURES
DUMPSTER PAD WITH PARTIAL SCREEN
LIGHTING PROTECTION SYSTEM (SEE ELECTRICAL)
BID OPTION 3 & 4 IGLOO PROJECT OVERVIEW SUMMARY
IGLOO STORAGE MODULE
BID OPTION 3 - APPROX CONSTR LIMITS
BID OPTION 4 - APPROX CONSTR LIMITS
RIGID PAVEMENT WITH BOLLARDS
BASE BID
MUNITIONS MAINT. FACILITY PROJECT SITE
CD-102
CS-102
CP-102
CG-102
CG-702
CG-705
BID OPTION 3 & 4
IGLOO STORAGE MODULES PROJECT SITE
4 3
96TH CEG MUNITIONS COMPLEX
10 9
CONSTRUCTION OF MUNITIONS MAINTENANCE
FACILITY SHALL BE IN ACCORDANCE WITH
ICD/ICS 705 VERSION 1.5 TECHNICAL
SPECIFICATIONS FOR CONSTRUCTION AND
MANAGEMENT OF SENSITIVE COMPARTMENTED
INFORMATION FACILITIES AND UFC-4-010-05
SENSITIVE COMPARTMENTED INFORMATION
D
C R
IP
TI
O N
M
AR
K D
AT
E
US Army Corps of Engineers
SHEET ID
SO
LI
C
IT
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .