This solicitation is for a construction project to build a 36,700 square foot two-story operations facility at Duke Field in Florida. The facility will include administration, planning and briefing areas, formal training, secure open storage, mobility storage, and aircrew flight equipment storage and maintenance spaces. Site work will include a new road, utilities, pavements and site improvements. The estimated cost range for the project is $10-25 million.
The North American Industry Classification System code for this project is 236220. This request for proposal uses best value source selection. The solicitation documents will be available exclusively on beta.sam.gov and plans and specifications require registration via that site one week prior to the issue date. The contractor must monitor the site daily for the solicitation and any amendments. This is a total small business set-aside where a small business is defined as having average annual receipts less than $39.5 million for the past three years. The request includes bid options that may not be awarded.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127821R0006 JA for Trane HVAC at Combined Squad Ops Facility Duke Field (Final)_Redacted.pdf | ||
| W9127821R0006 AM05 DRAWINGS.pdf | ||
| W9127821R0006 AM05.pdf | ||
| W9127821R0006 AM04.pdf | ||
| W9127821R0006 AM04 DRAWINGS.pdf | ||
| W9127821R0006 AM03.pdf | ||
| W9127821R0006 AM02.pdf | ||
| W9127821R0006 Minutes-Pre-Bid site visit.pdf | ||
| W9127821R0006 AM01.pdf | ||
| VOL4.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL2.pdf | ||
| VOL3.PDF | ||
| VOL1.PDF | ||
| RTA DRAWINGS VOL1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 2 OF 4
THIS PROJECT IS A TOTAL SMALL BUSINESS SESTASIDE
SOLICITATION NO: W9127821R0006
CADD NO: MEF20009
SPECIFICATIONS
FOR
FTFA163002 SOF COMBINED SQUAD OPS FACILITY
DUKE FIELD, FLORIDA
(OKALOOSA COUNTY)
“GOOD ENGINEERING RESULTS IN A BETTER ENVIRONMENT”
U.S. ARMY ENGINEER DISTRICT, MOBILE
109 St. Joseph St
Mobile, Alabama 36602
This page was intentionally left blank for duplex printing.
SOF COMBINED SQUAD OPS FACILITY W9127821R0006
DUKE FIELD, FLORIDA MEF20009
Table of Contents Page 1
TABLE OF CONTENTS
VOLUME 1 OF 4
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 70 00 SPECIAL CONTRACT REQUIREMENTS
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND
SUPPORTING DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING AND MICROGRID COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
Table of Contents Page 2
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
VOLUME 2 OF 4
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
DOOR HARDWARE SETS
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
Table of Contents Page 3
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 50 00.13 10 FURNITURE, FIXTURES, AND EQUIPMENT
12 59 00 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 20 EXTRUDED ALUMINUM CANOPY SYSTEM
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
Table of Contents Page 4
VOLUME 3 OF 4
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 – UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
Table of Contents Page 5
VOLUME 4 OF 4
APPENDICES
APPENDIX A AF813
APPENDIX B GEOTECHNICAL REPORT, BORING LOCATION PLAN, BORING LOGS, AND
LABORATORY DATA
APPENDIX C FF&E PACKAGE
APPENDIX D ASUS STANDARD DETAILS AND SPECIFICATIONS – WATER AND SEWER
--End of Project Table of Contents--
This page was intentionally left blank for duplex printing.
SECTION 08 11 13
STEEL DOORS AND FRAMES
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
ASTM A924/A924M (2018) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C578 (2016) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591 (2016) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation
ASTM D2863 (2017a) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)
ASTM E1300 (2012a; E 2012) Determining Load Resistance of Glass in Buildings
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
SECTION 08 11 13 Page 1
ASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements
ASTM F2247 (2011; R 2017) Standard Test Method for Metal Doors Used in Blast Resistant Applications (Equivalent Static Load Method)
ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.115 (2006) Hardware Preparation in Steel Doors and Steel Frames
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
NFPA 80 (2016) Standard for Fire Doors and Other Opening Protectives
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR 111 (2009) Recommended Selection and Usage Guide for Standard Steel Doors, Frames and Accessories
SDI/DOOR 113 (2001; R2006) Standard Practice for Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies
SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames
SDI/DOOR A250.6 (2003; R2009) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames
SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames
UNDERWRITERS LABORATORIES (UL)
UL 10C (2009) Standard for Positive Pressure Fire Tests of Door Assemblies
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S"
SECTION 08 11 13 Page 2 are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REQUIREMENTS. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Doors; G
Frames; G
Accessories
Weatherstripping; G
Show elevations, construction details, metal gages, hardware provisions, method of glazing, and installation details.
Schedule of doors; G
Schedule of frames; G
Submit door and frame locations.
SD-03 Product Data
Doors; G
Frames; G
Accessories; G
Weatherstripping; G
Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.
1.4 ANTITERRORISM FORCE PROTECTION (AT/FP)
All exterior doors that open to the exterior, to include framing supporting elements and their attachments shall meet AT/FP requirements of UFC 4-010-01, 9 Feb 2012, (Change 1, 1 Oct 2013) for low level of protection with explosive weight II, for standoff distances provided on Sheet G-120, tested in accordance with ASTM F2247.
SECTION 08 11 13 Page 3
PART 2 PRODUCTS
2.1 STANDARD STEEL DOORS
SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00. Undercut where indicated. Exterior doors shall have top edge closed flush and sealed to prevent water intrusion. Doors shall be 1-3/4 inch thick, unless otherwise indicated. Provide exterior glazing in accordance with ASTM F2248 and ASTM E1300.
2.1.1 Classification - Level, Performance, Model
2.1.1.1 Heavy Duty Doors
SDI/DOOR A250.8 , Level 2, physical performance Level B, Model 2, with core construction as required by the manufacturer for interior doors and for exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners shall be filled with mineral board insulation. Doors located in the security perimeter shall have additional reinforcing; Hinge - 7 gauge, Closer - 12 gauge and lock area predrilled and reinforced to 10 gauge.
2.2 SOUND RATED STEEL DOORS
Doors shall have a Sound Transmission Class (STC) Rating as indicated on the drawings when tested in accordance with ASTM E90 (door, frame and gasketing).
2.3 ACCESSORIES
2.3.1 Louvers
2.3.1.1 Interior Louvers
SDI/DOOR 111 , Louvers shall be stationary sightproof type. Detachable moldings on room or non security side of door; on security side of door, moldings to be integral part of louver. Form louver frames of 20 gage steel and louver blades of a minimum 24 gage. Sightproof louvers to be inverted "V" blade design with minimum 55 inverted "Y" blade design with minimum 40 percent net-free opening.
2.3.1.2 Exterior Louvers
Louvers shall be inverted "Y" type with minimum of 35 percent net-free opening. Weld or tenon louver blades to continuous channel frame and weld assembly to door to form watertight assembly. Form louvers of hot-dip galvanized steel of same gage as door facings. Louvers shall have steel-framed insect screens secured to room side and readily removable.
Provide aluminum wire cloth, 18 by 18 or 18 by 16 inch mesh, for insect screens. Net-free louver area to be before screening.
2.3.2 Astragals
For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors. For interior pairs of fire rated doors, provide stainless steel astragals complying with NFPA 80 for fire rated assemblies.
SECTION 08 11 13 Page 4
2.3.3 Moldings
Provide moldings around glass of interior and exterior doors and louvers of interior doors. Provide nonremovable moldings on outside of exterior doors and on corridor side of interior doors. Other moldings may be stationary or removable. Secure inside moldings to stationary moldings, or provide snap-on moldings. Muntins shall interlock at intersections and shall be fitted and welded to stationary moldings.
2.4 INSULATION CORES
Insulated cores shall be of type specified, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and shall conform to:
a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or
b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or
c. Mineral board: ASTM C612, Type I.
2.5 STANDARD STEEL FRAMES
SDI/DOOR A250.8 , Level 3, except as otherwise specified. Form frames to sizes and shapes indicated, with welded corners. Provide steel frames for doors, transoms, sidelights, cased openings, and interior glazed panels, unless otherwise indicated.
2.5.1 Welded Frames
Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.
Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.
2.5.2 Mullions and Transom Bars
Mullions and transom bars shall be closed or tubular construction and be a member with heads and jambs butt-welded thereto. Bottom of door mullions shall have adjustable floor anchors and spreader connections.
2.5.3 Stops and Beads
Form stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center.
Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.
2.5.4 Cased Openings
Fabricate frames for cased openings of same material, gage, and assembly as specified for metal door frames, except omit door stops and preparation for hardware.
SECTION 08 11 13 Page 5
2.5.5 Anchors
Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage. Provide addition anchors for STC rated assemblies as required by manufacturer.
2.5.5.1 Wall Anchors
Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.
a. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;
b. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts in accordance with SDI/DOOR 111 .
2.5.5.2 Floor Anchors
Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member.
2.6 FIRE DOORS AND FRAMES
NFPA 80 and this specification. The requirements of NFPA 80 shall take precedence over details indicated or specified.
2.6.1 Labels
Fire doors and frames shall bear the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey International (WHI) attesting to the rating required. Testing shall be in accordance with NFPA 252 or UL 10C . Labels shall be metal with raised letters, and shall bear the name or file number of the door and frame manufacturer. Labels shall be permanently affixed at the factory to frames and to the hinge edge of the door. Door labels shall not be painted.
2.6.2 Oversized Doors
For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.
2.6.3 Astragal on Fire Doors
On pairs of labeled fire doors, conform to NFPA 80 and UL requirements.
2.7 WEATHERSTRIPPING
As specified in Section 08 71 00 DOOR HARDWARE.
SECTION 08 11 13 Page 6
2.7.1 Integral Gasket
Black synthetic rubber gasket with tabs for factory fitting into factory slotted frames, or extruded neoprene foam gasket made to fit into a continuous groove formed in the frame, may be provided in lieu of head and jamb seals specified in Section 08 71 00 DOOR HARDWARE. Insert gasket in groove after frame is finish painted. Air leakage of weatherstripped doors shall not exceed 0.5 cubic feet per minute of air per square foot of door area when tested in accordance with ASTM E283.
2.8 HARDWARE PREPARATION
Provide minimum hardware reinforcing gages as specified in SDI/DOOR A250.6 .
Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Locate hardware in accordance with the requirements of SDI/DOOR A250.8 , as applicable. Punch door frames , with the exception of frames that will have weatherstripping or soundproof gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.
2.9 FINISHES
2.9.1 Hot-Dip Zinc-Coated and Factory-Primed Finish
Fabricate exterior and interior doors and frames from hot dipped zinc coated steel, alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight shall meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot, total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint. Thoroughly clean and chemically treat to insure maximum paint adhesion. Factory prime as specified in SDI/DOOR A250.8 .
Provide for exterior doors and interior doors.
2.9.2 Electrolytic Zinc-Coated Anchors and Accessories
Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .
2.10 FABRICATION AND WORKMANSHIP
Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints shall be well formed and in true alignment. Conceal fastenings where practicable. On wraparound frames for masonry partitions, provide a throat opening 1/8 inch larger than the actual masonry thickness. Design other frames in exposed masonry walls or partitions to allow sufficient space between the inside back of trim and masonry to receive caulking compound.
SECTION 08 11 13 Page 7
2.10.1 Grouted Frames
For frames to be installed in exterior walls and to be filled with mortar or grout, fill the stops with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.
2.11 PROVISIONS FOR GLAZING
Materials are specified in Section 08 81 00, GLAZING.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Frames
Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction. Where frames require ceiling struts or overhead bracing, anchor frames to the struts or bracing. Backfill frames with mortar. Coat inside of frames with corrosion-inhibiting bituminous material. For frames in exterior walls, ensure that stops are filled with rigid insulation before grout is placed.
3.1.2 Doors
Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .
After erection and glazing, clean and adjust hardware.
3.1.3 Fire Doors and Frames
Install fire doors and frames, including hardware, in accordance with
NFPA 80 .
3.2 PROTECTION
Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.
3.3 CLEANING
Upon completion, clean exposed surfaces of doors and frames thoroughly.
Remove mastic smears and other unsightly marks.
-- End of Section --
SECTION 08 11 13 Page 8
SECTION 08 11 16
ALUMINUM DOORS AND FRAMES
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 2604 (2013) Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B209M (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)
ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B221M (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
ASTM E1996 (2014a) Standard Specification for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Windborne Debris in Hurricanes
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
SECTION 08 11 16 Page 1
1.2 PERFORMANCE REQUIREMENTS
1.2.1 Structural Calculations
Exterior windows, and interior vestibule windows shall be designed to meet AT/FP Criteria of the UFC 4-010-01 9 February 2012 (Change 1, 1 Oct 2013), level of protection (low) explosive weight II for the stand off distances shown on drawings. Frame deflections shall not exceed L/160 of the!
unsupported member lengths. Equivalent static design loads for connections of window frame to the surrounding walls, slabs, structural steel or hardware and associated connections, and glazing stop connections shall be in accordance with ASTM F2248, ASTM F2247 and ASTM E1300 as required by UFC 4-010-01. Design supporting elements and their connections based on their ultimate capacities with appropriate factors. Provide calculations from a Specialty Professional Engineer that substantiates compliance with these requirements. Use frames that provide an equivalent level of performance. Shapes and thicknesses of framing members shall be sufficient to withstand the design wind load indicated with a deflection of not more than 1/175 times the length of the member and a safety factor of not less than 1.65. Provide glazing beads, moldings, and trim of not less than
0.050 inch nominal thickness. Reference the civil and structural drawings for blast type and stand-off distances.
Exterior doors and Windows, including at interior of vestibule, shall meet AT/FP requirements of UFC 4-010-01, 9 Feb 2012 (Change 1, 1 Oct 2013), for low level of protection with explosive weight II, tested in accordance with ASTM F 2247.
1.2.2 Wind Borne Debris
Provide impact resistant door assemblies meeting the Windborne-Debris-Impact Resistant Performance requirements of ASTM E1996 and ASTM E1886.
1.2.3 Air Infiltration
When tested in accordance with ASTM E283, air infiltration per door leaf must not exceed 0.06 cubic feet per minute per square footof fixed area at a test pressure of 6.24 pounds per square foot (50 mile per hour wind).
1.2.4 Water Penetration
When tested in accordance with ASTM E331, there must be no water penetration at a pressure of 8 pounds per square foot of fixed area.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
For Each Type of Door and Frame Assembly; G
Show elevations of each door and window type, size of doors and
SECTION 08 11 16 Page 2 frames, metal gages, details of door and frame construction, methods of anchorage, glazing details, weatherstripping, provisions for and locations of hardware, and details of installation.
SD-03 Product Data
For Each Type of Door and Frame Assembly; G
SD-04 Samples
Finish Samples; G
SD-05 Design Data
Design Analysis; G
Structural Calculations and test reports for Deflection and and test data demonstrating compliance with windloads, windborne debris intact resistance and Antiterrorism criteria; G
SD-06 Test Reports
ATFP Testing approvals and windborne debris test approvals; G
SD-07 Certificates
NFRC Project Label Certificates for Fenestration; G
SD-08 Manufacturer's Instructions
Installation of Each Type of Door and Frame Assembly; G
SD-10 Operation and Maintenance Data
Adjustments, Cleaning, and Maintenance; G
SD-11 Closeout Submittals
NFRC Project Label Certificates for Fenestration; G
Recycled Content; G
1.4 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the site for damage. Unload and store with minimum handling. Provide storage space in dry location with adequate ventilation, free from dust or water, and easily accessible for inspection and handling. Stack materials on non-absorptive strips or wood platforms. Do not cover doors and frames with tarps, polyethylene film, or similar coverings. Protect finished surfaces during shipping and handling using manufacturer's standard method. Do not apply coatings or lacquers to surfaces to which caulking and glazing compounds must adhere.
1.5 QUALITY CONTROL
1.5.1 Shop Drawing
Indicate elevations and sections for each type of door and frame assembly.
SECTION 08 11 16 Page 3
Show sizes and details of each assembly, frame construction,subframe attachment, thickness and gages of metal, details of door and frame construction, proposed method(s) of anchorage, glazing details, provisions for an location of hardware, mullion details, method and materials for flashing and weatherstripping, miscellaneous trim, installation details, and other related items necessary for a complete representation of all components.
1.5.2 Finish Samples
Submit two color charts and two finish sample chips from manufacturer's standard color and finish options for each type of finish indicated.
1.5.3 Operation and Maintenance Data
Submit detailed instructions for installation, adjustments, cleaning, and maintenance of each type of assembly indicated.
1.6 QUALITY ASSURANCE
1.6.1 Engineer Qualifications for Blast Design
All blast design calculations must be performed by or under the direct supervision of a registered engineer with a minimum of 5 years' experience performing blast design. The engineering firm performing the blast design must be able to demonstrate experience on similar size projects using similar design methods to meet the requirements outlined in this specification.
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
Provide products with recycled content and provide certificates of compliance in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.
2.2 DOORS AND FRAMES
Provide swing-type aluminum doors and frames of size, design, and location indicated. Provide doors complete with frames, framing members, subframes, transoms, adjoining side lites, or trim and accessories.
Coordinate side lites, window walls, adjacent curtainwall with Section
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES.
2.3 MATERIALS
2.3.1 Anchors
Stainless steel.
2.3.2 Weatherstripping
Continuous wool pile, silicone treated, or type recommended by door manufacturer.
2.3.3 Aluminum Alloy for Doors and Frames
ASTM B221M, ASTM B221, Alloy 6063-T5 for extrusions. ASTM B209M, ASTM B209, alloy and temper best suited for aluminum sheets and strips.
SECTION 08 11 16 Page 4
2.3.4 Fasteners
Hard aluminum or stainless steel.
2.3.5 Structural Steel
ASTM A36/A36M.
2.3.6 Aluminum Paint
Aluminum door manufacturer's standard aluminum paint.
2.4 FABRICATION
2.4.1 Aluminum Frames
Extruded aluminum shapes with contours approximately as indicated.
Provide removable glass stops and glazing beads for frames accommodating fixed glass. Use countersunk stainless steel Phillips screws for exposed fastenings, and space not more than 12 inches on center. Mill joints in frame members to a hairline fit, reinforce, and secure mechanically.
2.4.2 Aluminum Doors
Of type, size, and design indicated and minimum 1-3/4 inch thick. minimum wall thickness, 0.125 inch, except beads and trim, 0.050 inch. Door sizes shown are nominal; include standard clearances as follows: 0.093 inch at hinge and lock stiles, 0.125 inch between meeting stiles, 0.125 inch at top rails, 0.187 inch between bottom and threshold, and 0.687 inch between bottom and floor.
2.4.2.1 Full Glazed Stile and Rail Doors
Provide doors with medium stiles and rails as indicated. Fabricate from extruded aluminum hollow seamless tubes or from a combination of open-shaped members interlocked or welded together. Fasten top and bottom rail together by means of welding or by 3/8 or 1/2 inch diameter cadmium-plated tensioned steel tie rods. Provide an adjustable mechanism of jack screws or other methods in the top rail to allow for minor clearance adjustments after installation.
2.4.3 Welding and Fastening
Where possible, locate welds on unexposed surfaces. Dress welds on exposed surfaces smoothly. Select welding rods, filler wire, and flux to produce a uniform texture and color in finished work. Remove flux and spatter from surfaces immediately after welding. Exposed screws or bolts will be permitted only in inconspicuous locations, and must have countersunk heads. Weld concealed reinforcements for hardware in place.
2.4.4 Weatherstripping
Provide on stiles and rails of exterior doors. Fit into slots which are integral with doors or frames. Weatherstripping must be replaceable without special tools, and adjustable at meeting rails of pairs of doors.
During installation, verify doors swing freely and close positively. Air leakage of a single leaf weatherstripping door shall not exceed .5 cubic feet per minute of air per square foot door area when tested in
SECTION 08 11 16 Page 5 accordances with ASTM E283.
2.4.5 Anchors
On the backs of subframes, provide anchors of the sizes and shapes indicated for securing subframes to adjacent construction. Anchor transom bars at ends and mullions at head and sill. As required, reinforce vertical mullions with structural steel members of sufficient length to extend up to the overhead structural slab or framing and secure thereto.
Reinforce and anchor freestanding door frames to floor construction as indicated on approved shop drawings and in accordance with manufacturer's recommendation. Place anchors near top and bottom of each jamb and at intermediate points not more than 25 inch apart.
2.4.6 Provisions for Hardware
Coordinate with Section 08 71 00 DOOR HARDWARE. Deliver hardware templates and hardware (except field-applied hardware) to the door manufacturer for use in fabrication of aluminum doors and frames. Cut, reinforce, drill, and tap doors and frames at the factory to receive template hardware. Provide doors to receive surface-applied hardware, except push plates, kick plates, and mop plates, with reinforcing only;
drill and tap in the field. Provide hardware reinforcements of stainless steel or steel with hot-dipped galvanized finish, and secure with stainless steel screws.
2.4.7 Provisions for Glazing
Provide extruded aluminum snap-in glazing beads on interior side of doors.Provide extruded aluminum, theft-proof, snap-in glazing beads or fixed glazing beads on exterior or security side of doors. Provide glazing beads with vinyl insert glazing gaskets. Design glazing beads to receive thickness indicated for each glazed assembly. Coordinate requirements with Section 08 81 00 GLAZING.
2.4.8 Finishes
Provide exposed aluminum surfaces with factory finish of anodic coating or organic coating.
2.4.8.1 Organic Coating
Clean and prime exposed aluminum surfaces. Provide a high-performance finish in accordance with AAMA 2604 with total dry film thickness of minimum
1.2 mils. Finish color to be as indicated in Section 09 06 90 Color Schedule.
PART 3 EXECUTION
3.1 INSTALLATION
Plumb, square, level, and align frames and framing members to receive doors, transoms, adjoining side lites, and, adjoining window walls. Anchor frames to adjacent construction as indicated and in accordance with manufacturer's printed instructions and the approved shop drawings and test reports. Anchorage must comply with applicable structural requirements. Anchor bottom of each frame to rough floor construction with 3/32 inch thick minimum stainless steel angle clips secured to back of
SECTION 08 11 16 Page 6 each jamb and to floor construction; use stainless steel bolts and expansion rivets for fastening clip anchors. Hang doors to produce clearances specified in paragraph ALUMINUM DOORS. After erection and glazing, adjust doors and hardware to operate properly.
3.2 PROTECTION FROM DISSIMILAR MATERIALS
3.2.1 Dissimilar Metals
Where aluminum surfaces come in contact with metals other than stainless steel, zinc, or small areas of white bronze, protect from direct contact to dissimilar metals.
3.2.1.1 Protection
Provide one of the following systems to protect surfaces in contact with dissimilar metals:
a. Paint the dissimilar metal with one coat of heavy-bodied bituminous paint.
b. Apply elastomeric sealant between aluminum and dissimilar metals in accordance with Section 07 92 00 JOINT SEALANTS.
c. Paint dissimilar metals with one coat of primer and one coat of aluminum paint.
d. Use a non-absorptive tape or gasket in permanently dry locations.
3.2.2 Drainage from Dissimilar Metals
In locations where drainage from dissimilar metals has direct contact with aluminum, provide protective paint to prevent aluminum discoloration.
3.2.3 Masonry and Concrete
Provide aluminum surfaces in contact with mortar, concrete, or other masonry materials with one coat of heavy-bodied bituminous paint.
3.2.4 Wood or Other Absorptive Materials
Provide aluminum surfaces in contact with absorptive materials subject to frequent moisture, and aluminum surfaces in contact with treated wood, with two coats of aluminum paint or one coat of heavy-bodied bituminous paint. In lieu of painting aluminum, paint the wood or other absorptive surface with two coats of aluminum paint and seal joints with elastomeric sealant.
3.3 SEALING AROUND ASSEMBLIES
Seal all penetrations of the air barrier by sealing around door openings as necessary to achieve compliance with air leakage requirements indicated in the air barrier sections of the specifications. Flash all doors with corrosion resistant flashing to prevent water intrusion.
3.4 CLEANING
Upon completion of installation, clean door and frame surfaces in accordance with door manufacturer's written recommended procedure. Do not
SECTION 08 11 16 Page 7 use abrasive, caustic, or acid cleaning agents.
3.5 PROTECTION
Protect doors and frames from damage and from contamination by other materials such as cement mortar. Prior to completion and acceptance of the work, restore damaged doors and frames to original condition, or replace with new ones.
SECTION 08 11 16 Page 8
SECTION 08 14 00
WOOD DOORS
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ARCHITECTURAL WOODWORK INSTITUTE (AWI)
AWI AWS (2009) Architectural Woodwork Standards
ASTM INTERNATIONAL (ASTM)
ASTM E2226 (2012) Standard Practice for Application of Hose Stream
ASTM E90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
NFPA 80 (2016) Standard for Fire Doors and Other Opening Protectives
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS Scientific Certification Systems (SCS)Indoor Advantage
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED GBDC (2009) LEED Reference Guide for Green Building Design and Construction
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
UNDERWRITERS LABORATORIES (UL)
UL 10B (2008; Reprint Apr 2009) Fire Tests of Door Assemblies
SECTION 08 14 00 Page 1
WINDOW AND DOOR MANUFACTURERS ASSOCIATION (WDMA)
ANSI/WDMA I.S.1A (2013) Interior Architectural Wood Flush Doors
WDMA I.S.4 (2013) Preservative Treatment for Millwork
WDMA TM-7 (2008) Cycle Slam Test Method
WDMA TM-8 (2008) Hinge Loading Test Method
1.2 SUBMITTALS
Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29SUSTAINABILITY REQUIREMENTS. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
SD-02 Shop Drawings
Doors; G
Submit drawings or catalog data showing each type of door unit.
Drawings and data shall indicate door type and construction, sizes, thickness, door louvers, and glazing.
SD-03 Product Data
Doors; G
Accessories; G
Water-resistant sealer
Sample warranty
Sound transmission class rating; G
Fire resistance rating; G
Certification
Local/Regional Materials; ( LEED NC)
LEED documentation relative to local/regional materials credit in accordance with LEED GBDC. Include in LEED Documentation Notebook.
SD-04 Samples
Doors; G
Prior to the delivery of wood doors, submit a sample section of each type of door which shows the stile, rail, veneer, finish, and core construction.
Door finish colors; G
Submit a minimum of three color selection samples , minimum 3 by 5 inches in size representing wood stain on species specified .
SECTION 08 14 00 Page 2
SD-06 Test Reports
Cycle-slam
Hinge loading resistance
Submit cycle-slam test report for doors tested in accordance with WDMA TM-7, and hinge loading resistance test report for doors tested in accordance with WDMA TM-8.
1.3 SUSTAINABLE DESIGN CERTIFICATION/DOCUMENTATION
Product shall be third party certified in accordance with ULE Greenguard , SCS Scientific Certification Systems Indoor Advantage or equal.
Certification shall be performed annually and shall be current.
1.4 LOCAL/REGIONAL MATERIALS
Use products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. Refer to Section 01 33 29 LEED DOCUMENTATION for cumulative total local material requirements. Wood doors may be locally available.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver doors to the site in an undamaged condition and protect against damage and dampness. Stack doors flat under cover. Support on blocking, a minimum of 4 inch thick, located at each end and at the midpoint of the door. Store doors in a well-ventilated building so that they will not be exposed to excessive moisture, heat, dryness, direct sunlight, or extreme changes of temperature and humidity. Do not store in a building under construction until concrete, masonry work, and plaster are dry. Replace defective or damaged doors with new ones.
1.6 WARRANTY
Warrant doors free of defects as set forth in the door manufacturer's standard door warranty.
PART 2 PRODUCTS
2.1 DOORS
Provide doors of the types, sizes, and designs specified free of urea-formaldehyde resins.
2.1.1 Flush Doors
Conform to ANSI/WDMA I.S.1A for flush doors. Hardwood stile edge bands of doors receives a natural finish, compatible with face veneer. Provide mill option for stile edge of doors scheduled to be painted. No visible finger joints will be accepted in stile edge bands.
2.1.1.1 Interior Flush Doors
Provide staved lumber core, Type II flush doors conforming to ANSI/WDMA I.S.1A with faces of select premium white birch. Hardwood
SECTION 08 14 00 Page 3 veneers shall be plain sliced book matched.
2.1.2 Acoustical Doors
ANSI/WDMA I.S.1A , solid core, constructed to provide Sound Transmission Class rating of 45 and 50 when tested in accordance with ASTM E90 (door, frame and gasketing).
2.1.3 Fire Doors
Provide doors specified or indicated to have a fire resistance rating conforming to the requirements of UL 10B , ASTM E2226, or NFPA 252 for the class of door indicated. Affix a permanent metal label with raised or incised markings indicating testing agency's name and approved hourly fire rating to hinge edge of each door.
2.2 ACCESSORIES
2.2.1 Door Light Openings
Provide glazed openings with the manufacturer's standard wood moldings.
Provide moldings for doors to receive natural finish of the same wood species and color as the wood face veneers. Provide moldings on the exterior doors with sloped surfaces.
2.2.2 Additional Hardware Reinforcement
Provide the minimum lock blocks to secure the specified hardware. The measurement of top, bottom, and intermediate rail blocks are a minimum 125 mm 5 inch by full core width. Comply with the manufacturer's labeling requirements for reinforcement blocking, but not mineral material similar to the core.
2.3 FABRICATION
2.3.1 Marking
Stamp each door with a brand, stamp, or other identifying mark indicating quality and construction of the door.
2.3.2 Quality and Construction
Identify the standard on which the construction of the door was based and identify doors having a Type I glue bond.
2.3.3 Preservative Treatment
Treat doors scheduled for restrooms, janitor closets and other possible wet locations including exterior doors with a water-repellent preservative treatment and so marketed at the manufacturer's plant in accordance with
WDMA I.S.4 .
2.3.4 Adhesives and Bonds
ANSI/WDMA I.S.1A . Use Type I bond for exterior doors and Type II bond for interior doors. Provide a nonstaining adhesive on doors with a natural finish. Interior adhesives to meet LEED NC Credit EQ 4.1 for voc content.
SECTION 08 14 00 Page 4
2.3.5 Prefitting
Provide factory finished and factory prefitted doors for the specified hardware, door frame and door-swing indicated. Machine and size doors at the factory by the door manufacturer in accordance with the standards under which the doors are produced and manufactured. The work includes sizing, beveling edges, mortising, and drilling for hardware and providing necessary beaded openings for glass and louvers. Provide the door manufacturer with the necessary hardware samples, and frame and hardware schedules to coordinate the work.
2.3.6 Finishes
2.3.6.1 Field Painting
Factory prime or seal doors, and field paint.
2.3.6.2 Factory Finish
Provide doors finished at the factory by the door manufacturer as follows:
AWI AWS Section 1500, specification for System No. 4 Conversion varnish alkyd urea or System No. 5 Vinyl catalyzed and of a formula to meet low voc. The coating is AWI AWS premium, medium rubbed sheen, closed grain effect. Use stain when required to produce the finish specified for color. Seal edges, cutouts, trim, and wood accessories, and apply two coats of finish compatible with the door face finish. Touch-up finishes that are scratched or marred, or where exposed fastener holes are filled, in accordance with the door manufacturer's instructions. Match color and sheen of factory finish using materials compatible for field application.
2.3.6.3 Color
Provide door finish colors as specified in Section 09 06 00, Schedules for Finishes.
2.3.7 Water-Resistant Sealer
Provide manufacturer's standard water-resistant sealer compatible with the specified finish.
2.4 SOURCE QUALITY CONTROL
Meet or exceed the following minimum performance criteria of stiles of "B" and "C" label fire doors utilizing standard mortise leaf hinges:
a. Cycle-slam: 200,000 cycles with no loose hinge screws or other visible signs of failure when tested in accordance with the requirements of WDMA TM-7.
b. Hinge loading resistance: Averages of ten test samples not less than 700 pounds load when tested for direct screw withdrawal in accordance with WDMA TM-8 using a No. 12, 1-1/4 inch long, steel, fully threaded wood screw. Drill 5/32 inch pilot hole, use 1-1/2 inch opening around screw for bearing surface, and engage screw full, except for last 1/8 inch. Do not use a steel plate to reinforce screw area.
SECTION 08 14 00 Page 5
PART 3 EXECUTION
3.1 INSTALLATION
Before installation, seal top and bottom edges of doors with the approved water-resistant sealer. Seal cuts made on the job immediately after cutting using approved water-resistant sealer. Fit, trim, and hang doors with a 1/16 inch minimum, 1/8 inch maximum clearance at sides and top, and a 3/16 inch minimum, 1/4 inch maximum clearance over thresholds. Provide 3/8 inch minimum, 7/16 inch maximum clearance at bottom where no threshold occurs. Bevel edges of doors at the rate of 1/8 inch in 2 inch. Door warp shall not exceed 1/4 inch when measured in accordance with
ANSI/WDMA I.S.1A .
3.1.1 Fire Doors
Install fire doors in accordance with NFPA 80 . Do not paint over labels.
SECTION 08 14 00 Page 6
SECTION 08 44 00
CURTAIN WALL AND GLAZED ASSEMBLIES
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA ADM (2010) Aluminum Design Manual
AA ASD1 (2013) Aluminum Standards and Data
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 501.1 (2005) Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic Pressure
AAMA 501.4 & 501.6 (2009) Recommended Static Test Method for Evaluating Curtain Wall and Storefront Systems Subjected to Seismic and Wind Induced Interstory Drifts & Recommended Dynamic Test Method for Determining the Seismic Drift Causing Glass Fallout from a Wall System
AAMA 609 & 610 (2009) Cleaning and Maintenance Guide for Architecturally Finished Aluminum
AAMA 800 (2010) Voluntary Specifications and Test Methods for Sealants
AAMA CW-10 (2004) Care and Handling of Architectural Aluminum from Shop to Site
AAMA MCWM-1 (1989) Metal Curtain Wall Manual
AAMA/WDMA/CSA 101/I.S.2/A440 (2011) Standard/Specification for Windows, Doors, and Skylights
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISC/AISI 121 (2004) Standard Definitions for Use in the Design of Steel Structures
AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set
AMERICAN WELDING SOCIETY (AWS)
AWS A5.1/A5.1M (2012) Specification for Carbon Steel
SECTION 08 44 00 Page 1
Electrodes for Shielded Metal Arc Welding
AWS A5.10/A5.10M (2012) Welding Consumables - Wire Electrodes, Wires and Rods for Welding of Aluminum and Aluminum-Alloys - Classification
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A1011/A1011M (2017a) Standard Specification for…