W9124R-24-R-0004_RFP_Att0003_DIDs.pdf

PDF 733 KB Posted

Attached to
Yuma Mission Test Support Services - RFP W9124R-24-R-0004
Solicitation number
W9124R-24-R-0004
Issued by

About this file

The document contains three Data Item Descriptions (DIDs) related to a federal contract opportunity. DI-MGMT-80441D describes the requirements for a Government Property (GP) Inventory Report, which enables a contractor to periodically provide an inventory listing of Government Furnished Property (GFP) and Contractor Acquired Property (CAP). DI-MGMT-81834A outlines the requirements for a Contractor's Personnel Roster, which lists all contractor personnel assigned to the contract. DI-MGMT-81996 specifies the content and format for a Critical Plan of Action (CPOA), which describes the contractor's methodology for addressing known failure modes and corrective actions for a discrete critical characteristic.

The related federal contract opportunity is Solicitation W9124R-24-R-0004 for Yuma Proving Ground Mission Test Support Services, with a proposal due date of August 16, 2024 and a question submission deadline of July 26, 2024. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command Yuma Proving Ground.

View the file

Other files

File Type Posted
W9124R-24-R-0004_QA_For_Industry_RFP_16AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_14AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment3.xlsx XLSX spreadsheet
W9124R-24-R-0004_Amendment0003_Modification.pdf PDF
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 3.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment2.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories_Amendment 2.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0011_CBA Job Descriptions.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0010_WD_AK.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Amendment0002_Modification.pdf PDF
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 2.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0008_PPQ_Amendment1.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Amendment0001_Modification.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment 1.xlsx XLSX spreadsheet
W9124R-24-R-0004_PWS Att 0001-Performance Requirements Summary_Amendment 1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0005_OCI_Certification_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2024_Amendment1.pdf PDF
W9124R-24-R-0004_QA_ForIndustry_RFP_Amendment1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix.xlsx XLSX spreadsheet
W9124R24R0004_RFP_EXHIBIT_A_CDRLS.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0004_TE1_HistoricalWorkloadData.pdf PDF
W9124R-24-R-0004_RFP_Att0007_GFP_Different_Contract.docx DOCX document
W9124R-24-R-0004_RFP.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2021-2024.PDF PDF
W9124R-24-R-0004_RFP_Att0009_QuestionTemplate.xlsx XLSX spreadsheet
QA_ForIndustry_16JUL24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Att0006_TE3_Non-GFP_EquipMaintList.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0003_Contractor Furnished Equipment.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0005_TE2_GFP.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0007_TE4_GFF.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0001_Performance Requirements Summary.pdf PDF
W9124R-24-R-0004_RFP_Att0005_OCI_Certification.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS.pdf PDF
W9124R-24-R-0004_RFP_Att0008_PPQ.pdf PDF
W9124R24R0004_16July24_Letter_from_the_KO.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Government Property (GP) Inventory Report Number: DI-MGMT-80441D Approval Date: 20200609 AMSC Number: 10184 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2020-012 Applicable Forms: None

Use/Relationship: The Government Property (GP) Inventory Report enables the contractor to periodically provide to the Department of Defense (DoD) Service or Agency an inventory listing of GP (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.

This Data Item Description (DID) is applicable to all contracts where GP will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.

This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

This DID supersedes DI-MGMT-80441C.

Requirements:

1. Reference documents. None.

2. Format. The report shall be in an electronic .xls or .xlsx compatible format.

3. Content. The report shall contain the following column headers (i.e., data fields):

A. Contract Number B. Agency or Service Asset Identification Number (GFP Only) C. Contractor Asset Identification Number D. Item Description E. Manufacturer Part Number F. Manufacturer Model Number G. Manufacturer Serial Number H. National Stock Number (NSN) (if applicable) I. Quantity J. Unit of Measure K. Unit Acquisition Cost L. Unique Item Identifier (if registered in the Item Unique Identification (IUID) Registry;

GFP only) M. Asset Location N. Asset Sub-Location (if applicable) O. Type of Government Property (i.e., Government Furnished Property (GFP) or

Contractor Acquired Property (CAP) P. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling

Source: http://assist.dla.mil -- Downloaded: 2024-03-22T15:03Z Check the source to verify that this is the current version before use.

DI-MGMT-80441D

(ST))

Q. Date of Last Physical Inventory R. Federal Condition Code

END OF DI-MGMT-80441D

Source: http://assist.dla.mil -- Downloaded: 2024-03-22T15:03Z

Title: CONTRACTOR'S PERSONNEL ROSTER

Number: DI-MGMT-81834A Approval Date: 20130118 AMSC Number: N9316 Limitation: N/A DTIC Applicable: No GIDEP Applicable: N/A Office of Primary Responsibility: SH/MS10 Applicable Forms: N/A

Use/relationship:

This roster shall be used to list all contractor personnel assigned to the contract.

This Data Item Description (DID) contains the content and preparation instructions for data product resulting from the work task specified in the contract.

Requirements:

1. Format. The Roster shall be in contractor’s format.

2. Content. The Roster shall contain an alphabetical listing of the names of all contractor personnel assigned to the contract.

2.1 The roster shall identify the following for each employee:

a. Change Status: Add/Change/Remove

b. Start Date

c. End Date

d. First Name

e. Middle Name

f. Last Name

g. Position Title

h. Email Address

i. Work Phone Number

j. Physical Work Location – Base Name

k. Physical Work Location - City

l. Physical Work Location - State

m. Physical Work Location – Building Number

n. Physical Work Location – Room Number

o. Contract Number

p. Contract Name

q. Contracting Supervisor

r. Government Support POC

s. Supporting Code

2.2 The roster shall identify work schedules for full time and part time employees and shall include current CAC and clearance information for each.

3. End of DI-MGMT-81834A.

Source: http://assist.dla.mil -- Downloaded: 2024-01-24T14:22Z

Title: CRITICAL PLAN OF ACTION (CPOA)

Number: DI-MGMT-81996 Approval Date: 20150908

AMSC Number: N9577 Limitation:

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2015-006

Applicable Forms: N/A

Use/relationship: A Critical Plan of Action (CPOA) describes the Contractor’s methodology for addressing known Failure Modes within approved critical non-conformance creation rates

(also referred to as CPOA thresholds), appropriate corrective actions, and continuous improvement to reduce non-conformances (defects) against a discrete critical characteristic.

For a stable and in-control production process with well understood non-conformance creation rates and Failure Modes, a CPOA is a collection of alternative plans and provisions that potentially provides a means to maintain operational continuity while avoiding delays due to mandated shutdown.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

Requirements:

1. Format. The plan shall be in the Contractor’s format.

2. Content. The plan shall include the following elements:

2.1 Cover page specifying:

a. Contractor’s title.

b. Contract Number.

c. Revision and date.

d. Nomenclature of the system/component/program/project, the security classification, and the distribution restrictions.

e. Government activity issuing the controlling contract.

2.2 Table of contents. The plan shall contain a table of contents.

2.3 Index. The plan shall contain an index.

Source: http://assist.dla.mil -- Downloaded: 2024-03-22T14:48Z

DI-MGMT-81996

2.4 Descriptive material. The plan shall include any descriptive material needed to provide comprehensibility of the content such as sketches, drawings, photographs, tables, forms, graphs, worksheets, charts, etc.

2.5 The plan shall reference the specific associated Critical Characteristics Control Plan

(CCCP) and revision.

2.6 Critical characteristic. The plan shall identify the discrete critical characteristic and the known Failure Modes impacted by this plan.

2.6.1 The plan shall list the applicable critical characteristic, the location/facility which produces the material affected by the critical characteristic, and the associated document(s) specifying the requirement (specification and revision, Quality Assurance Provision (QAP) number, and/or drawing and revision).

2.6.2 The plan shall contain the critical characteristics management structure, roles/responsibilities, and procedures to ensure that CPOA(s) are evaluated for currency and process improvements including:

a. Personnel/position(s) responsible for monitoring and reporting the CPOA thresholds.

b. Personnel/position(s) responsible for confirming that a critical non-conformance is from a known/approved Failure Mode and executing root cause failure analysis.

c. Personnel/position(s) responsible for implementing corrective actions and determining that they adequately address the critical non-conformance based upon known/approved Failure Modes.

d. Personnel/position(s) responsible for controlling access to critical non-conformances and maintaining accountability and traceability through final disposition.

e. Personnel/position(s) responsible for controlling access to material suspected of having critical non-conformances and maintaining accountability and traceability through final disposition.

2.7 Failure Modes and Effects Analysis. The CPOA shall identify all Failure Modes associated with the critical characteristic, including Failure Modes and Effects

Analysis (FMEA), Cause and Effects diagrams, and data from any other tool used to establish a baseline of known Failure Modes.

2.7.1 The CPOA shall include the Failure Mode, frequency of occurrence, applicable key process parameters, and how they are specifically monitored.

It shall identify short term corrective action(s) and long term preventive action(s) for each Failure Mode.

2.7.2 The plan shall include procedures and objective evidence used to confirm that the Failure Mode of a critical non-conformance is that identified in the

CPOA.

2.7.3 The CPOA shall describe how the Contractor will handle an occurrence of a new Failure Mode not previously identified, exceeding the established threshold, or occurring after the inspection point (an escape).

2.8 Key Process Parameters. This section of the plan shall contain the maximum subject critical non-conformance rate and inspection equipment error rate, including those parameters which are used to control the quality of the listed critical characteristic

(i.e., dwell time, temperature, pressure, humidity, etc.).

2.8.1 The CPOA shall include procedures to monitor the non-conformance and inspection system error rates to assure that they do not exceed the maximum rates allotted.

2.9 The plan shall identify the actions initiated upon occurrence of a critical non-conformance including:

a. How the operation will be shut down and how a procedural investigation will be conducted if the CPOA threshold is exceeded or a non-conformance is generated from a previously unidentified mode.

b. Implementation of controls for ensuring that a non-conforming item does not inadvertently remain in or re-enter the production process.

c. Immediate verification that a produced critical non-conformance is consistent with the identified Failure Mode(s) and key process parameter limits.

d. Immediate notification to the Government that a critical non-conformance has occurred, even if the approved threshold has not been exceeded.

e. Implementation of process improvement plans with milestones that are specific in nature and tied to FMEA results and Failure Modes including defining the inspection processes, process capabilities, and key process parameters.

2.10 CPOA Threshold Calculation. The plan shall detail the CPOA Threshold Calculation including rationale for the selection of the data population from which the threshold is derived (describe the type of data selected including historical/limited production runs, how far the data goes back, why the particular time-frame was selected, any process changes/improvements over that timeframe, etc.).

2.10.1 The plan shall explain how the threshold was calculated based upon the factors above.

2.10.2 The CPOA shall contain the methodology for how the threshold rate applied to a particular quantity of production items (number of critical non-conformances allowed per number of items produced) is monitored and managed.

2.10.3 The plan shall explain and justify the established amount of product or time frame within which the threshold frequency is calculated (e.g., per 10,000 vs.

per 100,000; per week vs. per month, etc.).

2.11 The CPOA shall identify plans to ensure currency and process improvements including:

a. Planned improvements and/or corrective actions to reduce occurrences and/or eliminate Failure Modes.

b. The schedule for routinely updating the CPOA.

2.12 The plan shall detail the reporting structure for all critical non-conformances.

3. Media requirements. The plan shall be in Adobe® electronic Portable Document Format

(pdf), version 2007-2010.

End of DI-MGMT-81996

Source: http://assist.dla.mil -- Downloaded: 2024-03-07T13:19Z

Source: http://assist.dla.mil -- Downloaded: 2024-03-22T15:02Z

Source: http://assist.dla.mil -- Downloaded: 2024-03-22T15:02Z

Draft_24_Mar24_Yuma_MTSS_DI-MGMT-80441D
AMSC Number: 10184 Limitation: N/A
Requirements:
Draft_24_Mar24_Yuma_MTSS_DI-MGMT-81834A
Draft_24_Mar24_Yuma_MTSS_DI-MGMT-81996
Draft_24_Mar24_Yuma_MTSS_DI-MISC-81107A
Draft_24_Mar24_Yuma_MTSS_DI-MISC-81423

File details come from the government source that posted it. Updated .