AM02.pdf
PDF 3 MB Posted
- Solicitation number
- W9127820R0037
About this file
This document is an amendment to the solicitation for the construction of an Aircraft and Flight Equipment Building at Redstone Arsenal in Alabama. Key details include that the project involves constructing an aviation hangar facility to support developmental flight test activities for rotary-wing aircraft, including aircraft instrumentation and test systems integration. Supporting facilities include site development, utilities, lighting, paving, parking, walks, curbs, storm drainage, landscaping, signage, physical security, and AT/FP. The estimated value of the construction contract is between $25-100 million. The amendment revises specifications related to structural steel, roofing, interior and exterior finishes, and steel coatings. It also replaces submittal forms and registers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM04.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM03.pdf | ||
| AM02 DRAWINGS.pdf | ||
| Redstone Aircraft PreBid Signin.pdf | ||
| AM01 DRAWINGS.pdf | ||
| AM01.pdf | ||
| EM 385-1-1.pdf | ||
| RTA Drawings VOL1.pdf | ||
| RTA Drawings VOL2.pdf | ||
| VOL4.PDF | ||
| VOL2.PDF | ||
| VOL1.PDF | ||
| VOL3.PDF |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0037-0002 27 JULY 2020 MHY20008
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0037
9B. DATED (SEE ITEM 11)
29 JUNE 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: AIRCRAFT AND FLIGHT EQUIPMENT BUILDINGS
REDSTONE ARSENAL, ALABAMA
Is modified in the following: REFER TO THE ENCLOSED REVISED AND ADDED SPECIFICATIONS/DRAWINGS FOR AMENDMENT NO. 0002
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
AIRCRAFT AND FLIGHT EQUIPMENT BUILDINGS W9127820R0037
REDSTONE ARSENAL, ALABAMA MHY20008
SF 30 Page 2 W9127820R0037-0002
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
Table of Contents Revised as indicated herein.
01 00 00 Revised Paragraph 1.19
01 33 00 Replaced Submittal Register associated with Section 07 52 00 Added Submittal Register associated with Section 09 97 13.00 40
05 50 13 Revised Paragraphs 2.6 and 3.12
07 52 00 Replaced in its entirety.
09 90 00 Revised Paragraph 3.15.2
09 97 13.00 40 Added in its entirety.
22 00 00 Revised Paragraph 2.11.1
23 05 93 Revised Paragraphs 1.3.2 and 1.6.1.3
23 09 00 Revised Paragraph 1.1
23 11 25 Revised Paragraph 2.7.2
41 22 13.15 Revised Paragraphs 2.1.4.1 and 2.1.6
PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS
The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":
Page/Section
10 26 00
Submittal Register associated with Section 10 26 00
SF 30 Page 3 W9127820R0037-0002
PART III - NOTE: Revised, replacement, and deleted drawings are listed below.
These revised and replacement drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
SHT
REF. TITLE OF DRAWINGS
COVER SHEET
G-002 INDEX OF DRAWINGS
GC004.1 GENERAL NOTES (REPLACED)
GC102.1 PHASE 2 AND AIR TRAFFIC CONTROL PLAN & CONTROL ACCESS PLAN
CT103.1 GEOMETRIC LAYOUT PLAN
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU200 UTILITY PROFILES
CU201 SANITARY SEWER STRUCTURE AND PIPE TABLES
CU503 WATER UTILITY DETAILS
CU507 ANITARY SEWER DETAILS
CU511 CONTAINMENT TANK AND DIVERTER VALVE DETAILS
CU600 BID OPTION GAS LINE
CU601 BID OPTION GAS LINE
CU602 BID OPTION GAS LINE
CU603 BID OPTION GAS LINE
S-302 FOUNDATION SECTIONS
S-505 TYPICAL FRAMING DETAILS
P-107 SANITARY SEWER & VENT PLAN PART 'A'.pdf P-108 SANITARY SEWER & VENT PLAN PART 'B'.pdf
P-109 SANITARY SEWER & VENT PLAN PART ‘C’
P-110 SANITARY SEWER & VENT PLAN PART ‘D’
T-401 SYSTEMS PLANS
Encl as stated Replaced pages of the specifications as indicated in Part I.
25 Revised drawing as indicated in Part III.
1 Replaced drawing as indicated in Part III.
This page was intentionally left blank for duplex printing.
Table of Contents Page 1 Revised by Amendment No. W9127820R0037-0002
TABLE OF CONTENTS
VOLUME 1 OF 4
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING
DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES – BUILDING
WAGE RATES - HEAVY
01 00 01 GENERAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
ATTACHMENT 1: STATEMENT OF SPECIAL INSPECTIONS
ATTACHMENT 2: SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
Table of Contents Page 2
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
VOLUME 2 OF 4
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINIOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 45 23 INSULATED TRANSLUCENT FIBERGLASS WALL PANEL ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
Table of Contents Page 3
DIVISION 09 – FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.00 40 STEEL COATINGS
DIVISION 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14.00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 – SPECIAL CONSTRUCTION
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
VOLUME 3 OF 4
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION & EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL
BUILDING SYSTEMS
23 11 25 FACILIY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 54 16.00 10 HEATING SYSTEMS, GAS FIRED HEATERS
Table of Contents Page 4
23 81 00 DECENTRALIZED UNITARY EQUIPMENT
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS – FIRE
ALARM AND MASS NOTIFICATION SYSTEM
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS –
UTILITY MONITORING CONTROL SYSTEM
DIVISION 26 – ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 42 15.00 10 CATHODIC PROTECTION SYSTEM (STEEL WATER TANKS)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
VOLUME 4 OF 4
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 SEPARATION LAYER
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 DRAINAGE LAYERS
32 11 30 LIME TREATMENT SUBGRADE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS AND ROADS
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY CONCRETE
PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
Table of Contents Page 5
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERAGE
33 32 16 PACKAGE UTILITY WASTEWATER PUMPING STATION
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS/LIQUID PETROLEUM GAS DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 – TRANSPORTATION
34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 25 14 COALESCING OIL-WATER SEPARATORS
APPENDICES
APPENDIX A UTILITY MONITORING CONTROL SYSTEM DESIGN CRITERIA DIVISION
25 – UMCS FOR REDSTONE ARSENAL
APPENDIX B EXPLOSIVE SAFETY SUBMISSION (ESS), MUNITIONS AND EXPLOSIVES
OF CONCERN REMEDIAL ACTION, RSA-072, AIRCRAFT AND FLIGHT
EQUIPMENT BUILDING, REDSTONE ARSENAL, ALABAMA, DATED 26
FEBRUARY 2020.
APPENDIX C LEED V4 FOR BUILDING DESIGN AND CONSTRUCTION
APPENDIX D ARMY ENERGY SUSTAINABILITY RECORD CARD
APPENDIX E CID/SID AND TYPICAL INTERIOR SIGNAGE, REDSTONE ARSENAL
AIRCRAFT AND FLIGHT EQUIPMENT BUILDING
APPENDIX F GEOTECHNICAL DESIGN
--End of Project Table of Contents--
SECTION 01 00 00
SECTION 01 00 00
1.19 AVAILABILITY AND USE OF UTILITY SERVICES
(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer.
The Contractor shall carefully conserve any utilities furnished without charge. The current rates are:
Electric - $0.0993 KWH Water - $0.002865 / gallon
Other utilities are available but Government does not encourage the contractor tapping into them are:
Sewage - $0.006128 / gallon Gas - $0.00753 / CF
(NOTE: The remainder of Paragraph 1.19 is unchanged by the amendment.)
(NOTE: The remainder of the section is unchanged by the amendment.)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
AIRCRAFT FLIGHT EQUIPMENT BUILDING
07 52 00 SD-02 Shop Drawings
1.4.8 GRoof Plan
1.4.8Field Inspection and Existing
Conditions Report
SD-03 Product Data
2.2 GModified Bitumen Sheets
SHeat Island Reduction
SEnergy Star Label for Top
Coating
2.5 GPrimer
2.6 GModified Bitumen Roof Cement
2.9Pre-Manufactured Accessories
2.8 GFasteners And Plates
1.9Warranty
GDO
SD-05 Design Data
1.4.7 G DOWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.5Qualification of Engineer of
Record
1.4.7Wind Uplift Resistance
GDO
1.4.6 G DOFire Resistance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Replaced by Amendment No. W9127820R0037-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
07 52 00 3.3.4Modified Bitumen Membrane
Application
GDO
3.3.5 G DOFlashing
3.2.3.1Temperature Limitations for
Asphalt
2.5Primer
2.8.1Fasteners
Ventilating Base Sheets
Coating Application
1.6Cold Weather Installation
SD-11 Closeout Submittals
30-Year Warranty
3.9Information Card
Instructions To Government
Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
Replaced by Amendment No. W9127820R0037-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
09 97 13.00 40 SD-01 Preconstruction Submittals
3.3.1.1 GInspection Forms
1.3 GSafety Plan
SD-03 Product Data
2.1.1 GAbrasive Blasting Material
2.1.2 GSealant Compound
2.1.3.1 GInorganic Zinc
2.1.3.1 GInhibitive Polyamide Epoxy
2.1.3.1 GAliphatic Polyurethane
SD-04 Samples
1.3 GManufacturer's Standard Color
Charts
3.3.1.1 GInspection Forms
SD-05 Design Data
2.1.3.1Inorganic Zinc
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
SD-06 Test Reports
3.3.1.2Inspection Reports
SD-07 Certificates
2.1.1Abrasive Blasting Material
2.1.2Sealant Compound
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
SD-08 Manufacturer’s Instructions
2.1.3Protective Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
Added by Amendment No. W9127820R0037-0002
SECTION 05 50 13
SECTION 05 50 13
2.6 BOLLARDS/PIPE GUARDS
Provide 6 inch prime coated standard weight steel pipe in accordance with ASTM A53/A53M. Anchor posts in concrete as indicated and fill solidly with concrete with minimum compressive strength of 2500 psi.
3.12 INSTALLATION OF BOLLARDS/PIPE GUARDS
Set bollards/pipe guards vertically in concrete piers. Fill hollow cores with concrete having a compressive strength of 3000 2500 psi.
AIRCRAFT AND FLIGHT EQUIPMENT BUILDING W9127820R0037
SECTION 07 52 00
MODIFIED BITUMINOUS MEMBRANE ROOFING
05/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.24 (2014) Roofing - Safety Requirements of Low-Sloped Roofs
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
ARMA 410BUR88 (2001) Manual of Roof Maintenance and Repair
ARMA PMBRG98 (1998) Quality Control Guideline for the Application of Polymer Modified Bitumen Roofing
ASTM INTERNATIONAL (ASTM)
ASTM C1153 (2010) Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging
ASTM C1289 (2018a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D312/D312M (2016a) Standard Specification for Asphalt Used in Roofing
ASTM D1970/D1970M (2018) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D4586/D4586M (2007; E 2012; R 2012) Asphalt Roof Cement, Asbestos-Free
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof
SECTION 07 52 00 Page 1 Replaced in its entirety by Amendment No. W9127820R0037-0002
Membrane
ASTM D5147/D5147M (2014) Standard Test Methods for Sampling and Testing Modified Bituminous Sheet Material
ASTM D6298 (2016) Standard Specification for Fiberglass Reinforced Styrene-Butadiene-Styrene (SBS) Modified Bituminous Sheet with a Factory Applied Metal Surface
ASTM E108 (2011) Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2010) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices
MIDWEST ROOFING CONTRACTORS ASSOCIATION (MRCA)
CERTA (2007) NRCA/MRCA Certified Roofing Torch Applicator Program
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 58 (2020) Liquefied Petroleum Gas Code
NFPA 241 (2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA C3701 (1997) Repair Manual for Low Slope Membrane Roof Systems
NRCA CONDET (2014) Construction Details Manual
NRCA RoofMan (2017) The NRCA Roofing Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
SECTION 07 52 00 Page 2
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI/FM 4435/ES-1 (2017) Test Standard for Edge Systems Used with Low Slope Roofing Systems
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.12 Construction Work
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.16 Rules of Construction
UNDERWRITERS LABORATORIES (UL)
UL 790 (2004; Reprint Jul 2014) Standard Test Methods for Fire Tests of Roof Coverings
UL RMSD (2012) Roofing Materials and Systems Directory
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
Minimum two-ply SBS modified bitumen roof membrane consisting of SBS modified bitumen base sheet, and SBS urethane modified cap sheet.
Modified bitumen roof membrane must be set in Type IV hot asphalt.
Base Ply: SBS modified base sheet with a fiberglass scrim set in Type IV asphalt to meet or exceed the following performance criteria:
ASTM D6163/D6163M Type III Grade S Minimum Thickness: 80 Mils Tensile Strength (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 100 lbf/in CMD 100 lbf/i Tear Strength (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- def. F. MD 110 lbf CMD 110 lbf Elongation at Maximum Tensile (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 2.5 percent CMD 2.5 percent Low Temperature Flexibility (ASTM D5147/D5147M): Passes -20 degrees F
Cap Ply: Styrene-Butadiene-Styrene and Styrene-Isoprene-Styrene (SBS+SIS) rubber modified membrane that utilizes KEVLAR fibers and a dual polyester and fiberglass combination reinforcement mineral surfacecap sheet set in Type VI hot asphalt with the following characteristics:
ASTM D6162/D6163M, Type III Minimum Thickness: 145 Mils Tensile Strength (ASTM D5147/D5147M) 2 in/min @ 73.4 +/- 3.6 deg. F MD 1,0001bf/in XD 1,000 1bf/in Tear Strength (ASTM D5147/D5147M) 2 in/min @ 73.4 +/- 3.6 deg. F MD 1,500 1bf/in XD 1,700 1bf/in
SECTION 07 52 00 Page 3
Elongation at Maximum Tensile (ASTM D5147/D5147M) 2 in/min @ 73.4 +/- 3.6 deg. F MD 16 percent XD 16 percent Low Temperature Flexibility (ASTM D5147/D5147M): Passes at -40F deg.
Roof Coating: A non-fibered, asphalt-based aluminum roof paint with the following characteristics:
Reflectance: 0.74 (initial) 0.65 (3 Year Aged) Emittance: 0.33 (Initial) 0.33 (3 Year Aged) SRI: 77 (Initial) 60 (3 Year Aged)
All work must follow the NRCA RoofMan guidelines and standards stated within this Section.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Roof Plan; G drawing depicting wind loads and boundaries of enhanced perimeter and corner attachments of roof system components, as applicable
Field Inspection and Existing Conditions Report
Identify all fire safety issues including exposed or concealed combustible materials, which may require additional protection during roof installation.
SD-03 Product Data
Modified Bitumen Sheets; G
Heat Island Reduction; S
Energy Star Label for Top Coating; S
Primer; G
Modified Bitumen Roof Cement; G
Pre-Manufactured Accessories
Fasteners And Plates; G
Sample Warranty certificate; G DO
Submit all data required by Section 07 22 00 ROOF AND DECK INSULATION, together with requirements of this section. Include in data written acceptance by the roof membrane manufacturer of the products and accessories provided. Provide oroducts as listed in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SECTION 07 52 00 Page 4
SD-05 Design Data
Wind Uplift Calculations; G , DO
SD-07 Certificates
Provide evidence that products used within this specification are manufactured in the United States.
Qualification of Manufacturer
Certify that the manufacturer of the modified bitumen membrane meets requirements specified under paragraph QUALIFICATION OF
MANUFACTURER.
Qualification of Applicator
Certify that the applicator meets requirements specified under paragraph QUALIFICATION OF APPLICATOR.
Qualification of Engineer of Record
Certify that the Engineer of Record is fully qualified, competent, and currently licensed to practice in the project jurisdiction.
Wind Uplift Resistance; G DO classification, as applicable
Fire Resistance classification; G , DO
Submit the roof system assembly wind uplift and fire rating classification listings.
SD-08 Manufacturer's Instructions
Modified Bitumen Membrane Application; G DO
Flashing; G , DO
Temperature Limitations for Asphalt
Primer
Fasteners
Ventilating Base Sheets
Coating Application; G DO
Cold Weather Installation; G DO
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications.
Explicitly identify in writing, differences between manufacturer's instructions and the specified requirements.
SD-11 Closeout Submittals
SECTION 07 52 00 Page 5
30-Year Warranty
Information Card
Instructions To Government Personnel
Include copies of Safety Data Sheets for maintenance/repair materials.
Submit 30 year "No-Dollar-Limit" warranty for labor and materials.
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
Company specializing in manufacturing modified bitumen roofing system products specified with documented ISO 9001 certification and minimum of 20 years of documented experience. Manufacturer must not have been in Chapter 11 bankruptcy during the last five years.
1.4.2 Qualification of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the modified bitumen sheet roofing system manufacturer and have a minimum of TEN years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator must supply the names, locations and client contact information of five projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.
1.4.3 Qualification of Torch Operator
Torch applicators must be CERTA certified to operate torch equipment and must maintain and carry a valid Certified Roofing Torch Applicator (CERTA) card.
1.4.4 Qualifications of Photovoltaics (PV) Rooftop Applicator
The PV rooftop applicator must be approved, authorized, or certified by a Roof Integrated Solar Energy (RISE) Certified Solar Roofing Professional (CSRP), and comply with applicable codes, standards, and regulatory requirements to maintain the weatherproofing abilities of both the integrated roof system and photovoltaic system.
1.4.5 Qualification of Engineer of Record
Engineer of Record must be currently licensed within the jurisdiction of the project.
1.4.6 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, FM 4470, or UL 790 ; and
b. Be listed as part of Fire-Classified roof deck construction in UL RMSD, SECTION 07 52 00 Page 6 or Class I roof deck construction in FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
1.4.7 Wind Uplift Resistance
Provide a complete roof system assembly that is rated and installed to resist wind loads indicated and validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated systems, except as approved by the Contracting Officer. Submit licensed engineer's Wind uplift calculations and substantiating data to validate any non-rated roof system. Base wind uplift measurements on a design wind speed of 115 mph in accordance with ASCE 7 and other applicable building code requirements.
1.4.8 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings, including Roof Plan, specifications and submittals related to the roof work
b. Roof system components installation
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roof structure, and roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representatives to roof manufacturer
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing
e. Quality control, (ARMA PMBRG98) plan for the roof system installation
f. Field inspection and existing conditions report identifying all fire safety issues including exposed or concealed combustible materials, which may require additional protection during roof installation
g. Safety requirements
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, and personnel directly responsible for the installation of roofing and insulation, torch operator, flashing and sheet metal work, mechanical and electrical work, other trades interfacing with the roof work, designated safety personnel trained to enforce and comply with ASSP A10.24 , and a representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
SECTION 07 52 00 Page 7
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in manufacturers' original unopened containers and rolls with labels intact and legible. Mark and remove wet or damaged materials from the site. Where materials are covered by a referenced specification, the container must bear the specification number, type, and class, as applicable. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.5.2 Storage
Protect materials against moisture absorption and contamination or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms or pallets one level high in dry locations with adequate ventilation, such as an enclosed building or closed trailer. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work is finished and dry. Maintain roll materials at temperatures above 50 degrees F for 24 hours immediately before application. Do not store materials outdoors unless approved by the Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof. Provide sufficient ventilation to prevent condensation. Do not store more materials on roof than can be installed the same day and remove unused materials at end of each days work. Distribute materials temporarily stored on roof to stay within live load limits of the roof construction.
Maintain a minimum distance of 35 foot for all stored flammable materials, including materials covered with shrink wraps, craft paper or tarps from all torch/welding applications.
Immediately remove wet, contaminated or otherwise damaged or unsuitable materials from the site. Damaged materials may be marked by the Contracting Officer.
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment to prevent damage to materials or applied roofing.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not install roofing system when air temperature is below 40 degrees F, during any form of precipitation, including fog, or when there is ice, frost, moisture, or any other visible dampness on the roof deck. Follow manufacturer's printed instructions for Cold Weather Installation.
1.7 HOT-MOPPED ASPHALT APPLIED MODIFIED BITUMEN MEMBRANE SAFETY
1.7.1 Property Protection
Take all precautions necessary to prevent ignition of combustible materials during hot-mopped asphalt application of roofing. Immediately call the fire department if a fire commences. Review all fire safety procedures as outlined at the pre-roofing conference.
SECTION 07 52 00 Page 8
Install materials using the techniques recommended by CERTA NRCA/MRCA Certified Roofing Torch Applicator Program available from the National Roofing Contractors Association (NRCA) and the Midwest Roofing Contractors Association (MRCA) as endorsed by the Asphalt Roofing Manufacturers Association (ARMA) and the United Union of Roofers, Waterproofers and Allied Workers. Application procedures must comply with NFPA 241 , OSHA 29 CFR 1910 and 29 CFR 1910.12 , 29 CFR 1926.16 , 29 CFR 1926 Subpart F.
Do not store flammable liquids on the roof.
Provide a minimum of two 2.65 gallon containers of water and two fully charged minimum 20 pound CO2 fire extinguishers in separate, easily accessible locations on the roof and within 30 foot of each hot-mopped kettle at all times.
No AsphaltKettles are allowed on roofs. Locate kettles and supply LP-Gas Cylinders safely and secured per NFPA 241 outside of the building's perimeter a minimum of 20 foot from the structure and any combustible materials.
Maintain a minimum separation of 20 foot between LP-Gas Cylinders and kettle. Provide protective fire retardant blanket barrier or shield between any building structure to a minimum height of 8 foot and a clear surround distance of 4 foot if operations force placement of kettle within a distance of 20 foot. Do not obstruct or place kettles or Cylinder storage within 10 foot of exits, means of egress, gates, roadways, entrances. Locate kettles downwind and away from any building air intakes.
Provide a minimum of two portable fully charged 20 pound CO2 fire extinguishers no closer than 5 foot and no further than 25 foot of horizontal travel distance from each kettle at all times while kettle is in operation, in easily accessible and identifiable locations. Also provide a minimum of one multipurpose 2-A:20-B:C portable fire extinguisher on the roof being covered or repaired.
Comply with the following safety procedures:
a. Fuel containers, burners, and related appurtenances of roofing equipment in which liquefied petroleum gas is used for heating must comply with the requirements of NFPA 58 .
b. Fuel containers having capacities greater than one pound must be located a minimum of 10 foot clear distance from the burner flame.
c. Clearly label all LP-Gas Cylinders as "Flammable Gas", and secure to prevent accidental tip-over.
d. Check all pressure regulators and hoses prior to use for proper functioning and integrity.
e. Turn off fuel supply at LP Gas Cylinder when kettle is not in use.
f. Equip all kettles with a functioning temperature measuring device to ensure no heating in excess of 50 degrees F below the flash point.
g. Provide covers, lid, or top which are close fitting, constructed of minimum No.14 manufacturer's gauge steel, and can be gravity closed on all kettles.
SECTION 07 52 00 Page 9
h. Clean all roofing mops and rags free of excess asphalt and store safely away from all combustible materials. Store discarded roofing mops and rags in a non-combustible container and remove from site each day.
i. Position all pump lines handling hot asphalt securely and equip all pump lines with a shut-off valve on each with a coupler which may be opened when lines are full. Do not subject pump lines to pressures in excess of safe and recommended NRCA and ARMA working pressures.
Station an operator near the equipment to cut off flow and care for other emergencies while conducting heating, pumping and application operations.
j. Asphalt bucket used by roofers or workers in similar trades must be constructed of minimum No. 24 gauge or heavier sheet steel and have a metal bail of no less than 1/4 inch diameter material. The bail is to be fastened to offset ears or equivalent which have been riveted, welded, or otherwise safely and securely attached to the bucket.
Soldered bail sockets are prohibited. Position workers and other employees to avoid being struck by bucket or other roofing materials, which may accidentally fall while being hoisted, lowered, or used in the roofing operation. Provide safety barriers and caution signs at all skylights or other roof holes.
k. Do not use flammable liquids with a flash point below100 degrees F (gasoline and similar products) for cleaning purposes.
Do not use solid fuel or Class I liquids as fuel for roofing asphalt kettles. Provide a minimum of one employee fully knowledgeable of kettle operations and hazards to maintain constant surveillance during kettle operation within a minimum distance of 25 foot of the kettle.
Check all fire extinguishers prior to commencement of work, and upon completion of the day's work, to ensure fullness and operability.
Project supervisor must make daily inspections with the facility manager of all conditions and operations which could present hazards during hot-mopped applications and issue directives to address all such concerns and items of the work and existing conditions.
Identify and protect all combustible roof components, possible fire traps, and hidden hazards. Seal off voids or openings in the substrate with non-combustible materials prior to installing hot-mopped applied materials in the area. Install protective fire retardant blankets and shields at building walls, eaves, parapets and equipments curbs constructed of combustible materials within 3 foot radius of the area of hot-mopped kettle prior to commencement of the work.
When working around intakes and openings, temporarily disconnect and block to prevent fumes from kettle from being drawn into the opening.
1.7.2 Fire Watch
All personnel on the roof during hot-mopped application must be properly trained to use a fire extinguisher. Provide a fire watch for a minimum of 30 minutes after completion of hot-mopped kettle operations at the end of each work shift. Maintain the fire watch for additional time required to ensure no potential ignition conditions exist.
SECTION 07 52 00 Page 10
Do not torch in areas of poor or no visibility (curbs, corners, eaves, expansions joints, flashing, other voids and small penetrations) which could allow a torch flame to ignite combustible material(s) hidden from view or within the underside of the roof deck or building interior. Use cold finish applications in these areas whenever possible and per manufacturer's printed instructions, NRCA 4002, MRCA R&NW manual for "cold adhered" materials.
Do not leave the rooftop unattended during breaks in work during a work shift. Walk and scan all areas of application checking for hot spots, fumes, or smoldering, especially at wall and curb areas, prior to departure at the end of each work shift. Ensure any and all suspect conditions are eliminated prior to leaving the site each work shift.
1.7.3 Open Flame Application (Torch) Equipment and Personnel Safety
Only NRCA/MRCA CERTA certified roofing applicators are allowed to operate any torching equipment. Verify that all such applicators maintain and are currently carrying a valid Certified Roofing Torch Applicator (CERTA) card.
Train all crew members in preventive measures for indirect and direct dangers and hazards associated with roofing work, which include, but are not limited to the following:
a. Heat Stress: Wear light colored clothing, a hat for ultra-violet protection, and other eye protective devices. Drink sufficient quantities of non-alcoholic, non-caffeine liquids. Stage shifts for crew members to allow for breaks from heat and sun exposure without interfering with work progress.
b. First Aid for Burns: Immediately call for an ambulance. Contact local Occupational Health Services (OHS).
All crew members must wear correct personal protective equipment (PPE), including, but not limited to the following items:
a. Long-sleeved shirts buttoned at the collar and cuffs, made of non-flammable materials. Polyester materials are not allowed.
b. Work boots covering ankles with rubber or composite soles.
c. Long pants without cuffs to extend over the top of the work boots, be made of non-flammable materials. No polyester allowed.
d. Heavy leather gloves and flame retardant gauntlets which must be worn during all handling of a torch, whether operating or not.
e. OSHA and ANSI/ISEA Z87.1 approved face shields, goggles or safety glasses to be worn during torching and any other applicable roofing functions.
f. OSHA and ANSI approved hard hats.
1.7.4 Wind Conditions
Use side shields with all torching operations when winds are occurring to prevent flame distortion of end burners. Use torch machine equipment with bottom shield plate to prevent flame spread on to roof deck and
SECTION 07 52 00 Page 11 substrate. When high wind gusts are present, notify the safety officer and cease all use of torching equipment until wind conditions lower and authorization from the safety officer to proceed is received.
1.8 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counter flashing, per NRCA CONDET, and are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials. Apply roofing immediately following application of insulation as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with roof membrane installation the same day.
1.9 WARRANTY
.The roof manufacturer must manufacture the modified roof system and edge metal to be warranted. There will be one sole source warranty for roof system (30 Years) including the edge metal (ANSI SPRI ES-1 CODE). A signed letter from the president of the manufacturer stating the roof membrane and edge metal are products of the manufacturer shall accompany the roof submittal package. No relabeled products from third party manufacturers are acceptable. All materials must be manufactured in the
USA.
1.9.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 30-year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation in compliance with ASTM C1289, and accessories necessary for a watertight roof system construction. Provide warranty directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, blisters, splits, tears, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
c. Upon completion of installation, and acceptance by the Contracting Officer , Construction Manager and Roofing System Engineer of Record, the manufacturer must supply the appropriate warranty to the Owner.
d. Installer must submit a minimum two year warranty to the membrane manufacturer from the date of acceptance, with a copy to the Contracting Officer and Roofing System Engineer of Record.
SECTION 07 52 00 Page 12
1.9.2 Roofing System Installer Warranty
The roof system installer must warrant for a period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.9.3 Continuance of Warranty
Repair or replacement work, ARMA 410BUR88, NRCA C3701 that becomes necessary within the warranty period and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.10 CONFORMANCE AND COMPATIBILITY
Provide the entire roofing and flashing system in accordance with specified and indicated requirements, including fire and wind resistance ( ANSI/SPRI/FM 4435/ES-1 ) requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA Roofing and Waterproofing Manual, membrane manufacturer published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
1.11 ELIMINATION, PREVENTION OF FALL HAZARDS
1.11.1 Fall Protection
Installers should properly secure themselves against falling hazard during the installation of the roofing.
PART 2 PRODUCTS
2.1 MATERIALS
Coordinate with other specification sections related to the roof work.
Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.2 MODIFIED BITUMEN SHEETS AND FIBERGLASS FELT MATERIALS
Furnish a combination of specified materials that comprise the modified bitumen manufacturer's standard system of the number and type of plies specified. Provide materials suitable for the service and climatic conditions of the installation. Modified bitumen sheets must be watertight and visually free of pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Polymer modifier must comply with
SECTION 07 52 00 Page 13
ARMA PMBRG98 and be uniformly dispersed throughout the sheet. Edges of sheet must be straight and flat.
a. Install SBS modified base sheet with a fiberglass scrim in Type IV hot asphalt to meet or exceed the following performance criteria:
ASTM D6163/D6163M, Type III Grade S
Minimum Thickness: 80 Mils
Tensile Strength (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 100 lbf/in CMD 100 lbf/i
Tear Strength (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 110 lbf CMD 110 lbf
Elongation at Maximum Tensile (ASTM D5147/D5147M) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 2.5 percent CMD 2.5 percent
Low Temperature Flexibility (ASTM D5147/D5147M): Passes -20 degrees F
b. Install cap Ply: Styrene-Butadiene-Styrene and Styrene-Isoprene-Styrene (SBS+SIS) rubber modified membrane that utilizes KEVLAR fibers and a dual polyester and fiberglass combination reinforcement mineral surface cap sheet set in Type IV hot asphalt with the following characteristics:
ASTM D6162 Type III
Minimum Thickness: 145 Mils
Tensile Strength (ASTM D5147/D5147M) 2 in/min @ 73.4 +/- 3.6 deg. F MD 1,000 1bf/in XD 1,000 1bf/in
Tear Strength (ASTM D5147/D5147M) 2 in/min @ 73.4 +/- 3.6 deg. F MD 1,500 1bf/in XD 1,700 1bf/in
Elongation at Maximum Tensile (ASTM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .