AM01.pdf
PDF 1 MB Posted
- Solicitation number
- W9127820R0037
About this file
This modification notice and related solicitation opportunity outline requirements for the construction of an aviation test and integration facility at Redstone Arsenal, Alabama. The project scope includes construction of an aircraft hangar, administrative offices, aircraft parking aprons, utilities infrastructure, site development, security systems, and sustainability features. Supporting facilities such as a fire pump building and water storage tanks are also specified. The procurement will utilize firm-fixed-price construction contracts ranging from $25-100 million awarded by the US Army Corps of Engineers Mobile District. The pre-solicitation amendment provides revised drawings and specifications to incorporate changes to demolition and construction plans, layouts, grading, drainage, paving, and mechanical systems. The solicitation and related project represent a significant opportunity for construction contractors specializing in aviation and military facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM04.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM03.pdf | ||
| AM02.pdf | ||
| AM02 DRAWINGS.pdf | ||
| Redstone Aircraft PreBid Signin.pdf | ||
| AM01 DRAWINGS.pdf | ||
| EM 385-1-1.pdf | ||
| RTA Drawings VOL1.pdf | ||
| RTA Drawings VOL2.pdf | ||
| VOL4.PDF | ||
| VOL2.PDF | ||
| VOL1.PDF | ||
| VOL3.PDF |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0037-0001 14 JULY 2020 MHY20008
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0037
9B. DATED (SEE ITEM 11)
29 JUNE 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: AIRCRAFT AND FLIGHT EQUIPMENT BUILDINGS
REDSTONE ARSENAL, ALABAMA
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWINGS FOR AMENDMENT NO. 0001
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
AIRCRAFT AND FLIGHT EQUIPMENT BUILDINGS W9127820R0037
REDSTONE ARSENAL, ALABAMA MHY20008
SF 30 Page 2 W9127820R0037-0001
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
Appendix F Replaced Boring Layout.
PART II - NOTE: Revised, replacement, and deleted drawings are listed below.
These revised and replacement drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
SHT
REF. TITLE OF DRAWINGS
COVER SHEET
G-002 SHEET INDEX
GC005.1 OVERALL SITE MAP (REPLACED)
GC006.1 BID INFORMATION SHEET (REPLACED)
GC101.1 PHASE 1 AND AIR TRAFFIC CONTROL PLAN & CONTROL ACCESS
PLAN (REPLACED)
GC102.1 PHASE 2 AND AIR TRAFFIC CONTROL PLAN & CONTROL ACCESS
PLAN (REPLACED)
V-107 EXISTING CONDITIONS (DELETED)
V-108 EXISTING CONDITIONS (DELETED)
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103.1 DEMOLITION PLAN (REPLACED)
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106.1 DEMOLITION PLAN (REPLACED)
CD107 DEMOLITION PLAN (DELETED)
CD108 DEMOLITION PLAN (DELETED)
CT101 GEOMETRIC LAYOUT PLAN
CT102 GEOMETRIC LAYOUT PLAN
CT103.1 GEOMETRIC LAYOUT PLAN (REPLACED)
CT104 GEOMETRIC LAYOUT PLAN
CT105 GEOMETRIC LAYOUT PLAN
CT106.1 GEOMETRIC LAYOUT PLAN (REPLACED)
CT107 GEOMETRIC LAYOUT PLAN (DELETED)
CT108 GEOMETRIC LAYOUT PLAN (DELETED)
AIRCRAFT AND FLIGHT EQUIPMENT BUILDINGS W9127820R0037
REDSTONE ARSENAL, ALABAMA MHY20008
SF 30 Page 3 W9127820R0037-0001
CP101 PAVING AND MARKING PLAN
CP102 PAVING AND MARKING PLAN
CP103.1 PAVING AND MARKING PLAN (REPLACED)
CP104 PAVING AND MARKING PLAN
CP105 PAVING AND MARKING PLAN
CG101 GRADING PLAN
CG102 GRADING PLAN
CG103.1 GRADING PLAN (REPLACED)
CG104 GRADING PLAN
CG105 GRADING PLAN
CG106.1 GRADING PLAN (REPLACED)
CG107 GRADING PLAN (DELETED)
CG108 GRADING PLAN (DELETED)
CG208.1 STORM DRAINAGE PROFILES (REPLACED)
CG401.1 STORM WATER MANAGEMENT POND LAYOUT AND GRADING PLAN
(REPLACED)
CG402.1 POND SECTION CUTS (REPLACED)
CG505.1 RIP RAP DETAILS (REPLACED)
CG601.1 DRAINAGE STRUCTURE TABLES (REPLACED)
CG602.1 DRAINAGE STRUCTURE TABLES (REPLACED)
CG603.1 DRAINAGE STRUCTURE TABLES (REPLACED)
M-106 MECHANICAL - HVAC FLOOR PLAN PART 'F'
Encl as stated Replaced pages of the specifications as indicated in Part I.
19 Revised drawing as indicated in Part II.
18 Replaced drawing as indicated in Part II.
8 Deleted drawing as indicated in Part II.
4880E
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
R
A
M
P
L O
C U
S T
R
O A
D
G
G
G
2"
CO
CO
CO
SS
SS
SS
SS
IE=
IE=
IE=
IE=
18"
HEADWALL
RCP W/
HEADWALL
RCP W/
36"
RCP W/
HEADWALLS
18"
ST
ST
C
B
TRANSFORMER
FR3 OIL 12470-480/277Y
ON/OFF OIL SWITCH
3 PHASE 150KVA
LOOP FEED FUSES
LOAD BREAK INSERTS
SECTIONALIZING
CABINET
SECTIONALIZING
CABINET
E
X
X
P
R
O
P
O
S
E
D
F
U
T
U
P
A
R
A
L
L
L
X
I W
A
Y
EXISTING BIO RETENTION
P
R
O
P
O
S
E
D
B
I O
R
E
T
E
N
T
I O
N
P
R
O
P
O
S
I R
C
R
A
F
P
R
K
I N
G
E
A
P
R
O
P
O
S
H
N
G
A
R
FIRE PUMP BUILDING
AND GROUND STORAGE
WATER TANKS
RAF-01-18
RAF-02-18
RAF-05-18
RAF-03-18
RAF-04-18
RAF-14-18
RAF-17-18
RAF-15-18
RAF-09-18
RAF-10-18
RAF-08-18
RAF-06-18
RAF-12-18
RAF-13-18
RAF-16-18
RAF-07-18
RAF-11-18
HA-01-20
REPLACED BY AMENDMENT NO. W9127820R0037-0001
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| SF30 |
| LINEUP |
| APPF_AM01 |
File details come from the government source that posted it. Updated .