A-11_MATOC_Exhibits_A-D_F-G_Oct_2012_V2.docx

DOCX document 44 KB Posted

Attached to
Nevada Multiple Award Task Order Contract (MATOC)
Solicitation number
W9124X-13-R-0001
Issued by

About this file

Replacements/revisions highlighted

View the file

Other files

File Type Posted
The_following_businesses_received_a_contract_award_for_NVNG_MATOC.docx DOCX document
MATOC_Performance_Period_Clarification.docx DOCX document
MATOC_Revised_Answer_Performance_Period.docx DOCX document
MATOC_RFI_Answers7.docx DOCX document
MATOC_RFI_Answers6.docx DOCX document
MATOC_RFI_Answers_5.pdf PDF
MATOC_RFI_Answers4.docx DOCX document
Pre_Proposal_Conference_Roster.pdf PDF
MATOC_Preproposal_Conference_FY_13.pptx PPTX presentation
MATOC__EXHIBIT_E__Prototypical__Revised_7_March.docx DOCX document
W9124X13R00010003.doc DOC document
W9124X13R00010002.doc DOC document
MATOC_RFI_Answers3.docx DOCX document
EXHIBIT_C1_REVISED_DATE.docx DOCX document
MATOC_RFI_Answers2.pdf PDF
Exhibit_D_Attachment_1_Feb_13.xlsx XLSX spreadsheet
MATOC_RFI_Answers1.docx DOCX document
A-11_MATOC_Exhibits_A-D_F-G_Oct_2012_Rev.docx DOCX document
W9124X13R0001-0001.doc DOC document
Prototypical_Proj_-B55_100__Half_Size_Dwgs.pdf PDF
MATOC__EXHIBIT_E__Prototypical__Feb_13.docx DOCX document
A-11_MATOC_Exhibits_A-D_F-G_Oct_2012_Rev.docx DOCX document
W9124X13R0001_Released.doc DOC document
Prototypical_Proj-B55_100__Specs.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC RFP W9124X-13-R-0001

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Prepare not more than six (6) Part 1 forms for general construction.

Provide the following information requested in this format for each of the projects/contracts being described. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted. Projects may be on going, if complete to 70 % and cannot have been completed any earlier than 5 years prior to the solicitation issue date. . Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):_______________________________________

B. Project/Contract Title:________________________________________________________

C. Contract Specifics:

1. Description of Effort as ___________Prime Contractor or _________Subcontractor

2. Contract Number__________________________________________________________

3. Original Contract $ Value _____________ Current/Final Contract $ Value ____________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Award and Completion

i. Award date: __________________Original Completion Date:_____________________

ii. Current Scheduled Completion Date( if ongoing): _____________ % complete: _____
iii. Estimate/Final Completion Date:_________________________________________
iv. If IDIQ Number of Task Orders issued:____________________________________

**If reference is for an IDIQ Contract provide items 1-3 above, contract completion date and number of task/delivery orders issued. The Basic Contract will not count as one of 6 contracts/projects. The basic contract alone will not be considered for relevancy. The proposal must discuss relevant task order(s) complete to 90%. Count each TO discussed as a single project/contract**

Task Order Number _____________________________________________________ Title__________________________________________________________________ Original TO $ Value _____________ Current/Final $ Value _____________________ If amounts above are different, provide a brief description of the reason:

Task Order Completion Date:

1. Original Date: _____________________________________________

2. Current Schedule if ongoing _________________________________% complete: _____

3. Estimate/Final Completion Date:_______________________________

4. Primary cause for Contract Modifications________________________

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or somewhat-relevant to this solicited contract. Also discuss similarity of the client type, United States Green Building Council (USGBC) (LEED®) or similar sustainability requirements. Use as much space below as necessary to provide this description.

Exhibit A Part I continues on Next Page… Additionally, please address the following items:

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on MATOC projects.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

4. Point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired.

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of the six (6) General Construction projects. A “Final” Performance Evaluation (Construction) ( also referred to as CCASS Evaluation ) issued for a project may be included in lieu of sending out reference package for the project.

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 2: Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2A: Applicable to all offerors - Describe your Compliance with the requirements of FAR clause 52.219-8, Utilization of Small Business Concerns (May 2004). Describe below the methods you have used to comply with this policy on prior federal contracts. Include any evidence, or a point of contact to verify this information, if available.

Even if you are a Small or Small Disadvantaged Business, this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems.) It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts.

2B: Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline, but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:

Electrical:

Mechanical:

Roofing:

Horizontal disciplines: (include paving and civil site work)

Each major subcontractor and/or Teaming Partner must also complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered. Offerors shall have major subcontractors identify on the Exhibit B three references, owners (if they were the Prime) or other Prime contractors they have worked for. References for subcontractors from the proposing offeror are not acceptable. See Exhibit “B” format for information to be provided. Written references for subcontractors may be included and are encouraged. However, subcontractors do not need to send out Exhibit C questionnaires.

2C: Discuss assessment of liquidated damages on any contracts within the last five years. (frequency, circumstances, severity of problem, etc.)

2D: Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problems.

2E: (OPTIONAL) Other Past Performance Considerations. Information, if provided, shall be limited to the period starting 5 years prior to the solicitation release date. Page limit on this question is 8 pages.

Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

Limit of five (5) of the following: Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

IDIQ MATOC RFP W9124X-13-R-0001

EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted to the offering contractor for submission with past performance volume.

___________________(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with ___________________(prime contractor or name of entity providing proposal) in responding to the Request for Proposal No. W9124X-13-R-0001 for IDIQ Multiple Award Task Order Contract (MATOC) for construction projects issued by the USPFO for Nevada for multiple Air and Army National Guard locations in the State of Nevada.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature)(Title of Individual with authority to sign for and
Legally bind the company)

Company Name: ________________________ Telephone #____________________

Address: ______________________________

City/State/Zip Code:______________________ Date:_____________________

Reference List (required):

1. Contract No. And Title___________________________________________________________ Describe your role (Prime/Sub) and work Performed ___________________________________ Reference POC Name____________________________ Phone___________ Fax____________ Email address: _________________________________________________________________

2. Contract No. And Title___________________________________________________________ Describe your role (Prime/Sub) and work Performed ___________________________________ Reference POC Name____________________________ Phone___________ Fax____________ Email address: _________________________________________________________________

3. Contract No. And Title___________________________________________________________ Describe your role (Prime/Sub) and work Performed ___________________________________ Reference POC Name____________________________ Phone___________ Fax____________ Email address: _________________________________________________________________

EXHIBIT C PACKAGE INFORMATION AND FORMS - A “Final” Performance Evaluation (Construction) ( also referred to as CCASS Evaluation ) issued for a project may be included in lieu of sending out reference package for the project.

Instructions to Offeror for sending Reference Questionnaire Forms: Prepare and send a reference questionnaire package for each project listed on your Exhibit A, Performance Relevancy Questionnaires. For Government contracts, send to Contracting Officer or Technical Representative. For commercial references send to personnel with duties similar to those for Government contracts. It is your responsibility to follow-up and to encourage your references to send in their questionnaire. If you have multiple references at one location (Base etc.), Send one cover letter and questionnaire for each contract you want a reference for. Your questionnaire package should contain the following.

Cover Letter (See SAMPLE) (Exhibit C1) Respondent Info Rating Sheets (Exhibit C2) (the next 4 pages) Offeror should put name in spaces indicated and ensure it is on every page for identification purposes Suggested - Pre Addressed stamped envelope to return to Contracting Officer.

OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE!!!

OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES

EXHIBIT C1

SAMPLE TRANSMITTAL LETTER

AND

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Your Company Letterhead

Date: _________________ To: ______________________________________

We have listed your firm/agency as a reference for the work we have performed for you as listed below. Our firm is submitting a proposal for a Multiple Award Construction Task Order Contract advertised by the USPFO for Nevada. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. A “Final” Performance Evaluation (Construction) (also referred to as CCASS Evaluation) issued for a project may be included in lieu of completing the reference package for the project. Space is provided for comments. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306 (e) (4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.

Please send your completed questionnaire to the following address to arrive NOT LATER THAN 22 February, 2013. Do not return them to our company.

Department of the Army

USPFO FOR NEVADA

2452 FAIRVIEW DRIVE

CARSON CITY, NV 89701-6807

or brian.l.stanton.mil@mail.mil / karen.l.mccloud.ctr@mail.mil / pierce.e.tucker.mil@mail.mil or Fax 775-887-7874

If you have questions regarding the attached questionnaire, or require assistance, please contact Brian Stanton, 775-887-7825, brian.l.stanton.mil@mail.mil Thank you for your assistance. E-Mail is preferred.

Signature and Title

EXHIBIT C2

SOURCE SELECTION SENSITIVE WHEN COMPLETED*****NOT TO BE RELEASED OUTSIDE GOVERNMENT CHANNELS***** RETURN THIS PAGE WITH QUESTIONNAIRE

RATING DESCRIPTIONS: Use the following descriptions as guidance in providing ratings.

RATING
DEFINITION
Outstanding (O)
Indicates the contractor’s performance record within the area of evaluation Exceeded that required by the contract.
Above Average (A)
Indicates the contractor’s performance record within the area of evaluation Met All contractual requirements.
Satisfactory (S)
Indicates the contractor’s performance record within the area of evaluation Met Essentially All contractual requirements.
Marginal (M)
Indicates the contractor’s performance record within the area of evaluation Met Some of the contractual requirements. However, changes to the contractor’s existing processes may be necessary in order to achieve contract requirements.
Unsatisfactory (U)
Indicates the contractor’s performance record within the area of evaluation Failed to Meet the minimum Government requirements.
Unknown or Not Applicable (N/A)
The question does not apply. No performance record identifiable within the area of evaluation.

RESPONDENT IDENTIFICATION AND RATINGS

(Part 1 Contractor submitting Proposal fill-in) Reference is provided for:

Contract Number:

Project Title:

Date of Award:

Project Completion Date:

Project Location:

Dollar Value:
$

Brief Description of Proj:

Your role in referenced contract:

(Part 2 Person providing Reference) Reference is provided by:

Company/Agency:

Business Address:

Telephone Number:

Email Address:

Project Completion Date:

Relationship to Contract:

If information in Part I is not accurate please indicate.

To obtain an electronic version of the form please contact: brian.l.stanton.mil@mail.mil

THE QUESTIONNAIRE SHOULD BE SUBMITTED BY THE FOLLOWING MEANS: Return via FAX Commercial 775-887-7874 or DSN 530-7874 or via email to the email address shown above. Forms may be mailed to USPFO for Nevada, 2452 Fairview Drive, Carson City, NV 89701-6807 Mark cover sheet: (Attention: RFP W9124X-13-R-0001 “Source Selection Sensitive Information”)

IDIQ MATOC, RFP W9124X-13-R-0001

Please provide evaluation of the following Performance Elements by placing an X in the appropriate column that corresponds to the rating definitions on the previous page.

QUALITY CONTROL

Outstanding
Above Average
Satisfactory
Marginal
Unsatisfactory
Not Applicable
(O)
(A)
(S)
(M)
(U)
(N/A)

Quality of Workmanship

Adequacy of the quality control plan

Implementation of the Quality Control Plan

Quality of the Quality Control Documentation

Storage of Materials

Adequacy of Materials

Adequacy of Submittals

Adequacy of Quality Control Testing

Adequacy of As-Builts

Use of Specified Materials

Identification/Correction of Deficient work in a timely manner

Comments on Quality Control:

TIMELY PERFORMANCE

(O)
(A)
(S)
(M)
(U)
(N/A)

Adequacy of Initial Progress Schedule

Adherence to Approved Schedule

Resolution of Delays

Submission of Required Documentation

Completion of Punchlist Items

Submission of Updated and Revised Progress Schedules

Warranty Response

Comments on Timely Performance:

EFFECTIVENESS OF MANAGEMENT

(O)
(A)
(S)
(M)
(U)
(N/A)

Cooperation and Responsiveness

Management of Resources/Personnel

Coordination and Control of Subcontractors

Adequacy of Site Clean Up

Effectiveness of Job-Site Supervision

Compliance with Laws and Regulations

Professional Conduct

Review/Resolution of Subcontractor Issues

Implementation of Subcontracting Plan

Comments on Effectiveness of Management:

COMPLIANCE WITH LABOR STANDARDS

(O)
(A)
(S)
(M)
(U)
(N/A)

Correction of Noted Deficiencies

Payrolls Properly Completed and Submitted

Compliance with Labor Laws and Regulations with Specific Attention to the Davis-Bacon Act and EEO Requirements

Comments on Compliance With Labor Standards:

COMPLIANCE WITH SAFETY STANDARDS

(O)
(A)
(S)
(M)
(U)
(N/A)

Adequacy of Safety Plan

Implementation of Safety Plan

Correction of Noted Deficiencies

Comments on Compliance With Safety Standards:

OVERALL RATING of PERFORMANCE
(O)
(A)
(S)
(M)
(U)
(N/A)

Please provide any additional information you feel is important and not covered elsewhere in this evaluation:

Thank you for your remarks. Be sure to return to the Contracting Agency and not to the Contractor you are providing a reference for.

OFFEROR NAME___________________________

Respondent Signature ______________________________________Date Completed:______________________

IDIQ MATOC, RFP W9124X-13-R-0001

Offeror Name______________________

SOURCE SELECTION SENSITIVE WHEN COMPLETED

EXHIBIT D – TECHNICAL PROPOSAL DATA

Offerors are cautioned to read sections 00800 and Division One of the solicitation documents before completing Exhibit D as your answers must meet the minimum requirements found in these sections.

Offerors are strongly encouraged to review the evaluation information found in Section 00120 as they complete their Exhibit D.

Each question should be covered in sufficient detail to clearly address all required information. Answer questions in order presented. You are limited to 10 double sided pages (20 single pages) exclusive of tabs, indexes, dividers, and attachments listed in this exhibit. Any additional attachments you provide will be included in the page count provided. It is advisable to state the question then give the answer. This will aid in the evaluation.

In the event you reference another document or part of the proposal you must be clear as to where the information can be found to answer the particular question(s). Such statements as see Company profile or see Safety Plan are not acceptable. You must indicate on what page of the proposal the answer can be found in the referenced document. Failure to do so may make your proposal non-compliant.

The Technical Proposal data is obtained for the purpose of evaluating technical capability in performance of future task order projects. The offeror is required to provide required information to show experience and capability to manage multiple disciplined projects.

1. CAPABILITY AND EXPERIENCE:

1A:” Discuss your experience and technical capability to perform and manage multi-disciplined projects for the dollar levels, disciplines, and locations you are requesting in “Areas of Consideration”. Additionally the discussion should address familiarity with construction in the locations selected, and familiarity with issues pertaining to work in this area and involvement of the local workforce. In the table format provided in Attachment 1 show experience on multiple disciplined projects. Discuss your ability to manage multiple projects at one time. (Note: You will be evaluated at all levels with considerable consideration given to the highest dollar level you are requesting. If you have no experience at the higher dollar levels consider asking for an award at a lower level and going to the higher amounts in the option years.)

1B: This contract requires short notice site visits/proposal meetings, normally within 2 calendar days, but can be as short as 120 minutes. (Consider reporting to Reno Air Base, Reno NV (required) and Clark Co. Armory, Las Vegas, NV, if you chose that location). Give details on how you will ensure compliance with these requirements?

1C: Discuss experience with constructing to United States Green Building Council (USGBC) LEED® standards. If no experience, so state, and indicate how you plan to overcome this weakness should a task order have these requirements.

1 D: Explain in detail how you will perform the minimum percentage required, 15%, with your own forces. Note: An offeror who has the capability to perform both as a General contractor and self perform a major element of construction, for example, Electrical, or Mechanical or Roofing, may be afforded additional consideration in the evaluation.

2. ORGANIZATION:

2A: Provide as an attachment an Organizational Chart listing company personnel and their roles. (Titles) (Attachment 2)

2B: Provide names, duties and levels of responsibility of key personnel to include the Project Manager, Site Superintendent(s), Quality Control Manager and Safety Manager. Indicate to whom the Quality Control and Safety Managers report. (Lines of authority)

2C: Provide a list of the in-house trades that you employ. Provide the number (not names) of these employees and if they are full-time, part- time etc.

2D: If applicable, describe the support and interface with your home office or corporate headquarters for such aspects as financial, management and technical support. If not applicable state 2D- Not applicable.

3. SPECIFIC PERSONNEL

3A: Discuss the education, training and experience in managing construction projects of the key personnel listed in 2B. (A resume or experience cut sheet limited to two (2) pages may be submitted if it provides this information. Attachment # 3)

3B: Provide list of major subcontractors and their trades that you intend to use on these projects. (These also should have been listed in Exhibit A PART 2 and there must be an Exhibit B in the proposal for the named subcontractors or they will not be considered.)

3C: Tell us if you have worked together in the past. If yes, on what kind of jobs?

4. SCHEDULING METHODOLOGY - Adequate scheduling processes are necessary to ensure completion and control of the project from beginning to the end of the project.

4A: Discuss your scheduling capabilities. Include such things as programs and staff to do scheduling.

4B: Include a schedule for the prototypical project(s). Use a Notice to proceed date of May 1, 2013. Offerors not being considered for task orders over $1M may provide schedule in any acceptable format, offerors being evaluated for orders over $1 Million should provide the schedule in Critical Path Method (CPM) format to demonstrate capability. (This includes prototypical/seed projects valued at less than $1M.) If the project is less than $1M an offeror may provide a sample CPM from a previously completed project to demonstrate capability but must also provide a schedule in any format for the prototypical project.

5. QUALITY CONTROL- (In addition to the information required in this question, information on personnel, duties, responsibilities and lines of authority provided in response to questions 2 and 3 will be used in the evaluation of Quality Control.)

5A: Discuss how quality issues will be dealt with on various types of construction projects. Include in the discussion as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials.

(Note: A full Quality Control Plan will be required if you are awarded a contract and is NOT required or desired with the proposal. If you do provide a plan, indicate if it is a draft for this contract or a sample from another project. Also, provide in the answer to this question the page numbers where the required information (list of minimum information above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated.) Full Quality Control Plans if provided WILL NOT be evaluated.

5B: Discuss your procedures for contract closeout.

6. SAFETY

6A: Discuss your Safety Program in general, and provide as a minimum, details on training, documentation, and your plan to ensure adherence to OSHA Standards, and the USACOE EM 385-1-1 (Safety Manual).

(Note: A full Safety Plan will be required if you are awarded a contract and is NOT required or desired with the proposal. If you do provide a plan, indicate if it is a draft for this contract, a sample from another project or a corporate plan. Also, provide in the answer to this question the page numbers where the required information (listed above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated.) Full Safety Plans if provided WILL NOT be evaluated.

6B: Discuss the steps you took to promote safety during construction during the past three (3) years.

Attachments

1. Experience Chart- (limited to 4 pages (2 double sided pages)

2. Organization Chart (required)

3. Resumes (optional) Limit to 2 pages each

4. Schedule (required)

IDIQ MATOC RFP W9124X-13-R-0001

EXHIBIT F - PROPOSAL VOLUME CONTENTS AID

This listing is provided as an aid to offerors and in no way represents all information that is required in a proposal. Offerors must comply with Sections 00100, 00110 and 00120 of the solicitation.

Binder # 1 - VOLUME 1, PRICE/COST INFORMATION

( ) A Cover letter that contains a points of contact with names and email and phone numbers. Provide the names of authorized negotiators. Cage Code, Duns number, Tax ID number. Statement of socio-economic size

( ) Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102. Submit an original and the number of copies required by solicitation. An original signature is required on the original document.

( ) A completed Section 00010, Areas of Consideration

Prototypical project, Exhibit E

( ) Insert the price/cost associated with the prototypical project on the Prototypical Proposal Offer Schedule(s)

( ) Representations and Certifications- Section 00600- Complete the Annual Certification on ORCA. Insert the required certifications and representations in section 00600 and return with proposal.

Binder # 2 - VOLUME 2, PAST PERFORMANCE INFORMATION

**REMINDER- Send out Questionnaires to your former clients so responses reach Contracting Officer No later than solicitation closing date!!!**

( ) Exhibit A, Part 1: Performance Relevancy Questionnaire format, for six (6) general construction projects. Follow special instructions for IDIQ Contracts.

( ) Exhibit A, Part 2: Answer all questions.

( ) Exhibit B “Subcontractor Consent and Information Form” for each major subcontractor/ Teaming Partner listed in Exhibit A Part 2.

( ) Exhibit C reference questionnaires: Provide list by name and company agency only who you sent reference questionnaires, or include a “final” performance Evaluation for Construction in lieu of sending out questionnaire. Be sure to send a reference package to all Clients listed on Exhibit As, Part 1, in sufficient time so as to have questionnaires reach the Contracting Officer not later than the closing date for the solicitation. Follow-up with clients as necessary.

Offerors lacking relevant Past Performance experience may submit three (3) references for each Predecessor Company, Subcontractor or Key Personnel on an Exhibit C, or resume for key personnel. Exhibit C Reference Packages should also be sent.

Binder # 2 VOLUME 3, TECHNICAL INFORMATION

( ) Exhibit D – Is format and instructions complied with?

( ) Did you review Section 00800 and Division One to ensure your answers meet the minimum requirements? Did you review Section 00120, Technical Evaluation, to ensure answers to questions and submission provide information needed for the evaluation?

( ) Are answers to the questions clear and detailed?

( ) Are all required attachments provided?

General:

( ) Did you submit an Original and one copy of Binder # 1 (Volume 1)?

( ) Did you submit an Original and 3 hard copies of Binder # 2 (Volumes 2 and 3)?

( ) Did you submit an electronic version of your proposal? (Exhibit E does not have to be submitted in electronic version)

EXHIBIT G

PROPOSAL INQUIRY FORMAT

SOLICITATION W9124X-13-R-0001

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED VIA FAX OR EMAIL IN THIS FORMAT OR WITH ALL INFORMATION SHOWN ON FORM!

1.1.1. FAX: 775-887-7874 EMAIL: brian.l.stanton.mil@mail.mil / karen.l.mccloud.ctr@mail.mil / pierce.e.tucker.mil@mail.mil.

Date of Proposal Inquiry: _______________

From: ______________________________ Company Name: ________________________________

Address:_____________________________________________________________________________

Phone Number: _____________________________ Fax Number:______________________________

Email address: ________________________________________________________________________

Proposal Inquiry: (Please type or print clearly)

File details come from the government source that posted it. Updated .