The purpose of this amendment is to add the drawings inadvertently omitted from the solicitation. All other terms and conditions remain unchanged.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add draw ings inadvertently omitted from the solicitation. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G18B0030
X 9B. DATED (SEE ITEM
11) 22-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jun-2018
CODE
CESWF-EC
819 TAYLOR STREET, ROOM 4A17
FORT WORTH, TX 76102
FORT WORTH TX 76102
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G18B0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
SAN ANTONIO
M
E
D
I
N
A
RIV
ER
S
T
O
R
IV
G
U
L
P
C
K
V
GUADALUPE
B
CREEK
KENDALL
LU
RIVER
WILSON
BEXAR
COMAL
ATASCOSA
CALAVERAS
LAKE
Brooks AFB
Randolph AFB
International Airport
San Antonio
New
Braunfels
Seguin
Stockdale
Boerne
CANYON LAKE
REC. AREA
FORT SAM
HOUSTON
CAMP
BULLIS
LACKLAND AFB
Kelly
AFB
NO. 9
NO. 18
COURTS
BASKETBALL
TENNIS COURTS
. 1
NO
. 8
NO. 9
DODD
NO. 6
. 7
RUNNING TRACK
TENNIS COURT
FOOTBALL
FIELD
COURT
SLOW PITCH
SOFTBALL
BASKETBALL COURT
FOOTBALL
GOLF COURSE
FAIRWAYS
FIELDS
FAC.#1390
FAC.#1365
FAC. #6159
TENNIS
#940
FAC.#1391
RUNNING
TRACK 3325
638632 634630
688 616
602601
631 633 635
PM ADMIN
POST
CHAPEL
259258
756706 757
703 702
750701
414413411410
463 465
459457455
5 5
ADMIN
OFFICERS
OPEN MESS
H
450448
444442
404 405403
451449
447445443
471 472 473 474
462454 460
479476 477 478
B1010
BOQ
710711
760761
767 766
769 768
713 712
771720
725 724 775
735 734
730 781
726 777
838808
854816
B2412
A1002
1158 1159
1160 1161
C1014
OBSTACLE
COURSE
30013006
USACIDC
WATER TOWER
1381 1383
1373 1372
GOLF
CLUBHOUSE
VOQ
113 112114
Q
143 144
LATRINES
6048 6060
5937 5931
6149 6143
CDC
570157135725
5549 5561
B0626
96199619
9635 9627
9616 9608
9624 9626
A0610
B0610
A0609
B0609
A0608
B0608
A0607
B0607
B0606
A0606
A0605
B0605
A0604
B0604
A0603
B0603
A0602
B0602B0601
A0601
B0642
B0640
B0638
B0636
B0634
B0632
B0630
B0628
B0622
B0620
B0618
B0619
B0621
B0623
B0625
B0627
B0629
B0631
B0633
B0635
B0637
A0611
B0014
B0013
B0012
B0011
B0010
B0009
B0008
B0007
B0004
B0003
B0002
B0001
B0182
B0470 B0472
B0469
B0445
B0474
B0449
B0442
B0446
B0448
B0402
B0404
B0476 B0478 B0480
B0455
B0459
B0463
B0454 B0460 B0462
B0409
B0411
B0413 B
A0612
B0015
40554055
F
IC
IN-OUT
PROCESSING2226
POND
RX
B1462
4058 4057
ITR
TOWER
IN
W
#2
#1
FLAGPOLE
HELIPAD
YOUTH CENTER
COVEREDSTORAGE
COVERED
STORAGE
CENTER
USAR
1109 1106
B1203
B1205
B1207
B1209
B1211
B1213
B1215
B1217
B1219
B1223
B891
B889
B887
B885
8503 8504
8505 8506
8508 8509
8528 8530
8536 8540
8582 8584 8586 8588 8590
8523 8525 8527
8529 8531
8580 8581 8583 8585
8587 8589 8591 8593
8615 8617
8560 8562
8564 8566 8568 8570
8517 8518 8519
8561 8563 8565
8569 8571 8572
8614 8616
8623 8624
8662 8663 8664 8665 8666
8668 8669 8670 8671 8672 8673
8503 8504
8505 8506
8508 8509
8528 8530
8536 8540
8582 8584 8586 8588 8590
8523 8525 8527
8529 8531
8580 8581 8583 8585
8587 8589 8591 8593
8615 8617
8560 8562
8564 8566 8568 8570
8517 8518 8519
8561 8563 8565
8569 8571 8572
8614 8616
8623 8624
8662 8663 8664 8665 8666
8668 8669 8670 8671 8672 8673
#4
#3
INTREPID CTR
GUESTHOUSE
Y
PARK
RECREATION
SALADO
USNR/USMC
RESERVE CTR
X
LW
AR
EH
SE
CONCESSION STAND
PUMP HOUSE
USAR
YOUTH
ROBERT COLE
JR.- SR. HIGH SCHOOL
DEPENDENT
FLAG POLE
SCHOOL
ELEMENTARY
BARRACKS
MUSEUM
MONUMENT
MEDICAL
MEDICAL
COMMAND
HEALTH SCIENCES
ACADEMY OF
CLUB
GYM
EM
SERVICE
DRAMA
CLUB
DENTAL
CLINIC
STUDENT
SHOPETTE
PX
LIBRARY
NCO OPEN MESS
THEATER
PROCESSING
KIDDIE POOL
POOL
MINI-MALL
DINING
FACILITY
SWIMMING
OUTDOOR REC
DISPENSERY
SUBSTATION
CHILD CARE
RELIGIOUS CENTER
LEMON
LOT
VET
LAB
BOWLING
AUTO SHOP
GARAGE
PAVILLION
BEACH
CREDIT UNION
COMMISSARY
CLASS VI
BRANCH
EXCHANGE
PARKING
EXCHANGE
PXTRA
MAIN AAFES
PX EXCHANGE
IN
GYM
CONSOLIDATED
MAINTENANCE
20'X20'
CONCRETE BOX
FIFTH USA
BAND STAND
WATER TREATMENT
PLANT
HOSPITAL
VET
HQ AMEDD
C&S
SCHOFIELD AVE
GIB
NCO ACADEMY
UNIT
SANITARY FILL
AREA (ABANDONED)
INFANTRY POST ROAD
RD. NO. S-2
AREA
QUADRANGLE
LISCUM ROAD
JESSUP ROAD
PINE STREET
NIKA STREET
STAFF POST ROAD
GRAYSON STREET
N. NEW BRAUNFELS AVENUE
WILSON STREET
CARSON STREET
SPOFFORD STREET
SHARPE ROAD
AINSWORTH ROAD
RD. NO. S-34
EASLEY STREET
RD. NO. S-35
HOOD STREET
RD. NO. S-6-S
RD. NO. S-6-N
GREELEY ROAD
HOOD STREET
PARKER ROAD
RD. NO. S-5
DICKMAN ROAD
BURR ROAD
ARTHUR
MACARTHUR
CONNELL ROAD
TREAT FIELD
CAVALRY POST
ROAD NO. S-19
BUCK ROAD
BRACKENRIDGE ROAD
ARTILLERY POST ROAD
ROAD NO. S-3
ELEANOR AVENUE
ARMY BOULEVARD
LAWTON ROAD
L L
GORGAS CIRCLE
W.W. WHITE ROAD
TAYLOR ROAD
CROCKETT ROAD
McIDOE ROAD
IE
. S
-2
HARNEY ROAD
W.W. WHITE ROAD
HARNEY ROAD
ZINN ROAD
Z
KOEHLER ROAD
HARDEE ROAD
PERSHING FIELD
JACKSON FIELD
STONEWALL
NATIONAL
CEMETERY
HOUSTONFORT SAM
RITTIMAN ROAD
Z
MEIGS ROAD
HUMPHREY RD
COMMISSARY
PARKING
McGEE RD.McGEE RD.
TAYLOR RD.
FORT SAM
HOUSTON
NATIONAL CEMETERY
HARDEE ROAD
WASH RACK
WINANS ROAD
CALUGAS COURT
VIDALES CIRCLE
DECKER CIRCLE
BUCKNER COURT
MEEKS CIRCLE
BONDSTEEL
CIRCLE
ODOM
KIMBRO
FARR
DEAN
BURGE CIRCLERODRIGUES CIRCLE
ASHBY
GARDNER
BARKELY CIRCLE
JOHNSTON CIRCLE
c
McMURRAY RD
JESSUP ROAD
GRAVEL
HARDSTAND
BINZ ENGLEMAN ROAD
BURR ROAD
TREAT FIELD
CAVALRY POST
BEEBE LOOP
ARMY BOULEVARD
W. W. WHITE ROAD
HELIPORT
W. W. WHITE ROAD
P1234
ALLEN ROAD
BINZ ENGLEMAN ROAD
P3625
P3620
P3621
P3622
P3600
P3611
ALLEN ROAD
STANLEY ROAD
WHEATON ROAD
GRAHAM ROADGRAHAM ROAD
WHEATON ROAD
GRAHAM ROAD
AREA
PLAY
GROUND
J
INGRAM PATH
LANG ROAD
FOULOIS PASS
BIRKHEAD DRIVE
BINZ ENGLEMAN RD
CLOSED GATE
GATE
CLOSED GATE
MEADE FIELD
TRACK
RUNNING
REPAIR 502 ABW/FSH MULTI-SERVICE TROOP AND
FAMILY READINESS
JOINT BASE SAN ANTONIO
Scale: N.T.S
REGIONAL MAP
NN
Scale: N.T.S
JBSA - SAM HOUSTON
NN
CONTRACTOR'S
ENTRANCE
VISITOR'S
ENTRANCE
PROJECT
LOCATION
G-001
XX
d w g
JOINT BASE SAN ANTONIO
SAM HOUSTON
502d CIVIL ENGINEER SQ.
SAN ANTONIO, TX
2 3 4 5 a t e p r o v l s r i n
Reference Number:
Sheet of
PROJECT NUMBER
1 2 3 4 5
IX
III
ST
EN
JBSF150055A
G-002 r
Sheet List Table
Sheet Number Sheet Title
GENERAL
G-001 COVER SHEET
G-002 DRAWING INDEX
G-003 PROJECT LOCATION PLAN
G-004 LIFE SAFETY PLANS AND BUILDING CODE SUMMARY
G-005 LIFE SAFETY PLANS AND BUILDING CODE SUMMARY
G-006 LIFE SAFETY PLANS AND BUILDING CODE SUMMARY
GC100 GENERAL CONTRACT
SURVEY
V-001 SURVEY ABBREVIATIONS AND LEGEND
VF100 FIELD SURVEY - BUILDING 2263
VF101 FIELD SURVEY - SWING SPACE
CIVIL
C-001 CIVIL LEGEND AND ABBREVIATIONS
C-002 CIVIL NOTES
CD100 DEMOLITION PLAN - BUILDING 2263
CD101 DEMOLITION PLAN - SWING SPACE
CI100 CIVIL IMPROVEMENTS - BUILDING 2263
CI101 CIVIL IMPROVEMENTS - SWING SPACE
CG100 GRADING PLAN - BUILDING 2263
CG101 EROSION CONTROL PLAN - BUILDING 2263
CG102 EROSION CONTROL PLAN - SWING SPACE
CU100 UTILITY PLAN - BUILDING 2263
CU101 UTILITY PLAN - SWING SPACE
C-500 CIVIL DETAILS
C-501 CIVIL DETAILS
C-502 CIVIL DETAILS
C-503 CIVIL DETAILS
C-504 CIVIL DETAILS
C-505 CIVIL DETAILS
STRUCTURAL
S-001 STRUCTURAL NOTES
S-102 STRUCTURAL FIRST LEVEL FLOOR PLAN A
S-103 STRUCTURAL FIRST LEVEL FLOOR PLAN B
S-104 STRUCTURAL SECOND LEVEL FLOOR PLAN A
S-105 STRUCTURAL SECOND LEVEL FLOOR PLAN B
S-106 STRUCTURAL THIRD FLOOR PLAN A
S-107 STRUCTURAL THIRD FLOOR PLAN B
S-108 STRUCTURAL ATTIC PLAN A
S-109 STRUCTURAL ATTIC PLAN B
S-501 FRAMING AND CONCRETE ANCHORAGE
S-502 FRAMING ATTACHMENTS
S-503 STRUCTURAL DETAILS
S-504 STRUCTURAL DETAILS
ARCHITECTURAL
A-001 ABBREVIATIONS AND SYMBOLS
AD100 BASEMENT FLOOR DEMO PLAN A
AD101 BASEMENT FLOOR DEMO PLAN B
AD102 FIRST FLOOR DEMO PLAN A
AD103 FIRST FLOOR DEMO PLAN B
AD104 SECOND FLOOR DEMO PLAN A
AD105 SECOND FLOOR DEMO PLAN B
AD106 THIRD FLOOR DEMO PLAN A
AD107 THIRD FLOOR DEMO PLAN B
AD108 BASEMENT FLOOR REFLECTED CEILING DEMO PLAN A
AD109 BASEMENT FLOOR REFLECTED CEILING DEMO PLAN B
AD110 FIRST FLOOR REFLECTED CEILING DEMO PLAN A
AD111 FIRST FLOOR REFLECTED CEILING DEMO PLAN B
AD112 SECOND FLOOR REFLECTED CEILING DEMO PLAN A
AD113 SECOND FLOOR REFLECTED CEILING DEMO PLAN B
AD114 THIRD FLOOR REFLECTED CEILING DEMO PLAN A
AD115 THIRD FLOOR REFLECTED CEILING DEMO PLAN B
AD116 ATTIC DEMOLITION PLAN A
AD117 ATTIC DEMOLITION PLAN B
AD118 ROOF DEMO PLAN A
AD119 ROOF DEMO PLAN B
A-100 BASEMENT FLOOR PLAN A
A-101 BASEMENT FLOOR PLAN B
A-102 FIRST FLOOR PLAN A
A-103 FIRST FLOOR PLAN B
A-104 SECOND FLOOR PLAN A
A-105 SECOND FLOOR PLAN B
A-106 THIRD FLOOR PLAN A
A-107 THIRD FLOOR PLAN B
A-108 ROOF PLAN A
A-109 ROOF PLAN B
A-110 ATTIC FLOOR PLAN A
A-111 ATTIC FLOOR PLAN B
A-112 BASEMENT FLOOR REFLECTED CEILING PLAN A
A-113 BASEMENT FLOOR REFLECTED CEILING PLAN B
A-114 FIRST FLOOR REFLECTED CEILING PLAN A
A-115 FIRST FLOOR REFLECTED CEILING PLAN B
A-116 SECOND FLOOR REFLECTED CEILING PLAN A
A-117 SECOND FLOOR REFLECTED CEILING PLAN B
A-118 THIRD FLOOR REFLECTED CEILING PLAN A
A-119 THIRD FLOOR REFLECTED CEILING PLAN B
A-201 NORTH ELEVATION
A-202 SOUTH ELEVATION
A-203 EAST AND WEST ELEVATIONS
A-204 COURTYARD ELEVATIONS
A-301 TYPICAL WALL TYPES
A-302 TYPICAL WALL SECTIONS
A-303 STAIR RAILING SECTIONS
A-304 STAIR RAILING SECTIONS
A-401
ENLARGED RESTROOM PLANS AND INTERIOR
ELEVATIONS
A-402 ENLARGED STAIR PLANS
A-403 ENLARGED STAIR PLANS
A-404 ENLARGED STAIR PLANS
A-501 WINDOW DETAILS
A-502 STOREFRONT DETAILS
A-503 CURTAIN WALL ENTRANCE DETAILS
A-504 MISCELLANEOUS DETAILS
A-505 STAIR RAILING DETAILS
A-506 ROOF DETAILS
A-507 MILWORK AND CEILING DETAILS
A-601 DOOR SCHEDULE - ELEVATIONS
A-602 DOOR SCHEDULE
A-603 DOOR SCHEDULE
A-604 DOOR SCHEDULE
A-605 WINDOW SCHEDULE - ELEVATIONS
A-606 ROOM FINISH SCHEDULE
A-607 ROOM FINISH SCHEDULE
A-608 ROOM FINISH SCHEDULE
A-609 SCHEDULE OF FINISHES
A-610 ENLARGED FINISH PLAN - FLOOR PATTERN BASEMENT
A-611
ENLARGED FINISH PLAN - FLOOR PATTERN FIRST
FLOOR
A-612
ENLARGED FINISH PLAN - FLOOR PATTERN SECOND
AND THIRD FLOORS
A-613 SIGNAGE SCHEDULE
A-614 SIGNAGE ELEVATION AND DETAILS
A-615 SIGNAGE BASEMENT FLOOR PLAN A
A-616 SIGNAGE BASEMENT FLOOR PLAN B
A-617 SIGNAGE FIRST FLOOR PLAN A
A-618 SIGNAGE FIRST FLOOR PLAN B
A-619 SIGNAGE SECOND FLOOR PLAN A
A-620 SIGNAGE SECOND FLOOR PLAN B
A-621 SIGNAGE THIRD FLOOR PLAN A
A-622 SIGNAGE THIRD FLOOR PLAN B
A-701 SWING SPACE FLOOR PLANS
A-702 SWING SPACE FURNITURE LAYOUT
FIRE PROTECTION
FX001
FIRE PROTECTION FIRE SPRINKLER GENERAL
INFORMATION
FX100 FIRE SPRINKLER BASEMENT FLOOR PLAN A
FX101
FIRE PROTECTION FIRE SPRINKLER BASEMENT
FLOOR PLAN B
FX102
FIRE PROTECTION FIRE SPRINKLER FIRST FLOOR
PLAN A
FX103
FIRE PROTECTION FIRE SPRINKLER FIRST FLOOR
PLAN B
FX104
FIRE PROTECTION FIRE SPRINKLER SECOND FLOOR
FX105
FIRE PROTECTION AND FIRE SPRINKLER SECOND
FX106
FIRE PROTECTION FIRE SPRINKLER THIRD FLOOR
FX107
FIRE PROTECTION FIRE SPRINKLER THIRD FLOOR
FX108 FIRE PROTECTION FIRE SPRINKLER ATTIC PLAN A
FX109 FIRE SPRINKLER ATTIC PLAN B
FIRE ALARM
FA001
FIRE ALARM AND MASS NOTIFICATION GENERAL
INFORMATION
FA100
FIRE ALARM AND MASS NOTIFICATION BASEMENT
FLOOR PLAN A
FA101
FIRE ALARM AND MASS NOTIFICATION BASEMENT
FA102
FIRE ALARM AND MASS NOTIFICATION FIRST FLOOR
FA103
FIRE ALARM AND MASS NOTIFICATION FIRST FLOOR
FA104
FIRE ALARM AND MASS NOTIFICATION SECOND
FLOOR PLAN A
FA105
FIRE ALARM AND MASS NOTIFICATION SECOND
FA106
FIRE ALARM AND MASS NOTIFICATION THIRD FLOOR
FA107
FIRE ALARM AND MASS NOTIFICATION THIRD FLOOR
FA108 FIRE ALARM AND MASS NOTIFICATION ATTIC PLAN A
FA109 FIRE ALARM AND MASS NOTIFICATION ATTIC PLAN B
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS
M-002 MECHANICAL SYMBOLS
MD100 BASEMENT MECHANICAL DEMO PLAN A
MD101 BASEMENT MECHANICAL DEMO PLAN B
M-100 BASEMENT MECHANICAL PLAN A
M-101 BASEMENT MECHANICAL PLAN B
M-102 FIRST FLOOR MECHANICAL PLAN A
M-103 FIRST FLOOR MECHANICAL PLAN B
M-104 SECOND FLOOR MECHANICAL PLAN A
M-105 SECOND FLOOR MECHANICAL PLAN B
M-106 THIRD FLOOR MECHANICAL PLAN A
M-107 THIRD FLOOR MECHANICAL PLAN B
M-500 MECHANICAL DETAILS
M-600 MECHANICAL SCHEDULES
PLUMBING
P-001 PLUMBING ABBREVIATIONS AND SYMBOLS
PD100 BASEMENT AND FIRST FLOOR PLUMBING DEMO PLAN
PD101 SECOND AND THIRD FLOOR PLUMBING DEMO PLAN
P-100 BASEMENT AND FIRST FLOOR PLUMBING PLAN
P-101 SECOND AND THIRD FLOOR PLUMBING PLAN
P-102 BASEMENT AND FIRST FLOOR SANITARY PLAN
P-103 SECOND AND THIRD FLOOR SANITARY PLAN
P-500 PLUMBING DETAILS I
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED100 BASEMENT DEMO POWER PLAN A
ED101 BASEMENT DEMO POWER PLAN B
ED102 FIRST FLOOR DEMO POWER PLAN A
ED103 FIRST FLOOR DEMO POWER PLAN B
ED104 SECOND FLOOR DEMO PLAN AREA A
ED105 SECOND FLOOR DEMO PLAN B
ED106 THIRD FLOOR DEMO POWER PLAN A
ED107 THIRD FLOOR DEMO POWER PLAN B
ED600 ONE LINE DIAGRAM DEMO
EL100 BASEMENT LIGHTING PLAN A
EL101 BASEMENT LIGHTING PLAN B
EL102 FIRST FLOOR LIGHTING PLAN A
EL103 FIRST FLOOR LIGHTING PLAN B
EL104 SECOND FLOOR LIGHTING PLAN A
EL105 SECOND FLOOR LIGHTING PLAN B
EL106 THIRD FLOOR LIGHTING PLAN A
EL107 THIRD FLOOR LIGHTING PLAN B
EP100 BASEMENT POWER PLAN A
EP101 BASEMENT POWER PLAN B
EP102 FIRST FLOOR POWER PLAN A
EP103 FIRST FLOOR POWER PLAN B
EP104 SECOND FLOOR POWER PLAN A
EP105 SECOND FLOOR POWER PLAN B
EP106 THIRD FLOOR POWER PLAN A
EP107 THIRD FLOOR POWER PLAN B
EP501 POWER DETAILS
EL601 LIGHTING SCHEDULE
EP600 ONE LINE DIAGRAM
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
EP603 PANEL SCHEDULES
EP604 PANEL SCHEDULES
EP605 PANEL SCHEDULES
EP606 PANEL SCHEDULES
EP607 PANEL SCHEDULES NEW
EP608 PANEL SCHEDULES NEW
EP609 PANEL SCHEDULES NEW
EP610 PANEL SCHEDULE NEW
EP611 PANEL SCHEDULE NEW
EP612 PANEL SCHEDULE NEW
EP613 PANEL SCHEDULE NEW
EP614 LOAD SUMMARY SCHEDULE
TELECOMMUNICATION
TN001
TELECOMMUNICATION ABBREVIATIONS, SYMBOLS
AND GENERAL NOTES
TD100
TD101 BASEMENT TELECOMM DEMO PLAN B
TD102 FIRST FLOOR TELECOMM DEMO PLAN A
TD103 FIRST FLOOR TELECOMM DEMO PLAN B
TD104 SECOND FLOOR TELECOMM DEMO PLAN A
TD105 SECOND FLOOR TELECOMM DEMO PLAN B
TD106 THIRD FLOOR TELECOM DEMO PLAN A
TD107 THIRD FLOOR TELECOMM DEMO PLAN B
TN100 BASEMENT TELECOMMUNICATION PLAN A
TN101 BASEMENT TELECOMMUNICATION PLAN B
TN102 FIRST FLOOR TELECOMMUNICATION PLAN A
TN103 FIRST FLOOR TELECOMMUNICATION PLAN B
TN104 SECOND FLOOR TELECOMMUNICATION PLAN A
TN105 SECOND FLOOR TELECOMMUNICATION PLAN B
TN106 THIRD FLOOR TELECOMMUNICATION PLAN A
TN107 THIRD FLOOR TELECOMMUNICATION PLAN B
T-501 TELECOMMUNICATION DETAILS
T-502 TELECOMMUNICATION DETAILS
G-003 r
SCALE: NONE
PROJECT LOCATION PLAN
NORTH
GENERAL NOTES
1. ALL BORROW OR SPOIL OPERATIONS SHALL BE OFF GOVERNMENT CONTROLLED PROPERTY AT THE
CONTRACTOR'S RESPONSIBILITY AND EXPENSE UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR CAN EXPECT DELAYS OF 15 MINUTES AND LONGER AT ACCESS CONTROL POINT. CONTRACTOR
MAY NEED TO ADJUST CONCRETE MIX DESIGN TO ASSURE SATISFACTORY CONCRETE QUALITY AND PLACEMENT.
3. THE CONTRACTOR SHALL OBTAIN 502ND CIVIL ENGINEERING SQUADRON APPROVAL FOR THE PROPOSED HAUL
ROUTE AND STAGING AREA.
STAGING AREA
PROJECT LOCATION
HAUL ROUTE
SWING SPACE
C.P. = 54
T.D. = 148'
T.D. = 149'
DOORSTAIR
170146
170140
NR
DOOR
UP
DN
UP UP
CLASSROOM
OFFICE
CORRIDOR
JANITOR
COMM
STAIR
MEN
ELEV.
EQUIP.
TELECOM
STOR.
WOMEN
RECEPTION
STAIR STAIR
CORRIDORCORRIDOR
WATER SERVICE
B48
OFFICEOFFICE
UP UP
VESTIBULE
OFFICE OFFICE
JAN.
LOBBY
OFFICE OFFICE
BREAK
LOBBY OFFICE
LOBBY
T.D. = 221'
T.D. = 228'
C.P. = 54
C.P. = 30
T.D. = 101'
LEGEND
INDICATES TRAVEL DISTANCE TO EXIT
INDICATES EXISTING TWO HOUR EXIT
ENCLOSURE
T.D. = XXX'
xx
EGRESS COMPONENT
CLEAR WIDTH (INCHES)
MAXIMUM CAPACITY
ACTUAL OCCUPANT LOAD
NR = NOT REQUIRED
G-004 p r o v s c r i p t i
SCALE:
" = 1'-0"
0 8' 16' 48'32'
BASEMENT LIFE SAFETY PLAN
CODE SUMMARY
FIRST FLOOR LIFE SAFETY PLAN
DEAD END CORRIDOR (LSC 101: 39.2.5.2)
COMMON PATH OF TRAVEL (LSC 101: 39.2.5.3.1
MAXIMUM TRAVEL DISTANCE (LSC 101: 39.2.6.3)
EGRESS CAPACITY (LSC TABLE 7.3.3.1)
MEANS OF EGRESS (LSC 101: 39.2.4.3 / IBC 1015.1)
OCCUPANT LOAD (LSC 101: TABLE 7.3.1.2 / IBC TABLE 1004.1.2)
PORTABLE FIRE EXTINGUISHER
FIRE SPRINKLER SYSTEM
FIRE RESISTIVE SEPARATION
ALLOWABLE HEIGHT AND AREA (IBC TABLE 503)
CONSTRUCTION TYPE
OCCUPANCY CLASSSIFICATION
BUILDING CODES
SHALL NOT EXCEED 50 FEET
PROVIDED = NOT APPLICABLE
SHALL NOT EXCEED 100 FEET
PROVIDED = XX' - X"
MAXIMUM DISTANCE ALLOWED = 300 FEET
MAXIMUM PROVIDED = XX' - X" FROM MOST REMOTE POINT TO EXIT
MINIMUM NUMBER OF EXITS REQUIRED = 2
NUMBER OF EXITS PROVIDED = MIN. 2 (VARIES BY FLOOR)
OCCUPANT LOAD FACTOR -
BUSINESS OCCUPANCY = 100 GSF / PERSON
ASSEMBLY OCCUPANCY = 15 GSF / PERSON
OCCUPANT LOAD:
BASEMENT - 16,208 GSF - B OCC = 163 OCC + 3,888 SF - A OCC =
260 OCC.
1ST FLOOR - 20,703 GSF - B OCC = 207 OCC
2ND FLOOR - 20,542 GSF - B OCC = 206 OCC
3RD FLOOR - 20,182 GSF - B OCC = 202 OCC
ATTIC - NOT NORMALLY OCCUPIED
TOTAL OCCUPANT LOAD = 1037 OCCUPANTS
NOT REQUIRED IN FULLY SPRINKLERED BUILDING
PROTECTED THROUGHOUT
2 HOUR RATING (EXISTING) AT STAIR ENCLOSURES - 1 HOUR
REQUIRED
ALLOWABLE HEIGHT = FOUR STORIES
DESIGN HEIGHT = THREE STORIES WITH BASEMENT
ALLOWABLE AREA = 57,000 GROSS SQUARE FEET (GSF)
AREA INCREASE BASED ON FRONTAGE - 1.75 X ALLOWABLE = 99,750
GSF
DESIGN AREA = 81,523 GSF
TYPE IIIB
IBC: BUSINESS GROUP B
LSC: CHAPTER 38 NEW BUSINESS
- 2015 NFPA 101 LIFE SAFETY CODE (LSC)
- 2015 INTERNATIONAL BUILDING CODE (IBC)
- UFC 3-600-01 - FIRE PROTECTION
BASEMENT - 730 OCCUPANTS
FIRST FLOOR - 2,040 OCCUPANTS
SECOND FLOOR - 640 OCCUPANTS
THIRD FLOOR - 640 OCCUPANTS.
170174
OFFICE OFFICE OFFICE OFFICE
OFFICEOFFICE
UPDN
DN UP
MENSJANITOR
T.D. = 217'
T.D. = 233'
C.P. = 39
T.D. = 225' T.D. = 233'
C.P. = 39
INDICATES EXISTING TWO HOUR STAIR
G-005 p r o v s c r i p t i
SECOND FLOOR LIFE SAFETY PLAN
THIRD FLOOR LIFE SAFETY PLAN
17080
NOT OCC
17080
NOT OCC
T.D. = 181'
INDICATES EXISTING TWO HOUR STAIR
G-006 p r o v s c r i p t i
ATTIC FLOOR LIFE SAFETY PLAN
GC100
r
GENERAL CONTRACT NOTES
SWING SPACE
1. COMPLETE CONSTRUCTION AND TRANSITION TO THE
SWING SPACE PRIOR TO WORK BEGINNING AT BUILDING
2263.
2. THE ERECTION AND DISMANTLING OF THE SWING SPACE
AS WELL AS THE TEMPORARY FURNISHINGS FOR THE
SWING SPACE ARE A PART OF THE BASE BID UNDER THE
GENERAL CONSTRUCTION CONTRACT.
3. UTILITIES SUCH AS SANITARY SEWER, WATER (BOTH
DOMESTIC AND FIRE SPRINKLER), GAS, POWER,
TELECOMMUNICATION AND ANY OTHER SERVICE
REQUIRED TO MAKE THE SWING SPACE FUNCTION AS A
QUALITY OFFICE SPACE WILL BE A PART OF THE GENERAL
CONSTRUCTION CONTRACT.
4. PROVIDE MODULAR BUILDINGS AS FULLY FUNCTIONAL
UNITS INCLUDING PLUMBING, HVAC, ELECTRIC, TELECOM,
LIGHTING, FIRE ALARM, FIRE SPRINKLER, RAMPS, SITE
WORK, AND UTILITY CONNECTIONS.
5. HVAC IN MODULAR BUILDINGS TO BE SIZED TO SUSTAIN
RELATIVE HUMIDITY LESS THAN 50% WITH 78 DEGREE
TEMPERATURE INTERIOR CONDITIONS DURING THE
COOLING SEASON AND 68 DEGREE HEATING IN THE
HEATING SEASON. LEVERAGE HOT GAS REHEAT FOR
DEHUMIDIFICATION.
6. THE SWING SPACE WILL CONSIST OF TWO SIMILAR
BUILDINGS WITH DIMENSIONS OF 120' X 192' PROVIDING A
GROSS AREA OF 23,040 SQ. FT. PER BUILDING OR 46,080
SQ. FT. FOR BOTH. THE BUILDINGS ARE MADE UP OF 32
MODULAR SECTIONS OF 12' X 60'. ATTACHED TO THE END
OF EAST BUILDING IS A RESTROOM ADDITION MADE UP OF
TWO 12' X 20' MODULES FOR AN ADDED 480 SQ. FT.
7. THE MODULAR BUILDINGS WILL BE PLACED ON
TEMPORARY MASONRY PIERS AS DESIGNED BY THE
MODULAR BUILDING SUPPLIER. THE PIERS WILL SET ON A
PREPARED BASE OF COMPACTED STRUCTURAL FILL. THE
PIERS WILL RAISE THE FINISHED FLOOR ELEVATION TO
APPROXIMATELY 3'-0" ABOVE THE GRADE REQUIRING
STAIRS TO ACCESS THE BUILDING. AN ACCESSIBLE
ROUTE WILL BE PROVIDED BY A RAMP WITH A SLOPE OF 1
IN 12.
8. THE EXTERIOR WALLS OF THE STRUCTURE WILL BE 2 X 6
WOOD OR STEEL STUD CONSTRUCTION EXTENDING UP
TO A PITCHED METAL ROOF. WALLS WILL BE FINISHED
WITH COMPOSITE SIDING AT THE EXTERIOR AND GYPSUM
BOARD AT THE INTERIOR. WALL, CEILING AND CRAWL
SPACE INSULATION WILL BE R-19.
9. INTERIOR DEMISING WALLS WILL BE 3 5/8" STEEL STUDS
WITH A GYPSUM BOARD FINISH AND ACOUSTICAL
INSULATION.
10. SUSPENDED CEILINGS WILL BE 2' X 4' ACOUSTICAL.
11. OFFICES WILL HAVE A CARPET TILE FLOOR AND
RESTROOMS AND CORRIDORS WILL HAVE VINYL TILE.
RESTROOMS WILL HAVE AN FRP PANEL WAINSCOT AT
WET WALLS.
12. ALL ROOMS WITHIN THE OFFICE MODULES WILL BE
SERVED WITH AN AUTOMATIC SPRINKLER SYSTEM.
13. INTERIOR HARDWALL OFFICES WILL BE MADE UP OF A
MODULAR WALL SYSTEM. OFFICES WILL GENERALLY BE A
NOMINAL 10' X 10'.
14. SLIDING ALUMINUM WINDOWS GENERALLY WILL BE
LOCATED AT 12' O.C. AROUND THE PERIMETER OF THE
BUILDINGS. PROVIDE BLINDS FOR WINDOWS.
15. ELEVATED DECKS AND WALKWAYS WILL CONSIST OF
SPACED COMPOSITE DECKING OVER TREATED WOOD
CONSTRUCTION.
16. SIGNAGE WILL BE LOCATED AT THE EXTERIOR OF THE
BUILDING TO IDENTIFY THE DEPARTMENTS WITHIN EACH
BUILDING. DIRECTIONAL SIGNAGE INSIDE EACH BUILDING
WILL INDICATE WHERE TO FIND EACH OFFICE AND
SIGNAGE WILL IDENTIFY EACH MAJOR OFFICE AND
FUNCTION.
17. AFTER TENANTS RETURN TO A RENOVATED BUILDING.
2263, RETURN SWING SPACE SITE TO PRE-CONSTRUCTION
CONDITIONS , INCLUDING RE-VEGETATION.
18. ALL UTILITY COORDINATION AND COST INCLUDING
METERED WAGE COST FOR THE SWING SPACE AREA IS
TO BE THE RESPONSIBILITY OF THE CONTRACTOR.
19. CONCEPTUAL ENERGY MODELING SUGGEST (2) 300 KVA
TRANSFORMERS WILL BE REQUIRED TO SERVE MODULAR
BUILDINGS. ENERGY MODELING SUGGESTS
APPROXIMATELY 100kBtu PER SQUARE FOOT PER YEAR
ENERGY CONSUMPTION AND PEAK DEMAND
APPROXIMATELY 130kW PER PRIMARY MODULAR
BUILDING ASSUMING HOT GAS REHEAT AND HEAT PUMP
TO MEET HEATING NEEDS. CONTRACTOR
REQUIRED TO SUBMIT WORK REQUEST WITH CPS
ENERGY FOR NEW TRANSFORMER AND SERVICE AND TO
PAY ELECTRICITY COST FOR MODULAR
BUILDINGS. CONTRACTOR ALSO REQUIRED TO PAY
WATER COST TO PROVIDE SERVICE TO MODULAR
BUILDINGS. COORDINATE WITH 502d CES REGARDING ALL
UTILITIES. PRIVATE UTILITY PROVIDERS EXIST FOR
ELECTRICITY AND WATER, COORDINATE WITH THOSE
UTILITY PROVIDERS IN ADDITION TO 502d CES.
20. FIRE SPRINKLER TO INCLUDE MODULAR BUILDING
INTERIOR AND AREA UNDER MODULAR BUILDING FOR
EACH MODULAR BUILDING STRUCTURE GREATER THAN
5,00 SQUARE FEET. PROVIDE DRY-PIPE SPRINKLER
SYSTEMS FOR ANY NON- CONDITIONED SPACES. ALL
SPRINKLER DESIGNS SHALL COMPLY WITH NFPA 13, 2016
EDITION AND UFC 3-600-01, CHANGE I, 28 NOVEMBER 2016.
21. PROVIDE FIRE ALARM PANEL AND DEVICES TO EACH
BUILDING.
22. PROVIDE EXTERIOR LOCKS TO MODULAR BUILDING
MEETING BUILDING 2263 REQUIREMENTS. PROVIDE
INTERIOR LOCKS FOR OFFICES AND LOCKING DOORS
MEETING BUILDING 2263 REQUIREMENTS.
23. COORDINATE WITH 502d COMM FOR COMMUNICATION
CONNECTIONS. MEET BUILDING 2263 REQUIREMENTS
FOR MODULAR BUILDING COMMUNICATIONS SYSTEMS.
24. PROVIDE MINIMUM OF TWO DATA PORT PER INDIVIDUAL
WORKSTATION AND PROVIDE DEDICATED CIRCUIT WITH
SIX RECEPTACLES PER INDIVIDUAL WORK STATION.
25. SUBMIT SHOP DRAWINGS REFLECTING MODULAR
BUILDING LAYOUT AND SUPPORTING INFORMATION
DOCUMENTING COMPLIANCE WITH REQUIREMENTS.
26. CPS ENERGY WILL REQUIRE CONTRACTOR TO PROVIDE
ELECTRICAL ENGINEERING STAMP FOR TRANSFORMER
SIZING.
27. REMOVE CONTRACTOR-PROVIDED MODULAR BUILDINGS
AND FURNISHING FOLLOWING COMMISSIONING AND
OCCUPANCY OF BUILDING 2263.
28. CONCEPTUAL WATER MODELING (USING THE LEED V4
CALCULATOR AND ASSUMED OCCUPANCY COUNTS
STATED ABOVE) SUGGESTS ANNUAL CONSUMPTION OF
120 kgal PER YEAR FLUSH VOLUME AND 50kgal PER YEAR
FLOW VOLUME (APPROXIMATELY 650 GALLONS PER DAY
WATER CONSUMPTION).
BID OPTIONS
1. BID OPTION 1 INCLUDES EXTERIOR IMPROVEMENTS
SPECIFICALLY DENOTED IN THE CIVIL SERIES OF THESE
DRAWINGS.
2. BID OPTION 2 INCLUDES THE COMPLETE RENOVATION OF THE
CLAY TILE ROOF INCLUDING NEW UNDERLAYMENT,
STRINGERS AND THE REPLACEMENT AND REPAIR OF SOFFIT
BOARDS AND EXPOSED RAFTERS.
3. BID OPTION 3 INCLUDES THE COMPLETE REPAIR AND
REPAINTING OF THE STUCCO AND CONCRETE FACADE.
REPAIR AND RE-POINTING OF THE STONE ENTRANCES AND
WINDOW FEATURES REMAIN IN THE BASE BID.
FURNITURE
1. LEASED SWING SPACE FURNITURE INCLUDING WORK
STATIONS, CHAIRS, TABLES AND DESKS ARE PROVIDED AS A
PART OF THE BASE BID OF THIS PROJECT.
2. LABEL, PACK, AND RELOCATE NAVY AND DFAS FURNITURE TO
ON-BASE STORAGE AREA TO BE DETERMINED BY COR. PRIOR
TO OCCUPANCY RELOCATE TO ORIGINAL ROOM LOCATION IN
BUILDING 2263.
3. AFTER THE SWING SPACE IS OCCUPIED BY ALL OF THE
TENANTS, THE EXISTING FURNITURE WITHIN THE BUILDING
2263 WILL BE REMOVED FROM THE BUILDING BY THE
CONTRACTOR AND DELIVERED TO THE DLA DISPOSITION
SERVICES AT FT. SAM HOUSTON FOR STORAGE OR DISPOSAL.
4. THE COUNT OF FILING CABINETS BY USER GROUP TO BE
MOVED TO THE SWING SPACE IS:
(2) DRAWER: 6
(3) DRAWER: 19
(4) DRAWER: 40
(5) DRAWER: 12
(4) DRAWER WIDE:1
(5) DRAWER WIDE: 22
SUPPLY CABINETS: 3
5. TOTAL OF MOVING BOXES PER EMPLOYEE SHALL BE 20
BOXES PER EMPLOYEE, WHICH ALSO COVERS THE FILES
FROM THE FILES CABINETS (ASSUME 215 FTE).
CEILING GRID
1. CEILING SPACE WITHIN THIS BUILDING, IN PARTICULAR
THE BASEMENT ARE USUALLY SHALLOW. ADDITIONAL
PLANNING AND ADJUSTMENTS ARE REQUIRED TO
COORDINATE WITH THESE CEILING SPACE DIMENSIONS
ACROSS TRADES. PROVIDE ALL ADDITIONAL
COORDINATION AND ADDITIONAL WORK TO ROUTE
CONNECTIONS WITHIN ARCHITECTURAL CEILING SPACE
DIMENSIONS AT NO EXTRA COST TO THE GOVERNMENT.
REFERENCE ARCHITECTURAL SHEETS A-606, A-607,AND
A-608 FOR ADDITIONAL CLARIFICATION ON CEILING
HEIGHTS.
2. IN THE BASEMENT THE BOTTOM OF CONCRETE
STRUCTURE IS AS LOW AS 7'-5" AFF EXISTS FOR BEAMS
RUNNING BOTH NORTH AND SOUTH AND EAST-WEST.
MUCH OF BOTTOM OF CONCRETE STRUCTURE IS 7'-9" OR
7'-11".
3. BASEMENT NORTH-SOUTH RUNNING CONCRETE BEAMS
DO NOT TYPICALLY EXTEND TO CORRIDOR B45 BETWEEN
GRID LINE 4 AND GRID LINE 17. PROVIDE HIGHER CEILING
BETWEEN GRID LINE 7 AND GRID LINE 14 THAN GRID LINE
1 TO GRID LINE 4 AND GRID LINE 17 TO GRID LINE 20.
4. ASSUME 250 FEET OF SOFFITS WILL BE REQUIRED
AROUND PERIMETER OF CLASSROOMS OR TO CROSS
UNDER STRUCTURE AND BACK UP TO ROUTING PATH.
INLET
AIR RELEASE MANHOLE
SIGN
WATER VALVE
GUY ANCHOR
POWER POLE
ELEV
RPLS
TBPLS
W/
CONC
EAST
SOUTH
REGISTERED PROFESSIONAL LAND SURVEYOR
TEXAS BOARD OF PROFESSIONAL LAND SURVEYING
WEST
CONCRETE
ELEVATION
WITH
RCP
PVC
REINFORCED CONCRETE PIPE
POLYVINYL CHLORIDE PIPE
SANITARY MANHOLE
LIGHT POLE
OHP OHP
OVERHEAD ELECTRIC
FENCE LINE
PS PARKING SPACE
EXISTING FEATURES
BASELINE IRRIGATION LINE
CENTERLINE IRRIGATION ABANDONED
RIGHT OF WAY LINE SPRINKLER MAIN
PROPERTY LINE SPRINKLER LATERAL
EASEMENT LINE PETROLEUM LINE
FLOOD HAZARD ZONE 25 YEAR STORM DRAIN LINE
FLOOD HAZARD ZONE 100 YEAR
STORM DRAIN LINE (GENERIC)
CRITICAL WATER QUALITY ZONE STORM DRAIN ABANDONED
TRANSITION WATER QUALITY ZONE
STORM DRAIN ABANDONED (GENERIC)
DRAINAGE EDGE FIRE LINE
DRAINAGE CENTERLINE FIRE ABANDONED
DITCH EDGE WATER LINE
TIME OF CONCENTRATION WATER ABANDONED
MAJOR CONTOURS WASTE WATER LINE
MINOR CONTOURS FORCE MAIN LINE
ROAD PAVEMENT
WASTE WATER LINE (GENERIC)
DRIVEWAY / PARKING PAVEMENT
FORCE MAIN LINE (GENERIC)
GRAVEL EDGE WASTE WATER ABANDONED
UNPAVED EDGE FORCE MAIN ABANDONED
CURB LINE
WASTE WATER ABANDONED
(GENERIC)
BUILDING LINE
FORCE MAIN ABANDONED (GENERIC)
RAIL CENTERLINE CIP PIPE
GUARDRAIL DIP PIPE
HANDRAIL PVC PIPE
CHAINLINK FENCE RCP PIPE
BARBWIRE FENCE CMP PIPE
WOOD FENCE CLAY TILE PIPE
STEEL FENCE BIKE PATH DASH-DOT STRIPING
FENCELINE 6" - 10' DASH & 30' GAP STRIPING
STONE / ROCK WALL 6" - 2' DASH & 6' GAP STRIPING
BRICK WALL 6" - 1' DASH & 1' GAP STRIPING
TREE LINE 4" - 2' DASH & 2' GAP STRIPING
CABLE TV LINE 6" - 3' DASH & 9' GAP STRIPING
CABLE TV CONDUIT 12" - 1' DASH & 1' GAP STRIPING
CABLE TV DUCT BANK 4" WIDE STRIPING
CABLE TV OVERHEAD 6" WIDE STRIPING
CABLE TV UNDERGROUND 8" WIDE STRIPING
COMMUNICATION LINE 1' WIDE STRIPING
COMMUNICATION CONDUIT 2' WIDE STRIPING
COMMUNICATION DUCT BANK
COMMUNICATION OVERHEAD
COMMUNCATION UNDERGROUND
FIBER OPTIC LINE
FIBER OPTIC CONDUIT
FIBER OPTIC DUCT BANK
FIBER OPTIC OVERHEAD
FIBER OPTIC UNDERGROUND
TRAFFIC SIGNAL LINE
TRAFFIC SIGNAL CONDUIT
TRAFFIC SIGNAL DUCT BANK
TRAFFIC SIGNAL OVERHEAD
TRAFFIC SIGNAL UNDERGROUND
ELECTRIC LINE
ELECTRIC CONDUIT
ELECTRIC DUCT BANK
ELECTRIC OVERHEAD
ELECTRIC UNDEGROUND
CHILLED WATER LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER ABANDONED
NATURAL GAS LINE
NATURAL GAS SERVICE LINE
NATURAL GAS HIGH PRESSURE
NATURAL GAS ABANDONED
RECLAIMED WATER LINE
RECLAIMED WATER ABANDONED
25Y
100Y
CWQZ
WQTZ
DR
TC
TV
TV CO
TV DB
TV OH
TV UG
C CO
C DB
C OH
UTL UTL
FO
FO CO
FO DB
FO OH
FO UG
TS
TS CO
TS DB
TS OH
TS UG
E CO
E DB
E OH
E UG
CW
CWS
CWR
GS
HG
IR
IR
SM
SL
PET
SS
FW
FW
WW
FM
FM
CI
DI
PVC
RCP
CMP
CT
EXISTING FEATURES
BRASS DISK FOUND CABLE TV JUNCTION BOX PETROLEUM METER
BRASS DISK SET CABLE TV MANHOLE PETROLEUM LINE MARKER
BOLT FOUND CABLE TV LINE MARKER PETROLEUM VALVE
BOLT SET COMMUNICATION MANHOLE STORM DRAIN AREA INLET
BENCHMARK FOUND
COMMUNICATION LINE
MARKER
DRAINAGE ARROW
BENCHMARK SET COMMUNICATION PEDESTAL STORM DRAIN 5' CURB INLET
CALCULATED POINT COMMUNICATION POLE
STORM DRAIN 10' CURB
INLET
CONTROL POINT FOUND COMMUNICATION VAULT STORM DRAIN CLEANOUT
CONTROL POINT SET FIBER OPTIC MANHOLE STORM DRAIN GRATE INLET
COTTON SPINDLE FOUND FIBER OPTIC LINE MARKER STORM DRAIN HEADWALL
COTTON SPINDLE SET FIBER OPTIC JUNCTION BOX STORM DRAIN MANHOLE
DRILL HOLE FOUND TRAFFIC SIGNAL MANHOLE STORM DRAIN WINGWALL
DRILL HOLE SET
TRAFFIC SIGNAL CONTROL
BOX
WASTE WATER CLEANOUT
HUB & TACK FOUND TRAFFIC SIGNAL PULL BOX WASTE WATER MANHOLE
HUB & TACK SET TRAFFIC SIGNAL SIGNAL WASTE WATER METER
IRON PIPE FOUND
TRAFFIC SIGNAL LIGHT &
SIGNAL
WASTE WATER SRVC.
CONNECTION
IRON PIPE SET
TRAFFIC SIGNAL SIGNAL
EXTENDED
WASTE WATER VALVE
IRON ROD FOUND
TRAFFIC SIGNAL LINE
WASTE WATER CAP
IRON ROD SET
ELECTRIC DOWN GUY
ANCHOR
WATER 11.25° BEND
MONUMENT FOUND ELECTRIC JUNCTION BOX WATER 22.5° BEND
MONUMENT SET ELECTRIC LIGHT POLE WATER 45° BEND
MAGNAIL FOUND
ELECTRIC LIGHT POLE
EXTENDED
WATER 45° WYE LEFT
MAGNAIL SET ELECTRIC MANHOLE WATER 45° WYE RIGHT
PROPERTY CORNER FOUND ELECTRIC METER WATER 90° BEND
PROPERTY CORNER SET ELECTRIC LINE MARKER WATER AIR FLUSH VALVE
TEMPORARY BENCHMARK
FOUND
ELECTRIC POLE WATER AIR RELEASE VALVE
TEMPORARY BENCHMARK
SET
ELECTRIC VAULT WATER CAP
CROSS FOUND ELECTRIC TOWER WATER COUPLE
CROSS SET CHILLED WATER MANHOLE WATER CROSS
BIKE RACK
CHILLED WATER LINE
WATER DRAINAGE VALVE
BOLLARD CHILLED WATER VALVE
BENCH NATURAL GAS LIGHT WATER FIRE HYDRANT
BUS STOP NATURAL GAS MANHOLE WATER MANHOLE
GARBAGE CAN NATURAL GAS METER WATER METER
GUARDRAIL POST NATURAL GAS LINE MARKER WATER LINE MARKER
MAILBOX
NATURAL GAS SRVC.
WATER REDUCER
PARKING METER NATURAL GAS VALVE
POST NATURAL GAS VENT WATER SHUTOFF VALVE
RAMP IRRIGATION CONTROL VALVE WATER TEE
TREE GRATE SPRINKLER CONTROL VALVE WATER VALVE
SIGN SPRINKLER HEAD WATER WELL
MANHOLE UNKNOWN IRRIGATION HOSE BIB
TEST PIT
RECLAIMED WATER
MANHOLE
BORE HOLE RECLAIMED WATER METER
RAILROAD SIGNAL
RECLAIMED WATER LINE
RECLAIMED WATER VALVE
BM
BM
TBM
TBM
BUS
PM
TP
TC
TP
GSC
SC
SSCO
WWCO
WWSC
AF
AR
FH
WSC
WSO
WATER FIRE CONNECTION
(FDC)
TELECOM MANHOLE
SURVEY ABBREVIATIONS AND LEGEND
V-001 r
SURVEY ABBREVIATIONS AND LEGEND
AutoCAD SHX Text
WV
STANLEY RD
STANLEY RD
GUN SHED RD
x
SD
VF100
r
SCALE: 1" = 20'
0 20' 40' 60'10'
SCALE: 1" = 20'
FIELD SURVEY - BUILDING 2263
1. THIS SURVEY WAS COMPLETED ON THE GROUND ON DECEMBER 8, 2017.
2. ALL DIMENSIONS ARE SHOWN IN US SURVEY FEET AND DECIMAL PARTS THEREOF.
3. COORDINATES USED FOR THIS PROJECT ARE BASED ON TEXAS COORDINATE SYSTEM,
SOUTH CENTRAL ZONE (NAD83) COORDINATES, AS REFERENCED TO HARRIS COUNTY
FLOOD PLAIN REFERENCE MARKER No's 040060, 040070, AND 210030.
4. ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), AS
REFERENCED TO HARRIS COUNTY FLOOD PLAIN REFERENCE MARKER No's 040060, 040070, AND 210030.
5. SUBSURFACE UTILITIES WERE LOCATED BY OTHERS. ADDITIONAL UTILITIES EXIST NOT
SHOWN HEREON. ATKINS or AES GROUP, INC. WILL NOT BE RESPONSIBLE FOR DAMAGES
THAT MAY OCCUR.
CONTROL POINT TABLE
POINT #
754.70
761.83
759.01
762.24
760.89
761.43
761.76
761.39
759.99
757.53
NORTHING
13710404.92
13710770.51
13710772.19
13711591.79
13711649.45
13711452.22
13711455.06
13711425.80
13711598.71
13710881.22
EASTING
2141484.61
2141216.94
2141533.35
2141223.45
2141323.81
2141337.19
2141551.36
2141745.71
2141755.35
2141844.52
DESCRIPTION
PK Nail [Fnd]
"X" IN CONCRETE
NAIL
BUS STOP
BUS STOP
3 - STORY BRICK BUILDING
ASPHALT PAVEMENT
CONCRETE PAVEMENT
1 - STORY BRICK BUILDING
CONCRETE SIDEWALK
GRASS
CM TOP = 12.03'
CM TOP = 11.93'
CM TOP = 11.77'
5" 4" TWIN TREE
CM
CM
CM TOP = 21.22'
34" TREE TOP = 61.20'
12" TREE TOP = 30.67'
8" TREE TOP = 29.18'
17" TREE TOP = 28.97'
23" TREE TOP = 30.53'
9" TREE TOP = 23.39'
10" TREE TOP = 25.56'
16" CHINESE TALLOW TOP = 40.01'
28" TREE TOP = 43.41'
17" TREE TOP = 35.05'
20" TREE TOP = 36.11'
19" TREE TOP = 39.55'
30" TREE TOP = 52.39'
30" TREE TOP = 37.18'
36" TREE TOP = 40.10'
VAULT
LANDSCAPING
WATER METER VAULT
BARRIER GATE
BC
GV
GV
BUILDING OVERHANG
GRATE INLET RIM = 760.86' FL 15" CPP W = 758.34' FL 18" CPP E = 758.32'
GRATE INLET RIM = 761.15' FL 15" CPP E = 759.00'
GRATE INLET RIM = 761.89' FL 6" METAL PIPE = 759.74' BOTTOM = 758.89' (FILLED WITH WATER)
SANITARY MANHOLE RIM = 761.49' FL 10" PVC NE = 750.49' FL 10" PVC S = 756.19' FL 10" PVC SE = 750.79' BOTTOM = 744.69' (FILLED WITH WATER)
SANITARY MANHOLE RIM = 761.56' (UNABLE TO OPEN)
GRATE INLET RIM = 761.29' TOP OF 6" MTL W = 759.99'' BOTTOM = 758.29' (FILLED WITH WATER)
SANITARY MANHOLE RIM = 761.75' (UNABLE TO OPEN)
SANITARY MANHOLE RIM = 761.30' FL 6" CLAY NE = 756.02 FL 6" CLAY S = 755.90
STORM MANHOLE RIM = 762.29' FL 12" PVC W = 751.49' TOP 2" VERT PVC W = 761.39' BOTTOM = 749.49' (FILLED WITH WATER)
STORM MANHOLE RIM = 761.54' (UNABLE TO OPEN)
FF = 763.50'
FF = 766.82'
FF = 762.13'
FF = 762.21'
PAINT STRIPING TYPICAL
TOP = 8.61'
TOP = 12.34'
TOP = 4.22'
POLE WITH LIGHT TOP = 15.46'
TOP = 8.77'
TOP = 11.86'
TOP = 5.10'
TOP = 10.51'
TOP = 5.00'
TOP = 5.32'
TOP = 28.81'
TOP = 30.32'
TOP = 15.72'
TOP = 30.37'
TOP = 28.88'
TOP = 29.01'
TOP = 16.58'
TOP = 16.74'
TOP = 16.79'
TOP = 16.70'
TOP = 16.66'
TOP = 16.88'
TOP = 14.89'
TOP = 15.07'
TOP = 15.07'
TOP = 41.20'
TOP = 15.28'
TOP = 16.49'
TOP = 14.82'
TOP = 16.17'
DS
SANITARY MANHOLE RIM = 761.94' (UNABLE TO OPEN)
FIRE MAIN INDICATOR
FIRE MAIN INDICATOR
XP'S
SANITARY MANHOLE RIM = 761.49' FL 6" CLAY N = 753.54' FL 6" CLAY S = 753.51' FL 6" CLAY W = 753.54'
AC
GAS CONNECTION
WILSON ST
VF101
r
SCALE: 1" = 30'
0 15' 30' 60' 90'
SCALE: 1" = 30'
FIELD SURVEY - SWING SPACE
1. THIS SURVEY WAS COMPLETED ON THE GROUND ON DECEMBER 8, 2017.
2. ALL DIMENSIONS ARE SHOWN IN US SURVEY FEET AND DECIMAL PARTS THEREOF.
3. COORDINATES USED FOR THIS PROJECT ARE BASED ON TEXAS COORDINATE SYSTEM,
SOUTH CENTRAL ZONE (NAD83) COORDINATES, AS REFERENCED TO HARRIS COUNTY
FLOOD PLAIN REFERENCE MARKER No's 040060, 040070, AND 210030.
4. ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), AS
REFERENCED TO HARRIS COUNTY FLOOD PLAIN REFERENCE MARKER No's 040060, 040070, AND 210030.
5. SUBSURFACE UTILITIES WERE LOCATED BY OTHERS. ADDITIONAL UTILITIES EXIST NOT
SHOWN HEREON. ATKINS or AES GROUP, INC. WILL NOT BE RESPONSIBLE FOR DAMAGES
THAT MAY OCCUR.
CONTROL POINT TABLE
POINT #
754.70
761.83
759.01
762.24
760.89
761.43
761.76
761.39
759.99
757.53
NORTHING
13710404.92
13710770.51
13710772.19
13711591.79
13711649.45
13711452.22
13711455.06
13711425.80
13711598.71
13710881.22
EASTING
2141484.61
2141216.94
2141533.35
2141223.45
2141323.81
2141337.19
2141551.36
2141745.71
2141755.35
2141844.52
DESCRIPTION
PK Nail [Fnd]
BIKE RACKS
DROP INLET RIM = 753.26' THROAT = 752.25 FL 18" RCP S = 750.01'
SANITARY MANHOLE RIM = 755.73' FL 6" PVC N = 752.53' FL NE = 750.03' FL S = 749.83' FL W = 749.98'
MESQUITE
MESQUITE
4" WHITE OAK
4" WHITE OAK
21" OAK
26" OAK
7" ASH
GRATE INLET RIM = 753.33' FL 18" RCP N = 749.40' FL 18" RCP S = 749.35'
8" X 20" BOX CULVERT FL = 753.30'
8" X 20" BOX CULVERT FL = 753.33'
8" X 20" BOX CULVERT FL = 753.17'
8" X 20" BOX CULVERT FL = 753.09'
TELECOM BOX ON CONCRETE PAD
TELECOM BOX ON CONCRETE PAD
CONCRETE
TOP OF BANK
TOE OF SLOPE
14" PALM
10 STEPS
AHJ AUTHORITY HAVING JURISDICTION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALNMT ALIGNMENT
ALT ALTERNATE
AMT AMOUNT
APPROX APPROXIMATE
APPX APPENDIX
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AVE AVENUE
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS ASSOCIATION
B&F BELL AND FLANGE
B&S BELL AND SPIGOT
BC BACK OF CURB
BCV BUTTERFLY CHECK VALVE
BDRY BOUNDARY
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BKGD BACKGROUND
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICE
BN BULLNOSE
BOT BOTTOM
BRK BRICK
BV BALL VALVE
CAP CAPACITY
CB CATCH BASIN; CEMENT BASE; CIRCUIT BREAKER
CD CONSTRUCTION DOCUMENTS; CONTRACT
DOCUMENTS
CF CONTRACTOR FURNISHED
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CHFR CHAMFER
CHK CHECK
CHKV CHECK VALVE
CI CURB INLET; CAST IRON
CIP CAST IRON PIPE
CIR CIRCLE
CJ CONSTRUCTION JOINT; CONTROL JOINT
CL CENTERLINE; CLASS; CLOSE
CLL CONTRACT LIMIT LINE
CLR CLEAR(ANCE)
CM CENTIMETER
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CNCL CONCEALED
CO CLEANOUT, CONTRACTING OFFICER
COMM COMMUNICATION
CONC CONCENTRIC; CONCRETE
CONT CONTINUED; CONTINUATION; CONTROL
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR
COV COVER; CUT OFF VALVE
CPLG COUPLING
CRCMF CIRCUMFERENCE
CRN CROWN
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CRT YD COURTYARD
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSTL CAST STEEL
CTR CENTER; CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER; CUBIC
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CV CONTROL VALVE
CWA CONCRETE WASH-OUT AREA
CY CUBIC YARD
D PENNY (NAILS, ETC.)
DAT DATUM
DBL DOUBLE
DEG DEGREE
DIA(Ø) DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DIV DIVISION
DN DOWN
DOC DOCUMENT
DOM DOMESTIC
DOMW DOMESTIC WATER
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EOS EDGE OF SLAB
EPA ENVIRONMENTAL PROTECTION AGENCY
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EW EACH WAY
EXCL EXCLUDE
EXIST EXISTING
EXP EXPOSED; EXPANSION
EXST GR EXISTING GRADE
EXT EXTERIOR
F FAHRENHEIT; FEMALE; FIRE LINE
FF FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FIG FIGURE
FIL FILLET
FIN FINISH
FLG FLANGE
FLL FLOW LINE
FLRD FLARED
FLTR FILTER
FN FENCE
FND FOUNDATION
FOC FACE OF CONCRETE; FACE OF CURB
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FOOT; FEET
FTG FOOTING
G GROUND; NATURAL GAS
GA GAGE, GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUT
GDR GUARD RAIL
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL; GLASS; GLAZING
GOVT GOVERNMENT
GPD GALLONS PER DAY
GRND GROUND
GTV GATE VALVE
GUT GUTTER
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HANDICAP
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWL HEADWALL
HORZ HORIZONTAL
HT HEIGHT
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
ID INSIDE DIAMETER; INSIDE DIMENSION
IMH INLET MANHOLE
IN INCH; INCHES (“)
INC INCORPORATED
INCL INCLUDED
INSUL INSULATION/INSULATE(D)(ING)
IRRIGATION WATER
JAN JANITOR
JT JOINT
K KIP (1,000 LB.)
KWY KEYWAY
L ANGLE
LAT LATITUDE
LDR LADDER
LB POUND
LF LINEAR FEET (FOOT)
LG LENGTH / LONG
LIN LINEAR
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LPT LOW POINT
LS LUMP SUM
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MAIL BOX
MED MEDIUM
MER MERIDIAN
MET METAL
MFG MANUFACTURING
MFR MANUFACTURE(R)
MGT MANAGEMENT
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MM MILLIMETER
MN MAGNETIC NORTH
MO MASONRY OPENING; MOTOR OPERATED
MON MONUMENT
MTG MEETING
MULT MULTIPLE
MUNIC MUNICIPAL
MUTCD MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
N NORTH
N&D NAIL AND DISK
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
O, O2 OXYGEN
OA/FA/FA OUTSIDE
AIR/FORCED AIR/FORCED AIR
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OD OUTSIDE DIAMETER
OFC OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
OZ OUNCE
P PUMP
PA PUBLIC ADDRESS; PIPE ANCHOR
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVE
PCA PORTLAND CEMENT ASSOCIATION
PCC PORTLAND CEMENT CONCRETE; PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PED PEDESTAL
PEN PENETRATE
PERF PERFORATED
PERIM PERIMETER
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PR PAIR
PRCST PRECAST
PREFMD PREFORMED
PRELIM PRELIMINARY
PREV PREVIOUS
PRKG PARKING
PROP PROPERTY
PRV PRESSURE RELIEF VALVE
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FEET
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POST TENSIONED; POTENTIAL TRANSFORMER
PV PAVED
PVC POLYVINYL CHLORIDE (PLASTIC)
PVMT PAVEMENT
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
RAD RADIUS; RADIAN
RC REINFORCED CONCRETE
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RDC REDUCER
REBAR REINFORCING STEEL BARS
REIN REINFORCE(D)(ING)
REF REFERENCE
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RRB REINFORCED ROCK BERM
RW ROADWAY
S SOUTH
SAMP SAMPLE
SAN SANITARY
SB SPLASH BLOCK
SCH SCHEDULE
SD STORM DRAIN
SDL SADDLE
SDMH STORM DRAIN MANHOLE
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SQ FT SQUARE FOOT; SQUARE FEET
SS SANITARY SEWER
SSA STABILIZED STAGING AREA
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
T&G TONGUE AND GROOVE
TEL TELEPHONE
THRU THROUGH
TOC TOP OF CONCRETE
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS' LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
VAC VACUUM
VCB VACUUM CIRCUIT BREAKER
VEL VELOCITY
VENT VENTILATE
VERT VERTICAL
VIT VITREOUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF TANGENT
VPI VERTICAL POINT OF INTERSECTION
VPC VERTICAL POINT OF CURVATURE
VTC VEHICLE TRACING CONTROL
W WEST / WIDTH / WIDE / WATT
W/ WITH
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
ZN ZONE
SF
SYMBOL LEGEND
FIRE HYDRANT
LIGHT POLE
HANDICAP PARKING
POWER POLE
VALVE, BUTERFLY
TREE, CONIFEROUS
TREE, DECIDUOUS
PUMP/ WELL HEAD
WATER METER
EROSION CONTROL BMP LEGEND
CWA CONCRETE WASHOUT AREA
IP INLET PROTECTION
RRC RRB FOR CULVERT PROTECTION
ST SEDIMENT TRAP
SF SILT FENCE
SSA STABILIZED STAGING AREA
VTC VEHICLE TRACKING CONTROL
LOC LIMITS OF CONSTRUCTION
CF CONSTRUCTION FENCE
C-001 r
CIVIL LEGEND AND ABBREVIATIONS
C-002 r