AM01.pdf

PDF 4 MB Posted

Attached to
AFLCMC TEMPORARY TRAILERS EGLIN AFB, FL(OKALOOSA COUNTY)
Solicitation number
W9127819R0002
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
AM05_DRAWINGS.pdf PDF
AM05.pdf PDF
AM03.pdf PDF
AM03_DRAWINGS.pdf PDF
AM04.pdf PDF
AM03_DRAWINGS.pdf PDF
AM03.pdf PDF
AM02.pdf PDF
AM01_DRAWINGS.pdf PDF
W9127819R0002_-_AFLCMC_PreBid_Site_Visit_Sign_In.pdf PDF
EM_385-1-1.pdf PDF
VOL3.PDF PDF
RTA-DRAWINGS.pdf PDF
VOL2.PDF PDF
VOL1.PDF PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127819R0002-0001 6 FEB 2019 MHF18001

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127819R0002

9B. DATED (SEE ITEM 11)

18 JAN 2019

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: AFLCMC TEMPORARY FACILITIES, EGLIN AIR FORCE BASE, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWING REVISIONS FOR AMENDMENT NO. 0001

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

AFLCMC TEMPORARY FACILITIES W9127819R0002

EGLIN AIR FORCE BASE, FLORIDA MHF18001

SF 30 Page 2 W9127819R0002-0001

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

VOLUME 1

Table of Contents Revised as indicated herein.

00 11 00 Revised Paragraphs 4.3 and 4.4.1

01 00 00 Revised Paragraphs 1.1, 1.4 and 1.48

01 00 01 Revised Paragraph 1

VOLUME 3

Appendix F Added in its entirety

PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS

The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":

Page/Section

VOLUME 1

01 33 00 Deleted Submittal Register associated with Section 01 33 29

01 33 29 Deleted Section 01 33 29 in its entirety

28 10 05 Deleted Section 28 10 05 in its entirety

SF 30 Page 3 W9127819R0002-0001

PART III - NOTE: Revised and replacement drawings are listed below. These revised and replacement drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

SHT

REF. TITLE OF DRAWINGS

COVER SHEET

G-003 INDEX OF DRAWINGS

CU112 UTILITY PLAN – ENLARGED PLAN FW

T-001 COMMUNICATIONS LEGEND

T-101.1 MAIN FACILITY DATA CABLING (REPLACED DRAWING)

T-501 TERMINATIONS/OUTLETS

Encl as stated:

Revised pages of the specifications as indicated in Part I.

6 Revised and replaced drawings as indicated in Part III.

This page was intentionally left blank for duplex printing.

Table of Contents Page 1 Revised by Amendment No. W9127819R0002-0001

TABLE OF CONTENTS

VOLUME 1 OF 3

CHECKLIST FOR PREPARATION OF OFFERS

BIDDING REQUIREMENTS

Contract Clauses

STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

STANDARD FORM 24 - BID BOND

STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY

STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES

00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONTRACT CLAUSES

CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING

DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS

PROJECT SIGNS

EGLIN BASE ACCESS REQUIREMENTS

DD FORM 1354

DD FORM 1354 CHECKLIST

WAGE RATES

01 00 01 GENERAL CONTRACT REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

FORM 4025

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

SAM FORM 696

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

Table of Contents Page 2

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 21 – FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 26 – ELECTRICAL

26 01 01 BASIC ELECTRICAL REQUIREMENTS

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 22 00 LOW VOLTAGE TRANSFORMERS

26 24 13 SWITCHBOARDS

26 24 16 PANELBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 32 13 DIESEL ENGINE GENERATORS

26 33 53 STATIC UNINTERRUPTABLE POWER SUPPLY

26 36 00 TRANSFER SWITCHES

26 43 13 SURGE PROTECTION FOR LOW VOLTAGE FOR ELECTRICAL POWER

CIRCUITS

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 51 16 SOUND MASKING SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

VOLUME 2 OF 3

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

Table of Contents Page 3

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

DIVISION 33 – UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

APPENDIX A EGLIN AFB COMMUNICATIONS STANDARDS

APPENDIX B EGLIN AFB ELECTRICAL STANDARDS

APPENDIX C ASUS WATER AND SANITARY SEWER STANDARDS

VOLUME 3 OF 3

APPENDICES (Continued)

APPENDIX D EGLIN AFB FIRE DEPARTMENT STANDARDS

APPENDIX E CHELCO DESIGN – CONSTRUCTION STANDARDS, DECEMBER 1, 2008

APPENDIX F FF&E (FOR REFERENCE ONLY)

--End of Project Table of Contents--

00 11 00

AMENDMENT NO. W9127819R0002-0001

4.3 Volume I – Tab C. Factor 3 - Key Personnel Experience and Qualifications.

The Offeror shall include only resumes for the Key Personnel listed below. Key Personnel shall provide a resume to demonstrate project experience for their assigned role for the contract, clearly demonstrating duties performed supporting their assignment. Key Personnel shall emphasize “relevant” experience with recent design-build construction projects in and around military installations with multi-level secure area rated requirements.

For each person listed provide a resume of experience. If a time requirement for experience is noted below, ensure that the listed project experience duration when totaled meets or exceeds the minimum years of experience requirement. Attachment 5 at the end of this section may be used. At a minimum provide, all the information listed on the form. Individual personnel resumes are limited to 2 pages. Factor 2 3 shall not exceed ten pages.

(1) Construction Project Manager (person responsible for all construction operations): The Construction Project Manager shall have at a minimum a Bachelor’s Degree in Engineering, Construction Management, or Building Science from an accredited University, and a minimum of at least 5 years “relevant” experience, within the past 10 years, as construction project manager.

(2) On-site Superintendent (person in charge of all on-site operations):

minimum experience requirement for the on-site superintendent is at least 7 years “relevant” experience, within the past 10 years, as an on-site superintendent, managing multiple trades and subcontractors.

(3) Construction Quality Control Manager: The Construction Quality Control

Manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years of “relevant” experience in related work as a Construction Quality Control Manager or a construction person with a minimum of 10 years in related work.

(4) Project Scheduler: Proposed Project Scheduler is the person responsible for scheduling all construction operations. Minimum experience requirements for the Construction Project Scheduler are at least two (2) years of “relevant” construction scheduling experience similar to the project effort required by this RFP; and demonstrated past experience dealing with similar projects meeting the requirement of specification section 01 32 01.00 10 (PROJECT SCHEDULE) and the need for pertinent data to be uploaded into RMS/QCS. Describe experience with Primavera or equivalent scheduling software.

(5) Site Safety and Health Officer (SSHO) (person in charge of all safety operations): minimum experience requirement for the SSHO is at least five (5) continuous years “relevant” experience as specified in the EM 385-1-1 or four

(4) years of “relevant” experience if the SSHO has a third party, Nationally Accredited (ANSI or National Commission for Certifying Agencies - NCCA) SOH-related certification.

4.4 Volume I – Tab D. Factor 4 - Technical Approach.

4.4.1 In Factor 4, the Offeror must submit a technical approach narrative to explain their company’s capabilities to execute the construction work required by the solicitation. Reference drawings and specification for project information required by this solicitation. Factor 4 shall not exceed fifteen pages (all pages including schedules, drawings, figures, etc.). Address the following item, in a narrative format:

(a) Provide a matrix of the entities and, by name, key management personnel, and the projects that have been performed that demonstrates the degree of team collaboration and continuity the Offeror is proposing. In the matrix include the prime contractor, design team, major subcontractors and specialty subcontractors and the projects similar to the solicitation that the team performed.

(b) Describe the home office organizational structure, allocation of responsibilities, and show the lines of authority to support the execution of this design-build construction contract. At a minimum, discuss key management positions and departments, project team composition for both design and construction, to include subcontractors, etc. Include an organizational chart and ensure the information fully supports the narrative.

(c) Provide a preliminary construction schedule to demonstrate an understanding of the entire scope. As a minimum, include key tasks with durations for such activities the shop submittals with required reviews, the construction effort, joint occupancy and phasing required for Government Furnished/Contractor Installed and Government Furnished/Government Installed equipment, commissioning and Secure Area certification (accreditation) efforts, closeout, and turnover activities. Clearly indicate the major milestones for major work features. Ensure the project duration meets the project requirements in calendar days starting from the Government’s notice to proceed (NTP) to Closeout Documents approval. The preliminary project schedule shall state the scheduling software including version to be used that is compatible with the QCS software.

(d) Provide a description of the Offeror’s plan to ensure a safe and secure environment, especially in relation to the addition to the existing operational facility. The discussion shall include the contractor’s plan for safe performance of the project requirements that would be required for a facility construction project with Secure Area on a military installation, as well as any special requirements working in close proximity and connecting to the existing operational secure facility. The discussion shall also include the contractor’s plan for complying with the security requirements, specifically related to the Construction Security Plan requirements, UFC 4- 010-05, and ICD/ICS 705 and cooperation with the Accrediting Official, Site Security Manager, and other designated security representatives.

(NOTE: The remainder of the section is unchanged by the amendment.)

01 00 00

01 00 00

1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (1) commence work under this contract within 8 calendar days after the date the Contractor receives Notice To Proceed(NTP), (2) prosecute the work diligently, and (3) complete the entire work ready for use not later than 300365 calendar days after receipt of Notice To Proceed (NTP). This time stated for completion shall include final cleanup of the premises. Provisions stipulated for planting maintenance of grass are excluded from the completion time.

1.4 JOINT OCCUPANCY

The Contractor is hereby made aware that Joint Occupancy will be required for 30 90 calendar days prior to the construction completion date to allow the installation of the following Government Furnished/Government Installed (GFGI) systems and equipment by Base personnel and other Contractors; intrusion detection system (IDS), access control system (ACS), FF&E, and CCTV system.

Contractor shall cooperate to enable the GFGI work to be installed during the construction contract duration and complete the wiring of the FF&E workstations after GF installation.

1.48 Contractor Construction Security Plan

The Contractor shall develop a Contractor Construction Security Plan that defines how the existing secure areas will maintain operation during all phases of construction and submit to COTR for review by the User's Site Security Manager (SSM) and approval of Contractor's proposed approach and execution of the work. A security construction plan shall be prepared and submitted for review at each design submittal as required for compliance in ICD/ICS 705, including construction security requirements of Chapter 3. B.,in RFP Section 01 10 10-3.16 and Section 01 10 12-2.4.2 and updated during the construction phase if the plan changes. The design and construction documents shall include sufficient detail and information to support the security construction plan to explain how the Contractor will maintain uninterrupted operation of existing building, including current Secure Area accreditations.

01 00 01

1. REQUESTS FOR INFORMATION (MAR 2013)

Any questions about this solicitation, including technical questions about plans and specifications, shall be submitted via the Bidder Inquiry Portal in ProjNet at https://www.projnet.org. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.

Questions shall be submitted no later than 05 8 FEB 2019 at 2:00 p.m. Central Time to allow time for a response, and amendment to the solicitation if necessary. On this date and time the portal will be closed.

For technical questions, no other means of communication, e-mail, fax, or telephone will be accepted. Oral exchanges between Offerors or Bidders and the government prior to award of the contract will not be binding. In addition to information available to Offerors or Bidders on the Bidder Inquiry Portal, any information concerning this solicitation will be furnished to all Offerors or Bidders as an amendment to the solicitation if the information is necessary to the submittal of offers or bids.

The Solicitation Number is: W9127819R0002 The Bidder Inquiry Key is: 4EX852-N7U8N6

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

Offerors or Bidders are requested to review the solicitation and amendments in their entirety, as well as to review the Bidder Inquiry Portal for previous questions and responses, prior to submission of a new inquiry on the Portal.

CAUTION: ANY INQUIRY SUBMITTED AND ANSWERED WITHIN THIS SYSTEM, WILL BE

ACCESSIBLE TO VIEW BY ALL INTERESTED OFFERORS OR BIDDERS ON THIS SOLICITATION.

The call center for the ProjNet operates weekdays from 8 AM to 5 PM U.S.

Central Time Zone. The telephone number is 1-800-428-HELP.

End of Paragraph

Added in its entirety by Amendment No. W9127819R0002-0001

APPENDIX F

FF&E

(FOR REFERENCE ONLY)

SECTION 1: Systems and Modular Furniture 1 | P a g e

EGLIN AFB, FL

AFLCMC TEMPORARY FACILITIES - PHASE II

FF&E REQUIREMENTS FOR BUILDINGS 1 AND 2

SECTION 1

SYSTEMS AND MODULAR FURNITURE

1.1 SYSTEMS AND MODULAR FURNITURE

1.1.1 Systems and Modular Furniture: The contractor is to Purchase, design, assemble and install the workstations. Installation of all supporting electrical wiring, communication and data wiring to all workstations shall be by others. The Contractor will be required to solicit proposals from only the four approved Mandatory Systems and Modular Furniture vendors: Allsteel, Knoll, Teknion, and Haworth. The Contractor will be required to solicit competitive proposals from all four vendors.

1.1.2 STANDARD OFFICE WORKSTATION

A. The Standard 6 feet x 6 feet Staff Modular Workstation is as follows:

1. Work surface configuration: L-shaped with corner work surface.

2. Standard work surface size: 6 feet x 6 feet.

3. Stackable Panel System.

4. Panel height: 62 in – 70 in, includes 45”-57” base panels with stack panels above.

5. Powered Panels: three (3) duplex receptacles (six plug in points)

6. Communications:

a. One (1) Voice & Data Dual Port (RJ45)

b. One (1) 6-Port MM Fiber Outlet (Unkeyed LC)

c. One (1) 2-Port MM Fiber Outlet (Keyed LC)

7. Work surface: Laminate with vinyl edge.

8. Storage: one (1) Box/Box/File: two (2) small drawers and one (1) large file drawer, with locks, pencil tray and rails. File/File: two (2) large drawers with locks and rails.

9. Overheads: six lineal feet, includes lockable metal flipper doors for each overhead cabinet.

10. Full length tack boards and task light under each overhead cabinet.

11. Power-Pole as required by design.

12. Mid-grade recycled fabric, metal connectors.

13. All connectors, finish trim, hardware and support

B. The L-shaped workstation with the corner work surface is the basic configuration. The

Contractor will be allowed to design the workstations so as to accommodate multiple

FOR R

EFERENCE O

NLY

SECTION 1: Systems and Modular Furniture 2 | P a g e configurations, such as double and quad configurations, using the L-shaped workstation as its template and using the common wall to adjoin the workstations. The same requirements will be required within each workstation, but the cost of the common wall would reduce the overall cost.

1.1.3 STANDARD MANAGER OFFICE WORKSTATION

A. The Standard 8 feet X 12 feet Manager Modular Workstation is as follows:

1. U-Shaped work surface with D-top

2. Office Height Panels (76”-81”), All solid with door, includes 45”-57” base panels with two (2) stack panels.

3. Powered panels with three (3) Duplex Receptacles (six plug in points)

4. Communications:

a. One (1) Voice & Data Dual Port (RJ45)

b. One (1) 6-Port MM Fiber Outlet (Unkeyed LC)

c. One (1) 2-Port MM Fiber Outlet (Keyed LC)

5. Power Pole

6. Mid-grade recycled fabric, metal connectors.

7. All Connectors, finish trim, hardware and supports.

8. Work surfaces will be laminate with vinyl edge.

9. Storage: one (1) Box/Box/File (two small drawers and one large drawer) with locks, pencil tray and rails.

10. Storage: one (1) 30” wide, two drawer lateral file with lock and rails.

11. Overheads: eight lineal feet.

12. Full length tack boards and task lights under each overhead.

13. Includes lockable metal flipper doors for each overhead.

1.1.4 STANDARD ADMINISTRATIVE DESK

A. The Standard Freestanding “U” Shaped Administrative Desk:

1. Freestanding U-shaped configuration.

2. Size: 6 feet x 8 feet -6 inches x 6 feet

3. Work surface-laminate with vinyl edge.

4. Full depth end panels on each end.

5. Full height modesty panel on front.

6. 3/4 or 1/2 height modesty panel on back and side.

7. All hardware finish trim, and supports.

8. Storage: one (1) Box/Box/File (two (2) small drawers and (1) large drawer) with locks, pencil tray and rails.

9. Storage: one (1) 36” Wide 2-drawer lateral file with locks and rails.

FOR R

SECTION 1: Systems and Modular Furniture 3 | P a g e

1.1.5 ESD Workbench

A. Static-dissipative work bench with chip-resistant, ESD plastic laminate top with 180° soft front edge and 10⁶ to 10⁹ OHMS and 100 volts.

1. Dimensions: 72" W x 28"D x 28 7/8"-37 7/8" H

2. Open shelves below work surface, 3 drawer below left side of work surface.

3. Overhead light and overhead hinged door.

4. All storage to be locking.

5. UL approved 15 amp electrical outlet strip with 5 outlets.

6. Paint Finish: Flint Gray

7. Laminate: Dove Gray ESD

SECTION 1: Systems and Modular Furniture 4 | P a g e

SECTION 1: Systems and Modular Furniture 5 | P a g e

SECTION 1: Systems and Modular Furniture 6 | P a g e

SECTION 1: Systems and Modular Furniture 7 | P a g e

SECTION 1: Systems and Modular Furniture 8 | P a g e

SECTION 1: Systems and Modular Furniture 9 | P a g e

SECTION 1: Systems and Modular Furniture 10 | P a g e

SECTION 1: Systems and Modular Furniture 11 | P a g e

SECTION 2: Furniture 12 | P a g e

SECTION 2

FURNITURE

2.1 Furniture: The contractor is to Purchase, design, assemble, and install executive office furniture. Conference tables, conference chairs, task chairs, filing cabinets, projector screens, etc.

and install all supporting electrical wiring, communication and data wiring as required.

2.2 EXECUTIVE OFFICE FURNITURE

A. Traditional Style “U” Shaped Desk

1. 72”w x 36”d Rectangular Desk, 48”w x 24”d Bridge, 72”w x 24”d Credenza

2. Minimum room size required: 9’ x 12’ with guest chairs

3. (3) Wood veneer stain options for tops and chassis

4. (2) Traditional hardware pull options

5. (2) Traditional edge molding options

6. Support:

b. Full depth end panels

c. Full height modesty panels

d. Full height modesty panel on desk

e. Partial modesty panel on return and credenza

7. Storage:

a. One (1) Box/Box/File pedestal (two (2) small drawers and one (1) file drawer), with pencil tray, hanging rails, locks.

b. One (1) File/File pedestal (two (2) file drawers) with hanging rails, locks.

8. Hutch with half-height cabinets to top of credenza, includes wood doors, tack boards, task lights and locks.

2.3 SEATING

A. Breakroom Chair:

1. Company: NeutralPosture

2. Series/Style: Nightingale 808-Butterfly

3. Seat and back are 100% recycled plastic

4. Back is perforated with small holes to keep the user cool while seated.

5. Waterfall seat edge.

6. Dimensions: 22.5’w x 21.5”d x 32.5”h

7. Seat Dimensions: 17’w x 17”d x 18”h

8. Back Dimensions: 18.5”w x 16”h

B. Executive Office Task Chair:

2. Series/Style: Nightingale/Veronna 7000D

3. Synchronous swivel-tilt mechanism with multi-position tilt-lock, pneumatic height

FOR R

SECTION 2: Furniture 13 | P a g e adjustment, and tension control.

4. Trigger activated height adjustable arms with arm pads that pivot forward and backwards, inside and outside.

5. Built-in integral seat glider, 2-1/2” adjustable seat depth.

6. Waterfall seat.

7. Lumbar adjustment with a 3” travel.

8. ENERSORB foam seat for comfort and support. High density foam back for comfort and durability.

9. Black frame and base with chrome plated back support, upholstered seat and back.

10. 2” wheel casters for carpet.

11. Dimensions: 26”-27”w x 25”-27.5”d x 39”-43.5”h

C. Office Task Chair:

2. Series/Style: Nightingale/Veronna 7000D

3. Synchronous swivel-tilt mechanism with multi-position tilt-lock, pneumatic height adjustment, and tension control.

4. Trigger activated height adjustable arms with arm pads that pivot forward and backwards, inside and outside.

5. Built-in integral seat glider, 2-1/2” adjustable seat depth.

6. Waterfall seat.

7. Lumbar adjustment with a 3” travel.

8. ENERSORB foam seat for comfort and support. High density foam back for comfort and durability.

9. Black frame and base with chrome plated back support, upholstered seat and back.

10. 2” wheel casters for carpet.

11. Dimensions: 26”-27”w x 25”-27.5”d x 39”-43.5”h

FOR R

SECTION 2: Furniture 14 | P a g e

D. Guest Chair:

1. Company: NeutralPosture

2. Series/Style: Cricket-Nightingale 500

3. Heavy duty tubular steel frame and high density foam.

4. Stacks 6 high freestanding.

5. Static lumbar support located 4” to 15” above compressed seat

6. 4 leg frame with upholstered seat and back on glides.

7. Option: Will have arms.

8. Black frame upholstered seat and back.

9. Dimensions: 20”w x 21”d x 32”h

E. Executive Guest Chair:

1. Company: Kimball Office

2. Series/Style: Innsbruck 76-5012F

3. Frames are constructed of kiln dried maple hardwood with securely glued double doweled joints to ensure maximum strength.

4. Adjacent seat rails are reinforced with hardwood corner blocks attached with glue and wood screws,

5. All seat rails are faced with vertical, straight-cut veneer for grain uniformity.

6. Multiple pieces of strip webbing are spanned and stapled side-to-side and front-to-back on the seat frame.

7. Upholstered with a contoured interior frame constructed of 5/8” interior dimensions covered with solid webbing.

8. Interior frame is covered with 1” thick, high resiliency, CFC-free=free polyurethane foam and is fastened to the chair frame with steel pins and wood screws.

9. Dimensions: 23.25”w x 23.25”d x 37”h

F. Conference Chair:

2. Series/Style: Nightingale WXO 5800

3. Torsion activated synchronous.

4. 360 degrees swivel-tilt mechanism.

5. Black polyurethane integral skin, molded arm pads with enhanced waterfall.

6. Black frame and base, upholstered seat and mesh back.

7. Black dual wheel hooded nylon casters for carpet.

8. Dimensions: 18.5” back height, 16-20.5” seat height, 18” seat depth, 19.5” seat width.

G. Conference Guest Chair:

2. Series/Style: Firefly

3. Mesh back and upholstered seat.

4. Waterfall seat design.

5. Stacks 6 high freestanding.

6. Waterfall seat.

7. Black frame and arms.

8. Dimensions: 23.25 overall width, 22” overall depth, and 31.75” overall height.

FOR R

SECTION 2: Furniture 15 | P a g e

2.4 CONFERENCE TABLES AND TABLES

A. Circular Table:

1. Company: Versteel

2. Style: Performance Series

3. Dimensions: 42” Diameter x 29” high

4. Table Top Shape: Round Laminate Top, flat PVC edge

5. Base: Metal Double “X” Base

B. Conference Table:

1. Company: Versteel

2. Style: Brattice

3. Dimensions: Depending on the Conference Room requirements

(see chart at end of FF&E package, all tables to be 36” in height)

4. Table Top Shape: Rectangular Table Top

5. Base: Brattice T2

6. Conference Table is to be only used where integration of power and data requirements at the table are not required.

SECTION 2: Furniture 16 | P a g e

SECTION 2: Furniture 17 | P a g e

SECTION 2: Furniture 18 | P a g e

SECTION 2: Furniture 19 | P a g e

SECTION 2: Furniture 20 | P a g e

SECTION 2: Furniture 21 | P a g e

SECTION 2: Furniture 22 | P a g e

SECTION 2: Furniture 23 | P a g e

SECTION 2: Furniture 24 | P a g e

101 Product Support Manager 6 1 1 1 36"x60" table 102 Deputy Material Leader 1 8 1 1 36"x96" table 103 Chief Engineer 1 8 1 1 36"x96" table 104 Senior Material Leader 1 8 1 1 36"x96" table 106 Financial Manager 6 1 1 1 36"x60" table 107 B61 Area 2 54 54 108 Director of Contracts 6 1 1 1 36"x60" table 110 Conference Room 26 36 4 36"x84" tables 111 Conference Room 17 33 3 36"x72" tables 112 Integration 4 4 113 Office 1 2 1 114 Office 1 2 1 115 Conference Room 17 3 3 36"x72" tables 116 Open Office 13 13 117 Office 1 2 1 118 Secure Finance Room 8 8 119 M & S 5 5 120 Test 2 3 2 1

121 SCIF 2 2

122 Conference Room 9 13 1 48"x120" table 124 Open Office 159 42 21 138 125 Conference Room 17 3 3 36"x72" tables 126 Material Leader 6 1 1 1 36"x60" table 127 Financial Manager 6 1 1 1 36"x60" table 128 Product Support Manager 6 1 1 1 36"x60" table 129 Chief Engineer 1 8 1 1 36"x96" table 130 Conference Room 17 3 3 36"x72" tables 131 Material Leader 6 1 1 1 36"x60" table 132 Director of Contracts 6 1 1 1 36"x60" table 133 Senior Material Leader 1 8 1 1 36"x96" table 134 Deputy Material Leader 1 8 1 1 36"x96" table 135 IT/IA Working Room 15 13 2 Workbench with corner 136 Conference Room 17 3 3 36"x72" tables 139 Conference Room 18 34 3 42"x72" tables 140 Office 1 2 1 141 Conference Room 14 36 2 48"x96" tables 143 Area 4 Security 4 4 144 S.I.P.R. Café 5 5 147 Open Office 20 20 148 Deputy Material Leader O T & E 1 2 1 149 Conference Room 8 1 36"x72" table 150 Collateral Security 1 2 1 151 IT Working Area 2 2 157 Break Room 40 5 30"x96" tables

40 299 102 14 48 160 167 21 268 14 6 45 1

Eglin AFB, FL AFLCMC Phase II FF&E Requirements for Buildings 1 and 2

(Note: Quantities are listed For Each Building)

Room Number Room Name

Furniture Needed

N ot es

B re ak R oo m

C ha ir

O ff ic e

Ta sk

C ha ir

G ue st C ha ir

Ex ec ut iv e G ue st

C ha ir

C on fe re nc e

C ha ir

C on fe re nc e

G ue st C ha ir

ES

D

W or kb en ch

St an da rd

O ff ic e

W or ks ta tio n

St an da rd

A dm in is tra tiv e D es k

Ex ec ut iv e O ff ic e D es k

C on fe re nc e

Ta bl e

C irc ul ar

T ab le

Ex ec ut iv e O ff ic e Ta sk C ha ir

Total

St an da rd

M an ag er

W or k C ub e

FOR R

A

B

C

D

E

F

G

H

I

1 2 3 4 5 6 7 8 9 10 11 12

D E

S C

R I P

T I O

N M

A R

K

D A

T E

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

S I Z

E

S U

B M

I T

T E

D

B

Y

C O

N T

R A

C T

N

O

A N

S I

F

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

P R

O J E

U M

B E

R

F I L E

M

E

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

M O

B I

D

I S

T R

I C

T

M O

B I L E

A

L A

B A

M A

S

A I N

T

J O

S E

H

S

R

E E

T

SHEET ID

E G

L I

B

A F

L C

M

M

P O

R A

R Y

C

I L I T

Y

D E

C E

M B

W R

- M H

F

ID-01

F F

O

A

N

R E

V r c h i t e c t u r a l

I D d w g

FOR R

EFERENCE O

NLY

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text

FD

AutoCAD SHX Text

SENIOR

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

AutoCAD SHX Text

DEPUTY

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MANAGER

AutoCAD SHX Text

AutoCAD SHX Text

B61 AREA 2

AutoCAD SHX Text

AutoCAD SHX Text

FINANCIAL

AutoCAD SHX Text

MANAGER

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

DIRECTOR OF

AutoCAD SHX Text

CONTRACTS

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTEGRATION

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

TEST

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

SECURE

AutoCAD SHX Text

FINANCE ROOM

AutoCAD SHX Text

AutoCAD SHX Text M&S

AutoCAD SHX Text

AutoCAD SHX Text

SCIF

AutoCAD SHX Text

AutoCAD SHX Text

SERVER ROOM

AutoCAD SHX Text

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MANAGER

AutoCAD SHX Text

AutoCAD SHX Text

FINANCIAL

AutoCAD SHX Text

MANAGER

AutoCAD SHX Text

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

SECURE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

IT/IA WORKING

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

DIRECTOR OF

AutoCAD SHX Text

CONTRACTS

AutoCAD SHX Text

AutoCAD SHX Text

SENIOR

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

DEPUTY

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

LEADER

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

RISE ROOM

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN'S RR

AutoCAD SHX Text

AutoCAD SHX Text

MEN'S RR

AutoCAD SHX Text

AutoCAD SHX Text

JANITOR'S RM

AutoCAD SHX Text

AutoCAD SHX Text

DEPUTY MATERIAL

AutoCAD SHX Text

LEADER O T & E

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

COLATERAL

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

AutoCAD SHX Text

IT WORKING AREA

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

S.I.P.R. CAFE

AutoCAD SHX Text

AutoCAD SHX Text

COMM ROOM

AutoCAD SHX Text

NIPR

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

ENTRAPMENT

AutoCAD SHX Text

AutoCAD SHX Text

AREA 4

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLOOR PLAN

AutoCAD SHX Text 3/32"=1'-0"

AutoCAD SHX Text

SQUARE FOOTAGE - 35421 S.F.

AutoCAD SHX Text

OCCUPANCY LOAD = 325

AutoCAD SHX Text

BUILDING AREA INCREASE CALCULATION

AutoCAD SHX Text Aa = { At + [At + If ] + [At x Is]}

AutoCAD SHX Text Aa = { 9000 + [9000 + .00] + [9000 x 3]}

AutoCAD SHX Text 9000 + 9000 + 27000

AutoCAD SHX Text Aa = 45000 SQFT

AutoCAD SHX Text

ELECTRICAL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NOTE: DRAWING SCALES MAY BE APPROXIMATE. DO NOT SCALE DIMENSIONS OFF DRAWINGS, USE WRITTEN OR CALCULATED DIMENSIONS ONLY.

APPF_AM01.pdf
FF&E
EGLIN AFB, FL
AFLCMC TEMPORARY FACILITIES - PHASE II
FF&E REQUIREMENTS FOR BUILDINGS 1 AND 2
SECTION 1
SYSTEMS AND MODULAR FURNITURE
SECTION 2 FURNITURE
AFLCMC Phase I - FF&E Requirements
Trailer Requirements

20190204 - AFLCMC - Architectural ID01

File details come from the government source that posted it.