- Renovation of BLDG 620 Federal contract opportunity
- Solicitation number
- W9124M-16-B-0020
About this file
Solicitation Conform Copy as of amendment 0009
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124M-16-B-0020-0009
0010866929
PROJECT TITLE: Renovate Bldg. 620 at Fort Stew art
PROJECT LOCATION: Fort Stew art Georgia
SET ASIDE: HubZone
NAICS CODE: 236220 Commercial and Institutional Building Construction
SIZE STANDARD: $36.5 Million
MAGNITUDE OF CONSTRUCTION PROJECT: The estimated value of the proposed w ork is betw een $5,000,000 and $10,000,000
All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specifications.
PREBID MEETING/SITE VISIT: Will be held for this requirement: 1:00 PM 27 Oct 2016/ALREADY HELD DUE DATE FOR ALL QUESTIONS: 15 Feb 2017 15:00 pm/NEW DATE and TIME BID OPENING: The bid opening is scheduled at 14:00 02 Mar 2017/NEW DATE and TIME 976 William H. Wilson Ave, Building 621, Suite 101 Conference Room Fort Stew art GA 31535
BONDS: Bid Bond, Payment Bond, and Performance Bonds shall all be required.
MINIMUM GUARANTEE: No Minimum guarantee
X
SFC ANGEL DEL VALLE 9127678421
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Sep-2016
(RFP)
(IFB)
CALL:
Renovate Bldg 620
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Mar 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MISSION & INSTALLATION CONTRACTING CMND
MICC-FORT STEWART
976 WILLIAM H WILSON AVE SUITE 100
FORT STEWART GA 31314-3425
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
WG-33-8J
8. ADDRESS OFFER TO (If Other Than Item 7)
(912)767-2966FAX:TEL: (912)767-8420 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9124M-16-B-0020
Section SF 30 - BLOCK 14 CONTINUATION PAGE
REVISION LIST FOR SPECIFICATIO
Renovate Building 620, Fort Stewart (FS), Georgia; IJO: WG-33-8J
(AWP: 17-007) FS3670
1. Specification Changes
General Note -
i. Remove all references to “BOC & NOC”
ii. Remove all references to “Crack Unit”
Remove specification section 23.81.23 in its entirety.
Specification Section 22.00.00
i. Remove 2.4.11 in its entirety
ii. Remove 2.4.12 in its entirety
Specification Section 23.05.93
i. Item 3.3.10.1 Delete “computer room” from Group 1.
Specification Section 23.08.00
i. Remove “Pre-Functional Performance Testing Checklist Computer
Room Unit” in its entirety.
ii. Remove ““Functional Performance Testing Checklist Computer
Room Unit” in its entirety.
SEWAGE EJECTOR REMOVAL SOW
Renovate Building 620, Fort Stewart (FS), Georgia; IJO: WG-33-8J
(AWP: 17-007) FS3670
1. Sewage Ejector Removal SOW
a. Disconnect all utilities from Ejector
i. Power
ii. Water
iii. Sewer
b. Contents of ejector are to be pumped out into an approved transport vehicle to deliver to a waste water treatment facility
c. Triple Rinse out interior of injector of all remaining solids and pump out into an approved transport vehicle to deliver to a waste water treatment facility
d. Removal from Space
i. Option 1 – Removal through existing openings only.
1. Disassembly of ejector is required to remove it from location.
2. Largest section must be of a size to fit through existing doorways and stairwells
ii. Option 2 – Remove Ejector through reopened Masonry wall and open mechanical pit next to space on exterior of building.
1. This option may not require the disassembly of the ejector itself to remove.
e. All sanitary lines feeding the ejector are to be removed.
i. Lines supplying ejector are to be removed to source.
ii. Lines leaving the ejector are to be removed to sanitary main line and capped per plumbing plan notes.
f. Sanitize all surfaces where contaminate materials are spilled or splattered in the process of emptying, disassembly and removal from building.
g. Provide documentation that the ejector was disposed of in accordance with environmental requirements.
i. Location of disposal
ii. Weight ticket.
RE-ROOFING SOW
Add Alternate (Re-roofing) to Renovate Building 620, Fort Stewart (FS), Georgia;
IJO: WG-33-8J (AWP: 17-007) FS3670
Work to be executed: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Add Alternate to Renovate Building 620 complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items:
1. Demolition Scope
a. Remove and dispose of the all existing roofing membrane
b. Remove and dispose of the existing rigid insulation material down to concrete deck.
c. Remove and dispose of the existing aluminum flashing.
d. Remove roof curbs and equipment.
e. Remove existing expansion joint covers.
2. Installation Scope
a. Install treated 2 x 4 lumber blocking.
b. Install 4 x 4 cant strips.
c. Install 2” of polyisocyanurate insulation board.
d. Install #15 roofing felt.
e. Install 1” Perlite insulation.
f. Install .032” thick aluminum flashing at equipment support curbs.
g. Install aluminum drip edge, .016” thick, 5” girth, mill finish.
h. Install a two-ply SBS modified bitumen roof system.
i. Replace roof curbs and equipment.
j. Provide flashing for plumbing vents.
k. Install new expansions joint covers between building sections.
3. Specifications for Roofing are found in project manual under Division 07
a. Section 07.13.53 Elastomeric Sheet Waterproofing
b. Section 07.16.19 Metallic Oxide Waterproofing
c. Section 07.51.13 Built-up Asphalt Roofing
d. Section 07.60.00 Flashing and Sheet Metal
e. Section 07.84.00 Firestopping
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Renovate Bldg 620 "K" Work
FFP
Renovate Bldg 620 "K" Work FOB: Destination
PURCHASE REQUEST NUMBER: 0010866929
NET AMT
0002 1 Job Renovate Bldg 620 "K" Work (SAF)
FFP
Renovate Bldg 620 "K" Work. Work for re-roofing (Add Alternate)
0003 1 Job Renovate Bldg 620 "L" Work
FFP
Renovate Bldg 620 "L" Work
0004 1 Job Renovate Bldg 620 "M" Work
FFP
Renovate Bldg 620 "M" Work
0005 1 Each Contract ManPower Reporting
FFP
The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site - See Section H
Section C - Descriptions and Specifications
PROPOSAL BREAKDOWN K,L,AND M
PROPOSAL BREAKDOWN K,L,M
WG-33-8J Division of Work Description
K ‐ Renovation L ‐ New Work M ‐ Furniture/Equipment
K ‐ Renovation Civil work – Remove existing built up grade from building face (grade elevation is over weep line) and regrade for positive drain. Remove Trees growing from Mechanical Exhaust areas.
Install Sod over all disturbed areas.
General work – All demolition and construction performed within the boundary (perimeter) of the existing building 620 shell as indicated on the plans.
Mechanical work – All mechanical work in the original building. This includes HVAC, Plumbing and Fire Protection.
Electrical Work ‐ All electrical items demolished within the footprint of the original building are categorized as K Work. This work includes lighting and associated circuits/controls, panelboards and feeders, wiring devices and associated circuits, fire alarm and associated circuits, and data system components.
Demolition of non‐utility electrical service items is Electrical K Work.
New Electrical K Work shall comprise those systems within the footprint of the original building that replace those demolished, eg. lighting and associated circuits and controls, panelboards and feeders, wiring devices and associated circuits, new fire alarm and mass notification systems as well as associated circuits, and telecommunications systems infrastructure. The prospective Contractor shall take note that infrastructure items such as conduit sleeves, cable trays, j‐hooks, bridle rings, device boxes, power circuits for telecommunications items, etc., are a part of the Electrical K work
L ‐ New Work Civil work – Remove vegetation as indicated in plans for elevator construction. Install silt fence and a construction exit for erosion control. Bring in structural fill as required. Compact soil before installing foundation of elevator tower. Install new sidewalk and ramp with detectable warning tiles as indicated on plans. Install topsoil as indicated on plans, fine grade soil, and install grass sod.
General L work – All building construction performed to the existing building 620 shell (building addition) as indicated on the plans.
L ‐ New Work Mechanical work – All mechanical work in the addition This includes HVAC, Plumbing and Fire Protection.
Electrical Work ‐ New Electrical L work shall comprise those systems within the footprint of the building addition performed to the existing Building 620 shell. New systems include power for elevator and sump pump, lighting and associated circuits and controls, panelboards and feeders, wiring devices and associated circuits, new fire alarm and mass notification systems as well as associated circuits, and telecommunications systems infrastructure.
The prospective Contractor shall take note that infrastructure items such as conduit sleeves, cable trays, j‐hooks, bridle rings, device boxes, power circuits for telecommunications items, etc., required for the addition construction are a part of the Electrical L work
M ‐ Furniture/Equipment Civil work – N/A
General work – All new building furnishings and window treatments.
Mechanical work ‐ N/A
Electrical Work ‐ New Electrical M Work for data, telephone, and CATV shall include low voltage wiring, jacks, cover plates, racks, rack electronics, trunk and backbone cables and fibers both interior and exterior, as well as miscellaneous telecommunications wiring. Testing of the aforementioned systems is also considered Electrical M Work.
STATEMENT OF WORK (SOW)
PROJECT TABLE OF CONTENTS
SUBMITTAL LIST
DIVISION 01 – GENERAL REQUIREMENTS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 16 19 METALLIC OXIDE WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 51 13 BUILT-UP ASPHALT ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPET
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 23 00 REFRIGERANT PIPING
23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM
HEAT EXCHANGERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING
SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 51 00.00 40 INTERIOR LIGHTING
26 52 00.00 40 EMERGENCY LIGHTING
26 53 00.00 40 EXIT SIGNS
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents –
SUBMITTAL LIST FOR
RENOVATE BUILDING 620, FORT STEWART, GEORGIA
Listed below are contractor submittals required for above project. The Specifications shall govern in the event of conflict between this list and the specifications. The following notes apply to the submittals as indicated in the submittal schedule below.
Time of Submittal:
1. The submittal shall be furnished within 15 calendar days after notice to proceed and before the item(s) are incorporated in the work.
2. The submittal shall be furnished during the course of the work, but not later than 15 calendar days prior to beneficial use or final acceptance, whichever comes first.
Level of Review:
A. Review by Designer
B. Review by Construction Inspection/Representative
C. Review and Approval by Contractor, copies furnished For Information Only (FIO).
SUBMITTAL SCHEDULE
TP Sect/Para. No. Description of
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
01 74 19/1.4 Preconstruction Submittals
Waste Management Plan
1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
02 82 14.00 10/ 1.5
Shop Drawings Detailed Drawings 1B
Product Data Asbestos Waste Shipment Records
1B
Weight Bills and Delivery Tickets
1B
Respiratory Protection Program
1B
Cleanup and Disposal
1B
Qualifications 1B Training Program 1B Licenses, Permits and Notifications 1B
Asbestos Management Plan
1B
Test Reports Exposure Assessment and Air Monitoring
2B
Local Exhaust System
2B
Certificates Local Exhaust System
Medical Surveillance Requirements
1B
03 11 13.00 10/ 1.3
Shop Drawings Formwork 2B
Product Data Design 2C Form Materials 2B Form Releasing
Agents 2B
Test Reports Inspection 2B 03 15 00.00 10/ 1.3
Shop Drawings Waterstops 2B
Product Data Preformed Expansion Joint Filler
2B
Sealant 2B Waterstops 2B Certificates Preformed Expansion
Joint Filler 2B
Sealant 2B Waterstops 2B 03 20 00.00 10/ 1.2
Shop Drawings Reinforcement 2B
Product Data Material 2B Test Reports Material 2B Tests, Inspections, and Verifications 2B
Certificates Reinforcing Steel 2B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
03 30 00.00 10/ 1.4
Product Data Portland Cement 2B
Ready-Mixed Concrete
2B
Vapor Barrier 2B Latex Bonding Agent 2B Floor Finish 2B Chemical Admixtures 2B Epoxy Resin 2B Design Data Mixture Proportions 2B Test Reports Testing and
Inspection for CQC 2B
Certificates Qualifications 2B 04 20 00/1.3 Shop Drawings Detail Drawings 2B Design Data Pre-mixed Mortar 2B Unit Strength
Method 2B
Test Reports Field Testing of Grout
2B
Prism tests 2B Certificates Concrete Masonry
Units (CMU) 2B
Anchors, Ties, and Bar Positioners
2B
Joint Reinforcement 2B Masonry Cement 2B 05 52 00/1.2 Shop Drawings Iron and Steel
Hardware 2B
Steel Shapes, Plates, Bars and Strips
2B
Product Data Steel Railings and Handrails
2B
06 41 16.00 10/ 1.3
Shop Drawings Shop Drawings 2B
Installation 2B Product Data Wood Materials 2B Finish Schedule 2B Samples Plastic Laminates 2B Cabinet Hardware 2B 07 13 53/1.2 Product Data Elastomeric waterproofing sheet material
2B
Protection board 2B Primers, adhesives, and mastics 2B
Test Reports Elastomeric waterproofing sheet material
2B
Verification Of Conditions
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Protective Covering 2B Manufacturer’s
Instructions Primers, adhesives, and mastics
2B
07 51 13/1.3 Product Data Wind Uplift Calculations
2B
Asphalt 2B Felts 2B Granule Surface
Modified Bitumen Cap Sheet
2B
FLASHING MEMBRANE 2B
Fasteners 2B Primer 2B Asphalt Roof Cement 2B Closeout
Submittals
WARRANTY 2B
08 11 13/1.2 Shop Drawings Doors 2B Frames 2B Accessories 2B Product Data Doors 2B Frames 2B Accessories 2B 08 14 00/1.2 Shop Drawings Doors 2B Product Data Doors 2B Accessories 2B Water-resistant sealer 2B warranty 2B Sound transmission class rating 2B
Fire resistance rating
2B
08 41 13/1.3 Shop Drawings Installation Drawings
2B
Fabrication Drawings
2B
Product Data Manufacturer's Catalog Data
2B
Samples Finish and Color Samples
2B
Test Reports Certified Test Reports
2B
Certificates Manufacturer's Product Warranty
2B
08 56 53/1.2 Shop Drawings Window units 2B Product Data Window units 2B Hardware 2B Setting materials 2B Weatherstripping 2B Sample Window units 2B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Manufacturer’s Instructions
Glass 2B
Operation and Maintenance Data
Window units 2B
08 71 00/1.2 Shop Drawings Hardware schedule 2B Keying system 2B Product Data Hardware items 2B Closeout
Submittals Key Bitting 2B
08 81 00/1.2 Product Data Insulating Glass 2B Glazing Accessories 2B 09 29 00/1.2 Certificates Asbestos Free
Materials 2B
09 30 00/1.3 Product Data Tile 2B Setting-Bed 2B Mortar, Grout, and
Adhesive 2B
Samples Tile 2B Accessories 2B 09 30 00/1.3 Marble Thresholds 2B Grout 2B 09 51 00/1.3 Samples Acoustical Units 2B 09 65 00/1.3 Product Data Resilient Flooring and Accessories 2B
Adhesives 2B Samples Resilient Flooring and Accessories 2B
09 68 00/1.2 Product Data Carpet 2B Surface Preparation 2B Installation 2B Regulatory
Requirements 2B
Samples Carpet 2B 09 90 00/1.2 Product Data Coating 2B Manufacturer's
Technical Data Sheets
2B
10 14 00.20/1.2 Shop Drawings Detail Drawings 2B Product Data Installation 2B Warranty 2B 10 21 13/1.3 Shop Drawings Fabrication
Drawings 2B
Installation Drawings
2B
Product Data Cleaning and Maintenance Instructions
2B
Colors And Finishes 2B Galvanized Steel
Sheet
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Sound-Deadening Cores
2B
Anchoring Devices and Fasteners
2B
Hardware and Fittings
2B
Brackets 2B Door Hardware 2B 10 22 13/1.2 Shop Drawings Wire mesh partitions 2B
Product Data Wire mesh partitions
2B
10 28 13/1.2 Product Data Finishes 2B Accessory Items 2B Certificates Accessory Items 2B 10 44 16/1.1 Shop Drawings Cabinets 2B Wall Brackets 2B Product Data Cabinets 2B Wall Brackets 2B 10 44 16/1.1 Replacement Parts 2B 12 21 00/1.2 Product Data Window Blinds 2B Installation 2B Certification 2B Manufacturer’s
Instructions Window Blinds 2B
Operation and Maintenance Data
Window Blinds 2B
13 48 00.00 10/ 1.4
Shop Drawings Coupling and Bracing
2B
Flexible Couplings or Joints
2B
Equipment Requirements
2B
Contractor Designed Bracing
2B
Product Data Coupling and Bracing
2B
Equipment Requirements
2B
Contractor Designed Bracing
2B
13 48 00/1.4 Shop Drawings Bracing 2B Resilient Vibration
Isolation Devices 2B
Equipment Requirements
2B
Product Data Bracing 2B Equipment
Requirements 2B
Design Data Design Calculations 2B Test Reports Anchor Bolts 2C
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
14 24 00/1.3 Shop Drawings Detail Drawings 2B Product Data Passenger Elevators 2B Field Quality
Control 2B
Logic Control 2B Design Data Reaction Loads 2B Heat Loads 2B Test Reports Field Tests Reports 2B Operation and
Maintenance Data Maintenance and Diagnostic Tools
2B
Maintenance and Diagnostic Software
2B
Maintenance and Repair Action Plan
2B
Operation and Maintenance Training
2B
21 13 13.00 10/ 1.3
Shop Drawings Shop Drawings 2B
As-Built Drawings 2B Product Data Fire Protection
Related Submittals 1B
Materials and Equipment
1B
Spare Parts 1B Preliminary Tests 2B Final Acceptance
Test 2B
Onsite Training 2B Fire Protection
Specialist 1B
Sprinkler System Installer
1B
Design Data Sway Bracing 2B Hydraulic
Calculations 2B
Test Reports Preliminary Test Report
2B
Final Acceptance Test Report
2B
Certificates Inspection by Fire Protection Specialist
Operation and Maintenance Data
Operating and Maintenance Manuals
2C
22 00 00/1.2 Shop Drawings Plumbing System 1B Product Data Fixtures 1B Flush valve water closets
Flush valve urinals 1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Countertop lavatories
1B
Service sinks faucet
1B
Drinking-water coolers
1B
Water heaters 1B Pumps 1B Backflow prevention assemblies 1B
Shower Faucets 1B Welding 1B Vibration-Absorbing
Features 1B
Plumbing System 1B Test Reports Tests, Flushing and
Disinfection 2B
Test of Backflow Prevention Assemblies
2B
Certificates Materials and Equipment
1C
Bolts 1C Operations and
Maintenance Data Plumbing System 2C
23 00 00/1.3
Product Data Insulated Nonmetallic Flexible Duct Runouts
1B
Duct Connectors 1B Duct Access Doors 1B Fire Dampers 1B Manual Balancing
Dampers 1B
Sound Attenuation Equipment
1B
Acoustical Duct Liner
1B
Diffusers 1B Registers and
Grilles 1B
Louvers 1B Ceiling Exhaust
Fans 1B
Air Handling Units 1B Variable Volume, Single Duct Terminal Units
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Manufacturer’s Instructions
Manufacturer's Installation Instructions
1C
Operation and Maintenance Training
2C
Operations and Maintenance Man.
Operation and Maintenance Manuals
2C
Fire Dampers 2C Manual Balancing
Dampers 2C
Ceiling Exhaust Fans
2C
Air Handling Units 2C 23 00 00/1.3
Variable Volume, Single Duct Terminal Units
2C
23 05 93/1.4 Preconstruction Submittals
TAB Firm 1B
TAB team engineer 1B TAB Specialist 1B Shop Drawings TAB Schematic
Drawings and Report Forms
2B
Product Data Equipment and Performance Data
2B
TAB Related HVAC Submittals
2B
TAB Procedures 1B Calibration 1B Systems Readiness
Check 2B
TAB Execution 2B Test Reports Design review report 2B
TAB report 2B TAB Firm 2B Independent TAB
Agency and Personnel Qualifications
2B
TAB Submittal and Work Schedule
2B
Pre-field TAB engineering report
2B
Prerequisite HVAC Work Check Out List
2B
23 07 00/1.3 Shop Drawings Pipe Insulation Systems
1B
Duct Insulation Systems
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Equipment Insulation Systems
1B
Product Data Pipe Insulation Systems
1B
Duct Insulation Systems
1B
Equipment Insulation Systems
1B
Manufacturer’s Instructions
Pipe Insulation Systems
1B
Duct Insulation Systems
1B
23 07 00/1.3 Equipment Insulation Systems
1B
23 08 00.00 10/ 1.4
Shop Drawings Commissioning Plan 2B
Product Data Pre-Functional Performance Test Checklists
2B
Functional Performance Tests
2B
Test Reports Commissioning Report
2B
Certificates Commissioning Firm 1B Commissioning
Specialist 1B
23 09 23.13 20/1.4
Shop Drawings Control system drawings title sheet
2B
List of I/O Points 2B Control System
Components List 2B
Control system schematics
2B
HVAC Equipment Electrical Ladder diagrams
2B
Component wiring diagrams
2B
BACnet communication architecture schematic
2B
Product Data Direct Digital Controllers
2B
DDC Software 2B Sensors and Input
Hardware 2B
Output Hardware 2B Surge and transient protection
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Variable frequency (motor) drives
2B
Design Data Performance Verification Testing Plan
2C
Pre-Performance Verification Testing Checklist
2C
Test Reports Performance Verification Testing Report
2C
23 09 23.13 20/1.4
Certificates Contractor's Qualifications
2B
Manufacturer’s Field Reports
Pre-PVT Checklist 2C
Operation and Maintenance Data
BACnet Direct Digital Control Systems
2C
Controls System Operators Manuals
2C
VFD Service Manuals 2C Closeout
Submittals Training documentation
2C
23 23 00/1.2 Product Data Refrigerant Piping System
1B
23 57 10.00 10/ 1.2
Product Data Spare Parts 1B
Welding 1B Framed Instructions 1B Test Reports Testing and
Cleaning 2C
Water Treatment Testing
2C
Certificates Bolts 1B Operation and
Maintenance Data Operation and Maintenance Manuals
2C
23 64 26/1.3 Product Data Grooved Mechanical Connections For Steel
1B
Grooved Mechanical Connections For Copper
1B
Calibrated Balancing Valves
1B
Pump Discharge Valve
1B
Water Pressure Reducing Valve
1B
Pressure Relief Valve
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Combination Pressure and Temperature Relief Valves
1B
Pumps 1B Combination
Strainer and Pump Suction Diffuser
1B
Expansion Tanks 1B Air Separator Tanks 1B 23 64 26/1.3 Test Reports Piping welds NDE report 2C
Pressure tests reports
2C
Certificates Employer’s Record Documents (For Welding)
2C
Welding Procedures and Qualifications
2C
Operation and Maintenance Data
Calibrated Balancing Valves
2C
Pump Discharge Valve
2C
Water Pressure Reducing Valve
2C
Pressure Relief Valve
2C
Combination Pressure and Temperature Relief Valves
2C
Pumps 2C Combination
Strainer and Pump Suction Diffuser
2C
Expansion Tanks 2C Air Separator Tanks 2C 23 82 02.00 10/ 1.3
Shop Drawings Drawings 1B
Product Data Materials and Equipment
1B
Spare Parts 1B Verification of
Dimensions 1B
26 05 00.00 40/ 1.3
Preconstruction Submittals
Material, Equipment, and Fixture Lists
1B
Conduits, Raceway sand Fittings
Wire and Cable 1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Splices and Connectors
1B
Switches 1B Receptacles 1B Outlets, Outlet
Boxes, and Pull Boxes
1B
Circuit Breakers 1B Panelboards 1B 26 05 00.00 40/ 1.3
Lamps and Lighting Fixtures
1B
Dry-Type Distribution Transformers
1B
Product Data Conduits, Raceway sand Fittings
1B
Wire and Cable 1B Splices and
Connectors 1B
Switches 1B Receptacles 1B Outlets, Outlet
Boxes, and Pull Boxes
1B
Circuit Breakers 1B Panelboards 1B Lamps and Lighting
Fixtures 1B
Dry-Type Distribution Transformers
1B
Spare Parts 1B Certification 1B Test Reports Continuity Test 2B Phase-Rotation
Tests 2B
Insulation Resistance Test
2B
Manufacturer’s Instructions`
Manufacturer's Instructions
1C
26 05 48.00 10/ 1.4
Shop Drawings Lighting Fixtures in Buildings
1B
Equipment Requirements
1B
Product Data Lighting Fixtures in Buildings
1B
Equipment Requirements
1B
Contractor Designed Bracing
26 20 00/1.3 Shop Drawings Panelboards 1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Transformers 1B Cable trays 1B Product Data Receptacles 1B Circuit breakers 1B Switches 1B Transformers 1B Enclosed circuit breakers 1B
26 20 00/1.3 Motor controllers 1B Combination motor controllers 1B
Manual motor starters
1B
Grounding Busbar 1B Surge protective devices 1B
Test Reports 600-volt wiring test
2B
Grounding system test
2B
Transformer tests 2B Ground-fault receptacle test 2B
Certificates Fuses 2C Manufacturer’s
Field Reports Transformer factory tests
2B
Operation and Maintenance Data
Electrical Systems 2B
26 24 16.00 40/ 1.3
Shop Drawings Detail Drawings 1B
Outline Drawings 1B Product Data Panelboards 1B Directory Card and
Holder 1B
Samples Keys 1B Test Reports Continuity Tests 2B Insulation Tests 2B Certificates Statements 2B Manufacturer’s
Instructions Panelboards 1B
26 28 21.00 40/ 1.2
Shop Drawings Connection Diagrams 1B
Fabrication Drawings
1B
Installation Drawings
1B
Product Data Equipment and Performance Data
1B
Contacts 1B Indicating Lights 1B Terminal Board 1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Enclosures 1B Accessories 1B Test Reports Qualification
Testing 2B
Operation Tests 2B Certificates Listing of Product
Installations 2B
26 28 21.00 40/ 1.2
Manufacturer’s Instructions
Automatic Transfer Switch
1B
26 41 01.00 10/ 1.2
Shop Drawings Detail Drawings 1B
Certificates Materials 2B 26 51 00.00 40/ 1.4
Shop Drawings Commercial Incandescent Lighting Fixtures
1B
Lowering Devices 1B Product Data Fluorescent lighting fixtures 1B
Fluorescent electronic ballasts
1B
Fluorescent lamps 1B High-intensity-discharge (HID) lighting fixtures
1B
HID ballasts 1B High-pressure sodium (HPS) lamps 1B
Metal-halide lamps 1B Electronic dimming ballast 1B
Dimming ballast controls
1B
Light Level Sensor 1B Energy Efficiency 1B Commercial
Incandescent Lighting Fixtures
1B
Lowering Devices 1B Samples Lighting fixtures 1B Test Reports Operating test 2B Operational Tests 2B Operation and
Maintenance Data Operational Service 2C
26 52 00.00 40/ 1.3
Preconstruction Submittals
Material, Equipment, and Fixture Lists
1B sample warranty 1B Shop Drawings Central Emergency
Lighting System 1B
Product Data Emergency Lighting Egress Units
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Emergency Fluorescent Lighting
1B
Accessories 1B Test Reports System Operational
Tests 2B
26 52 00.00 40/ 1.3
Certificates Certificates of Conformance
2C
Warranty 2C 26 53 00.00 40/ 1.3
Preconstruction Submittals
Material, Equipment, and Fixture Lists
1B
Shop Drawings Exit Lighting Units 1B Exit Lighting Units
Outline Drawings 1B
Product Data Exit Lighting Units 1B Contemporary
Fixtures 1B
Accessories 1B Test Reports Operational Tests 2B Certificates Energy Efficiencies 2C 27 05 14.00 10/ 1.3
Shop Drawings Cable TV Premises Distribution System
1B
Installation 1B Product Data Spare Parts 1B Test Plan 1B Qualifications 1B Test Reports Testing 2B Certificates
Materials and Equipment
1B
Manufacturer’s Instructions
Manufacturer's Recommendations
1B
Operation and Maintenance Data
Operation and Maintenance Manuals
2C
27 05 28.36 40/ 1.3
Shop Drawings Fabrication Drawings
1B
Installation Drawings
1B
Product Data Cable Trays 1B Supports 1B Manufacturer’s
Instructions Manufacturer's Instructions
1B
27 05 29.00 10/ 1.4
Shop Drawings PDS design 1B
PDS Design Technical Review
1B
PDS Design Approval 1B Product Data PDS Hardened
Carrier 1B
Samples PDS Carrier Surface Mounted
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Pull Boxes 1B Fittings 1B Closeout
Submittals User Drop Box 1B
Other Enclosures 1B 27 10 00/1.5 Shop Drawings Telecommunications drawings 1B
Telecommunications Space Drawings
1B
Product Data Telecommunications cabling
1B
Patch panels 1B Telecommunications outlet/connector assemblies
1B
Equipment support frame
1B
Connector blocks 1B Test Reports Telecommunications cabling testing 2B
Certificates Telecommunications Contractor
1B
Key Personnel 1B Manufacturer
Qualifications 1B
Test plan 1B Manufacturer’s
Field Reports Factory reel tests
Operation and Maintenance Data
Telecommunications cabling and pathway system
2B
Closeout Submittals
Record Documentation
2C
28 31 76/1.5 Shop Drawings Nameplates 1B Instructions 1B Wiring Diagrams 1B System Layout 1B System Operation 1B Notification
Appliances 1B
Amplifiers 1B Product Data Technical Data And
Computer Software 1B
Fire Alarm Control Unit and Mass Notification Control Unit (FMCP)
1B
Terminal cabinets 1B Manual stations 1B Batteries 1B Battery chargers 1B
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Smoke sensors 1B Heat detectors 1B Notification appliances 1B
28 31 76/1.5 Amplifiers 1B Tone generators 1B Digitalized voice generators 1B
Remote Fire Alarm/Mass Notification Control Units
1B
Local Operating Console (LOC)
1B
Design Data Battery power 1B Battery chargers 1B Test Reports Field Quality
Control 2C
Testing Procedures 2C Smoke sensor testing 2B
Certificates Installer 1B Formal Inspection and Tests 1B
Final Testing 1B Manufacturer’s
Field Reports System Operation 2B
Fire Alarm/Mass Notification System
2B
Operation and Maintenance Data
Operation and Maintenance (O&M) Instructions
2B
Instruction of Government Employees
2B
Closeout Submittals
As-Built Drawings 2C
31 00 00/1.6 Preconstruction Submittals
Shoring 1B
Dewatering Work Plan
1B
Product Data Utilization of Excavated Materials
1B
Test Reports Testing 2B Borrow Site Testing 1B Certificates Testing 1B 31 16 13/1.3 Test Reports
Field Quality Control
2B
33 11 00/1.2 Product Data Piping Materials 1B Water distribution main
Data to be Submitted
Item(s) for which the Data is Required*
See Referenced Notes Above
Water service line 1B Hydrants 1B Indicator posts 1B 33 11 00/1.2 Valve boxes 1B Test Reports Disinfection 2B
Water distribution main
1C
Water service line 1C Lining 1C hydrants 1C Manufacturer’s
Instructions Delivery, storage, and handling Installation
1C
* For a full description of these item(s), see the submittals paragraph of the individual referenced technical specification section.
SECTION 01 74 19
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2002; R 2005) Leadership in Energy and
Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)
1.2 GOVERNMENT POLICY
Government policy is to apply sound environmental principles in the design, construction and use of facilities. As part of the implementation of that policy: (1) practice efficient waste management when sizing, cutting, and installing products and materials and (2) use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling or reuse.
1.3 MANAGEMENT
Develop and implement a waste management program. Take a pro-active, responsible role in the management of construction and demolition waste and require all subcontractors, vendors, and suppliers to participate in the effort. Construction and demolition waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the work. In the management of waste consideration shall be given to the availability of viable markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable to available markets, and time constraints imposed by internal project completion mandates. The Contractor is responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste.
Revenues or other savings obtained for salvage, or recycling accrue to the Contractor. Appropriately permit firms and facilities used for recycling, reuse, and disposal for the intended use to the extent required by federal, state, and local regulations. Also, provide on-site instruction of appropriate separation, handling, recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.
1.4 SUBMITTALS
Preconstruction Submittals
Waste Management Plan
1.5 WASTE MANAGEMENT PLAN
A waste management plan shall be submitted within 15 days after contract award and not less than ten days before the preconstruction meeting. The plan shall demonstrate how the project waste diversion goal shall be met and shall include the following:
a. Name of individuals on the Contractor's staff responsible for waste prevention and management.
b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.
c. Description of the regular meetings to be held to address waste management.
d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.
e. Characterization, including estimated types and quantities, of the waste to be generated.
f. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.
g. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. Include the name, location, and phone number for each reuse facility to be used, and provide a copy of the permit or license for each facility.
h. List of specific waste materials that will be salvaged for resale, salvaged and reused on the current project, salvaged and stored for reuse on a future project, or recycled. Recycling facilities that will be used shall be identified by name, location, and phone number, including a copy of the permit or license for each facility.
i. Identification of materials that cannot be recycled/reused with an explanation or justification, to be approved by the Contracting Officer.
j. Description of the means by which any waste materials identified in item (h) above will be protected from contamination.
k. Description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).
l. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.
Revise and resubmit Plan as required by the Contracting Officer. Approval of Contractor's Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations or meeting project cumulative waste diversion requirement. Distribute copies of the Waste Management Plan to each subcontractor, the Quality Control Manager, and the Contracting Officer.
1.6 RECORDS
Records shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Records shall be kept in accordance with the LEED Reference Guide and using the LEED Letter Template. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.
Demolition accomplished by other parties on this project site count toward the project's total waste diversion cumulative score for LEED. Information on the quantity and disposition of these materials will be provided by the Contracting Officer. Include this data in records, annotated to indicate that it was accomplished by another party.
1.7 REPORTS
Provide quarterly reports and a final report to the Fort Stewart Contracting Officer's Representative. Quarterly and final reports shall include project name, information for waste generated this quarter, and cumulative totals for the project. Each report shall include supporting documentation to include manifests, weight tickets, receipts, and invoices specifically identifying the project and waste material. Include timber harvest and demolition information, if any.
1.8 COLLECTION
Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in a manner that maximizes recyclability and salvageability of identified materials. Provide the necessary containers, bins and storage areas to facilitate effective waste management and clearly and appropriately identify them. Provide materials for barriers and enclosures around recyclable material storage areas which are nonhazardous and recyclable or reusable. Locate out of the way of construction traffic.
Provide adequate space for pick-up and delivery and convenience to subcontractors. Recycling and waste bin areas are to be kept neat and clean, and recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials. Clean contaminated materials prior to placing in collection containers. Use cleaning materials that are nonhazardous and biodegradable. Handle hazardous waste and hazardous materials in accordance with applicable regulations and coordinate with TECHNICAL PROVISIONS Paragraph 4 and Section 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES. Separate materials by one of the following methods:
1.8.1 Source Separated Method
Waste products and materials that are recyclable shall be separated from trash and sorted as described below into appropriately marked separate containers and then transported to the respective recycling facility for further processing. Deliver materials in accordance with recycling or reuse Installation requirements (e.g., free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process). Separate materials into the following category types as appropriate to the project waste and to the available recycling and reuse programs in the project area:
a. Land clearing debris.
b. Asphalt.
c. Concrete and masonry.
d. Metal (e.g. banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized, stainless steel, aluminum, copper, zinc, lead brass, bronze).
(1) Ferrous.
(2) Non-ferrous.
e. Wood (nails and staples allowed).
f. Debris.
g. Glass (colored glass allowed).
h. Paper.
(1) Bond.
(2) Newsprint.
(3) Cardboard and paper packaging materials.
i. Plastic.
(1) Type 1: Polyethylene Terephthalate (PET, PETE).
(2) Type 2: High Density Polyethylene (HDPE).
(3) Type 3: Vinyl (Polyvinyl Chloride or PVC).
(4) Type 4: Low Density Polyethylene (LDPE).
(5) Type 5: Polypropylene (PP).
(6) Type 6: Polystyrene (PS).
(7) Type 7: Other. Use of this code indicates that the package in question is made with a resin other than the six listed above, or is made of more than one resin listed above, and used in a multi-layer combination.
j. Gypsum.
k. Non-hazardous paint and paint cans.
l. Carpet.
m. Ceiling tiles.
n. Insulation.
o. Beverage containers.
1.8.2 Co-Mingled Method
Waste products and recyclable materials shall be placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed.
1.8.3 Other Methods
Other methods proposed by the Contractor may be used when approved by the
1.9 DISPOSAL
Control accumulation of waste materials and trash. Recycle or dispose of collected materials off-site at intervals approved by the Contracting Officer and in compliance with waste management procedures. Except as otherwise specified in other sections of the specifications, disposal shall be in accordance with the following:
1.9.1 Reuse
First consideration shall be given to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Coordinate reuse with the Contracting Officer. Sale or donation of waste suitable for reuse shall be considered.
1.9.2 Recycle
Waste materials not suitable for reuse, but having value as being recyclable, shall be made available for recycling. All fluorescent lamps, HID lamps, and mercury-containing thermostats removed from the site shall be recycled. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials.
1.9.3 Compost
Consider composting on site if a reasonable amount of compostable material will be available. Compostable materials include plant material, sawdust, and certain food scraps.
1.9.4 Waste
Materials with no practical use or economic benefit shall be disposed at a landfill or incinerator.
1.9.5 Return
Set aside and protect misdelivered and substandard products and materials and return to supplier for credit.
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
-- End of Section --
SECTION 02 41 00
DEMOLITION AND DECONSTRUCTION
1.1 REFERENCES
The publications listed below form a part of this specification to the
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered
Non-Flammable Fluorocarbon Refrigerants
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition
Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard
Requisitioning and Issue Procedures
MIL-STD-129 (2007; Rev P; Change 4 2007) Military Marking for Shipment and Storage
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air
Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and
Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
See the demolition drawings for the extent of all demolition operations.
1.2.1 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government.