This solicitation requests proposals for the construction of facilities at Eglin Air Force Base as part of the Advanced Munitions Technology Complex. The project includes construction of six bunkers for the Complex for Agile Processing of Energetics, three explosive machining bunkers and a staging building comprising the CAPE Explosive Machining Facility totaling 4,035 square feet. An Advanced Dynamics Chamber Facility of 10,247 square feet is also to be constructed along with an Advanced Energetics Research Laboratory of 11,137 square feet. An Explosive Storage Facility designed to Department of Defense standards for storage of 40,000 pounds net explosive weight is additionally requested. Proposals are due in response to solicitation number W9127820R0093 issued by the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127820R0093 JA Brand Name Spec - Overly Door.pdf | ||
| W9127820R0093 JA Brand Name Spec (HVAC).pdf | ||
| AM03.pdf | ||
| AM02.pdf | ||
| AM01 DRAWINGS.pdf | ||
| Site Visit Sign In.pdf | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL 4.pdf | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| RTA DRAWINGS VOL 1.pdf | ||
| RTA DRAWINGS VOL 3.pdf | ||
| RTA DRAWINGS VOL 2.pdf | ||
| VOL1.PDF | ||
| EM 385-1-1.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0093-0001 21 AUG 2020 MEF20050
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0093
9B. DATED (SEE ITEM 11)
31 JUL 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: ADVANCED MUNITIONS TECHNOLOGY COMPLEX PH II FTFA 043000, EGLIN AIR FORCE BASE, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/REVISED DRAWINGS FOR AMENDMENT NO. 0001
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
ADVANCED MUNITIONS TECHNOLOGY COMPLEX PH II FTFA 043000 W9127820R0093
EGLIN AIR FORCE BASE, FLORIDA MEF20050
SF 30 Page 2
W9127820R0093-0001
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
VOLUME 1
Bidding Schedule Revised and reissued as indicated herein.
01 91 00.00 40 Revised PART 1 and Paragraph 3.8
VOLUME 2
09 67 23.13 Revised Paragraph 3.2.2
09 67 23.14 Revised Paragraph 1.6
PART II - NOTE: Revised drawings are listed below. These revised drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
Sheet Reference Number Title
COVER SHEET
P-100 OVERALL-PLUMBING PLAN
Encl as stated:
Revised pages of the specifications as indicated in Part I.
2 Revised drawings as indicated in Part II.
Bid Schedule page - 1 Revised and reissued by Amendment No. W9127820R0093-0001
BIDDING SCHEDULE
BIDDING SCHEDULE A
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Base Bid:
1. CAPE Processing Bunkers #1, #2, #3, #4, #5, & #6 1 Job XXX ___________
2. CAPE Explosives Machining Saw Bunker;
CAPE Explosives Machining Lathe Bunker 1 Job XXX ___________
3. Construct All Site Work Improvements and Utilities for AMTC Facilities (unless listed separately) 1 Job XXX ___________
4. CHELCO (Privatized Electrical Utility) Connection Fee 1 Job XXX $25,690.00
5. ASUS (Privatized Water & Wastewater Utility) $14,850.00 Connection Fee 1 Job XXX $10,098.00
6. Okaloosa Gas (Privatized Gas Utility) Connection Fee And Meters 1 Job XXX $4,950.00
Total Base Bid ______________
Bid Option No. 1
7. Explosive Storage Facility & All Site Improvements and Utilities 1 Job XXX ___________
Bid Option No. 2
8. Construct ADC-50 Facility & All Site Improvements and Utilities 1 Job XXX ___________
Bid Option No. 3
9. ADC-50 Main Chamber Door 1 Job XXX $679,915.00
Bid Schedule page - 2
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Bid Option No. 4
10. ADC-50 2nd Layer of Chamber Steel 1 Job XXX ___________
Bid Option No. 5
11. Construct AERL Facility & All Site Improvements and Utilities 1 Job XXX _____________
Bid Option No. 6
12. North Road 1 Job XXX ___________
Bid Option No. 7
13. POV Parking 1 Job XXX ___________
Bid Option No. 8
14. Monument Sign 1 Job XXX ___________
Bid Option No. 9
15. Furniture, Fixtures, & Equipment (FFE) Package for AERL 1 Job XXX ___________
Bid Option No. 10
16. Furniture, Fixtures, & Equipment (FFE) Package for ADC-50 1 Job XXX ___________
Bid Option No. 11
17. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Explosives Machining Saw Bunker 1 Job XXX ___________
Bid Option No. 12
18. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Explosives Machining Lathe Bunker 1 Job XXX ___________
Bid Option No. 13
19. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #1 1 Job XXX ___________
Bid Schedule page - 3
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Bid Option No. 14
20. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #2 1 Job XXX ___________
Bid Option No. 15
21. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #3 1 Job XXX ___________
Bid Option No. 16
22. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #4 1 Job XXX ___________
Bid Option No. 17
23. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #5 1 Job XXX ___________
Bid Option No. 18
24. Furniture, Fixtures, & Equipment
Bunker #6 1 Job XXX ___________
Total Base Bid Plus Bid Options 1 – 18 ___________
OFFEROR ELECTS TO WAIVE THE PRICE EVALUATION PREFERENCE
FOR HUBZONE SMALL BUSINESS CONCERNS: ( )NO ( )YES
(SEE BID SCHEDULE NOTE NO. 7 and 8)
Bid Schedule page - 4
NOTES FOR BIDDING SCHEDULE A
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto.
In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.
NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.
NOTE NO. 3. If a modification to a bid is submitted and provides for a job adjustment to the total estimated cost, the application of the job adjustment to each unit price and/or job price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the job adjustment shall be applied on a pro rata basis to every bid item in the bid schedule.
NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF CONTRACTS.
There are two bid schedules for the construction of this project – Bidding Schedule A and Bidding Schedule B. Bidders are to provide bids for each bidding schedule. The government will evaluate all bids and make an award in accordance with the source selection criteria established in this solicitation Section 00 12 00: EVALUATION CRITERIA AND BASIS OF AWARD.
A firm fixed priced contract award will be made on only one of the bid schedules. Award will be made on the Base Bid and selected Options, in accordance with the paragraph entitled Evaluation of Options (JUL 1990) in Section 00 21 16: INSTRUCTIONS TO PROPOSERS.
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise Bid Options No. 1–8 by written notice to the Contractor within 365 days of Notice to Proceed and Bid Options 9-18 by written notice within the days of Notice to Proceed as noted below:
- CAPE Bid Options: FF&E Bid Options 11-18 exercised within 365 days after NTP.
- AERL Option: FF&E Bid Option 9 exercised within 730 days after NTP.
- ADC-50 Option: FF&E Bid Option 10 exercised within 820 days after
NTP.
NOTE NO. 5. The programmed amount (PA)for this project is $23,000,000 for the FY20 Base Bid and $35,000,000 for the FY21 Bid Options.
NOTE NO. 6. This contract bid items have separate durations and completion dates. Liquidated Damages shall be assessed on individual options past their required completion dates (See Section 01 00 00 for additional information).
See below for contract durations:
CAPE Base Bid = 548 days, ADC-50 Bid Option = 640 days, AERL Bid Option = 548 days, Explosive Storage Bid Option = 365 days
Bid Schedule page - 5
NOTE NO. 7. FAR Clause 52.219-4, relating to a 10% price evaluation preference for HUB ZONE small business concerns, is included in and made a part of this RFP.
NOTE NO. 8. This procurement is not restricted to Hubzone Small Business Concerns. However, offerors certifying as a Hubzone Small Business Concern must be certified by the SBA on or prior to date set for receipt of offers.
END OF BIDDING SCHEDULE A
Bid Schedule page - 6
BIDDING SCHEDULE B
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Base Bid:
1. CAPE Processing Bunkers #1, #2, #3, #4, #5, & #6 1 Job XXX ___________
2. CAPE Explosives Machining Saw Bunker;
CAPE Explosives Machining Lathe Bunker 1 Job XXX ___________
3. Construct All Site Work Improvements and Utilities for AMTC Facilities (unless listed separately) 1 Job XXX ___________
4. CHELCO (Privatized Electrical Utility) Connection Fee 1 Job XXX $25,690.00
5. ASUS (Privatized Water & Wastewater Utility) $14,850.00 Connection Fee 1 Job XXX $10,098.00
6. Okaloosa Gas (Privatized Gas Utility) Connection Fee And Meters 1 Job XXX $4,950.00
Total Base Bid ____________
Bid Option No. 1
7. Explosive Storage Facility & All Site Improvements and Utilities 1 Job XXX ___________
Bid Option No. 2
8. Construct ADC-50 Facility & All Site Improvements and Utilities 1 Job XXX ___________
Bid Option No. 3
9. ADC-50 Main Chamber Door 1 Job XXX $679,915.00
Bid Schedule page - 7
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Bid Option No. 4
10. ADC-50 2nd Layer of Chamber Steel 1 Job XXX ___________
Bid Option No. 5
11. Construct AERL Facility & All Site Improvements and Utilities 1 Job XXX _____________
Bid Option No. 6
12. North Road 1 Job XXX ___________
Bid Option No. 7
13. POV Parking 1 Job XXX ___________
Bid Option No. 8
14. Monument Sign 1 Job XXX ___________
Bid Option No. 9
15. Furniture, Fixtures, & Equipment (FFE) Package for AERL 1 Job XXX ___________
Bid Option No. 10
16. Furniture, Fixtures, & Equipment (FFE) Package for ADC-50 1 Job XXX ___________
Bid Option No. 11
17. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Explosives Machining Saw Bunker 1 Job XXX ___________
Bid Option No. 12
18. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Explosives Machining Lathe Bunker 1 Job XXX ___________
Bid Option No. 13
19. Furniture, Fixtures, & Equipment
Bunker #1 1 Job XXX ___________
Bid Schedule page - 8
BIDDER'S NAME:______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount___
Bid Option No. 14
20. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #2 1 Job XXX ___________
Bid Option No. 15
21. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #3 1 Job XXX ___________
Bid Option No. 16
22. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #4 1 Job XXX ___________
Bid Option No. 17
23. Furniture, Fixtures, & Equipment (FFE) Package for CAPE Processing Bunker #5 1 Job XXX ___________
Bid Option No. 18
24. Furniture, Fixtures, & Equipment
Bunker #6 1 Job XXX ___________
Total Base Bid Plus Bid Options 1 – 18 ___________
OFFEROR ELECTS TO WAIVE THE PRICE EVALUATION PREFERENCE
FOR HUBZONE SMALL BUSINESS CONCERNS: ( )NO ( )YES
(SEE BID SCHEDULE NOTE NO. 7 and 8)
Bid Schedule page - 9
NOTES FOR BIDDING SCHEDULE B
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto.
In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.
NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.
NOTE NO. 3. If a modification to a bid is submitted and provides for a job adjustment to the total estimated cost, the application of the job adjustment to each unit price and/or job price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the job adjustment shall be applied on a pro rata basis to every bid item in the bid schedule.
NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF CONTRACTS.
There are two bid schedules for the construction of this project – Bidding Schedule A and Bidding Schedule B. Bidders are to provide bids for each bidding schedule. The government will evaluate all bids and make an award in accordance with the source selection criteria established in this solicitation Section 00 12 00: EVALUATION CRITERIA AND BASIS OF AWARD.
A firm fixed priced contract award will be made on only one of the bid schedules. Award will be made on the Base Bid and selected Options, in accordance with the paragraph entitled Evaluation of Options (JUL 1990) in Section 00 21 16: INSTRUCTIONS TO PROPOSERS.
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise Bid Options No. 1–8 by written notice to the Contractor within 180 days of Notice to Proceed, and Bid Options 9-18 by written notice within the days of Notice to Proceed as noted below:
- CAPE Bid Options: FF&E Bid Options 11-18 exercised within 365 days after NTP
- AERL Option: FF&E Bid Option 9 exercised within 548 days after NTP
- ADC-50 Option: FF&E Bid Option 10 exercised within 640 days after NTP
NOTE NO. 5. The programmed amount (PA) for this project is $23,000,000 for the FY20 Base Bid and $35,000,000 for the FY21 Bid Options.
Bid Schedule page - 10
NOTE NO. 6. This contract bid items have separate durations and completion dates. Liquidated Damages shall be assessed on individual options past their required completion dates (See Section 01 00 00 for additional information).
See below for contract durations:
CAPE Base Bid = 548 days, ADC-50 Bid Option = 640 days, AERL Bid Option = 548 days, Explosive Storage Bid Option = 365 days
NOTE NO. 7. IMPORTANT NOTICE: FAR Clause 52.219-4, relating to a 10% price evaluation preference for HUB ZONE small business concerns, is included in and made a part of this RFP.
NOTE NO. 8. This procurement is not restricted to Hubzone Small Business Concerns. However, offerors certifying as a Hubzone Small Business Concern must be certified by the SBA on or prior to date set for receipt of offers.
END OF BIDDING SCHEDULE B
END OF BIDDING SCHEDULE
01 91 00.00 40 Revised by Amendment No. W9127820R0093-0001
PART 1 GENERAL
The requirements of this Section apply to, and are a component part of, each section of the specifications.
This Section includes:
a. Building commissioning of the following systems:
(1) HVAC components and equipment
(2) HVAC system: interaction of cooling, heating, and comfort delivery systems
(3) Building Automation System (BAS): control hardware and software, sequence of operations, and integration of factory controls with BAS
(4) Lighting Control System and interface with daylighting
(5) Domestic hot water systems
(6) Renewable energy generation systems
b. Building commissioning activities and documentation in support of the U.S. Green Building Council (USGBC) LEED BD+C™ rating program. Commissioning activities and documentation include the section on "Energy and Atmosphere" prerequisite of "Fundamental Commissioning of Building Energy Systems."
The Government, Green Consultant, Architect/Engineer, or Commissioning Authority are not responsible for construction means, methods, job safety, or management function related to commissioning on the job site.
The commissioning process does not take away from or reduce the responsibility of the system designers or installing contractors to provide a finished and fully functioning product.
The Owner Contractor will contract with the Commissioning Authority (CxA) for this Project. The Commissioning Authority:
a. May be an employee of the Government or A/E. NOT USED
b. Will coordinate all aspects of the Commissioning Process.
c. Will conform to the commissioning procedures outlined in this specification.
The following Sections are an integral part of this Project Commissioning:
a. Section 01 33 00 SUBMITTAL PROCEDURES.
b. Section 01 78 23 OPERATION AND MAINTENANCE DATA.
c. Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR
TIGHTNESS.
d. Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM.
e. Section 22 00 00 PLUMBING, GENERAL PURPOSE.
f. Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS.
g. Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
h. Section 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS.
i. Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
j. Section 26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION
SWITCH.
k. Section 26 51 00 INTERIOR LIGHTING.
3.8 EQUIPMENT AND SYSTEM SCHEDULE
Commission the following equipment in this project.
System Equipment Tag Qty. Building
HVAC Air Handling Unit
AHU-03-01; 02 2 AERL
Air Handling Unit
AHU-09-01 thru
3 AC-50
Air Handling Unit
AHU-04-01 thru
4 ROCC
Air Handling Unit
AHU-10-01 1 BIRSST
Rooftop Air Handling Unit
RFU-07-01 thru
4 CAPE EM
Rooftop Air Handling Unit
RFU-08-01 thru
6 CAPE AP
Chiller CH-03-01 thru 03 3 AERL
Chiller CH-04-01 thru 03 3 ROCC
Chiller CH-07-01 1 CAPE EM
Chiller CH-10-01 thru 03 3 BIRSST
Hot Water Boiler B-03-01; 02 2 AERL
Hot Water Boiler B-09-01; 02 2 AC-50
Hot Water Boiler B-04-01; 02 2 ROCC
Hot Water Boiler B-10-01; 02 2 BIRSST
Steam Boiler SB-07-01 1 CAPE EM
Chilled Water Pumps
CHWP-03-01 thru 03-05
5 AERL
Chilled Water Pumps
CHWP-04-01 thru
5 ROCC
Chilled Water Pumps
CHWP-10-01 thru
5 BIRSST
Heating Water Pumps
HWP-03-01 thru 03-05
5 AERL
Heating Water Pumps
HWP-09-01 thru
5 AC-50
Heating Water Pumps
HWP-04-01 thru
5 ROCC
Heating Water Pumps
HWP-10-01 thru
5 BIRSST
Condensate System
CPU-07-01 1 CAPE EM
Ductless Split System
DSS-03-01 1 AERL
Ductless Split System
DSS-09-01 1 AC-50
Ductless Split System
DSS-04-01; 02 2 ROCC
Ductless Split System
DSS-07-01 1 CAPE EM
Ductless Split System
DSS-10-01; 02 2 BIRSST
Exhaust Fans EF-03-01 thru 03-10
10 AERL
Exhaust Fans EF-09-01 thru 09 9 AC-50
Exhaust Fans EF-04-01 thru 32 32 ROCC
Exhaust Fans EF-07-01 1 CAPE EM
Exhaust Fans EF-08-01 thru 06 6 CAPE AP
Exhaust Fans EF-10-01 thru 16 16 BIRSST
Supply Fans SF-03-01; 02 2 AERL
Supply Fans SF-09-01 thru 02 2 AC-50
Supply Fans SF-04-01 thru 04 4 ROCC
Supply Fans SF-07-01 thru 03 3 CAPE EM
Supply Fans SF-11-01 1 FIRE PUMP
Unit Heater UH-03-01; 02; 03 3 AERL
Unit Heater UH-09-01 thru 03 3 AC-50
Unit Heater UH-04-01 thru 04 4 ROCC
Unit Heater UH-07-01 1 CAPE EM
Unit Heater UH-11-01 1 FIRE PUMP
Cabinet Unit Heater
CUH-03-01; 02 2 AERL
Cabinet Unit Heater
CUH-09-01; 02 2 AC-50
Cabinet Unit Heater
CUH-04-01; 02 2 ROCC
Cabinet Unit Heater
CUH-10-01; 02 2 BIRSST
Humidifier H-03-01; 02 2 AERL
Humidifier H-09-01 thru 03 3 AC-50
Humidifier H-04-01 thru 04 4 ROCC
Humidifier HUM-07-02 thru
3 CAPE EM
Humidifier HUM-08-01 thru
6 CAPE AP
Humidifier H-10-01 1 BIRSST
Variable Air Volume Units
VAV-03-01 thru 03-29
29 AERL
Variable Air Volume Units
VAV-09-01 thru
10 AC-50
Variable Air Volume Units
(SA)
VAV-SA-04-01
thru 47
47 ROCC
Variable Air Volume Units
(SA)
VAV-SA-10-01
thru 14
14 BIRSST
Variable Air Volume Units
(EA)
VAV-EA-04-01
thru 15; 27-32;
45-47
24 ROCC
Variable Air Volume Units
(EA)
VAV-EA-10-01
thru 09
9 BIRSST
Bypass Variable Air Volume Units
BPVAV-07-01 1 CAPE EM
Fan Coil Units FCU-04-01; 02 2 ROCC
Fan Coil Units CCU-10-01 1 BIRSST
Fan Powered Variable Air Volume Units
FPVAV-SA-04-16;
21; 37; 38; 39
5 ROCC
Steam Traps ST-07-01 thru 09 9 CAPE EM
Steam Traps ST-08-01 thru 24 24 CAPE AP
Condensate Pumps PPCP-07-02 thru
3 CAPE EM
Condensate Pumps PPCP-08-01 thru
6 CAPE AP
BAS/METER Building Automation System
Controls Systems 1 LOT ALL BUILDINGS
Utility Monitoring System
Utility Metering 1 LOT ALL BUILDINGS
PLUMBING Domestic Water Heater
DWH-03-01 1 AERL
Domestic Water Heater
DWH-09-01 1 AC-50
Domestic Water Heater
IWH-04; 02 2 ROCC
Domestic Water Heater
IWH-07-01 thru
3 CAPE EM
Domestic Water Heater
IWH-08-01 thru
6 CAPE AP
Domestic Water Heater
IWH-10-01; 02 2 BIRRST
Booster Pumps BP-03-01 1 AERL
Booster Pumps BP-09-01 1 AC-50
Booster Pumps BP-04-01 1 ROCC
Booster Pumps BP-07-01 1 CAPE EM
Booster Pumps BP-10-01 1 BIRSST
Domestic Return Pump
DHWP-03-01 1 AERL
Domestic Return Pump
DHWP-09-01 1 AC-50
Domestic Return Pump
DHWP-04-01; 02 2 ROCC
Domestic Return Pump
DHWP-10-01 1 BIRSST
Air Compressor AC-03-01 1 AERL
Air Compressor AC-09-01 1 AC-50
Air Compressor AC-04-01 1 ROCC
Air Compressor AC-07-01; 02 2 CAPE EM
Air Compressor AC-10-01 1 BIRSST
Air Dryers RAD-03-01;
DD-03-01
2 AERL
Air Dryers RAD-09-01 1 AC-50
Air Dryers RAD-04-01;
DD-04-01
2 ROCC
Air Dryers RAD-07-01;
DD-07-01
2 CAPE EM
Air Dryers RAD-10-01;
DD-10-01
2 BIRSST
Receiver Tank AR-03-01 1 AERL
Receiver Tank AR-09-01 1 AC-50
Receiver Tank AR-04-01; 02 2 ROCC
Receiver Tank AR-07-01 1 CAPE EM
Receiver Tank AR-10-01 1 BIRSST
Vacuum Pump VP-03-01 1 AERL
Vacuum Pump VP-04-01 1 ROCC
Vacuum Pump VP-07-01; 02 2 CAPE EM
ELECTRICAL Backup Power Connection
Connections for power
1 LOT ALL BUILDINGS
Transformer Contractor Testing per Specifications
1 LOT ALL BUILDINGS
Switchgear Contractor Testing per Specifications
1 LOT ALL BUILDINGS
Panelboards Contractor Testing per Specifications
1 LOT ALL BUILDINGS
Lighting/ Emergency Lighting
Contractor Testing per Specifications
1 LOT ALL BUILDINGS
Lighting Controls
Contractor Testing per Specifications
1 LOT ALL BUILDINGS
-- End of Section --
(Note: The remainder of the section is unchanged by this amendment.)
This page was intentionally left blank for duplex printing.
09 67 23.13
09 67 23.13
3.2.2 Application of Prime Coat and Troweling
Combine the epoxy binder components A and B in the proportions specified by the manufacturer to form a clear compatible system immediately on mixing.
Cure combined components to a clear film possessing a glossy, non-greasy surface at relative humidities less than 80 percent, having the following properties after curing 24 hours at 77 degrees F, followed by 24 hours at 125 degrees F:
Ensure prepared subfloor surface is dry and at a temperature of not less than 60 degrees F when application of the floor topping is initiated.
Immediately prior to application of the prime/scratch coat on the prepared surface, remove dust or other loose particles by blowing with compressed air or vacuum cleaned. Use only an air compressor equipped with an efficient oil-water trap to prevent oil contamination or wetting of surface.
System Primer: Standard Primer at 6 mils WFT.
Base Coat: High Performance CR Epoxy – Pigmented at 6-8 mils DFT.
Chip Broadcast (full broadcast): Vinyl Chip (Blend) at 100lbs/1000sf.
Seal Coat: Water-Based Polyurethane at 4-5 mils DFT.
Ensure any surface imperfections are corrected prior to placing the coating.
A 100 percent solids, zero VOC primer is recommended. The solid colored base coat, High Performance CR Epoxy-Pigmented is to be applied at 250 to 300 square feet per gallon after the primer is tacky. Vinyl paint chips are to be fully broadcast into the wet epoxy at about 100 pounds per 1000 square feet.
After the epoxy has set and is tack-free, sweep the floor to remove any loose chips. The full broadcast requires a clear topcoat of Water-Based Polyurethane. The Water-based Polyurethane is applied at 300-400 square feet per gallon.
09 67 23.14
09 67 23.14
1.6 WARRANTY
Provide manufacturer's standard performance guarantees or warranties including a five year wear warranty and ten five year conductivity warranty.
File details come from the government source that posted it. Updated .