W9127821R0006 AM01.pdf

PDF 699 KB Posted

Attached to
FY21 SOF Combined Squad Ops Facility, Duke Field, FL Federal contract opportunity
Solicitation number
W9127821R0006
Issued by
Department of the Army Corps of Engineers Engineering District Mobile

About this file

This solicitation requests proposals for the construction of a Special Operations Forces Combined Squad Operations Facility at Duke Field in Florida. The project involves constructing a two-story, 36,700 square foot operations facility with administration, planning and briefing areas, formal training, secure open storage and planning vault, mobility storage, and aircrew flight equipment storage and maintenance spaces. The estimated cost range for the project is $10 million to $25 million. The North American Industry Classification System code for this opportunity is 236220. This is a total small business set-aside for firms with average annual receipts less than $39.5 million over the past three years. Proposals are due in accordance with the dates outlined in the solicitation, which is available exclusively on beta.SAM.gov. The selected contractor will be responsible for site work including utilities, pavements and other site improvements.

View the file

Other files for this federal contract opportunity

Other files attached to FY21 SOF Combined Squad Ops Facility, Duke Field, FL, newest first.
File Type Posted
W9127821R0006 JA for Trane HVAC at Combined Squad Ops Facility Duke Field (Final)_Redacted.pdf PDF
W9127821R0006 AM05 DRAWINGS.pdf PDF
W9127821R0006 AM05.pdf PDF
W9127821R0006 AM04.pdf PDF
W9127821R0006 AM04 DRAWINGS.pdf PDF
W9127821R0006 AM03.pdf PDF
W9127821R0006 AM02.pdf PDF
W9127821R0006 Minutes-Pre-Bid site visit.pdf PDF
EM 385-1-1.pdf PDF
RTA DRAWINGS VOL2.pdf PDF
VOL2.PDF PDF
VOL4.PDF PDF
VOL3.PDF PDF
VOL1.PDF PDF
RTA DRAWINGS VOL1.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127821R0006-0001 23 APRIL 2021 MEF20009

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127821R0006

9B. DATED (SEE ITEM 11)

14 APRIL 2021

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: SOF COMBINED SQUAD OPS FACILITY, DUKE FIELD, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0001

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SOF COMBINED SQUAD OPS FACILITY W9127821R0006

DUKE FIELD, FLORIDA MEF20009

SF 30 Page 2 W9127821R0006-0001

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

00 11 00 Revised Paragraph 4.2 as indicated herein.

Encl as stated Revised pages of the specifications as indicated in Part I.

SOF COMBINED SQUAD OPS FACILITY W9127821R0006

DUKE FIELD, FLORIDA MEF20009

SECTION 00 11 00

Revised by Amendment No. W9127821R0006-0001

00 11 00

4.2 Volume II, Factor 1 – Past Performance Information of the Prime Contractor. The Past Performance of the Offeror consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality information provided by the owners of those efforts to assess the Offeror’s past experience and probability of successfully performing the work described in this solicitation. A recent, relevant project is a construction project:

(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for Federal projects, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project.

However, do not combine multiple projects under separate contracts or task orders to create a single project.);

(b) That is “recent”; one that has been completed within eight (8) six (6) years of the solicitation issue date, or one where the construction is at least 50% complete (measured by performance period days) as of the solicitation issue date. (Offerors are responsible for providing start and completion dates for each completed project, or the start and scheduled completion dates for projects currently under construction.);

(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project described in this solicitation.

In terms of dollar value, a relevant project is one ranging from $10M to $25M; however, projects outside of this dollar range may be considered when similar in scope and complexity. For a project to be assessed any degree of “relevancy” it must reflect performance of the type work similar to that being procured by this solicitation.

(Note: The remainder of the section is unchanged by this amendment.)

SF30
LINEUP
00 11 00_AM01

File details come from the government source that posted it. Updated .