W9124R-24-R-0004_PWS Att 0001-Performance Requirements Summary_Amendment 1.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Yuma Mission Test Support Services - RFP W9124R-24-R-0004
Solicitation number
W9124R-24-R-0004
Issued by

About this file

This document is a Performance Requirements Summary (PRS) that outlines the performance standards, thresholds, and incentives for various services required under solicitation W9124R-24-R-0004 for Yuma Proving Ground Mission Test Support Services. The PRS covers a wide range of services such as contract management, telemetry operations, instrumentation tracking, ballistics instrumentation, fleet vehicle maintenance, and more. For each service, the PRS defines the performance objective, the acceptable quality level (AQL), and the incentives (positive and/or negative) associated with meeting or failing to meet the standards. Key services include operating and maintaining test equipment and instrumentation, providing engineering and technical analysis, performing maintenance on a variety of vehicles and weapons systems, and managing logistics and supply operations. The contractor will be required to meet stringent performance thresholds across these functional areas, with nonconforming services potentially resulting in negative CPARS reporting.

View the file

Other files

File Type Posted
W9124R-24-R-0004_QA_For_Industry_RFP_16AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_14AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment3.xlsx XLSX spreadsheet
W9124R-24-R-0004_Amendment0003_Modification.pdf PDF
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 3.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment2.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories_Amendment 2.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0011_CBA Job Descriptions.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0010_WD_AK.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Amendment0002_Modification.pdf PDF
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 2.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0008_PPQ_Amendment1.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Amendment0001_Modification.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment 1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0005_OCI_Certification_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2024_Amendment1.pdf PDF
W9124R-24-R-0004_QA_ForIndustry_RFP_Amendment1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix.xlsx XLSX spreadsheet
W9124R24R0004_RFP_EXHIBIT_A_CDRLS.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0004_TE1_HistoricalWorkloadData.pdf PDF
W9124R-24-R-0004_RFP_Att0003_DIDs.pdf PDF
W9124R-24-R-0004_RFP_Att0007_GFP_Different_Contract.docx DOCX document
W9124R-24-R-0004_RFP.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2021-2024.PDF PDF
W9124R-24-R-0004_RFP_Att0009_QuestionTemplate.xlsx XLSX spreadsheet
QA_ForIndustry_16JUL24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Att0006_TE3_Non-GFP_EquipMaintList.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0003_Contractor Furnished Equipment.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0005_TE2_GFP.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0007_TE4_GFF.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0001_Performance Requirements Summary.pdf PDF
W9124R-24-R-0004_RFP_Att0005_OCI_Certification.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS.pdf PDF
W9124R-24-R-0004_RFP_Att0008_PPQ.pdf PDF
W9124R24R0004_16July24_Letter_from_the_KO.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRS

PRS Line #PWS ParagraphPerformance ObjectiveStandardPerformance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)Incentive (Positive and/or Negative)
11.6 Contract ManagementContractor shall control overhead and indirect costs.Contractor is responsible for maintaining their indirect rates as originally proposed or on reflected on a contract modification.AQL: 100% ComplianceNon-conformance will result in a10% reduction in awardable fee for the entire period in which the rate increase is applied.
21.6 Contract ManagementThe contractor will not exceed the contract ceilingContractor will track contract costs and provide all cost related reporting to ensure that all costs remain within awarded Task Order/Contract ceiling.100% complianceAny cost overrun on any task order or against the base contract will result in a 5% reduction of total fee for the related task order or total contact, whichever is applicable
31.6.3 Cost Reimbursement Rate
Contractor shall provide a workforce to maintain a cost reimbursement rate as designated by the COR's office.Contractor provides a workforce to maintain a cost reimbursement rate as designated by the COR's office. Cost reimbursement rates will range between 70-90% depending on the workload estimate each FY.AQL: 70% - 90% Directly ReimbursableNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
41.22.5 Contractor Training PlanCombatting Trafficking in persons FAR 52.222-50(c)The Contractor shall Notify its employees of :
a.The United States Government's zero tolerance policy described in paragraph (b) of this clause and the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.AQL: 100% ComplianceContractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR system; contractor shall re-perform the service
55.3.1 TelemetryThe Contractor shall operate, maintain, sustain, and support all USAYPG’s telemetry systems in support of the mission.

a) STD: Setup Telemetry Systems to operate and maintain equipment at the fixed sites, remote fixed sites, and mobile sites IAW the range schedule and applicable AR's and SOP's.

b) STD: Maintain a work order request log for all daily instrumentation requests for both classified and non-classified missions.

c) STD: Provide a useable data product in the format required from the requestor IAW applicable SOP's and AR's.

d) STD: Operate, maintain, and set-up tests with security requirements for signals IAW applicable SOP’s and AR’s.

AQL: 90% Compliance

AQL: 96% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
65.3.2 Instrumentation Tracking RadarThe Contractor shall operate, maintain, and sustain the instrumentation tracking radar systems.
a)STD: Provide daily & weekly maintenance checklist; radar data requirements; ballistic test information sheet; system pre-mission checklist; digital data report (to include number of test rounds tracked) and data transmittal receipt as requested by the test customer.
b)STD: Maintain a work order request log for all daily test support.
AQL: 90% Accuracy of data and no more than 2 late reports per month.

AQL: 90% Accuracy of data monthly

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
75.3.3 Ballistics InstrumentationThe Contractor shall operate, maintain, and sustain the Ballistics Instrumentation Systems.
a)STD: Instrument, collect, and record test data as requested by the customer.

b) STD: Maintain a work order request log for all daily test support. AQL: 90% Accuracy of test data

AQL: 90% Accuracy of dataNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
85.3.4 InstrumentationThe Contractor shall operate, maintain, and sustain the Instrumentation Systems.

a) STD: Instrument, de-instrument, repair, and provide data elements on test vehicles as requested.

b) STD: Mobile Dynamometer Systems – setup, operate, and maintain dynamometer trains.

c) STD: Establish and maintain project/vehicle folder for each test/vehicle and archive folder at completion of test.

d) STD: Maintain work request log for all daily instrumentation requirements.

e) STD: Operate and maintain reference stations and installation of vehicle tracking systems for data acquisition.

AQL: 90% Accuracy of data

AQL: 90% Accuracy and no more than 1 verified customer complaint per month.

AQL: 100% Compliance

AQL: 90% Accuracy of data and no more than 2 validated customer complaints per monthNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
95.3.5 Threat Systems and Target SimulationThe Contractor shall operate, maintain, and sustain the Target Systems.
a)STD: Dispatch target vehicles IAW DA Pam 738-750.

b) STD: All threat system operators shall maintain a Commercial Driver’s License (CDL) for the classification of vehicle operated to include any hazardous materials endorsements. In addition, all operators shall possess a contractor issued license for the vehicle/equipment under test.

c) STD: Maintain the Target Management Office (TMO) vehicle fleet – both foreign and domestic target vehicles – in a mission capable condition prior to commencing test operations.

d) STD: Maintain moving target systems and rails to include the ARCAMEX, CASWELL Rangemaster 9000, K-PATH, and OEHLER Acoustic scoring systems in an operational status prior to commencing test operations.

e) STD: Maintain all moving target and stationary target systems and document all maintenance activity on the appropriate work order form.

AQL: 90% Compliance and no more than 2 validated customer complaints per month.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Accuracy of data and no more than 2 validated customer complaints per month

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
105.3.6 Threat System Radio Frequency (RF) Engineering and Spectrum SupportThe Contractor shall operate, maintain, and sustain the threat system radio frequency (RF) engineering and spectrum support systems.
a)STD: Operate and maintain wireless communications to meet test requirements.

b) STD: Provide scheduled and unscheduled maintenance and characterization of all threat systems and instrumentation.

c) STD: Provide coordination for threat systems and instrumentation, transportation, set-up, operation and continuous monitoring of threat systems and instrumentation during testing.

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
115.4.1 Optical TrackingThe Contractor shall operate, maintain, and sustain the Optical Tracking Systems.
a)STD: Operate, set-up, and perform field maintenance of KTM's at fixed and mobile sites IAW applicable AR's and SOP's.

b) STD: Maintain complete and accurate optical tracking field data sheets.

c) STD: Deliver optical tracking data on time to data reduction personnel as required by the test customer.

d) STD: Operate muzzle exit triggering, time-tag, and transmission equipment as necessary to support daily mission. Ensure weekly optic schedules, work orders, operational checklists and data transmittal receipts are maintained IAW applicable SOP’s.

AQL: 90% Compliance and no more than 2 validated customer complaints per month AQL: 90% Accuracy of data

AQL: 90% Compliance

AQL: 90% Compliance and no more than 2 validated customer complaints per monthNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
125.4.2 Geographic information System (GIS)The Contractor shall operate, maintain, and sustain the Geographic Information System.
a)STD: Collect, assimilate, and archive GIS data.

b) STD: Produce accurate GIS maps per customer request on time.

c) STD: Train customers on how to use GIS data as requested.

d) STD: Maintain a work order request log for all daily test support.

AQL: 90% Compliance

AQL: 90% Compliance and no more than 2 validated customer complaints per month.

AQL: 90% Compliance with no more than 2 validated customer complaints per month

AQL: 90% Accuracy of data

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
135.4.3 Range Optical MeasurementsThe Contractor shall operate, maintain, and sustain the Range Optical Measurement Systems.
a)STD: Maintain monthly project support files containing at least an Operating Checklist and a firing conditions sheet for the test projects supported.

b) STD: Maintain complete/accurate observation field data sheets IAW applicable SOP's.

c) STD: Record complete and accurate Behind the Gun (BG) measurements onto BG data sheets IAW applicable SOP's.

d) STD: Conduct theodolite maintenance every quarter IAW applicable SOP’s.

AQL: 90% Compliance per quarter

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
145.4.5 TV InstrumentationThe Contractor shall operate, maintain, and sustain the Television Instrumentation Systems.
a)STD: Maintain monthly project support files containing: YPG test schedule for each week, TV Instrumentation operating checklist, TV Inst. mission data sheet, video tape usage log, and data transmittal receipt for the test projects supported.

b) STD: Operate, install, and maintain various camera systems to record scientific data of test related items in support of YPG testing.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
155.4.6 Photo-Optical Imaging (POI)The Contractor shall operate, maintain, and sustain the Photo-Optical Imaging Systems.
a)STD: Maintain monthly test project support files containing operation checklist, POI field data sheets, POI camera layout, specific mathematic engineering sheets and data transmittal receipts.

b) STD: Provide still photography services IAW project work request. Maintain all work request in a logbook, record consumables in a usage log, and maintain other documentation IAW applicable AR’s, DOD Directives, and SOP’s

c) STD: Provide electronic imagery that captures data in support of weapons systems. Set-up and operate high speed camera systems in support of YPG tests.

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
165.4.7 Electro-Optical MaintenanceThe Contractor shall operate, maintain, and sustain Electro-Optical Maintenance systems.
a)STD: Inspect, repair, modify, design, and fabricate for a variety of electronic, mechanical, and optical equipment. Document as required by AR's and SOP's and maintain a control system for tracking purposes

b) STD: Maintain work request log for all maintenance requirements on the appropriate form or Government approved system.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
175.4.8 MeteorologyThe Contractor shall operate, maintain, and sustain the Meteorology Systems.a)STD: Instrument, collect, and record data for the test customer.AQL: 90% Accuracy of data and no more than 2 validated customer complaints per monthNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
185.5.1 Nondestructive Testing (NDT)The Contractor shall perform nondestructive test inspections
a)STD: Provide Level II certified personnel to conduct non-destructive testing.

b) STD: The testing/inspection will be on the applicable form and inspection results will be documented in the "Gun tube file database".

AQL: 100% Compliance

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
195.5.2 Mass Properties, Material Properties, and Precision MeasurementsThe Contractor shall operate high precision measuring machines and equipment IAW SOPs YP-YTGS-P-7000, YP-YTAM-L-003 and YP-YTGS-P-7721 to determine mass and material properties, and to perform precision measurements.a)STD: Provide copper crusher support, center of gravity and moments of inertia IAW the test plan and the applicable form and the schedule request.AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
205.5.3 Ballistics Pressure TransducersThe Contractor shall operate, maintain, and sustain the Ballistic Pressure Transducer Systems.
a)STD: Procure needed materials to fabricate piezo-electric pressure transducers in support of test activity.

b) STD: Maintain a monthly control work log for tracking progress.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
215.6.1 Vibration and ShockThe Contractor shall operate, maintain, and sustain the Vibration and Shock Systems.
a)STD: Operate electrodynamic and electrohydraulic shakers and digital vibration controllers.

b) STD: Produce data in the form of engineering units with outputs in graphical and or tabular form on electronic media IAW MIL-STD-810G, test plan, or other directives.

AQL: 90% Accuracy of dataNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
225.6.2 Rough HandlingThe Contractor shall operate, maintain, and sustain the Rough Handling and Drop Test Systems.
a)STD: Conduct operations at the Loose Cargo Facility to simulate transporting unsecured munitions and equipment IAW ITOP 4-2-602 or MIL-STD-810G. Test data in support of these operations shall be provided as outlined in the test plan or other directive.

b) STD: Provide certified personnel to perform drops IAW MIL-STD-810G and the test plan.

c) STD: Perform post-test inspection and operate temperature chambers providing temperature data in the form of charts.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
235.6.3 Climatic Testing / Controlled and Natural EnvironmentsThe Contractor shall operate, maintain, and sustain the Climatic Testing/Controlled and Natural Environments Systems.
a)STD: Operate a variety of climatic chambers, performing test IAW MIL-STD-810G and the test plan.

b) STD: Operate Weapons Firing Chamber IAW MIL-STD-810G and test plans. The data collected will be in the form of temperature charts or digital readout.

c) STD: Operate Rain and Dust facilities IAW MIL-STD-810G. Data shall be provided in the format outlined in the test plan or other directive.

AQL: 98% Compliance

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
245.6.4 A/C Maintenance & ElectricalThe Contractor shall operate, maintain, and sustain the A/C and Electrical Systems.a)STD: Ensure all maintenance activities – scheduled and unscheduled – are maintained in the EMS database as well as individual equipment logs to establish failure trends and audit purposes.AQL: 90% Compliance and no more than 2 validated customer complaints per month
Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
255.6.5 RadiographyThe Contractor shall operate, maintain, and sustain the Radiography Systems.
a)STD: Setup, operate, and maintain Static X-Ray equipment on a wide variety of ordnance and other materiel as requested by test activity.

b) STD: Setup, operate, and maintain Flash X-Ray equipment for various test sites on YPG as requested by test activity.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
265.7.1 Real-Time Mission Support SystemsThe Contractor shall operate, maintain, test, and verify operational performance capabilities of the real-time Mission Control Centers and mobile mission assets
a)STD: Support, operate, and maintain a fully operational real-time data center. Follow all applicable guidance, SOP’s, and AR’s.

b) STD: Format test data into a useable format to be utilized for data reporting and processing.

c) STD: Maintain work order log for all daily assigned work and repairs.

AQL: 90% Useable data

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
275.7.2 Computer Software ProgrammingThe Contractor shall operate, maintain, and sustain Information Technology Software.
a)STD: Design, develop, maintain, document, and modify software for graphic displays and user interfaces in high level languages for a real-time environment.

b) STD: Format test data into a useable format to be utilized for data reporting and processing.

c) STD: Maintain work order log for all daily assigned work and repairs.

d) STD: The Contractor provides documented and hands-on training in the use of new or modified software within 15 business days.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 90% Compliance

AQL: No more than 1 instance that contractor did not provide documented and hands-on training within the specified timeframe.

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
285.7.3 Systems Configuration & MaintenanceThe Contractor shall provide systems administration, maintenance configuration management, and quality improvements of all equipment in support of data processing and data analysis environment.
a)STD: Operate, maintain, design, modify, purchase, setup, tear down, cabling, calibrate, and plan for equipment in support of the real-time and data processing environment.

b) STD: Analyze, document, prepare schematics, troubleshoot, and be an administrator for the real time computer systems.

c) STD: Maintain work order log for all daily assigned work and repairs.

d) STD: Perform data reduction from raw data and convert to a useable format for computer processing. Extract data, process, document and maintain data for accuracy, completeness, accountability, and historical value as required by the requestor. Follow applicable SOP’s and AR’s.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 95% Compliance and no more than 2 validated customer complaints per month

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
295.7.4 Test Data Management Development and MaintenanceThe Contractor shall design, organize, and develop databases
a)STD: Design and maintain an accurate report database for test data in user-required format utilizing software designed for Test Incident Report and scoring documents.

b) STD: Enter data into the database as requested by the customer.

c) STD: Maintain work order log for all daily assigned work and repairs.

AQL: 90% Accuracy of data and no more than 2 validated customer complaints per month

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
305.7.5 Database System AdministrationThe Contractor shall manage the local database network interface including installation, modification, troubleshooting, etc.
a)STD: Administer, data storage, backup, troubleshoot, and manage the Test Incident Report database for a fully functional and accurate database at all times.

b) STD: Maintain work order log for all daily assigned work and repairs.

c) STD: Operate and monitor financial computer systems for YPG. Follow all applicable guidance, SOP's, and AR's.

AQL: 96% Compliance and no more than 1 validated customer complaint per month

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
315.7.6 Software and Hardware MaintenanceThe Contractor shall maintain and sustain all personnel computers used to support the USAYPG test mission.
a)STD: Maintain and repair YPG’s computers, hardware, and software IAW applicable guidance, SOP’s, and AR’s.

b) STD: Operate an IT/Communications desk to handle customer requests for hardware/software and email support IAW applicable guidance, SOP’s, and AR’s.

c) STD: Maintain an automated work order log for all assigned work and repairs in a government approved database system.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
325.8.1 Ground Based Weapons and Communication Systems TestingThe Contractor shall operate, maintain, and sustain artillery, motor, and tank weapons fixed, towed, or self-propelled.
a)STD: Per specified schedule support request, the contractor shall provide certification gunners to conduct artillery testing support. Crew leaders will capture tube history on tube cards and documented test events will be kept on file. All of this will be completed IAW applicable AR's and SOP's.

b) STD: Provide certified operators and maintainers to install, align, repair, and modify communications systems on wheeled and armament vehicle systems.

c) STD: Provide certified operators to conduct pre-operational and post-operational inspections of weapons and communication systems.

d) STD: Provide qualified mechanics to troubleshoot and repair fire control and communication systems on handheld, crew served, or shoulder fired soldier weapons systems as required.

e) STD: Record and maintain documentation on mission scenario worksheets for performance, human factor issues and failures as required by the Test Plan or Test Officer direction.

AQL: 90% Compliance of certified operators at any given time

AQL: 100% Compliance and 90% Accuracy of dataNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
335.8.2 Aircraft WeaponsThe Contractor shall install, align, repair, load, unload, modify, troubleshoot, functionally test, and perform other operations on aircraft weapon systems, unmanned air vehicles/systems, laser systems, target acquisition systems, and other aircraft and related systems as scheduled.
a)STD: Provide certified technicians to conduct Aircraft Weapons support.

b) STD: Align, load, install, repair, modify and fire weapons systems as delineated in the schedule request provided by the Test Officer. Operations shall be annotated via Form AA-CL-001 to capture data during firing support and IAW applicable AR’s and SOP’s.

AQL: 90% Compliance

AQL: 90% Compliance and no more than 2 validated customer complaints per monthNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
345.8.3 Air DeliveryThe Contractor shall plan, build, rig, drop, inspect, repair, pack (cargo and personnel parachutes), and unpack and tear down airdrop equipment in support of testing that includes personnel system, vehicles, supplies, equipment, and ammunition.
a)STD: Maintain, construct, inspect, repair, rig, pack and unpack both personnel and precision guided system parachutes IAW applicable guidance, regulations, and standards.

b) STD: All personnel are certified IAW applicable guidelines and requirements.

c) STD: All personnel qualified in rigging will demonstrate proficiency on an annual basis.

d) STD: Provide jumpmaster operations as directed by applicable AR’s and SOP’s. Manage and maintain drop zone (DZ) operations and perform as Drop Zone Safety Officer (DZSO).

e) STD: Maintain work order log for daily assigned work and repairs.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
355.8.4 Test Vehicle OperationsThe Contractor shall operate, maintain, and sustain the Test Vehicle Operation Systems.
a)STD: Dispatch test vehicles IAW DA Pam 738-750.

b) STD: All vehicle operators shall maintain a Commercial Driver’s License (CDL) for the classification of vehicle operated to include any hazardous materials endorsements. In addition, all operators shall be trained and licensed for the vehicle/equipment under test.

c) STD: Conduct test vehicle operations on test courses as outlined in the Test Plan and IAW YPG SOP 5001 – Operating Procedures & Automotive Testing.

d) STD: Maintain equipment record folders for all vehicles/equipment under test. Equipment folders shall contain as a minimum the Equipment Identification Card (DA Form 5823); Equipment Inspection List (DA Form 2408-18); Uncorrected Fault Record (DA Form 2408-14), Accident Identification Card (DD Form 518); and Motor Vehicle Accident Report (SF Form 91).

e) STD: Maintain driver’s log documentation IAW SOP TO-001. Daily logs shall contain as a minimum the Test Vehicle Daily Operation Log; Daily Operations Record; Equipment Inspection and Maintenance Worksheet (DA Form 2404); and Motor Equipment Utilization Record (DD Form 1970).

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
365.8.5 Fleet Vehicle MaintenanceThe Contractor shall operate, maintain, and sustain the Fleet Vehicles.
a)STD: Perform Scheduled Maintenance and Unscheduled Maintenance on all fleet equipment such as GSA passenger vehicles and trucks, material handling equipment, passenger busses, construction/earth moving equipment, generators and auxiliary power units, fuel trucks and emergency response vehicles IAW response times and Army Maintenance Standards delineated in AR 750-1. Maintenance Turn-Around-Time (TAT) shall be maintained at a 90% efficiency rate.

b) STD: Enroll TDA vehicles in the AOAP. Required oil samples shall be taken on time IAW AR 750-1, TB 43-0211 and external lab SOP.

c) STD: MWO’s shall be applied IAW AR-750-1 and AR 750-10 Army Modification Program.

d) STD: Maintain historical and operational maintenance records on all fleet equipment IAW DA Pam 750-8 and AR 24-400-2.

e) STD: Submit monthly, quarterly, and annual Total Logistics Response Time (T-LRT) maintenance reports IAW AR 750-1.

f) STD: Provide weekly and monthly productivity reports to the Chief, Maintenance Quality Assurance Branch. Mechanics/technicians shall maintain an 80% efficiency rate IAW MAC and commercial flat rate charts.

AQL: 100% Compliance for AOAP, 95% Compliance for oil samples

AQL: 95% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
375.8.6 Test Vehicle MaintenanceThe Contractor shall perform sustainment level maintenance on military ground equipment undergoing tests.
a)STD: Perform Scheduled Maintenance and Unscheduled Maintenance on all military vehicles/equipment undergoing testing such as tracked/armored vehicles and tanks, field kitchens, tents, generators, fuel tankers, trailers, and other heavy equipment.

b) STD: Maintain historical and operational maintenance records on all test vehicles/equipment IAW DA Pam 750-8 and AR 24-400-2.

c) STD: Submit monthly, Total Logistics Response Time (T-LRT) maintenance reports IAW AR 750-1.

d) STD: Provide weekly productivity reports to the Chief, Maintenance Quality Assurance Branch. Mechanics/technicians shall maintain an 80% efficiency rate IAW MAC and commercial flat rate charts.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 90% Compliance and no more than 1 instance of late submission

AQL: 90% Compliance and no more than 2 validated customer complaints per month

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
385.8.7 Artillery Weapons MaintenanceThe Contractor shall operate, maintain, and sustain Artillery Weapon Systems.
a)STD: Perform Scheduled Maintenance and Unscheduled Maintenance on all artillery weapons systems undergoing testing such as towed/self-propelled howitzers, gun tubes, turret artillery, mortars, rocket launchers and other weapon systems IAW response times and Army Maintenance Standards delineated in AR 750-1.

b) STD: Maintain historical and operational maintenance records on all artillery weapon systems IAW DA Pam 750-8 and AR 24-400-2.

c) STD: Submit monthly Total Logistics Response Time (T-LRT) maintenance reports IAW AR 750-1.

d) STD: Provide weekly productivity reports to the Chief, Maintenance Quality Assurance Branch.

AQL: 90% Compliance and no more than 1 instance of late submission

AQL: 90% Accuracy for reports, Mechanics / Technicians shall maintain an 80% efficiency rate IAW MAC

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
395.8.8 Small Arms Maintenance [60mm and smaller]The Contractor shall maintain individual, and crew served small arms weapons.
a)STD: Perform Scheduled Maintenance and Unscheduled Maintenance of Small Arms weapons IAW response times and Army Maintenance Standards delineated in AR 750-1.

b) STD: Small Arms weapons inventory control.

c) STD: Provide weekly productivity reports to the Chief, Maintenance Quality Assurance Branch. Mechanics/technicians shall maintain an 80% efficiency rate IAW MAC.

d) STD: Maintain historical and operational maintenance records on all artillery weapon systems IAW DA Pam 750-8 and AR 24-400-2.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
405.8.9 Direct Fire Weapons MaintenanceThe Contractor shall operate, maintain, and sustain Direct Fire Weapon systems Maintenance.
a)STD: Perform Scheduled Maintenance and Unscheduled Maintenance of Direct Fire Weapons IAW response times and Army Maintenance Standards delineated in AR 750-1

b) STD: Provide weekly and monthly productivity reports to the Chief, Maintenance Quality Assurance Branch. Mechanics/technicians shall maintain an 80% efficiency rate IAW MAC.

c) STD: Submit monthly Total Logistics Response Time (T-LRT) maintenance reports IAW AR 750-1.

d) STD: Maintain historical and operational maintenance records on all artillery weapon systems IAW DA Pam 750-8 and AR 24-400-2.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
415.8.10 Welding & MachiningThe Contractor shall perform welding and machining to support maintenance operations and for the fabrication of a variety of metal items.
a)STD: Provide certified welders and machinists IAW Federal, State and U.S. Army certification requirements – AWS D1.1. Personal protective equipment (PPE) is worn during welding/machining operations.

b) STD: Perform welding operations IAW work request instructions and schematics/drawings on the appropriate form or database.

c) STD: Perform machining operations IAW work request instructions and schematics/drawings. Machining areas are kept clear of debris from lathes, milling machines, plasma cutters, etc.

d) STD: Maintain work order log for daily welding & machining requirements on the applicable form or database.

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
425.8.11 General Support ServicesThe Contractor shall operate, maintain, and sustain products of General Support Services.
a)STD: Fabricate test fixtures and target displays consisting of wood, cloth, brick, masonry concrete, or other fabrication materials per the customer work request.

b) STD: Paint surfaces of test fixtures, targets, or general-purpose facilities IAW the customer work request.

c) STD: Design/fabricate structural fixtures for mock-up test items IAW the customer work request.

d) STD: Maintain work order log and work order ledger sheets for daily work requirements IAW SOP GS-001.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
435.8.12 Technical Acquisition (Supply)The Contractor shall perform the supply functions.
a)STD: Maintain tool room operations IAW DA Pam 710-2-1. Tools and equipment shall be signed out via daily sign out sheets. Tools and equipment shall be maintained in serviceable condition and calibration required items turned in according to AR 750-43.

b) STD: Ensure repair parts are issued and re-order points established to adequately maintain on-hand stock levels. On-hand repair parts are issued to maintenance personnel and DA Form 2404 forwarded to stock control point for replenishment determination. Manage and maintain tire inventory for both test and TDA assets, inventory shall be recorded in SAMS E maintenance program

c) STD: Coordinate monthly reconciliation reports with the YPG Supply Support Activity. Ensure follow-up action is conducted IAW DA Pam 710-2-1.

d) STD: Maintain adequate stock of consumable items and ensure bench stock list is approved by the Maintenance Officer semi-annually IAW AR 710-2.

e) STD: Ensure hazardous materials are stored by commodity and receiving, turn-in and disposal of all hazardous entities are in compliance with DA Pam 710-2-1

f) STD: Enroll required equipment into the TMDE Program. Equipment shall be calibrated IAW AR 750-1, AR 750-43, TB 750-25, and TB 43-180.

AQL: 100% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
445.8.13 Maintenance Operation SupportThe Contractor shall perform a variety of maintenance operations support.a)STD: Coordinate facility upgrades/repairs for the maintenance facilities thru the work order desk at DPW (Department of Public Works)AQL: 90% Compliance and no more than 2 validated customer complaints per month
Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
455.9.1 Ammunition Logistics and SupplyThe Contractor shall perform management and control of the ammunition logistics and operations.
a)STD: Perform Ammo Receiving/Shipping, Inventory and Re-warehousing Operations. Forms to be reviewed for compliance: Magazine Data Cards (DA Form 3020-R), Request for Shipment of Ammo & Explosives (YT Form 10), Shipping Documents (DD 1149 or DD 1348), Ammo Log Shipping Checklist, Magazine Plano graph and other applicable forms IAW AR's and SOP's

b) STD: Submit a quarterly inventory report of ammunition utilizing the applicable inventory database. Ammo Site Inventory Control Listing, Ammo Recount Sheets, Plano graphs, Ammo Request Forms are to be filled-out and processed correctly IAW applicable AR's and SOP's

AQL: 96% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
465.9.2 Ammunition Assembly Plant OperationsThe Contractor shall operate ammunition assembly plants and perform the ammunition assembly operations.a)STD: Conduct assembly/disassembly of live and inert ammunitions. Magazine Data Cards, Bulk Propellant Burn Control Register, Ammo for Demil, Weight Sheets, Issues/Turn-ins, Ammo Requisition & Expenditure Record, Ammo Control Record and Ammo Prep Assignment Sheets are to be filled-out/processed IAW applicable AR's and SOP's.AQL: 98% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
475.9.3 Conditioning Chamber OperationsThe contractor shall transport ammunition to and from test sites, loading plants, storage facilities and other locations.a)STD: Condition ammunition and maintain Temperature Recording Charts for all ammunition being conditioned. Temperature charts on monitors must be annotated for proper performance every 2 hrs.AQL: 95% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
485.9.4 Ammunition RecoveryThe Contractor shall perform ammunition recovery and explosive ordnance disposal operations.
a)STD: Ammunition Recovery SOP's must be current and reviewed when performing AA&E hazardous test support operations.

b) STD: Maintain a log of the daily scheduled test missions supported.

c) STD: Operate Cryofracture facility and annotate demilitarization log for work supported.

AQL: 90% Accuracy of dataNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
495.10.1 Developmental Staff EngineersThe Contractor shall perform engineering tasks such as feasibility studies, design and development projects, special analytical studies, analysis of alternatives, data analysis, and other technical tasks.
a)STD: Produce technically innovative solutions that interface seamlessly with other YPG systems as required by the requestor.

b) STD: Ensure data integrity and validity of data.

AQL: 90% Compliance and no more than 2 validated customer complaints

AQL: 100% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
505.10.2 Operations Test Engineers & Test TechniciansThe Contractor shall perform test engineering, test engineering technician and technical analysis services, special studies, or other technical tasks.
a)STD: Submit test planning documentation in formats for data, letter, abbreviated, and formal reports IAW YPG Test Director’s Guide and AR 73-1 - Test and Evaluation Policy.

b) STD: Conduct test scheduling, execution, and coordination activities to ensure milestone events are completed as scheduled per the Test Plan and AR 73-1 - Test and Evaluation Policy.

c) STD: Submit test reports or compilation of raw test data in formats for data, letter, abbreviated and formal reports IAW YPG Test Director’s Guide and AR 73-1 - Test and Evaluation Policy. All documentation is to be provided in MS Office software format.

d) STD: Ensure no test related safety violations occur during test mission activity and Test Officer's conduct pre-operational safety meetings as described in Test Director's Guide.

AQL: 90% Compliance and no more than 2 instances of late submission

AQL: 95% Compliance

AQL: 100% Accuracy of data and format

AQL: 100% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
515.10.3 Test CoordinationThe Contractor shall assist the Test Officer in the timely conduct of testing activities
a)STD: Conduct test scheduling, execution, and coordination activities to ensure milestone events are completed as scheduled per the Test Plan and AR 73-1 - Test and Evaluation Policy.

b) STD: Submit test planning documentation in formats for data, letter, abbreviated and formal reports IAW YPG Test Directors Guide and AR 73-1 - Test and Evaluation Policy.

c) STD: Provide field technicians on systems under test to collect, assimilate, and annotate threat data as requested by the Test Officer.

d) STD: Maintain test incident database on deficiencies noted during testing of threat systems undergoing testing.

e) STD: Provide adequate, in terms of appropriate experience level and number of personnel, to act as access control guards during training or conference activities.

AQL: 95% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance and no more than 2 instance of late submission

AQL: 95% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
525.11.1 Range SchedulingThe Contractor shall perform the range scheduling function to develop the weekly and daily schedules.
a)STD: Capture all range activity in RTSS and maintain record keeping.

b) STD: Provide resource support sheets in preparation for scheduling meetings.

c) STD: Ensure private industry contracts for YPG test services are complete.

d) STD: Prepare required analysis and documentation in support of Risk Based Safety Assessment (RBSA) process.

AQL: 98% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
535.11.2 Range Control (Does not include Range Safety and Airspace Management)The Contractor shall perform the function of Range Control under the supervision of a government certified Range Controller.
a)STD: Capture and maintain all range activity in the Daily Range Activities Record (DRAR) and other databases.

b) STD: Conduct verification of daily airspace request, Range Activity Display (RAD), and Range Test Schedule System (RTSS), to ensure all documents and systems reflect the accurate range requirements.

c) STD: Compose daily range schedules (snapshots) by required deadline.

d) STD: Conduct range inspections and report findings.

e) STD: Execute range controller functions in coordination with government certified range controller.

AQL:100% Compliance

AQL: 100% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
545.11.3 Range Access Center (Range Cards)The Contractor shall provide a fully operational Range Access Center (RAC) to issue range cards.
a)STD: Issue Range Safety Passes to permanent party personnel and visitors.

b) STD: Issue Range Safety Passes within 30 minutes and provide a positive experience for customers.

c) STD: Maintain database for Range Passes.

d) STD: Show Range Safety video and maintain log.

AQL: 100% Compliance

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 100% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
555.12.1 Telephone ServicesThe Contractor shall provide telephone services support to all USAYPG facilities.
a)STD: Maintain, install, test, operate, modify, troubleshoot, and repair the digital/analog telephone system at YPG IAW Northern Telecom Practices.

b) STD: Operate, repair, and maintain the telephone SL 100 Telephone Switch.

c) STD: Receive, prepare, and submit vouchers (SF1034/DD250) and distribute all phone charges for proper payment.

d) STD: Maintain an automated work order log for all assigned work and repairs.

AQL: 90% Compliance to established timeframes in paragraph 5.12.1.5

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 98% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
565.12.2 Computer Aided Design (CAD) Drawing SupportThe Contractor shall provide CAD drawing support services for contractor operations, Network Enterprise Center (NEC), and other USAYPG activities.
a)STD: Design, operate, and maintain plotters, modify, and maintain finished drawings from customer requests from a variety of media.

b) STD: Maintain a work order log for all assigned work and repairs.

AQL: 90% Compliance and no more than 2 validated customer complaints

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
575.12.3 Telecommunications Planning SupportThe Contractor shall provide design and engineering services for telecommunications systems, subsystems, and components.
a)STD: Design and engineer various telecommunication systems, subsystems, and components in support of YPG as requested.

b) STD: Maintain a work order log for all assigned work and repairs.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
585.12.4 Visual Information (VI) Services (Multi-Media)The Contractor shall provide Visual Information (VI) services that include, but not limited to graphics services, audio-visual (AV) services, photographic services, video Tele-conference (VTC) services, Audio-Visual video production services, and customer services in support of all USAYPG activities.
a)STD: Provide support for secure/nonsecure VTCs as requested and in the manner required. Follow applicable SOP's and AR 25-400-2.

b) STD: Develop, design, set-up, and support visual information outputs as requested from multiple sources throughout YPG. Follow applicable SOP's and AR's.

c) STD: Maintain and operate audiovisual equipment IAW applicable SOP's and AR's.

d) STD: Provide daily input to database for all work orders to meet the monthly report to the QAE NLT the 10th of the month.

e) STD: Support YPG customers when requested IAW Higher Headquarters requirements and guidance.

AQL: 96% Compliance and no more than 1 validated customer complaint per month

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

AQL: 90% Accuracy of data and timeliness

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
595.12.5 Network and Automation ApplicationsThe Contractor shall operate and maintain multiple Information Technology (IT) network, server, and infrastructure systems.
a)STD: Operate, maintain, install, monitor, update, and be the POC for all Secure, Non-Secure/Wireless network issues on a 24/7-hour basis. Notify email account holders of all scheduled/unscheduled network outages. Follow all applicable guidance, SOP's, and AR's.

b) STD: Operate, maintain, install, monitor, update and be the POC for all network issues on a 24/7-hour basis. Follow all applicable guidance, SOP’s, and AR’s.

c) STD: Maintain work order log for all daily assigned work and repairs.

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
605.12.6 Range CommunicationThe Contractor shall perform range communications services in support of the NEC.
a)STD: Perform communication operations IAW customer requirements, industry standards, and practices for fiber and metallic distribution equipment.

b) STD: Repair, maintain, install, test, locate, and troubleshoot all forms of communications systems.

c) STD: Maintain a work order log for all assigned work and repairs - IAW the applicable form or database.

AQL: 90% ComplianceNon-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
615.12.7 Spectrum ManagementProvide support and maintenance for USAYPG’s Signal Acquisition Network System (SANS).
a)STD: Ensure reports are submitted within 10 business days.

b) STD: Maintain Spectrum XXI account.

c) STD: Ensure 80% of Signal Acquisition Network System is operational.

AQL: 90% Compliance

AQL: 100% Compliance

AQL: 100% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
625.12.8 Configuration Management SupportThe Contractor shall provide configuration management support services on telecommunications systems, automated information systems, and their interfaces at USAYPG.
a)STD: Operate, maintain, and provide configuration management support for YPG's telecommunications and automated information systems.

b) STD: Maintain a work order log for all assigned work and repairs.

AQL: 90% Compliance and no more than 2 validated customer complaints per month

AQL: 90% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative CPARS report.
635.13.1 Data AcquisitionThe Contractor shall observe test operations, test conditions, and test maintenance, and other related parameters, and record the observations in the forms, media, and formats specified by Test Officers.
a)STD: Test Incident Reports (TIR's) are submitted, released, and distributed electronically via ATIRS and IAW DA Pam 73-1. Critical TIR's within 24 hours; Major TIR's within 3 workdays; Minor TIR's within 5 workdays; and Informational TIR's within 10 workdays following incident occurrence.

b) STD: Maintain Equipment Component Logbooks (ECL's also referred to as Daily Test Diaries) for each test component IAW SOP DA-001.

c) STD: Maintain TIR Tracker Form for each test component - TIR routing is to be tracked on a TIR tracker form for accountability IAW SOP DA-001.

d) STD: Maintain historical records on all ECL's for a minimum of 5 years after submission of the final report. Logbooks are maintained for any archived data that is checked out.

AQL: Timeliness of TIRs is 100% compliant to the established timeframes per category

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .