This document is the Question and Answer (Q&A) log for Amendment 2 to Request for Proposal (RFP) W9124R-24-R-0004 for Yuma Proving Ground Mission Test Support Services. The RFP is seeking proposals for a wide range of technical, engineering, and support services required to execute the mission of the Yuma Proving Ground. Key details include:

The RFP provides responses to 62 questions from offerors covering topics such as facility clearance requirements, labor categories and qualifications, pricing matrix instructions, organizational chart requirements, CBA provisions, and proposal formatting and submission instructions. The Government provides clarification, revises RFP language, and updates or corrects information in the RFP attachments in response to the questions. The proposal due date has been extended to August 19, 2024. The contract will be a performance-based, cost-plus-fixed-fee contract with a 2-month transition-in period. The period of performance is 1 April 2025 through 31 March 2032.

View the file

Other files

File Type Posted
W9124R-24-R-0004_QA_For_Industry_RFP_16AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_14AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment3.xlsx XLSX spreadsheet
W9124R-24-R-0004_Amendment0003_Modification.pdf PDF
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 3.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment2.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories_Amendment 2.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0011_CBA Job Descriptions.xlsx XLSX spreadsheet
W9124R-24-R-0004_QA_For_Industry_RFP_Amendment 2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP Att 0010_WD_AK.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment2_7AUG24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Amendment0002_Modification.pdf PDF
W9124R-24-R-0004_RFP_Att0008_PPQ_Amendment1.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Amendment0001_Modification.pdf PDF
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix_Amendment 1.xlsx XLSX spreadsheet
W9124R-24-R-0004_PWS Att 0001-Performance Requirements Summary_Amendment 1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0005_OCI_Certification_Amendment 1.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2024_Amendment1.pdf PDF
W9124R-24-R-0004_QA_ForIndustry_RFP_Amendment1.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0004_Pricing_Matrix.xlsx XLSX spreadsheet
W9124R24R0004_RFP_EXHIBIT_A_CDRLS.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0004_TE1_HistoricalWorkloadData.pdf PDF
W9124R-24-R-0004_RFP_Att0003_DIDs.pdf PDF
W9124R-24-R-0004_RFP_Att0007_GFP_Different_Contract.docx DOCX document
W9124R-24-R-0004_RFP.pdf PDF
W9124R-24-R-0004_RFP_Att0006_CBA YumaMTSS_2021-2024.PDF PDF
W9124R-24-R-0004_RFP_Att0009_QuestionTemplate.xlsx XLSX spreadsheet
QA_ForIndustry_16JUL24.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att0001_PWS_Att0006_TE3_Non-GFP_EquipMaintList.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0003_Contractor Furnished Equipment.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0005_TE2_GFP.xlsx XLSX spreadsheet
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0002_DD254.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0007_TE4_GFF.pdf PDF
W9124R-24-R-0004_RFP_Att 0001_PWS_Att 0001_Performance Requirements Summary.pdf PDF
W9124R-24-R-0004_RFP_Att0005_OCI_Certification.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS.pdf PDF
W9124R-24-R-0004_RFP_Att0008_PPQ.pdf PDF
W9124R24R0004_16July24_Letter_from_the_KO.pdf PDF
W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Yuma MTSS- W9124R-24-R-0004- Question & Answer Log
KO: Jennifer Hastedt CS: Jessica Ecker Email both at: usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil
Q #SubjectAttachment or # RFP SectionDocument Paragraph #Question/CommentA #Answer
Q.1QA_ForIndustry_16JUL24

W9124R-24-R-0004_RFP

Section L A.242

L.4.5.9

Per the answer to Q.242, “Upon further research, the Offeror shall have a Top Secret FCL upon contract award. This answer supersedes the answers to question 90 and 207”, we recommend the government revise Section L.4.5.9 of the RFP to state, “The Offeror must provide a statement regarding the Offeror’s Final Facility Clearance (FCL). At time of contract award, the Contractor must be able to fulfill all contract requirements, including a Top Secret FCL.”A.1Updated L.4.5.9. See revised RFP.
Q.2QA_ForIndustry_16JUL24

W9124R-24-R-0004_RFP

Section M A.242

M.2.1.i.

Per the answer to Q.242, “Upon further research, the Offeror shall have a Top Secret FCL upon contract award. This answer supersedes the answers to question 90 and 207”, we recommend the government revise Section M.2.1.i. of the RFP to state, “The Offeror does not have a final Top Secret Facility Clearance (FCL).”A.2Updated M.2.1.i. See revised RFP.
Q.3DD 254W9124R-24-R-0004_RFP_Att+0001_PWS_Att+0002_DD254

DD Form 254, APR 2018, Instructions 1b, 11a Per the DD Form 254 Instructions: Instruction Item 11a (1) states “If item 11a is checked, then: item 1b should be marked “N/A” or None. NOTE: If no classified work is to be done at the contractor’s facility then they will not be receiving, generating or fabricating anything classified at that location. The contractor will not have access to classified information at its own contractor facility, but will have that “access elsewhere” at another contractor’s facility or at a government activity.”

Given the DD Form 254 instruction guidance and also given that Section 11 b and 11c are also not checked , will the government please update the marking of Section 1b of the DD254 to be “N/A” or “None” consistent with the marking in Section 11a of the DD254?A.3Updated Section 1b to be "None". See revised DD Form 254.
Q.4Key PersonnelW9124R-24-R-0004_RFP_Att0001_PWS1.4.10Will the Government please confirm if Key Personnel are considered Direct or Indirect positions?A.4Key Personnel are considered Indirect positions
Q.5Labor CategoriesW9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_CategoriesWill the Government please confirm that Offerors can add Labor Categories and hours to both the TE-5 and the Pricing Matrix?A.5Offerors can add Labor Categories and hours to both TE-5 and the Pricing Matrix. In such cases, the Offeror shall highlight the cells/columns/rows/tabs that have been modified. Per L.4.4.4.2, any changes and the rationale must be explained.
Q.6PPQW9124R-24-R-0004_RFP_Att0008_PPQCover LetterThe Cover Letter for the PPQ is dated April 1, 2024 and requests PPQ POCs to return the PPQ by May 1, 2024. Will the Government please update the dates on the cover letter?A.6See revised RFP Attachment 0008
Q.7PRSW9124R-24-R-0004_RFP_Att+0001_PWS_Att+0001_Performance+Requirements+SummaryWhole documentThe PRS attachment is scanned as an image and does not allow copying or exporting from Acrobat as a Word or Excel file. Will the Government please provide the document scanned or converted from a Word or Excel document for ease in copying/editing for efficiency/effectiveness changes.A.7Excel version of PWS Attachment 0001, PRS, is published with RFP Amendment 0001.
Q.8OCI CertificationW9124R-24-R-0004_RFP_Att0005_OCI_CertificationWhole documentThe OCI Certification form is scanned as an image and does not allow copying or exporting from Acrobat as a Word file. Will the Government please provide the document scanned or converted from a Word or Excel document for ease in copying/editing.A.8A fillable PDF of RFP Attachment 0005, OCI Certification, is published with RFP Amendment 0001.
Q.9QA_ForIndustry_16JUL24
W9124R-24-R-0004_RFP_Att0006_CBA+YumaMTSS_2021-2024A.249A.249 states that the new CBA is included with the RFP; however the CBA attached to the FRFP (W9124R-24-R-0004_RFP_Att0006_CBA+YumaMTSS_2021-2024) is the old CBA dated June 1, 2021 Through May 31, 2024. Will the Government please provide the updated CBA with updated rate and wage determination applicable to this effort?A.9See revised RFP Attachment 0006
Q.10Subcontracting Plan requirement unclearSection MM.4A Subcontracting Plan is not a requirement of Section L, however, Section M states that "acceptance of the Offeror’s small business participation proposal does not preclude the requirement required in FAR Part 19.702 for submission and approval of a Subcontracting Plan". Please confirm that a Subcontracting Plan is to be submitted post-award and not with Offeror's proposals.A.10The Subcontracting Plan is to be submitted PRIOR to award. See revised L.4.5.7.
Q.11Missing CBAAttachment 0006The Answer to Q.249 states that the new CBA is included with the RFP and the CBA labor rates have been updated in the price workbook, however, the new CBA file appears to have been omitted; the referenced Attachment 0006 is the old CBA. Please provide the new CBA.A.11See answer to Question 9
Q.12Labor Hours Instructions ConflictAttachment 0004 - Pricing WorkbookThere is a conflict in the stated labor hours. The Instructions tab and the Labor Hours tab of the RFP Attachment 0004 - Pricing Workbook show Productive Labor Hours as 1,820. The embedded MS Word document on the Instructions tab shows 1,880 hours. Please confirm which is correct.A.12Instructions tab is revised to 1,820 hours.
Q.13Proposed Hours Instructions ConflictAttachment 0004 - Pricing Workbook and Section LL.4.4.4.2There is a conflict between Attachment 0004 and Section L. Note 6 on page 3 of the embedded MS Word document on the Instructions tab of Attachment 0004 - Pricing Workbook states that "offerors shall propose to the number of hours populated in the worksheets". Please revise Section L.4.4.4.2 to reflect the pricing workbook instructions by removing "Offerors who alter the Government-provided skill mix or hours within RFP Attachment 0004 – Pricing Workbook must justify the reasons for adjusting the hours or rates. The explanation for changing hours will be included in Volume I, Management Factor, L.4.1.2.2 response. The explanation for changing the labor rates will be included in this volume."A.13The language says "offerors shall propose to the number of hours" not "offerors shall propose the number of hours."

See revised language in L.4.4.4.2 resulting from Question 18.

Q.14Organizational Chart instructionsSection LL.4.1.2.1.c.There is a conflict between the answer to Q.272 and Section L. Q.272 states that only management positions are required on the organizational chart, however, Section L.4.1.2.1 paragraph c requests an offerors organizational chart "showing all positions". Please update Section L to reflect the guidance provided in Q.272.A.14See revised language in Section L.4.1.2.1
Q.15Incorrect SCA IdentifierAttachment 0004 - Pricing WorkbookLabor Hours and Direct Labor Rate Schedule tabsBoth the Labor Hours tab and the Direct Labor Rate Schedule tab of Attachment 0004 - Pricing Workbook show an incorrect number for the SCA Identifier in Column D. Please provide the correct SCA Identifier.A.15See revised Attachment 4
Q.16Old/Incorrect PPQ return request dateW9124R-24-R-0004_RFP_Att0008_PPQ.pdfThe Past Performance Questionnaire return request date is May 1, 2024 in the provided letter dated April 1, 2024. Please provide a new letter with an updated return request date.A.16See answer to Question 6.
Q.17CBA Job Descriptions OmissionCBA job descriptions were provided in a prior Draft RFP, however, appear to have been omitted in the Final RFP. Please provide job descriptions for all labor categories that are associated with the CBA.A.17The CBA does not include job descriptions. PWS Attachment 8, TE-5, Labor Categories and Job Descriptions, include the Government's minimum qualifications per labor category.
Q.18Alterations to Government provided skill mix and hoursL.4.4.4.2 Cost Volume4.4.4.2The explanation for changing hours will be included in Volume I, Management Factor, L.4.1.2.2 response.

The reference to Volume I Factor, L.4.1.2.2 is for Sub-factor 2 - Transition Plan.

Question: Should the reference be for this discussion of any alterations be L.4.1.2.1 Staffing Plan?A.18Yes. Section L.4.4.4.2 has been updated to reference L.4.1.2.1
Q.19Incomplete SF33SF33Block 9 of the SF33 is blank, please complete the proposal due date and time in Block 9.A.19RFP is updated to include RFP due date and time on the SF33, block 9 to match RFP section L.2.1
Q.20Unresolved language in the PWSPWS1.1.7The end of paragraph 1.1.7 of the PWS states "Waiting on a response from Tim Szymanski." Please confirm if changes are anticipated to PWS 1.1.7.A.20See revised PWS removing the statement.
Q.21PPQsAtt0008First pageThe date on the PPQ form requests a response by May 1, 2024.
Would the Government please issue a revised PPQ form with the date of 16 August?A.21See answer to Question 6.
Q.22Q.272RFP Section LL.4.1.2.1.cThe Answer to Q.272 stated that "Only management positions are required on the organizational chart."

Paragraph c still states that "Its organizational chart showing all positions in the proposed organization to meet the stated mission in the PWS. All lines of authority/communication including those with the Installation, ATEC, and MICC-YPG shall be included in the organizational chart. The Offeror shall provide a staffing matrix that depicts sufficient labor hours by position by year;"

Would the Government please amend paragraph L.4.1.2.1.c to state that only management positions are required in the organization chart and not all positions?A.22See answer to Question 14.
Q.23Vol III Page LimitL.2.5Will the Government consider allowing the Small Business Subcontracting Plan, which is required per FAR Clause 52.219-9 (Alt II), to be outside the 25 page limitation such that only the Small Business Participation Commitment Document (SBPCD) counts toward the 25-page limit?A.23Small Business Subcontracting Plan will be excluded from the page count. See revised L.2.5 language.
Q.24Proposal Adequacy ChecklistSection L - L.4.5.12Clause 252.215-7009The Proposal Adequacy Checklist largely pertains to proposals developed in the Table 15-2 format and generally used when certified cost or pricing data is required.

Is it the government’s intent that bidders submit the Proposal Adequacy Checklist with their initial submission or only if certified cost or pricing data is called for due to lack of competition? A.24 Section L.4.5.12 has been revised. Checklist requirement deleted.

Q.25 Cost Volume Pricing Matrix Instructions Point 6 RFP Section L.4.4.4.4 states areas of the pricing workbook are locked and there may be instances where the pricing workbook is not consistent with offerors accounting system. Consequently, offerors are to submit additional cost data in their own format along with the cost narrative.

However, the instructions included in Att004 Pricing Matrix under point 6, state that offerors are to revise the number of rows, columns, and/or formulas as required to comply with offerors’ accounting and estimating systems.

Will the government please clarify the conflict between RFP Section L.4.4.4.4 and Att004 Pricing Matrix?A.25Section L.4.4.4.4 has been revised.
Q.26Cost VolumePricing Matrix InstructionsWill the government allow bidders to add tabs for supporting calculations and/or data to the right of the government’s pricing matrix tabs?A.26Section L.4.4.4.4 has been revised.
Q.27Cost VolumePricing Matrix InstructionsWill the government allow bidders to add supporting calculations and/or data to the right of the government’s columns in the pricing matrix tabs?A.27Section L.4.4.4.4 has been revised.
Q.28Staffing MatrixRFP and Att 004 Pricing MatrixSection L.4.1.2.1.c and Pricing Matrix Tabs - Regular Labor Detail Tab, IT Services 5.7.6 and 5.12 Tab, Fleet Maintenance 5.8.5 Tab and the Exempt labor Tab.The four tabs in the Pricing Matrix have a total of 345 labor categories excluding overhead, management and PMO personnel that will create a labor staffing matrix with at least 360+ rows and 8 columns to address "labor hours by position by year" of the Section L requirement. Even with the minimum Times New Roman or Arial font size of 10 pt. this still creates an extremely large matrix that spans numerous pages (7 pages).
Would the Government please exclude the staffing matrix required by L.4.1.2.1.c from the page count?A.28See answer to Question 14.
Q.29Organizational ChartRFPSection L.4.1.2.1.cSection L.4.1.2.1.c requires "All lines of authority/communication including those with the Installation, ATEC, and MICC-YPG shall be included in the organizational chart." Given the size of the Yuma organization and the plethora of Installation, ATEC, MICC-YPG and other offices that must be coordinated with, this will create an almost unreadable organization chart.
Is it acceptable to provide a separate authority/communication matrix that will de-clutter the organization chart?A.29See answer to Question 14.
Q.30CBA Turnaround TimeAtt0006 - CBAArticle Eighteen, Page 14Reference: Article Eighteen: Turnaround Time. Specifically: In the event the employee is required by his Supervisor or Manager to report to work without a mandatory turnaround time, the employee will be
paid at two (2) times his regular straight time rate until the ten (10) hours have elapsed since the employee quit working his preceding shift and time and one-half (1 ½ ) times his regular straight time rate for all remaining hours up to a maximum total of twelve (12) continuous hours worked on the subsequent shift. This element is not typically addressed in similar CBAs. Can the Government provide a summary of how frequently this occurs, the specific areas of performance and impact on operations?A.30This specific scenario is very infrequent. An example is a mis-fire at the very end of a test. In such cases, the start time of the subsequent shift or test is expediently adjusted to ensure the 10-hour duration is maintained.
Q.31ODCsAtt0004 - Pricing Matrix
RFP M.1.6.1 Task OrdersPhase In Labor Detail Tab
Page 126The Phase In tab in the pricing matrix states Phase In is CLIN 0006. However, RFP M.1.6.1. states, "Task order 0001 will be for the Transition-In utilizing the proposed FFP in CLIN 0007." Please clarify if Phase In should be CLIN 0006 or CLIN 0007.A.31

CLIN 0007 is Phase In. See revised Attachment 0004

Q.32ODCsAtt0004 - Pricing Matrix
RFP L.4.4.5.6 Other Direct CostsPhase In Labor Detail Tab
Page 119The Phase In Labor Detail tab in the pricing matrix allows Offeror to put rate information into the tab to get the phase in period price. However, this tab also states that the Phase In is an ODC (CLIN 0006). RFP L.4.4.5.6 states, "The U.S. Government will provide a dollar amount (plug figure) for the Other Direct Costs (ODCs)." Please clarify if Offerors should separately price the Phase In? Or will the Government provide a ODC plug number for Phase In ODC CLIN 0006? If this is not an ODC, we recommend the Government revise the Phase In tab to remove the ODC verbiage from the Description in Column B46-53.A.32See revised languge in L.4.4.5.6 and L.4.4.5.7 and in the Pricing Matrix Instructions, section 2, bullet 6.

Offerors may propose ODCs and travel as part of the Phase-in price. The Government is not providing ODC plug numbers for Phase-in.

Q.33Ordering PeriodRFP 52.216-18 OrderingPage 36RFP page 36 52-216-18(a) states, “Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 01 April 2025 through 31 March 2032.” Should the ordering period be updated to include the two month transition period?A.33The dates are an accurate reflection of the ordering period expected by the Government.
Q.34Pricing Matrix BOERFP L.4.4.5.1 Direct Labor
Att0004-Pricing MatrixPage 117L.4.4.5.1 (a) requires BOEs to substantiate changes to the Government- provided hours down to the PWS paragraph level of detail. The hours provided in the Pricing Matrix are at the summary level by labor category. Most labor categories span multiple PWS paragraphs. Without additional detail, Offerors will need to make assumptions to allocate the labor category hours to the applicable PWS paragraphs. Will the Government provide the hours by labor category at the PWS paragraph level thereby allowing Offerors to reflect an appropriate starting point for hours by labor category at PWS paragraph level to support BOE development?A.34No. As a performance based contract, the Offeror must detail its approach to meeting the contract and PWS requirements.
Q.35Pricing Matrix LCAT MappingAtt0004-Pricing Matrix
Att0001-PWS_Att0008-TE-5_Labor_CategoriesExempt Labor Detail TabSeveral labor categories contained in the Exempt Labor Detail tab do not have a corresponding Job Description in Att0008-TE-5_Labor_Categories. Will the Government please provide the mapping of labor categories contained in Att0008-TE-5_Labor_Categories to the Pricing Matrix Exempt Labor Detail tab?A.35The following Exempt Labor Categories were removed:

- SME/ Special I, II and III

- IT Professional I, II and III

The following Exempt Labor Categories were added:

- ENGINEER IV

- FIELD INSTRUMENTATION ENG

- IT SUPPORT SPECIALIST

- SOFTWARE ENGINEER II

- PROJECT MANAGEMENT TRAINER

- SYSTEMS ANALYST II

- SYSTEM ADMINISTRATOR II

- DATA CENTER/CYBER SPEC II

- SOFTWARE ENGINEERING PROJ MGR

- SOFTWARE ENGINEER III

- ENGINEER CELL NETWORK

- SOFTWARE ENGINEER I

- ELECTRICAL ENGINEER

- SOFTWARE ARCHITECT

- TEST DATA ANALYST II

- TEST DATA ANALYST I

- COMMUNICATIONS FIELD ENGINEER

- DATA CENTER/CYBER SPEC I

- SYSTEM ADMINSTRATOR I

Q.36 Pricing Matrix Direct Labor Rates Att0004-Pricing Matrix Direct Labor Schedule Tab Several labor categories listed on the Direct Labor Rate Schedule tab do not have a pre-populated direct labor rates. Will the Government please provide direct labor rates for all CBA labor categories, to include categories with no hours provided? A.36 The following labor categories were removed from Attachment 0004, Pricing Matrix.

- Carpenter, Maintenance

- Engineering Technician I through VI

- General Maintenance Worker

- Supply Technician

- Unexploded Ordance Tech III

- Welder Combination Maintenance

ARCT Test Coordinator was changed to Test Coordinator/Engineering Tech III

Rates were added for:

-ARTC Test Coordinator -Inst Data Comp Prog I-IV

Also see answer to question 35.

Q.37Pricing Matrix and PWS Job DescriptionsAtt0004-Pricing Matrix
Att0001-PWS_Att0008-TE-5_Labor_CategoriesDirect Labor Schedule Tab and Att0001_PWS_Att0008-TE-5_Labor_CategoriesSeveral labor categories contained in that Pricing Matrix do not have have a corresponding job description in Att0001_PWS_Att0008-TE-5_Labor_Categories. Will the Government please update to ensure all labor categories provided in the pricing matrix have a corresponding job description in Att0001_PWS_Att0008-TE-5_Labor_Categories?A.37See answers to questions 35 and 36.
Q.38Pricing Matrix Labor Field TypeAtt0004-Pricing MatrixRegular Labor DetailSeveral labor categories are missing data in the labor type field in column B. Will the Government please provide the missing data for those labor categories?A.38See answers to questions 35 and 36.
Q.39Pricing Matrix CRTC or ARTC LCATsAtt0004-Pricing Matrix
Att0001-PWS_Att0008-TE-5_Labor_CategoriesRegular Labor Detail Tab and Att0001_PWS_Att0008-TE-5_Labor_CategoriesSeveral labor categories in the pricing matrix on the Regular Labor Detail Tab are labeled as "CRTC." Several labor categories in Att0001_PWS_Att0008-TE-5_Labor_Categories are labeled as "ARTC." Should Offerors use Cold Regions Test Center (CRTC) or Artic Regions Test Center (ARTC) for these labor categories?A.39

ARTC (Arctic Regions Test Center) is the approprate acronym. Please use ARTC.

Q.40Pricing Matrix Exempt LCATsAtt0004-Pricing MatrixRegular Labor DetailCRTC Elect-Mech Inst. Tech IV and CRTC Test Coordinator do not have a labor type identifed in the labor type column, and a direct labor rate is not provided for these categories. Are Offerors to assume these are exempt labor categories? If so, will the Government update the Pricing Matrix to reflect these positions on the Exempt Labor Detail tab?A.40See answers to questions 35 and 36.
Q.41Pricing Matrix Labor Hour Assignments per CLINAtt0004-Pricing Matrix
Att0001-PWS_Att0008-TE-5_Labor_CategoriesRegular Labor Detail Tab

Shift Labor Detail Tab IT Services 5.7.6 and 5.12 Tab There are several instances of improper assignment of labor category hours to CLINs. For example, the Government provides labor hours for the telecommunications technician job family in CLINs 0001 and 0002. The labor category description maps this job family solely to performance of PWS paragraph 5.12. Per the CLIN descriptions, PWS paragraph 5.12 falls under CLIN 0002. Will the Government please provide clarification on hours allocation inconsistencies across CLINs 0001, 0002, and 0003? A.41 This question is unclear. Per the verbiage in for CLINS X001 and X002, Labor to support PWS section 5.12 is shown in both CLINS. Several labor categories are required in multiple CLINs; the Government provided its estimate of hours provided to each CLIN.

In your example, telecommunication technicians, the hours are the same in each CLIN. However, Field Technican I and II have different hours in the Regular Labor Detail compared to IT Services (CLIN X002).

Q.42Pricing Matrix CLIN 0005RFP Section B & Pricing Matrix Section B TabSection B TabIn RFP Section B field for CLIN 0005, the price is blank; however, in the Section B tab of the pricing matrix CLIN 0005 contains "N/A." Will the Government clarify if offerors should propose a price for CLIN 0005 or if it should be Not Seperately Priced (NSP) based on the "N/A" provided in the pricing matrix?A.42Revised to allow costs for X005 in new tab "Reporting - CLIN X005"
Q.43Pricing MatrixAtt0004_Pricing_Matrix Embedded Instructions Document
RFP Section LL.4.4.5.3 Major Subcontracts, Page 118

L.4.4.5.4 Direct Material and Non-Major Subcontracts, Page 118 L.4.4.5.5 Inter-Organizational Transfers, Page 119

Pricing Matrix Embedded Word Document Instructions, Page 1RFP sections L.4.4.5.3 - L.4.4.5.5 specify the pricing detail requirements for Major Subcontracts, Non-Major Subcontracts, and Inter-Organizational Transfers. Per Section L, Major Subcontracts and Inter-Organizational Transfers require cost information equivalent to the prime. However, Non-Major subcontracts are required only to "provide a narrative which explains the method used to develop proposed cost." The embedded instructions in the Pricing Matrix state, "The completed workbook shall be part of the cost/price proposal. This is a required flow down requirement, and therefore shall be submitted for the prime offeror AND for any and all divisions and subcontractors proposed to perform effort in response to this solicitation." Will the Government please revise the embedded instruction language to "shall be submitted for the prime offeror AND for any and all divisions and MAJOR subcontractors proposed..." to align w/ Section L instructions?A.43Added "major subcontractors" to the word document embedded in Att 0004, paragraph 1.
Q.44CBA SeniorityAtt0006 - CBA6.00 Seniority List, Page 8Will the Government please provide a copy of the seniority list, as referenced within the CBA?A.44The seniority list will not be provided.
Q.45BOEPWS_Att0008-TE-5_Labor_Categories5.4.7 Electro-Optical Maintenance, 5.6.5 Radiography , 5.7.2 Computer Software Programming, 5.7.3 Systems Configuration & Maintenance, 5.8.8 Small Arms Maintenance, 5.8.9 Direct Fire Weapons Maintenance, 5.11.2 Range Control, 5.12.3 Telecommunications Planning Support, 5.12.7 Spectrum Management, 5.13.5 Project Management Module (PMM) and ATEC Decision Support System (ADSS)In PWS_Att0008-TE-5_Labor_Categories, the Government did not provide Labor Categories positions in the identified PWS Elements. Will the Government update PWS_Att0008-TE-5_Labor_Categories to define the Labor Categories associated with the identified PWS Elements?A.45Your question is unclear. Column B contains the PWS paragraph for every labor category.
Q.46RFP Due Date ExtensionWe respectfully request the Government provide an extension to 8/26 to provide Offerors with an appropriate amount of time to incorporate the new information released with Amendment 1? In particular, the updated CBA information has a significant impact on the development of the pricing response.A.46Proposal due date is extended until 12:00 PM CDT on 19 August 2024.
Q.47Workforce QualificationsPWS & PWS Attachment TE=5 and Attachment 4 to the RFP, Pricing MatrixPWS Paragraph 1.4.8 and Attach 4 to RFP (Pricing Matrix)Attachment 4 to the RFP requires offerors to price positions not listed within TE-5. Would the Government please provide position descriptions and qualifications for the following positions so that realistic data can be entered into the pricing matrix?

IT Professional I IT Professional II

IT Professional IIIA.47See answers to questions 35 and 36.
Q.48FormattingSection LL.2.5.fWould the Government please confirm that reproduced sections of the document (SF33/SF30, DD254, and Sections A through K, etc.) and preexisting documentation (such as DCAA approval letters, CAS Disclosure Statement, signed teaming agreements, etc.) are exempt from the stated font and margin requirement?A.48Reproduced documents are exempt from the font and margin requirements.
Q.49FormattingSection LL.2.5.fWould the Government please confirm that document Headers and Footers are excluded from font requirements?A.49Reproduced documents are exempt from the font. Other documents must adhere to the font and margin requirements.
Q.50Cost/PriceSection LL.4.4.4.3 / L.4.4.4.4Both L.4.4.4.3 and L.4.4.4.4 request offerors to provide a Roadmap demonstrating how the narrative reconciles with RFP Attachment 0004. Should the Roadmap be provided within the narrative or submitted as a separate file?A.50The Roadmap should be submitted as a separate file. See revised L language.
Q.51Staffing MatrixSection LL.4.1.2.1 cSection L.4.1.2.1.c states "The Offeror shall provide a staffing matrix that depicts sufficient labor hours by position by year;"
Would the Government consider removing this matrix from the allocated page count?A.51The staffing matrix will not be included in the page count. The staffing matrix shall be provided as a separate matrix.

Section L.4.1.2.1.c has been revised.

Q.52HyperlinksSection LL.2.5.d
L.4.4.2Section L2.5 states "The proposal shall not contain citations for, or active links to live Internet sites or pages. All linked information shall be contained within the electronic proposal. Any linked information that is not contained in the proposal will not be reviewed or accepted."

Section L.4.4.2 states "Provide a Table of Contents showing each file submitted as part of the Cost Volume with a short description of the contents of the file. Hyperlink each of these entries in the Table of Contents to the respective files."

Since the proposals will be submitted via email, the hyperlinks required in Section L.4.4.2 will not work because there will be no direct path. Would the Government please confirm the hyperlink requirement?A.52Revised L.4.4.2 to make the hyperlink optional.
Q.53Cost VolumeAttach 0004 Pricing MatrixCost Summary TabWe discovered formula errors in Amendment 0001 Pricing Matrix on the rows for the "Other Direct Costs (ODCs) (Less Burden)" and the "G&A Burden on ODCs" elements of cost. Cells F46 and G46 should be "='ODC Cost Detail'!C9/5". Also, Cells C47:G47 should be "='ODC Cost Detail'!E9/5".A.53Corrected
Q.54Omitted WBSSection LL.4.4.5.1L.4.4.5.1 requires Basis of Estimates (BOEs) for changes to the labor hour estimates provided by the Government that include:

The PWS paragraph The Work Breakdown Structure (WBS)

The PWS was provided as a solicitation attachment, however, a WBS was not provided. Will the Government remove the WBS requirement in the BOEs or provide the WBS as a solicitation attachment?A.54No. As a performance based contract, the Offeror must detail its approach to meeting the contract and PWS requirements. The WBS is specific to each Offeror.
Q.55Unclear instructions on where to include eSRS formsSection L, Vol II Past PerformanceL.4.2.6The reference to SB page counts is confusing in the following Volume II Past Performance Section L requirement "... include SF 294 and SF 295... for the last five years which are excluded from the SB page counts." Please clarify which volume shall include these attachments Volume II Past Performance or Volume III Small Business Participation.A.55The SF 294 and 295 are submitted in Volume II, Past Performance. See revised language removing "SB."
Q.56Ambiguity in the evaluation of enhancements considered strengthsSection LL.4.1.1.1Paragraph L.4.1.1.1 for Factor 1 invites bidders to include enhancements with its proposal, and to describe those enhancements, believed to be a strength, in the cost/price volume. Section M evaluation criteria for the cost/price volume (Factor 4) does not score strengths. How does the Government anticipate evaluating the enhancements/strengths proposed as part of the price/cost volume? Recommend the Government allow enhancements as a non-page counted attachment to Factor 1/Volume I so that it is scored according to Section M.5A.56Volume I, Management Approach allows Offeror's an opportunity to include strengths and enhancements in Offeror's proposal. The narrative in Volume IV, Pricing, is to explain the Offeror's cost impacts comapred to the Government provided labor hour estimates.
Q.57Omitted Job Descriptions"W9124R-24-R-0004_RFP_Att0001_PWS_Att0008-TE-5_Labor_Categories" and "W9124R-24-R-0004_RFP_Att0006_CBA+YumaMTSS_2024_Amendment1"The Army’s response to Q&A No. 55 regarding the Draft RFP stated that the RFP would provide labor category descriptions; however, when asked for the job descriptions applicable to the CBA, the Army’s response to Q&A No. 17 in Amendment 001 states that the CBA does not include job descriptions. Although job descriptions are not physically attached to the CBA, they are expressly referenced in the CBA in Exhibit A, Section 4.0, and the job descriptions were provided to the Army so that they can be shared with offerors. The job descriptions not only define the types of duties and equipment associated with a labor category, they also explicitly describe how the employer may use and schedule the individuals covered by the CBA. Because the Yuma MTSS contractor cannot change these job descriptions without negotiating the change with the union, the job descriptions should be provided to all offerors so that they understand duties associated with the labor categories they are proposing. The qualifications and experience requirements provided in Attachment 8, TE-5, does not contain the information included in the job descriptions.A.57The Government will provide an answer soon.
Q.58Price shift hoursThe Direct Labor Rate Schedule worksheet within the Attachment 0004 Pricing Matrix currently shows a shift labor rate in column I that equals the regular rate + $1.25 per hour. This rate is carried over to column H of the Shift Labor Detail worksheet and applied to the shift hours in column G of the Shift Labor Detail worksheet. However, because the shift hours in the Shift Labor Detail worksheet are not overtime hours, applying the Shift rate from column I of the Direct Labor Detail worksheet overstates the cost of Shift labor. For example, row 10 of the Shift Labor Detail worksheet estimates 215.49 productive shift labor hours for the AC Electrician II labor category. Because the 215.49 hours are not overtime hours, the employees have already been paid for these hours at the Regular rate in column G of the Direct Labor Rate Schedule worksheet. The employees would only be paid an additional $1.25 per hour for out of shift work, not an additional $39.73 per hour. Please revise the Pricing Matrix so that column I in the Direct Labor Rate Schedule only includes the $1.25 shift differential.A.58The hours in the Shift Labor Detail tab are hours in addition to regular hours detailed in the Regular Labor Detail tab. Therefore, applying the the total OT rate would apply.
Q.59Price workbookDoes the total FTE estimate on the Regular Labor Detail worksheet of 835.34 FTEs include the 25.06 FTEs of shift hours listed on the Shift Labor Detail worksheet? The Government's answer to Q.287 stated that the intention was to avoid "double counting" these hours. Please clarify to eliminate any possible duplication of cost for the same direct labor hours per labor category.A.59There are the same labor categories for both Regular Labor Detail and Shift Labor Detail. The productive hours are different between the two different labor categories so there would not be any "double counting" of these hours.
Q.60Ambiguity in certain costs related to the management and administration of the YPG MTSS contractThe Yuma MTSS RFP contains an ambiguity regarding the allocation of certain costs related to the management and administration of the Yuma MTSS contract. This is the same ambiguity that GAO identified in the Aberdeen Test Support Services RFP in TRAX Int’l Corp., B‑420361.7, B‑420361.8, June 28, 2023, 2023 CPD ¶ 162 at 17-19. Specifically, Section 1.6 of the Yuma MTSS states: “Any anticipated overhead/allowable costs shall be included in the Contractor’s indirect charge rate (contract administration and management, supervision, team leadership, procurement, logistics, human resources, financial management, safety, quality management, Contractor Furnished Equipment (PWS Attachment 3), Cybersecurity administration and Personnel Administration, to include scheduling and resource management).” Section 4.1 also directs offerors to include costs for contractor-furnished items in the “the Contractor’s indirect charge rate.” The Army’s responses to offeror questions similarly direct offerors to include a variety of costs that only benefit the Yuma MTSS contract in the contractor’s “indirect rates” or “overhead rate.” Q&A Nos. 65, 86, 151. We appreciate that, per Section 1.6.2, the Army needs a mechanism to allocate to specific test programs certain costs that benefit multiple test programs. However, as GAO found with respect to the ATSS RFP, the language in the Yuma MTSS RFP suggests that contractors can include these costs in an existing indirect rate that allocates to multiple contracts in addition to Yuma MTSS. Although these costs benefit multiple Yuma MTSS test programs, they are not “indirect costs” under FAR 30.001 and 31.203(b) because they only benefit the Yuma MTSS contract. As a result, these costs cannot be allocated to non-Yuma MTSS contracts unless the contractor has an established accounting practice of allocating similar costs on other contracts across the same allocation base. Please confirm that offerors must employ a FAR- and CAS-compliant approach and that offerors must allocate Yuma MTSS-specific costs across a base that includes only Yuma MTSS costs, unless the contractor’s established accounting practices consistently allocate similar costs under similar circumstances across a broader base.A.60The Government will provide an answer soon.
Q.61PP - Page CountRFPL.4.2.4.1(a)Would the Government please confirm the "legal documentation, including but not limited to corporate papers, establishing the legal nexus between the Offeror and the associated entity" are not included in the Past Performance page count.A.61The legal documentation is not included in the Past Performance volume page count.
Q.62PP - EvaluationRFPM.6.3.2Section M.6.3.2 currently states: "A relevancy determination of the Offeror’s (including joint venture partner(s) as detailed in L.4.2.4.3 and major and critical subcontractor(s)) past performance will be made. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated."

Would the Government please confirm that subcontractor Past Performance is not being assessed and that associated entity/affiliate Past Performance will also be assessed? A.62 The Government will not evaluate past performance for subcontractors. As detailed in L.4.2.4, the Government may consider the past performance of an associated entity, a predecessor company, or joint venture.