Addendum_08_Changes_Drawings.pdf
PDF 2 MB Posted
- Attached to
- General Repairs to Building 2263
- Solicitation number
- W9126G18B0030
About this file
Amend 08: Sealed Bid Room location change; 2 Fire Protection Sheets added.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GR. X GR. BUTTERFLY VA.
W/ TAMPER SWITCH
T O
S U
P P
L Y
R
I S
E R
D R
A I N
300 lb. PRESSURE
FLOW SWITCH
SYSTEM
GAUGE
TO
TEST AND DRAIN WITH
RELIEF VALVE
LEGEND
DESCRIPTION
VALVE,GATE,OSY
VALVE,BFLY
VALVE,CHECK
PUMP, JOCKEY
PUMP, 1000 GPM @ 60 PSI,
TEST HEADER
CNTRLR,ELECTRIC,MAIN
LOAD,CENTER,PANELBOARD
FDC
10 HEATER, W/ THERMOSTAT, 7.5KW
11 CNTRLR,JOCKEY,FIRE
6'-8"
BACKFLOW PREVENTER
11'-3"
23'-2"
12 8-INCH SUCTION PIPING
13 6-INCH DISCHARGE PIPING
BYPASS LINE
FM
14 FLOWMETER
GENERAL NOTES
1. AUTOMATIC FIRE SPRINKLER SYSTEM DESIGN,
ENGINEERING AND INSTALLATION AS INDICATED
ON THESE DESIGN DOCUMENTS SHALL COMPLY
WITH NFPA 13 (2016 EDITION), NFPA 101 (2015
EDITION, UNIFIED FACILITIES CRITERIA (UFC)
3-600-01, CHANGE 1, 28 NOVEMBER 2016 AND
OTHER APPLICABLE CODES AND STANDARDS AS
REQUIRED BY THE AUTHORITY HAVING
JURISDICTION (AHJ).
2. CONTRACTOR TO PROVIDE A WET-PIPE AND
DRY-PIPE AUTOMATIC SPRINKLER SYSTEMS FOR
THIS EXISTING BUILDING AS SHOWN ON THESE
DESIGN DOCUMENTS. SYSTEM TO BE
CONNECTED TO NEW ELECTRIC FIRE PUMP.
3. AIR RELEASE VALVES TO BE PROVIDED IN
ACCORDANCE WITH NFPA 13.
4. OFFICE AREAS SHALL BE DESIGNED AS
LIGHT-HAZARD PER UFC 3-600-01 TABLE'S 9-3 AND
9-4 USING ORDINARY TEMPERATURE, MINIMUM
K-FACTOR OF K-5.6 UL-LISTED AND/OR
FM-GLOBAL APPROVED AUTOMATIC SPRINKLERS.
A 250 GPM HOSE STREAM ALLOWANCE SHALL BE
INCLUDED IN THE HYDRAULIC CALCULATIONS.
3. MECHANICAL, ELECTRICAL AND STORAGE AREAS
SHALL BE DESIGNED AS ORDINARY-HAZARD PER
UFC 3-600-01 TABLE'S 9-3 AND 9-4 USING
ORDINARY TEMPERATURE, MINIMUM K-FACTOR
OF K-8.0 UL-LISTED AND/OR FM-GLOBAL
APPROVED AUTOMATIC SPRINKLERS. REFER TO
KEYNOTES TO IDENTIFY THESE AREAS. A 250
GPM HOSE STREAM ALLOWANCE SHALL BE
INCLUDED IN THE HYDRAULIC CALCULATIONS.
4. PENDENT SPRINKLER HEADS TO BE USED UNDER
ALL SUSPENDED CEILINGS AND CENTERED AT
ALL CEILING TILES. UPRIGHT SPRINKLERS TO BE
USED UNDER ALL OPEN CEILINGS.
5. ALL MATERIALS AND DEVICES USED IN THIS
PROJECT SHALL BE UL-LISTED AND/OR
FM-GLOBAL APPROVED FOR USE IN AUTOMATIC
SPRINKLER SYSTEMS AND FIRE PUMP SYSTEMS.
6. ALL SPRINKLER PIPING PENETRATIONS THROUGH
FIRE RATED ASSEMBLIES SHALL BE SEALED WITH
A UL-APPROVED THROUGH PENETRATION FIRE
STOP ASSEMBLY.
7. ALL AUTOMATIC SPRINKLER SYSTEM PIPING
INSTALLED UNDER THIS CONTRACT SHALL BE
HYDROSTATICALLY TESTED IN ACCORDANCE
WITH NFPA 13 AND OTHER APPLICABLE NFPA
STANDARDS, STATE AND LOCAL CODES.
8. SPRINKLER PIPE HANGERS SHALL BE
UL-APPROVED. PIPE HANGARS SHALL BE
INSTALLED AS REQUIRED BY NPFA 13.
9. CEILING SPACES WITHIN THIS BUILDING, IN
PARTICULAR THE BASEMENT, ARE UNUSUALLY
SHALLOW. ADDITIONAL PLANNING AND OTHER
ADJUSTMENTS ARE REQUIRED TO COORDINATE
WITH THESE CEILING SPACE DIMENSIONS.
COORDINATE SIMILARLY TO SUPPORT THE WORK
OF OTHER TRADES. PROVIDE ALL ADDITIONAL
COORDINATION AND ADDITIONAL WORK TO
ROUTE CONNECTIONS WITHIN ARCHITECTURAL
CEILING SPACE DIMENSIONS AT NO ADDITIONAL
COST TO THE GOVERNMENT. REFERENCE
ARCHITECTURAL SHEETS FOR ADDITIONAL
REQUIREMENTS - ESPECIALLY A-606, A-607, AND
A-608 - FOR ADDITIONAL CLARIFICATION ON
CEILING HEIGHTS, STRUCTURE ELEVATIONS, AND
DECK ELEVATIONS.
D
2 3 4 5
C
B
A
D a t e
A P
P R
O V
E D
A S
B
U I L T
A p p r o v a l
D a t e
D e s c r i p t i o n
R e v
Reference Number:
Sheet of
F I L
E
N
A M
E
D W
N
B
Y
D E
S I G
N E
D
B
Y
R E
L E
A S
E D
B
C K
D
B
Y
W O
K
O
D
N
U M
B E
R
C O
N T
R A
C T
M
B E
R
D R
A W
I N
G
C
O D
E
D A
T E
PROJECT NUMBER
F S
N
D
C
B
A
1 2 3 4 5
X I I
X
I
X
IX
V
I
I
I
V
I
I
V I
V
I
V
III
I
I
I
B
U
I
ST
O
N
G
D
C
I
V
I L
EN
G
I N
E
E
R
S
Q
J O
I N
T
B
A S
E
S
A
T
O N
I O d
C
I V
I L
E
N G
I N
E E
R
S
Q
S A
N
A
N T
O N
I O
T
X
W
G
D
W
G
F
J U
N O
T
F O
R
C
O N
S T
R U
C T
I O
N
FX001
XX
R D
L
J A
M
R D
L
XX
J B
S F
F X
G e n e r a l
I n f o r m a t i o n d w g
R E
L E
A S
I N
G
A
U T
H O
R I T
Y
SCALE:
" = 1'-0"
0 4' 8' 24'16'
JBSF150055A
T R
O O
P F
A M
I L
Y
R
E A
D I N
E S
S
J O
I N
T
B
A S
E
S
T
O N
I O
F I R
E
P
R O
T E
C T
I O
N
F I R
E
S
P R
I N
K L E
R
G E
N E
R A
L
I N
F O
R M
A T
I O
N
WATER SUPPLY
1. CONTRACTOR TO PROVIDE A COMPLETE
ELECTRIC DRIVEN FIRE PUMP WITH ALL
NECESSARY SUPPORT EQUIPMENT (JOCKEY
PUMP, PUMP CONTROLLERS, ETC).
2. FIRE PUMP SHALL BE RATED MINIMALLY FOR
1000 GPM @ 60 PSI. ELECTRIC MOTOR
ESTIMATED TO BE 50 HP. COORDINATE WITH
ELECTRICAL IF MOTOR HP CHANGES.
3. ALL EQUIPMENT SHALL BE INSTALLED WITHIN A
ONE-HOUR FIRE-RATED ENCLOSURE WITH
AUTOMATIC SPRINKLER PROTECTION WHICH
WILL ALSO BE PROVIDED BY THE CONTRACTOR.
ENCLOSURE EXTERIOR TO BE PAINTED TO
MATCH EXTERIOR OF BLDG. 2263.
WATER SUPPLY TEST (DESIGN
PURPOSES)
STATIC PRESSURE: 50 PSI
RESIDUAL PRESSURE: 46 PSI
PITOT PRESSURE: 32 PSI
FLOW 950 GPM
FLOW COEFFICIENT: 0.9
DATE OF TEST: 6 DEC 2017
LOCATION OF TEST HYDRANT: SEE THIS DWG
LOCATION OF FLOW HYDRANT: SEE THIS DWG
* HYDRAULIC CALCULATIONS SHOULD BE BASED ON A
WATERFLOW TEST THAT WAS PERFORMED NO MORE THAN
6 MONTHS PRIOR TO SUBMISSION OF THE CALCULATIONS.
SCALE: NONE
FLOOR CONTROL ASSEMBLY (TYPICAL)
SCALE: NONE
ELECTRIC PUMP - 1 HR FRR ENCLOSURE
(ACTUAL SIZE AND LAYOUT MAY VARY)
SCALE: NONE
FLOW TEST HYDRANT LOCATIONS
A
D D
E N
D U
M
A
D D
E N
D U
M
A D
D E
N D
M
D E
N D
DN
UP
DN
DN
DN
UP
UP
DN
DN
VESTIBULE
OFFICE
OFFICE
OFFICE
OFFICE
MEN
OFFICE OFFICE
CORRIDOR
JAN.
MECHANICAL
STAIR
VESTIBULE
FIRE RISER ROOM
LOBBY OFFICE
LOBBY
CORRIDOR
102 103
OFFICE
1W
C
1W
C
1W
C
1W
S
C
1W
S
C
1W
S
C
.25W
S
C
.25W
S
C
1W
C
1W
C
1W
C
.25W
C
.25W
C
.25W
C
.25W
C
1W
C
1W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
.25W
C
P
P
P
P
P
P
P
P
L C
D L
O C
M A
P
LOC
RPWR
WP
S
WP
2W
S
WP
2W
S
WP2W
S
WP2W
S
R
S
R
FS
TS
FLOOR CONTROL VALVE
MMMM
MM
TS TS
TS TS
TS TS
DH
8 8
TS TS
MM
KEY NOTES:
1. COORDINATE LOCATION AND INTERFACE OF MONITOR
MODULES FOR TAMPER AND FLOW SWITCHES WITH
SPRINKLER CONTRACTOR.
2. PROVIDE REMOTE POWER SUPPLIES AS REQUIRED.
COORDINATE ACTUAL LOCATION WITH EXISTING
EQUIPMENT.
3. COORDINATE LOCATION AND INTERFACE OF MONITOR
MODULES WITH FIRE PUMP CONTROLLER AND
VALVES.
4. PROVIDE WEATHERPROOF HORN/STROBE. FINAL
LOCATION TO BE APPROVED BY FIRE MARSHAL.
5. EXTERIOR MASS NOTIFICATION SPEAKER. FINAL
LOCATION TO BE APPROVED BY FIRE MARSHAL.
COORDINATE LOCATION WITH EXISTING
ARCHITECTURAL ELEMENTS.
6. FINAL LOCATION OF REMOTE ANNUNCIATOR, LOC
AND GRAPHIC MAP TO BE APPROVED BY FIRE
MARSHAL.
7. THIS AREA IS A STAIR ENCLOSURE. EQUIPMENT AND
WIRING NOT SERVING THE STAIR SHALL NOT BE
LOCATED WITHIN THE ENCLOSURE.
8. COORDINATE LOCATION OF DUCT SMOKE DETECTORS
WITH EXISTING EQUIPMENT. FINAL LOCATION SHALL
BE IN ACCORDANCE WITH MANUFACTURER
INSTRUCTIONS.
FA102
XX
J A
M
R D
L
J A
M
XX
J B
S F
F A
F i r s t
F l o o r
P a r t
A d w g
R E
L E
A S
I N
G
A
U T
H O
R I T
Y
SCALE:
" = 1'-0"
0 4' 8' 24'16'
JBSF150055A
T R
O O
P F
A M
I L
Y
R
E A
D I N
E S
S
J O
I N
T
B
A S
E
S
T
O N
I O
F I R
E
P
R O
T E
C T
I O
N
F I R
E
A
L A
S
S
N
O T
I F
I C
A T
I O
N
F I R
S
F
O
P
A
N
A
SCALE:
" = 1'-0"
FIRST FLOOR PLAN A
NORTH
D
2 3 4 5
C
B
A
D a t e
A P
P R
O V
E D
A S
B
U I L T
A p p r o v a l
D a t e
D e s c r i p t i o n
R e v
Reference Number:
Sheet of
F I L
E
N
A M
E
D W
N
B
Y
D E
S I G
N E
D
B
Y
R E
L E
A S
B
C K
D
B
Y
W O
K
D
M
B E
R
C O
N T
R A
C
M
B E
R
D R
A W
I N
G
C
O D
E
D A
T E
PROJECT NUMBER
F S
N
D
C
B
A
1 2 3 4 5
X I I
X
I
X
IX
V
I
I
I
V
I
I
V I
V
I
V
III
I
I
I
B
U
I
S
R
O
N
G
D
C
I
V
I L
EN
G
I N
E
E
R
S
Q
J O
I N
T
B
A S
E
S
T
O N
I O d
C
I V
I L
E
N G
I N
E E
R
S
Q
S A
N
A
N T
O N
I O
T
X
W
G
D
W
G
F
J U
N O
T
F O
R
C
O N
S T
R U
C T
I O
N
A
D D
E N
D U
M
A
D D
E N
D U
M
| 20180725 corrected FX001 |
| Sheets and Views |
| FX001 |
| 20180730 updated FA001 |
| FA102.pdf |
| Sheets and Views |
| FA102 |
File details come from the government source that posted it.