This solicitation seeks proposals to provide prime power generation and renewable energy operation and maintenance services at Soto Cano Air Base in Honduras. The contractor will be responsible for supplying, installing, and maintaining a minimum of four diesel-electric power generation modules rated at 1730 kW each to continuously supply the base peak demand of 6500 kVA at 0.8 power factor. The contractor will also operate and maintain an existing 2 MW photovoltaic farm, performing scheduled inspections, repairs, preventative maintenance, and remote monitoring services. The contract term consists of an initial base year with four one-year option periods to provide energy and usage fees. Proposals are due by 2:00 PM local time on April 12, 2021, with award anticipated by April 28, 2021. Pricing will be paid as fixed-price monthly invoices based on recorded energy usage and plant availability.

View the file

Other files

File Type Posted
W9127821R0012 For Information Only- JTFB Power Station Project As-Builts.pdf PDF
W9127821R0012 Submittals Procedures for Prime Power.pdf PDF
W9127821R0012 For Information Only- Fuel Piping Plan.pdf PDF
W9127821R0012 OEBGD Vol. 4-HAZMAT.pdf PDF
W9127821R0012 Base Access Requirements.pdf PDF
W9127821R0012 For Information Only- 2MW PV Solar Farm Project (As_Builts).pdf PDF
W9127821R0012 OEBGD Vol. 3-Water.pdf PDF
W9127821R0012 Overseas Environmental Bassline Guidance Document (OBEGD).pdf PDF
W9127821R0012 Reglamento para el control de emisiones generadas por fuentes fijas.pdf PDF
W9127821R0012 OEBGD Vol. 2-Air.pdf PDF
W9127821R0012 DBA Certification.pdf PDF
W9127821R0012 For Information Only- Fifth Unit Installation As-Builts.PDF PDF
W9127821R0012 For Information Only- Power Plant Stacks As-Builts.pdf PDF
W9127821R0012 Liquid-Filled Transformer Instruction and Maintenance Manual.pdf PDF
W9127821R0012 For Information Only- Controller with BOM.pdf PDF
W9127821R0012 OEBGD Vol. 1-Conservation.pdf PDF
W9127821R0012 152738 kV Vacuum Recloser Descriptive Bulletin.pdf PDF
W9127821R0012 OEBGD Vol. 5-Waste.pdf PDF
W9127821R0012 Virtual Site Visit-Prime Power-Soto Cano.pdf PDF
W9127821R0012 For Information Only- PV Farm Specifications 08-14-2019.pdf PDF
W9127821R0012 For Information Only- Generator Switchyard Plan.pdf PDF
W9127821R0012 Submittal Register.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 12 Apr 2021

X

A X B X C

D

EX

X G F 58 - 62

63 - 79 X H 80 - 85

Terry.L.Herbert@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 85

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W91278 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

TERRY L HEBERT JR 251-441-5520

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

7 - 25 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

26 - 28 29 - 31

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 32 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 33 - 44 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

45 - 56

PART II - CONTRACT CLAUSES

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

26 Feb 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W9127821R0012

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Item – Electrical System

FFP

Modification and Site Preparation

FOB: Destination

NET AMT

0002 20,854,010 Kilowatt

Hour

Base Item-Fiscal Year 2021 Energy

FFP

0003 12 Months Base Item- FY 2021 Usage Charge

0004 21,636,000 Kilowatt

OPTION Fiscal Year 2022 Energy

0005 12 Months OPTION FY 2022 Usage Charge

0006 22,447,350 Kilowatt

OPTION Fiscal Year 2023 Energy

0007 12 Months OPTION FY 2023 Usage Charge

0008 23,289,125 Kilowatt

OPTION Fiscal Year 2024 Energy

0009 12 Months OPTION FY 2024 Usage Charge

0010 24,162,500 Kilowatt

OPTION Fiscal Year 2025 Energy

0011 12 Months OPTION FY 2025 Usage Charge

CLAUSES INCORPORATED BY REFERENCE

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018

52.212-4 Alt I Contract Terms and Conditions--Commercial Items (OCT 2018) Alternate I

JAN 2017

52.232-29 Terms for Financing of Purchases of Commercial Items FEB 2002

Section C - Descriptions and Specifications

ENERGY SERVICES CONTRACT REQUIREMENTS

1. PART I DIESEL-ELECTRIC POWER GENERATION MODULE AND ASSOCIATED EQUIPMENT

1.1 GENERAL

been primarily prime power for Soto Cano Air Base. All requirements to maintain the generator farm as is currently done in the existing contract shall remain. Newly added services as part of the last contract shall entail the operation and maintenance of a newly installed 2 MW PV farm adjacent to the generation facility.

1.1.1 PRIME POWER - The work under this action consists of supplying and supporting all generator set activities for prime power operations in support of Joint Base Soto Cano, Honduras. Generator set activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the contractor will be responsible for the Operations and Maintenance (O&M) of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including VT’s & CT’s and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence as indicated on drawing E-01 appendix A. The switch connecting the PV farm to the grid as well as the PV farm itself shall be maintained under this contract (see single line of PV Farm appendix A). All primary located on the load side of the reclosers shall be the responsibility of a separate primary distribution contractor. The installation if necessary and maintenance of all 480V or low voltage distribution from the generators to the transformers shall be included in the contract. The contractor shall provide all administrative support and logistics required to support all requirements of the contract. The government will provide required square footage of land space for the generator modules and container storage but the generator installation will have to be coordinated with the existing contract holder for time of replacement and reconnection to the system. The existing switchyard, primary distribution equipment, 125V DC control, control building with PLC based controller, transformers and fuel systems will remain for re-use as is unless otherwise directed in other parts of this contract. The Contractor shall perform generator set activities, operating the power plant on site, twenty-four (24) hours a day, seven (7) days a week including all weekends and holidays. The contractor shall be required to be in compliance with all applicable federal and local ordinances, permits, and license requirements to include emissions standards. The contractor shall be responsible for removing the generator modules at the conclusion of the contract.

The Contractor shall furnish, install and operate a minimum of four (4) utility-grade, electric power generation modules. Three of the modules shall be capable of supplying the entire base peak demand of 6500 kVA @ 0.8 pf continuously with the fourth unit available as a backup to the others. A fifth generator will be required as currently configured to enable re-build of the existing generator sets and remain in compliance with the minimum of three main generators and one spare.

The modules proposed shall be rated for continuous power generation at the loads specified, when fueled by government furnished #2 diesel fuel. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel with the local utility power source if necessary. The power modules shall be in compliance with these specifications and contract drawings. The Contractor shall provide and will receive all reports and documentation required under this contract in English, and shall provide a designated official representative who is fluent in speaking, reading and writing in both English and Spanish. Operation of the plant shall be in accordance with these specifications and as approved & supervised by the Government's Contracting Officers Representative (COR). The contractor shall provide standard operating procedures for generator failure, transformer failure, power bus failure, lightning outages, recloser failure and cable failures. Existing manuals for the plant will be provided by the government for incorporation.

All electrical controls, monitoring devices and related equipment cabling shall be reused or shall be installed in existing pathways to the existing government owned contractor-maintained control building. See FIO Generator Controller and Metering Shop Drawings, JTFB Power Station 2010 As-builts & Fifth Unit Installation As-builts for existing generator control information in Appendix A.

The existing transformers, cables, switchyard equipment, etc. minus the generators are property of the government. Any alteration or addition of these systems will become government property at the end of the contract.

Maintenance of Government Furnished Equipment, to include repair and replacement, is to be performed as prescribed is this contract. Should a major piece of Government Furnished Equipment fail, such as a step up transformer, recloser, VT and CT, or PLC, requiring maintenance beyond that prescribed in the contract, the contractor shall immediately contact the government to initiate negotiation of a Contract Modification for an immediate replacement.

1.1.2 PV FARM OPERATION AND MAINTENANCE- The work under this action consists of operation/monitoring and maintenance of an existing 2 MW PV Farm. The PV Farm and almost all systems/components will have, at least, a one-year warranty period ending in December 2021. See Appendix C for as-built drawings. The PV farm is on property across the drainage basin adjacent to the generator farm. Local monitoring of the system shall be provided in the existing generator control building. The monitoring of the PV farm and documentation of the data will be another task asked of the technician overseeing the generator facility. Check lists of services to be provided shall be based on the tasks described herein. In general, the scope of services will be:

1.1.2.1 System Monitoring and On-call Service Technician

a. Provide remote monitoring of System operations via Internet connection. Track changes and respond to power outages within three business days.

b. As needed and reasonably appropriate for a solution to a low power alarm, a service technician will be required to visit the Site or determine an action plan to troubleshoot and resolve the issue within two business days of an alarm to identify the cause.

1.1.2.2 Electrical Inspection & Maintenance:

a. Electrical Maintenance

The technician will:

i. Perform a visual inspection of PV modules and array wiring, strain relief, mounting system, trackers, inverters, switchgear, transformers, combiner boxes, wireways and conduit, protection devices, data acquisition system, weather sensors and outdoor lighting. (BI-ANNUALLLY)

ii. Perform vegetation management around array and equipment pad or make recommendations to host for vegetation removal.

(QUARTERLY)

iii. Check pyranometers and reference cells (BI-ANNUALLLY)

iv. Record operational data from inverters and meters (DAILY AT

CONTROL BUILDING)

b. External and/or Internal DC Disconnects and Combiner Boxes During the inspection, the technician will: (ANNUALLY)

i. Ensure that Imp testing is performed on all DC strings.

ii. Tighten loose electrical connections in combiner boxes, switchgear and inverters.

c. Inverter and Transformer The technician will: (BI-ANNUALLLY)

i. Clean out all electrical enclosures

ii. Clean inverter air filters

iv. Perform visual inspection of security and equipment fences.

v. Perform Preventive Maintenance on the inverter(s) as required to maintain inverter manufacturer’s warranty.

d. AC Disconnect

i. The technician will check for proper operation. (BI-ANNUALLLY)

1.1.2.3 Preventive Maintenance, Troubleshooting, Repairs and Customer Service

a. Preventive Maintenance.

i. Operator shall perform all necessary preventive and corrective maintenance on the System, which includes routine maintenance adjustments, replacements, and electrical panel/transformer/ inverter cleaning (interior and exterior) with supporting documentation delivered to Owner after the work has been performed. Maintenance by Owner will ensure that all warranties, particularly inverter warranties, are preserved. The frequency and timing of panel wash-downs shall be determined by Operator based on System monitoring data (QUARTERLY). Environmental sensors such as pyranometers shall be tested and recalibrated every three (3) years.

ii. Operator’s routine System maintenance will include correction of loose electrical connections, ground connections, replacement of defective modules found during testing, and other minor maintenance repair work.

iii. Operator shall perform module cleaning at a frequency to be determined by the ongoing monitoring of the System such that the effect on production is no more than 5%, but not less often than twice a year.

iv. Operator shall perform routine DAS maintenance to include sensor calibration and data integrity check.

b. Troubleshooting and Repairs.

i. Operator will dispatch field service resources within two business days of notification (via automated or manual means) for repairs as necessary to maintain System performance.

ii. Operator shall complete any corrective action required to restore the System to fully operational status within 24 hours of the service resources arriving on-site.

iii. Major system repairs, not to include mid-voltage switchgear or transformers.

c. Customer Service Support.

i. Operator will provide Owner with a support telephone number for Owner to ask questions and report issues.

ii. Operator’s support line will be staffed during operational hours from 8:00 a.m. to 6:00 p.m. Pacific Standard Time (“Business Hours”). During times outside of Business Hours, Emergency calls will be routed to a supervisor for immediate action.

Maintenance of Government Furnished Equipment, to include repair and replacement, is to be performed as prescribed is this contract. Should a major piece of Government Furnished Equipment fail, such as step up transformers, primary switchgear, inverters, battery module, or Micro Grid Controller, requiring maintenance beyond that prescribed in the contract, the contractor shall immediately contact the government to initiate negotiation of a Contract Modification for an immediate replacement.

1.2 PLANT POWER MODULES

The utility grade power modules, shall consist of a Diesel engine generator, with a radiator cooling system, air intake and exhaust systems, engine starting system with DC battery source, and paralleling switchgear, all factory assembled into an outdoor enclosure to provide a completely self-contained electric power generating system. Switchgear, radiator and engine generator shall be located in separate compartments in the enclosure.

The power module shall have the capability of manual/automatic operation by local personnel and via remote control signals. The power plant, consisting of multiple modules, shall be controlled by a programmable load controller (PLC) (See For Information Only Generator Controller and Metering Shop Drawings for connection), capable of sensing the load demand of the system and the operational status of each power module. The PLC shall automatically control each module by issuing start/stop signals to the modules in response to demand load. Upon receipt of a start command from the PLC, a generator set shall start, synchronize and parallel with the base power grid (should other generation or utility sources be already connected); then softly load up to capacity and supply power to the base transmission/distribution system.

The generator unit shall continue to operate at the rated capacity, with system load fluctuation absorbed by the starting/stopping of other power generation modules by the PLC. Each of the power module generator sets shall function as prime power units without regard to condition or operational status of other modules. Once the generator set has been signaled to shut down, it shall softly unload, disconnect from the utility grid, and run unloaded for preset cool down run period followed by automatic shutdown. Each power module unit and the Remoter Terminal Unit shall be supplied, complete, by the engine manufacturer and single source warranted.

The power module, including engine, generator, switchgear, and enclosure shall be a prime power rated product of Caterpillar, Kohler, Cummins or approved equal.

1.2.1 Engine-Generator Parameter Schedule

The engine-generator parameters set forth in this schedule are not intended to limit competition but should be used as a minimum standard of quality.

ENGINE-GENERATOR PARAMETER SCHEDULE

Number of Sets 4

Engine-Generator Applications Parallel

Engine Cooling Type Water

Governor Type Electronic-Hydraulic

Governor Application Isochronous

Maximum Speed 1800 rpm

Frequency 60 Hz

Voltage 480 volts with step-up transformer to 34.5Kv Grd wye

Phases 3-Phase,4 wire, Wye

Phase Rotation ABC

Service Load 1730 kW average peak per unit minimum

Power Application Continuous, varying load (unit shall produce 1250 kW 80% of the time)

Power Factor 0.8

Fuel Type Diesel #2 (government furnished)

Max Step Load Increase 25 percent of rated Load

Maximum Voltage Deviation 10 percent of rated voltage with Step Load Increase

Maximum Frequency Deviation 2 percent of rated frequency with Step Load Increase

Area Type Industrial Seismic Zone 2

Installation Elevation 2062 feet (628 meters) above sea level

Max Summer Outdoor Temp 105 degrees F.

Min Winter Outdoor Temp 50 degrees F.

1.2.2 Submittal of Technical Information

Government approval is required for submittals.

1.3 ENGINE

The module engine shall be a liquid-cooled, four-stroke cycle, Diesel engine.

The engine shall have a diesel strength cylinder block, hardened crankshaft, steel-backed copper bonded aluminum alloy bearings, hardened cylinder liners, forged connecting rods with oil gallery cooled pistons. It shall be equipped with air, fuel, and lube oil filters; coolant water pumps, flywheel and housing; service meter, oil cooler, and gages for lube oil pressure, lube oil filter differential pressure, intake manifold temperature and pressure, exhaust pyrometers, and engine coolant temperature.

1.3.1 Engine Fuel System

The power modules shall be equipped with a fuel auxiliary tank designed to operate the module for a time and to provide ready fuel for the engine. The Government owned above ground two 20,000 gal and one 50,000-gal storage tanks at the site shall be used by the contractor to provide running fuel for the power plant. The contractor shall use the existing fuel piping header system from the Government tanks to each power module. Shutoff ball valves shall be installed at the point of connection to each storage tank, and at each point of supply to a generator as a minimum. Connections from the fuel piping header to each power module shall be via a flexible hose section designed for the purpose. Piping, valves, fittings, and other appurtenances shall be sanded, primed with an oil-based primer, and painted with two coats of a white oil-based enamel paint. See drawing M-01 for further details.

Up keep, maintenance, and operation of the fuel off-loading area, fuel storage tanks, secondary containment systems, and the oil separator shall be the responsibility of the power generation Contractor. The contractor shall perform monthly inspections on the fuel system piping and tanks. Any leaks discovered in the piping or valves shall be repaired. The contractor shall perform monthly inspections of all safety devices including all fuel level sensors, pressure relief valves, and shut off valves and repair and replace as required.

The contractor shall maintain the existing oil water separator in the switchyard. This is to include draining water off as separator becomes filled and also pumping any fuel that has become accumulated in the separator. Fuel recovered shall be turned over to the installation for proper disposal.

The Contractor shall provide a monthly fuel consumption report per generator showing fuel consumption and hours of operation.

1.4 GENERATOR

The generator shall be a three-phase, four-wire, six-lead, wye-connected, single-bearing, close-coupled, static-regulated, brushless type, with a permanent magnet excitation system. The Generator shall provide a series boost circuit to supply 300% rated current for 10 seconds to allow system fault clearing. The voltage regulation system will be a three-phase sensing solid state volts-per Hertz type, providing voltage regulation within plus or minus 1%. The generator output shall have a wave form deviation of less than 5%, with a TIF factor less than 50 and a RIF factor less than 3%. The generator shall be capable of withstanding 150% overspeed without damage.

1.4.1 Generator Rating

The generator shall be rated for prime continuous service at a minimum of 1730 kW, 0.8 PF, 480V, three phase, 60 Hz, and maximum 1800 rpm.

1.4.1.1 Regulator Features

The Generator regulator shall include the following features:

(a) Voltage level rheostat shall provide generator output voltage adjustment of -25% to +10% of nominal.

(b) Gain adjustment shall provide output voltage compensation for changes in load or frequency.

(c) At full throttle engine starting, output voltage shall not overshoot more than 5% of its rated value, with respect to the volts/Hz curve.

(d) Response time shall be less than twenty milliseconds.

(e) Protection shall be provided against loss of voltage sensing and long term overcurrent conditions. The overcurrent protection function shall automatically reset when the regulator is de-energized.

1.4.1.2 Regulator Ratings and Construction

The regulator module shall be sealed in a waterproof and dustproof shock resistant plastic housing and shall withstand:

(a) Temperatures between 0 to 70 deg C.

(b) Vibration of 4.5 G's (peak) between frequencies of 18 to 2000 Hz in three perpendicular planes, and mechanical shock of 20 G's in all three planes.

(c) Salt spray as described by MIL-STD-810C, Method 509.1, and ASTM B11;7.

1.5 MODULE CHARACTERISTICS

1.5.1 Enclosure

The Power Module enclosure shall hold the engine generator, switchgear, and the other auxiliary equipment required for the Electric Power Generating System. The enclosure shall be equipped with a chassis and axles for overland transportation by a highway tractor/truck. The enclosure shall be an ISO qualified shipping container listed under the following standards:

ISO Std. TC 104 Requirements for Cargo Containers ANSI Std. MH5.1 Basic Requirements for Cargo Containers ANSI Std. MH5.1.1 Basic Requirements for Closed Van Containers UIC Code 592-1

1.5.1.1 Basic Container

The Power Module basic enclosure shall be new or reconditioned, and be approximately 40 feet (12.19m) long hi-cube (9.5 foot/2.89m high) ABS approved, CSC rated 1 trip shipping container. It shall have a rated gross weight capacity of 67,200 lb. (30,481 Kg) and a net load weight capacity of 58,000 lbs. (25,308 Kg).

1.5.2 Fire Extinguishers

Two (2) NFPA-compliant 4.5 Kg carbon dioxide portable bottle-type fire extinguishers shall be provided and wall-mounted within each of the Power Module enclosures. In the event of a fire the Base Fire Department shall be notified and installation guidelines shall be followed.

1.5.3 Muffler/Exhaust

The exhaust system shall consist of an industrial grade muffler constructed of a minimum 16 gage steel with flanges on inlet and outlet. All necessary elbows, flexible exhaust connectors and expanders shall be provided. The muffler shall be rigidly mounted on the roof frame of the Power Module. The muffler shall be connected to the engine by a flexible connector. A muffler drain plug shall be provided to remove any condensation. The exhaust outlet shall be designed to reduce rain penetration into the module. In addition to the listed requirements the exhaust shall be made to comply with Honduran emission standards as part of this contract. Those requirements are as stated in Appendix B Reglamento Para el Control de Emisiones por Fuentaes Fijas.

1.6 POWER MODULE MAINTENANCE REQUIREMENTS

The contractor shall provide a schedule of the maintenance intervals for the power modules as recommended by the manufacturer and also to include additional procedures which the contractor plans to implement based on his experience and/or company policies. The equipment usage charge bid by the contractor shall be understood to include the maintenance cost plus the equipment capital recovery cost over the option year contract term, reduced to a series of 12 equal payments, to be paid monthly.

1.6.1 Service Response Time

The contractor shall assure competent repair and service capability for the power plant equipment by supplying equipment supported by the equipment manufacturer with factory trained service centers located within the country of Honduras. The manufacturer of the power plant generation equipment shall have a local authorized representative located such that they can provide a guaranteed response time for service of no more than three hours from time of notification to time of arrival of a service technician at the site. The local representative must be able to provide factory trained servicemen, a complete service depot capable of major equipment overhauls, the recommended stock of replacement parts required for units provided, technical assistance, and warranty administration for the power plant generation equipment. The contractor shall produce documentation to verify the service response time for the equipment purposed as part of the Technical proposal submittals.

1.6.2 Disposal of Oil & Other Waste

Engine lube oil drains will be connected through a pipe nipple extension and will route spent engine oil to the outside of the Power Module for proper disposition. A ball valve and pipe plug shall be provided to prevent accidental oil loss. The Contractor will arrange for proper disposal of all waste oil and lubricants along with other hazardous or toxic waste in accordance with the laws and regulations of Honduras and other provisions in this contract.

The Contractor shall take sufficient measures to prevent spillage of hazardous and toxic materials and shall collect waste in suitable containers observing compatibility. The Contractor shall transport hazardous waste off Government property and dispose of it in compliance with Federal and local laws and regulations. Spills of hazardous or toxic materials shall be immediately reported to the Contracting Officer's Representative. Cleanup and cleanup costs due to spills shall be the Contractor's responsibility.

1.7 SWITCHGEAR AND CONTROLS

1.7.1 General

The power module shall include the necessary switchgear and controls required for manual operation and automatic operation in parallel with other power modules and with the utility power source. The system shall be designed to provide power into the base electrical distribution grid system as a prime power source, independent of the utility in the normal mode of operation. The circuit breakers used as the generator main breaker shall be vacuum type. No other types shall be allowed.

The contractor shall perform a protective device coordination study for approval. The study shall start at the reclosers and continue back to the generators. The study shall include time-current curves, short circuit calculations and a report of recommendations and device settings. The complete study including one-lines shall be provided to the Base after approval.

1.7.2 Control and Monitoring

The existing government furnished PLC and kWH power metering equipment shall be utilized to control and meter the generation plant to the extent possible.

Each power module generator set must be able to be started and stopped by signals from a remote location by signals from the existing power plant Programmable Load Controller (PLC). Each module shall have a Remote Terminal Unit (RTU) to interface the individual module to the Programmable Load Control unit (PLC). If other than the existing controller is to be proposed then the PLC may be located in one of the modules or remotely as desired.

The PLC will monitor system wide conditions, starting and stopping each module in response to system requirements by sending start-stop signals to each module RTU. The remote signal I/O shall be a voltage free, momentary contact to initiate operation and a separate voltage free, momentary contact to cease operation. Upon receipt of the initiate signal, the generator set shall automatically start and synchronize with the other sources, if any, on the utility grid. Once in synchronism, the generator circuit breaker shall automatically close and the generator set shall softly load up to its pre-programmed or rated capacity. The generator shall continue to operate with output determined by the switchgear loading control. Upon a signal to stop, The generator shall softly unload, the circuit breaker will then trip open, and the generator shall continue to run unloaded for a preset cool down period followed by automatic shutdown. The RTU shall also provide outputs for generator set alarm & status functions to provide for remote monitoring at the central control location.

1.7.2.1 Programmable Load Control

In the case of existing system failure, then a new system shall be installed where the sequence of operation shall be as described below:

The Power Plant Programmable Load Control (PLC) or approved equal shall be the primary device for automatically starting and stopping each module in response to base load variations and for managing cold load (initial) startup after outages and synchronized operation of the plant with the utility (should this requirement be needed). The PLC shall be designed to show status of the reclosers located in the existing synchronizing control panel.

The interface to the existing control panel shall be such to allow the PLC to operate and monitor the status of each of the four distribution circuit reclosers feeding the base loads. Future energy projects will require monitoring of a Utility company tie switch through the existing 120 Volt control circuits. The PLC shall have the following general operation modes:

1. Cold or Initial Start, no power on base load bus: The logic, upon a command to start either manually or from a remotely generated command through an I/O contact via a communication interface, start the first module to obtain control power, leaving the generator breaker open. Upon receiving a verifying input signal from the first module indicating stable operation, the PLC shall then shall initiate a momentary contact closure to command each of the four load reclosers and the base utility switch to open. After a verifying input signal (from the remote device A/B contact) indicating the reclosers and utility switch are opened, the PLC shall command the first generator breaker to close to the bus. The PLC shall in turn command the next two modules to start, and automatically synchronize to the first on the load bus. Upon receiving a signal from each module of a successful start and close along with independent input verifying availability of bus voltage at the correct level, the PLC shall then command the first load recloser to close the first base distribution circuit to the bus. After a sufficient time delay and after verifying input from the device A/B contact indicating desired operation, the PLC shall close the next three load reclosers in turn in like manner. Should a recloser be manually turned off at the control panel, the PLC shall ignore its condition and not attempt to close it by remote means on startup. The PLC shall then monitor the load and stop or start the modules to serve the load with a 25% minimum spare capacity on line at all times. One module may be run under light load conditions such as nights and weekends, however two modules will be run at all times during normal duty hours as directed by the COR.

2. Overload or Fault on system bus: The PLC shall monitor bus load and attempt to maintain bus voltage and frequency by starting and stopping modules to satisfy load. Short time faults on the distribution system and overloads shall not initiate shutdown of any module unless the condition persists beyond 3 seconds. The line reclosers shall not be set for a time longer than this time. The PLC shall monitor the recloser status after the initial startup and not command any recloser to close after a trip or after it has been manually opened at the control panel. A system fault which causes the bus voltage or frequency to decay beyond preset limits for longer than 3 seconds shall initiate an immediate shutdown by the PLC which shall command the Generator Breakers to open, and the generator shutdown sequence to be initiated. The system shall remain shut down until manually restarted as in #1 above.

3. Loss of utility: The loss of utility starts engine start delay timer in the PLC. If this timer expires, than the following sequence occurs: 1. The closed utility breaker opens. All 4 circuit reclosers and primary PV switch open 2. The generators start. 3. The first generator to reach 90% of rated voltage and frequency closes onto the bus. The paralleling logic shall prevent both generators from closing onto the bus simultaneously. 4.

The other generators synchronizes to the bus. When synchronized, their circuit breakers closes. 5. With all called up generators on-line, the reclosers begin closing in succession. 6. If the generator management control is in AUTO, the system will monitor the power demand of the load, if the load demand is below the setpoints set by the operator, the system will automatically take a generator off-line. If the load should increase, the system will automatically place the generator back on-line. 7. If the system becomes overloaded or if a generator fails, the system will close a set of normally open dry contacts signaling downstream load to shed. The PV system primary switch will remain open during loss of utility and will not close until the generators are online and normal. When the system has stabilized the PV switch shall close. At no time shall the PV system primary switch be closed to energize the base grid when the generators are down. The PV switch shall only be closed during normal power usage from the generators.

4. Orderly Shutdown: The orderly shutdown sequence shall be the inverse of the startup sequence #1 except that modules will be removed from the bus via the module breaker, allowing the unit to run through a cool down period. The PLC shall initiate a system wide shut down via Manual or Remote control command, and shall open the utility breaker and reclosers before the last unit shutdown unless set for the utility parallel mode, in which case it will not affect the switch or recloser positions.

1.7.2.2 Plant Monitoring Panel

The existing consolidated plant monitoring & alarm panel shall be maintained until replaced by the contractor at its existing location and shall remain accessible to both contractor & Government personnel. The contractor shall manage access to the site allowing only authorized personnel access.

1.7.3 Revenue Metering and Disturbance Analyzer and Power Quality Metering

The Contractor shall utilize the existing government furnished power system metering and disturbance analyzer in the existing government furnished control building. The system shall continuously monitor plant power output at the load side of the plant power bus through existing 34.5 kV PT’s & CT’s.

The analyzer shall be used for revenue metering of kilowatt-hours supplied under this contract and as a measurement device for reliability and availability of the plant equipment under the usage charge payment portion of the option year contract. Should the analyzer fail, it shall be replaced and incorporate the following functions and capabilities:

A. High accuracy measurements, high-speed waveform recording, data logging and setpoint control, to include:

(1) 3-phase measurements: Voltage and current (per phase and average), Amps demand, neutral or ground current, kW, kW demand, kWh, kVAR, kVARh, kVA, kVAh, power factor, frequency (for each generator set and each of the four

(4) outgoing distribution feeders).

(2) Waveform recording: High speed 36-cycle waveform recording at 128 samples/cycle for detailed power quality analysis. Pre or post-event simultaneous sampling of 8 inputs for fault or swell/sag analysis. Up to 36-cycle event storage in non-volatile memory. Waveform recording shall be triggerable from a setpoint, digital input condition (e.g. breaker trip), or manually via a communications port. Harmonic distortion for each input (to 15th harmonic). K-Factor for each input. Thermal, sliding window, and predicted demand. Include software for ordinary PC to display waveforms, K- Factor, Crest Factor and harmonic content to the 63rd.

(3) Data logging: Eight(8) concurrent snapshot logs, each recording up to 12 user-definable parameters. Memory which can be partitioned to provide up to 40 days of recording. Trigger from a setpoint, digital input condition, or on a time interval basis. Assignable high-speed log records 2-cycle intervals. Analyze short-term conditions such as motor start-up, system stability, load switching response, etc. Alarm/event log to provide 100 records with 1 ms resolution. Up to 16 additional min/max logs. Each log to store up to 15 coincident values on the occurrence of a new extreme.

All logs to be time-stamped and stored in, non-volatile memory.

B. Additional inputs/outputs: Four digital inputs (incl. 1 counter), one voltage input (0-1 V), one current output (0-20 mA).

C. Setpoints: High-speed setpoint system for power quality monitoring, fault capture, breaker performance monitoring (using time-overcurrent characteristics), or secondary protection functions. User-programmable setpoint control system with Three relay outputs for fully automated demand/power factor/load control, alarm activation, etc. Trigger relays from over/under current or voltage, voltage unbalance, over or reverse kW.

E. Communications: Provide two RS485 ports, one RS232 port, & Power Measurement or Modbus protocol, operating up to 115.2 kbaud. User-configurable RS-232 / RS-485 port. DNP protocol compatibility. All four digital inputs provide pulse counting capabilities. Optional Modbus and Multi-Port Comm.

F. Windows platform software: PC based software to bring data from disturbance analyzer into any client application that supports DDE under Windows 10 to automatically show real time data, status information, kW trending, waveform data and setpoint conditions using the powerful spreadsheet capabilities of Windows Software such as Microsoft Excel, Lotus 123, and others.

The disturbance analyzer shall be located in the existing control building and shall be accessible to Government personnel at all times. The Government may at its own expense, connect the communications output of the analyzer to a communications line for remote monitoring of the system performance by the Base Civil Engineer. The contractor shall manage the recording of the analyzer and provide reports of any disturbances, outages or other anomalies of operation of the plant (and the causes of these) along with billing statements and maximum kW demand to the Contracting Officers Representative on a monthly basis. Power quality on each of the four (4) outgoing feeders (#1-#4) shall be monitored using a General Electric Company type PQM power quality meter or equal. Monthly metering reports with an executive summary shall be provided by the contractor to the Base.

1.7.4 Auxiliary AC Power

(a) The existing generator backed auxiliary AC Power or station service power transformer rated 25 KVA, 120/240 VAC single phase shall remain to supply power to the control building and switchyard lighting. The station service and switchyard lighting shall be maintained under this contract.

1.8 INSTALLATION AND CONNECTION TO SYSTEM

The Contractor shall furnish as part of the leased generation plant cable connections, and all associated equipment necessary to connect the power plant to the existing base power distribution system . The installation shall be performed in accordance with the contract drawings and documents herein as modified by the approved proposal documents, shop drawings, specifications, and the manufacturer's instructions for all work and any incidental to it.

The contractor shall be responsible for maintenance and recalibration of the existing four (4) Cooper Kyle ABB vacuum circuit reclosers and the existing primary metering VT’s, PT’s and brackets.

1.8.1 Phasing

The contractor shall install and acceptance test the new generating plant.

Temporary connections to other feeders and/or the existing bus shall be permitted while performing this work. The intent is to swap the existing generators for the new one at a time thus always maintaining a spare. The same applies if the existing generators will remain in contract and will have to be re-built.

1.8.2 Low Voltage Cable

Low Voltage cable for connections between the generation plant and the step-up transformers feeding the base distribution system shall be rated 600 volts. Other parts of cable systems such as splices and terminations shall be rated at not less than 600 Volts. Splices in wires No. 10 AWG and smaller shall be made with an insulated, solderless, pressure type connector and conforming to the applicable requirements of UL 486A. Splices in wires No. 8 AWG and larger shall be made with non-insulated, solderless, pressure type connector conforming to the applicable requirements of UL 486A and UL 486B. They shall then be covered with an insulation and jacket material equivalent to the conductor insulation and jacket. All splices below grade or in wet locations shall be sealed type conforming to ANSI C119.1 or shall be waterproofed by a sealant-filled, thick wall, heat shrinkable, thermosetting tubing or by pouring a thermosetting resin into a mold that surrounds the joined conductors.

1.8.3 Pad-Mounted Transformer Step-up Stations

The contractor shall perform routine maintenance on the existing government owned transformers. Each of the five transformers shall be tested as prescribed in appendix A (Liquid Filled Transformer Maintenance) Chapter 13 and the field test form page 12 shall be utilized for an annual report prepared and submitted to the contracting officer at the beginning of the contract and at the end of each year thereafter. If replacement becomes necessary due to failure then the specification section 26 12 19.00 40 PAD- MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS shall be followed.

1.9 QUALITY CONTROL:

The complete power plant installation (being provided by this contract and connected to the existing distribution system) shall be checked for procedural and operational compliance of the system by the manufacturer's authorized local representative. The contractor shall furnish all labor, components, repair parts, consumables (except for Diesel fuel to be supplied by the government and delivered by same to the bulk tanks on site) and supplies including engine lubricating oil and antifreeze, as recommended by the generator module manufacturer, for the duration of the contract. The generator module manufacturer's representative shall be present to assist the Contractor during start-up, system check, adjusting, and site testing required after the installation is complete. Fuel required for testing shall be furnished by the Government.

1.9.1 Maintenance Plan.

The Government goal of reliable operation will require that the contractor perform required maintenance on the equipment to be paid as part of the monthly usage charge. The quality of maintenance and the execution of the maintenance plan by the contractor will be part of the evaluation by the government when and if it chooses to execute options for subsequent Fiscal years. Maintenance shall be accomplished and Performed to enhance operations and assure operation objectives are met. Maintenance shall he accomplished in consonance with operations. Maintenance shall be performed to levels which will offset the effects of exposure, and enhance equipment performance, reliability, and life expectancy. The contractor shall develop and follow a maintenance plan (to be submitted initially to the COR prior to contract commencement, and updated quarterly as conditions may change) which delineates procedures for performing Maintenance, for measuring and assessing the quality of maintenance achieved, and for determining the effectiveness of the maintenance accomplished. Record keeping shall be a regular part of the routine employed. The maintenance plan shall be submitted to the COR, for initial approval and shall then become a binding part of this contract. The maintenance plan shall encompass all portions of the leased power system, (generators, transformer, switchyard, etc.) and shall reflect the specific needs of individual power generator units, and associated systems.

Maintenance plans for the generator shall reflect two tiers to indicate what is required for prime power and what is required for standby. The contractor shall provide to the COR a maintenance activity report quarterly along with the bill for payment of the monthly usage charge payment for that quarter, of all work activities performed in support of the maintenance plan. A projection of work planned for the subsequent quarter shall be included in the report to facilitate monitoring of the activities by the COR.

The contractor shall be responsible for cleaning the overhead switches and insulators in the switching yard for a minimum of to (2) times per year or more often as required. The insulators and switches shall not be covered with soot from the engine exhausts. The contractor shall also be responsible for the replacement of 25% of the suspension and pin insulators (including clamps and accessories) in each year of the contract and other maintenance as required.

1.9.2 Plan Goals

The effectiveness of Maintenance shall be evaluated by the COR's inspection, analyses, and comparisons of current performance records with records of past performance and with designated performance characteristics set forth in manufacturer's literature and operating manuals. Goals shall be:

a. Reduce operating and maintenance costs.

b. Improved technical performance reflected in records of fuel consumption, lower incidence of power and mechanical failures, and progressively less maintenance required to attain maximum performance, operability, and life expectancy.

c. Improved physical protection and appearance of system components noted by absence of corrosion, maintenance of insulation and valves, c1ean1iness of equipment. and overall good housekeeping.

1.9.3 Unscheduled Maintenance and Repair

The contractor shall perform unscheduled maintenance and repair to the extent necessary to correct failures or other conditions requiring corrective actions which were not precluded by cyclical measures. Unscheduled maintenance and repairs shall he diligently performed after being started and expeditiously completed. Normally, maintenance and repair shall be done on a normal-work-week basis; however, if emergency conditions exist, work shall be expedited on an around-the-clock basis. In some cases, it may be necessary to assign supplementary skills and equipment to accomplish work. If major repair operations are of such magnitude or criticality to be beyond the capabilities of the contractor’s personne1, the contractor shall obtain the services of factory specialists. Equipment or components that cannot be repaired at the site, shall be forwarded to the local manufacturer’s service depot for repair and shall be re-installed and tested upon return. A fifth generator bay is provided for on-site major repair of generators when deemed feasible.

Temporary replacement equipment (e.g. spare generation module to be used during maintenance of other units). The contractor shall provide ten (10) days written notice to the Base prior to scheduled maintenance shall be procured at the contractor’s expense as necessary to maintain power plant operation while equipment is being repaired. At all times a spare generator shall be available for use above the three required to power the base.

1.9.4 Fuel Quality Monitoring

The contractor shall be totally responsible for insuring that the fuel supplied by the government under this contract is of acceptable quality for the use by the generator plant. The Contractor should develop a procedure for testing the fuel quality at the site at time of delivery to verify that the fuel meets the required standards. Should the contractor discover any problems with the fuel, the contractor shall notify the COR immediately.