Questions and Answers for W9124M23B0007 (19 May 2023).pdf

PDF 103 KB Posted

Attached to
IDIQ Roofing
Solicitation number
W9124M23B0007
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Solicitation W9124M23B0007

19 May 2023

Q: In addition to any material warranties the contractor shall provide a performance warranty” can you explain what is required for this?

A: Reference paragraph 7, warranty of the scope of work. If the roof leaks within five year period after construction turnover, the contractor will be required to come out and fix the leak if a defect in the roof installation causes the leak.

Q: For clarity the unlock excel version bid schedule|Task list mention on Sam.gov should be on a disk and submitted with the bid package

A: Yes, the Excel version of the bid schedule should be on a disk, and it should be unlocked for editing.

Q: Are we required to bring certain documentation to be granted access to the base? Do we need to get to the base prior to 10:00 to have background checks?

A: The contractor must bring your driver's license and vehicle registration to Gate 1: CPT Jess

Wooldridge Gate & Visitor Control Center (266 W. General Screven Way, Fort Stewart, GA 31313) to access the base. The hours of the Visitor Control Center are 6:00 am to 6:00 pm. The meeting start time for the site visit is 10:00 am. It is the contractor's responsibility to ensure they have sufficient time to get access to the base and make it to the site visit meeting location.

File details come from the government source that posted it. Updated .