MATOC RFI Answers 7
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEVADA NATIONAL GUARD
UNITED STATES PROPERTY AND FISCAL OFFICE
PURCHASING AND CONTRACTING DIVISION
2452 Fairview Drive Carson City, Nevada 89701
NVMD-PFO-PC 19 March 2013
SUBJECT: Answers to Requests for Information, MATOC 2013
1. The following are questions and the government’s answers:
a. What is the wage decision number we are required to use for the prototypical project? Unless I’ve overlooked it, I didn’t see it included with the solicitation.
-ANSWER: See Exhibit E, “Wage Determination.”
b. If the 120 minute Emergency Response time cannot be met, will this exclude a contractor from award of the MATOC? There are parts of the state where that requirement will be improbable to meet.
-ANSWER: Response time is only one factor, and alone may not necessarily exclude a contractor from award.
c. What is the Performance Period that should be annotated in Exhibit “E”?
-ANSWER: Contract Duration/Performance Period is 180 days.
| Contractor Request for Information |
| REQUEST NO: |
| X |
| PROJECT: |
| MATOC Pre-Solicitation |
| PROJECT NO: |
| Solicitation Number: |
L 919636
W9124X-13-R-0001
CONTRACTOR:
| Drawing No./Detail No.: |
| N/A |
| Spec. Section: |
| N/A |
| Cost Impact: |
| N/A |
| Schedule Impact: |
| N/A |
Questions:
1. Do the windows that are to be replaced need to comply with the anti-terrorism specifications i.e. do they need to be blast proof for this application?
2. In section 01732 what percentage of recycle is required for each task order?
3. It says the contractor is responsible for air monitoring in 01410 1.04a. Do we need to hire an independent entity to provide the testing?
4. Does the requirement for submitting items on a 3-1/2 MS-DOS diskette still apply?
5. On page 103 it says the contractor is responsible for the office furniture and equipment to be moved by the contractor. Does this apply for computers and/or servers as well? If it does is there a security clearance required.
| To: |
| NVANG |
| Requested by: |
| Northcon, Inc. |
| Date: |
| 3/19/13 |
Response:
1. For puprposes of the bid, assume minimum anti terrorism stand offsets are met and standard glazing will be used.
2. Use 10% as the percentage of recycled content used in construction.
3. An independent entity shall be contracted to provide air monitoring.
4. Delete any requirement to provide submitted items on a 3 /12 inch diskette.
5. The owner / government shall be responsible for relocating computers and servers.
Answered by: Lt Col Robert Nicholas, P.E., NVANG
Company: NVANG
| Date: |
| 3/19/13 |
| Contractor Request for Information |
| REQUEST NO: |
| 9 |
| PROJECT: |
| MATOC Pre-Solicitation |
| PROJECT NO: |
| Solicitation Number: |
L 919636
W9124X-13-R-0001
CONTRACTOR:
| Drawing No./Detail No.: |
| N/A |
| Spec. Section: |
| N/A |
| Cost Impact: |
| N/A |
| Schedule Impact: |
| N/A |
Questions:
1. Is the estimate to include removal of any lead paint from the exterior building, or is the contractor to assume encapsulation only?
2. Is the estimate to include removal of any asbestos from the existing stucco, or is the contractor to assume encapsulation only?
3. Is the schedule to include phasing to evacuate the tenants when removing and replacing the windows and roof?
4. "1.16 SEQUENCING AND SCHEDULING; A. Work/ Scheduling Requirements: Work shall be carried out in sequential phases" -Please clarify "sequential phases," as to the length of sequence and tenant coordination.
| To: |
| NVANG |
| Requested by: |
| MCM Services |
| Date: |
| 3/19/13 |
Response:
1. For puprposes of the bid, assume hazardous materails have been removed proior to the award of the project, or that hazardous materials will be encapsulated within the normal scope of the project.
2. As per the response to question 1, for puprposes of the bid, assume hazardous materails have been removed proior to the award of the projec,t or that hazardous materials will be encapsulated within the normal scope of the project.
3. The building will be entirely vacated prior to the start of the project..
4. As per the response to question 3, the building will be entirely vacated prior to the start of the project.. The contract duration shall be 180 days.
Answered by: Lt Col Robert Nicholas, P.E., NVANG
Company: NVANG
| Date: |
| 3/19/13 |
This represents the final posting to address Requests For Information (RFI).