am_10.pdf
PDF 26 KB Posted
- Solicitation number
- W9126G-08-R-0003
About this file
Amendment No. 0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| g08r0003.exe | EXE file | |
| am_9.pdf | ||
| am_8.pdf | ||
| am_7.pdf | ||
| am_4.pdf | ||
| am_3.pdf | ||
| am_2.pdf | ||
| am_1.pdf | ||
| g08r0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for CONSTRUCT SAN ANTONIO MILITARY MEDICAL CENTER (SAMMC) - NORTH, FORT SAM HOUSTON, TX is amended as follows:
SEE CONTINUATION PAGE(S)
NOTE: Proposal Receipt date is 18 April 2008, 2:00 p.m., local time, as previously announced.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-08-R-0003
X 9B. DATED (SEE ITEM 11)
21-Dec-2007
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Apr-2008
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-08-R-0003 Am #0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO THE APPENDICES
Appendix B - Construction Site Utilization Master Plan And Specification For Temporary Facilities.- Replace the Narrative Page with the accompanying new Narrative Page, bearing the notation “ACCOMPANYING
AMENDMENT NO. 0010 TO SOLICITATION NO. W9126G-08-R-0003.”
The remainder of Appendix B is correct. The only change is to the Narrative Page.
END OF AMENDMENT
ACCOMPANYING AMENDMENT 0010 TO SOLICITATION NO. W9126G-08-R-0003
APPENDIX B – CONSTRUCTION SITE UTILIZATION MASTER PLAN AND
SPECIFICATION FOR TEMPORARY FACILITIES
(AM#7)NARRATIVE:(AM#7)“Construction Site Utilization Phase One and Two Bubble Transition”
Phase One Construction Bubble
Phase One Construction Bubble configuration identifies the area designated as the contractor controlled work area. The Phase One Construction Bubble will include a Fort Sam Houston approved isolation fence installed per the locations and details provided in the SAMMC North – Construction Haul Road, Erosion Control, and Environmental Protection Plan design documents (Work Package 2). Phase I includes required areas for construction of the Consolidated Parking Structure (CPS), New Central Energy Plant (CEP), Consolidated EDIT/CAT Tower, construction trailers, lay down areas, contractor parking, and other ancillary facilities required by the contractor.
(AM#7)Contractor will install vehicle gates across George C Beach Ave. at points intersected by the Phase One Construction Bubble and George C Beach Ave.
Prior to Phase One Construction Bubble implementation new Emergency Department entrances will be established. Emergency Department North (ED North) and Emergency Department South (ED South) entrances will be established per the attached layout and remain operational until occupancy of the new EDIT/CAT Tower. Contractor will provide and maintain for each ED entrance a ten foot wide lighted covered walkway that extends from a lighted covered bay to the ED entrance. Walkways will meet ADA standards for accessibility and travel. Contractor will provide conduits and junction boxes for use by others in support of BAMC surveillance and communication installations. (AM#7)
(AM#10) Note: Implementation of the Phase One Construction Bubble will be coordinated thru the SAMMC Area Engineer Office to ensure maximum utilization of existing site parking until civil construction activities begin on the Consolidated Parking Structure and Combined EDIT/CAT Tower. Approved temporary barricades may be utilized while contractor establishes construction offices and ancillary facilities prior to construction of the Phase One Construction Bubble. (AM#10)
Phase Two Construction Bubble
Phase Two Construction Bubble configuration identifies the area designated as the contractor controlled work area after completion of the Consolidated Parking Structure (CPS). This will allow the government to place the CPS in service upon completion. The Phase Two Construction Bubble realigns the Phase One isolation fence by removing the Consolidated Parking Structure area and one contractor access point from Binz Engleman. The controlled gate closing Beach Street located west of the CPS will be relocated east of the CPS and west of the Helipad allowing access and egress to the in service CPS. Phase Two includes required area for construction of the New Central Energy Plant (CEP), Consolidated EDIT/CAT Tower, construction trailers, lay down areas, contractor parking, and other ancillary facilities required by the contractor.
| AMENDMENT NO. 0010 |
| PAGE 2 |
| APPENDIX B - NARRATIVE PAGE |