W9127821R0012 For Information Only- JTFB Power Station Project As-Builts.pdf

PDF 5 MB Posted

Attached to
Provide Prime Power, Soto Cano AB, Honduras
Solicitation number
W9127821R0012
Issued by

About this file

This document contains as-built plans and drawings for the JTFB Power Station 2010 project in Honduras. The plans include details for exhaust boxes, electrical systems, fuel filters, pad-mounted equipment, and transformer pads. The related federal contract opportunity is solicitation number W9127821R0012 from the Department of the Army Corps of Engineers Engineering District Mobile to provide prime power services at Soto Cano Air Base in Honduras. Offerors should review the attached SF-33 form and attachments for full requirement details, submission instructions and timelines. The opportunity type is listed as a solicitation.

View the file

Other files

File Type Posted
W9127821R0012 Submittals Procedures for Prime Power.pdf PDF
W9127821R0012 For Information Only- Fuel Piping Plan.pdf PDF
W9127821R0012 OEBGD Vol. 4-HAZMAT.pdf PDF
W9127821R0012 Base Access Requirements.pdf PDF
W9127821R0012 For Information Only- 2MW PV Solar Farm Project (As_Builts).pdf PDF
W9127821R0012 OEBGD Vol. 3-Water.pdf PDF
W9127821R0012 Overseas Environmental Bassline Guidance Document (OBEGD).pdf PDF
W9127821R0012 Reglamento para el control de emisiones generadas por fuentes fijas.pdf PDF
W9127821R0012 OEBGD Vol. 2-Air.pdf PDF
W9127821R0012 DBA Certification.pdf PDF
W9127821R0012 For Information Only- Fifth Unit Installation As-Builts.PDF PDF
W9127821R0012 For Information Only- Power Plant Stacks As-Builts.pdf PDF
W9127821R0012 Liquid-Filled Transformer Instruction and Maintenance Manual.pdf PDF
W9127821R0012 For Information Only- Controller with BOM.pdf PDF
W9127821R0012 OEBGD Vol. 1-Conservation.pdf PDF
W9127821R0012 SF-33.pdf PDF
W9127821R0012 152738 kV Vacuum Recloser Descriptive Bulletin.pdf PDF
W9127821R0012 OEBGD Vol. 5-Waste.pdf PDF
W9127821R0012 Virtual Site Visit-Prime Power-Soto Cano.pdf PDF
W9127821R0012 For Information Only- PV Farm Specifications 08-14-2019.pdf PDF
W9127821R0012 For Information Only- Generator Switchyard Plan.pdf PDF
W9127821R0012 Submittal Register.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LA INFORMACIÓN CONTENIDA EN ESTOS DIBUJO ES

PROPIEDAD INTELECTUAL EXCLUSIVA DE ENERCOM.

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

EXTRAÍDA O COPIADA SIN PREVIA AUTORIZACIÓN

ESCRITA POR ENERCOM.

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

EXHAUST BOX DETAIL

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

ELECTRICAL DETAILS

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

FUEL FILTER

INSTALATION

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

PAD MOUNTED DETAIL

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

UBICACION DE LOSA

DE TRANFORMADORES

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

SON ENTREGADOS AL CLIENTE PARA USO ÚNICAMENTE

EN EL PROYECTO PARA EL CUAL FUERON PREPARADOS,

NO DEBEN SER DUPLICADOS, TRANSFERIDOS A OTRO

LUGAR, O TRANSMITIDOS ELECTRÓNICAMENTE POR

NINGÚN MOTIVO SIN PREVIA AUTORIZACIÓN POR

ESCRITO POR ENERCOM. NINGUNA PARTE DE LA

VERSIÓN ELECTRÓNICA DE ESTOS DIBUJOS DEBE SER

PERMISO PARA USO DE PLANOS.pdf
JTFB POWER STATION 2010 PROJECT-AS BUILT.pdf
IE-01
IE-02
IE-03
IE-04
IE-05
IE-06
IE-07
IE-08
IE-09
IE-10
IE-11
IE-12
IE-13
IE-14
IE-15
IE-16

File details come from the government source that posted it. Updated .