W9127821R0012 Submittal Register.pdf
PDF 62 KB Posted
- Attached to
- Provide Prime Power, Soto Cano AB, Honduras
- Solicitation number
- W9127821R0012
About this file
This submittal register outlines the required submittals for a contract to provide prime power services at Soto Cano Air Base in Honduras for the Department of the Army Corps of Engineers Engineering District Mobile. Key submittals include shop drawings for pad-mounted transformers and underground structures, product data for transformers, cables, joints, and terminations. Test reports are required for cable qualification, arc proofing, and field acceptance checks. Certificates must be provided for cable installers, concrete and steel poles, wood poles and crossarms, and transformer efficiencies. Operation and maintenance manuals and test schedules are also included as submittal requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
FY-21 PRIME POWER, SOTO CANO AIR BASE, HONDURAS
01 33 00 SD-01 Preconstruction Submittals
1.9 G CDSubmittal Register
26 12 19.00 40 SD-02 Shop Drawings
1.4.1 GPad-Mounted Transformer
Drawings
SD-03 Product Data
2.1.1 GPad-Mounted Transformers
SD-06 Test Reports
3.3.1 GAcceptance Checks And Tests
SD-07 Certificates
GTransformer Losses
SD-09 Manufacturer’s Field
Reports
2.3.2 GDesign Tests
2.3.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.5.1 GTransformer(s)
SD-11 Closeout Submittals
2.3.1 GTransformer Test Schedule
1.6 GWarranty
33 71 01 SD-03 Product Data
2.6Conductors
GG
2.5Insulators
2.2.2Concrete Poles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
33 71 01 Steel Poles
2.2.1Wood Poles
GNameplates
3.1.10 GPole Top Switch
2.17 GRecloser
2.18 GSectionalizer
2.13 GCutouts
2.15 GTransformer
2.19 GMetering Equipment
2.19.3 GMeters
2.12 GSurge Arresters
GCapacitors
GVoltage Regulator
2.8Guy Strand
2.10Anchors
SD-05 Design Data
2.2.2 GConcrete Poles
GSteel Poles
3.1.4.2 GPower-Installed Screw
Foundations
SD-06 Test Reports
1.5.4Wood Crossarm Inspection
Report
1.5.4.1 GField Test Plan
3.6 GField Quality Control
1.5.3 GGround Resistance Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
33 71 01 3.6.3 GMedium-Voltage Preassembled
Cable Test
3.6.4 GSag and Tension Test
3.6.5 GLow-Voltage Cable Test
3.6.7Acceptance Checks and Tests
SD-07 Certificates
2.2.2 GConcrete Poles
GSteel Poles
2.2.1 GWood Poles
2.3.1 GWood Crossarms
2.15.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
1.6 GOperation and Maintenance
Manuals
1.6.1 GOperation and Maintenance
Manuals
GTransformer Test Schedule
GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6 GOperation and Maintenance
Manuals
1.6.1 GOperation and Maintenance
Manuals
33 71 02 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
33 71 02 2.2.1 GAluminum conductors
1.5.1 GPrecast underground structures
SD-03 Product Data
2.5 GMedium voltage cable
2.7 GMedium voltage cable joints
2.6 GMedium voltage cable
terminations
2.14.2.1 GPrecast concrete structures
2.14.2.4Sealing Material
3.5.3Pulling-In Irons
2.14.3 GManhole frames and covers
2.14.4 GHandhole frames and covers
2.14.7 GComposite/fiberglass handholes
2.15 GCable supports
SD-06 Test Reports
2.20.2 GMedium voltage cable
qualification and production tests
3.18.1 GField Acceptance Checks and
Tests
2.20.1 GArc-proofing test
SD-07 Certificates
GCable splicer/terminator
1.5.2 GCable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR