Solicitation_Conform_Copy_as_of_Amendment_0009.pdf

PDF 2 MB Posted

Attached to
Renovation of BLDG 620 Federal contract opportunity
Solicitation number
W9124M-16-B-0020
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Stewart

About this file

Solicitation Conform Copy as of amendment 0009

View the file

Other files for this federal contract opportunity

Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124M-16-B-0020-0009

0010866929

PROJECT TITLE: Renovate Bldg. 620 at Fort Stew art

PROJECT LOCATION: Fort Stew art Georgia

SET ASIDE: HubZone

NAICS CODE: 236220 Commercial and Institutional Building Construction

SIZE STANDARD: $36.5 Million

MAGNITUDE OF CONSTRUCTION PROJECT: The estimated value of the proposed w ork is betw een $5,000,000 and $10,000,000

All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specifications.

PREBID MEETING/SITE VISIT: Will be held for this requirement: 1:00 PM 27 Oct 2016/ALREADY HELD DUE DATE FOR ALL QUESTIONS: 15 Feb 2017 15:00 pm/NEW DATE and TIME BID OPENING: The bid opening is scheduled at 14:00 02 Mar 2017/NEW DATE and TIME 976 William H. Wilson Ave, Building 621, Suite 101 Conference Room Fort Stew art GA 31535

BONDS: Bid Bond, Payment Bond, and Performance Bonds shall all be required.

MINIMUM GUARANTEE: No Minimum guarantee

X

SFC ANGEL DEL VALLE 9127678421

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Sep-2016

(RFP)

(IFB)

CALL:

Renovate Bldg 620

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Mar 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

MISSION & INSTALLATION CONTRACTING CMND

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314-3425

W9124M

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

WG-33-8J

8. ADDRESS OFFER TO (If Other Than Item 7)

(912)767-2966FAX:TEL: (912)767-8420 TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9124M-16-B-0020

Section SF 30 - BLOCK 14 CONTINUATION PAGE

REVISION LIST FOR SPECIFICATIO

Renovate Building 620, Fort Stewart (FS), Georgia; IJO: WG-33-8J

(AWP: 17-007) FS3670

1. Specification Changes

General Note -

i. Remove all references to “BOC & NOC”

ii. Remove all references to “Crack Unit”

Remove specification section 23.81.23 in its entirety.

Specification Section 22.00.00

i. Remove 2.4.11 in its entirety

ii. Remove 2.4.12 in its entirety

Specification Section 23.05.93

i. Item 3.3.10.1 Delete “computer room” from Group 1.

Specification Section 23.08.00

i. Remove “Pre-Functional Performance Testing Checklist Computer

Room Unit” in its entirety.

ii. Remove ““Functional Performance Testing Checklist Computer

Room Unit” in its entirety.

SEWAGE EJECTOR REMOVAL SOW

Renovate Building 620, Fort Stewart (FS), Georgia; IJO: WG-33-8J

(AWP: 17-007) FS3670

1. Sewage Ejector Removal SOW

a. Disconnect all utilities from Ejector

i. Power

ii. Water

iii. Sewer

b. Contents of ejector are to be pumped out into an approved transport vehicle to deliver to a waste water treatment facility

c. Triple Rinse out interior of injector of all remaining solids and pump out into an approved transport vehicle to deliver to a waste water treatment facility

d. Removal from Space

i. Option 1 – Removal through existing openings only.

1. Disassembly of ejector is required to remove it from location.

2. Largest section must be of a size to fit through existing doorways and stairwells

ii. Option 2 – Remove Ejector through reopened Masonry wall and open mechanical pit next to space on exterior of building.

1. This option may not require the disassembly of the ejector itself to remove.

e. All sanitary lines feeding the ejector are to be removed.

i. Lines supplying ejector are to be removed to source.

ii. Lines leaving the ejector are to be removed to sanitary main line and capped per plumbing plan notes.

f. Sanitize all surfaces where contaminate materials are spilled or splattered in the process of emptying, disassembly and removal from building.

g. Provide documentation that the ejector was disposed of in accordance with environmental requirements.

i. Location of disposal

ii. Weight ticket.

RE-ROOFING SOW

Add Alternate (Re-roofing) to Renovate Building 620, Fort Stewart (FS), Georgia;

IJO: WG-33-8J (AWP: 17-007) FS3670

Work to be executed: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Add Alternate to Renovate Building 620 complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items:

1. Demolition Scope

a. Remove and dispose of the all existing roofing membrane

b. Remove and dispose of the existing rigid insulation material down to concrete deck.

c. Remove and dispose of the existing aluminum flashing.

d. Remove roof curbs and equipment.

e. Remove existing expansion joint covers.

2. Installation Scope

a. Install treated 2 x 4 lumber blocking.

b. Install 4 x 4 cant strips.

c. Install 2” of polyisocyanurate insulation board.

d. Install #15 roofing felt.

e. Install 1” Perlite insulation.

f. Install .032” thick aluminum flashing at equipment support curbs.

g. Install aluminum drip edge, .016” thick, 5” girth, mill finish.

h. Install a two-ply SBS modified bitumen roof system.

i. Replace roof curbs and equipment.

j. Provide flashing for plumbing vents.

k. Install new expansions joint covers between building sections.

3. Specifications for Roofing are found in project manual under Division 07

a. Section 07.13.53 Elastomeric Sheet Waterproofing

b. Section 07.16.19 Metallic Oxide Waterproofing

c. Section 07.51.13 Built-up Asphalt Roofing

d. Section 07.60.00 Flashing and Sheet Metal

e. Section 07.84.00 Firestopping

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Renovate Bldg 620 "K" Work

FFP

Renovate Bldg 620 "K" Work FOB: Destination

PURCHASE REQUEST NUMBER: 0010866929

NET AMT

0002 1 Job Renovate Bldg 620 "K" Work (SAF)

FFP

Renovate Bldg 620 "K" Work. Work for re-roofing (Add Alternate)

0003 1 Job Renovate Bldg 620 "L" Work

FFP

Renovate Bldg 620 "L" Work

0004 1 Job Renovate Bldg 620 "M" Work

FFP

Renovate Bldg 620 "M" Work

0005 1 Each Contract ManPower Reporting

FFP

The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site - See Section H

Section C - Descriptions and Specifications

PROPOSAL BREAKDOWN K,L,AND M

PROPOSAL BREAKDOWN K,L,M

WG-33-8J Division of Work Description

K ‐ Renovation L ‐ New Work M ‐ Furniture/Equipment

K ‐ Renovation Civil work – Remove existing built up grade from building face (grade elevation is over weep line) and regrade for positive drain. Remove Trees growing from Mechanical Exhaust areas.

Install Sod over all disturbed areas.

General work – All demolition and construction performed within the boundary (perimeter) of the existing building 620 shell as indicated on the plans.

Mechanical work – All mechanical work in the original building. This includes HVAC, Plumbing and Fire Protection.

Electrical Work ‐ All electrical items demolished within the footprint of the original building are categorized as K Work. This work includes lighting and associated circuits/controls, panelboards and feeders, wiring devices and associated circuits, fire alarm and associated circuits, and data system components.

Demolition of non‐utility electrical service items is Electrical K Work.

New Electrical K Work shall comprise those systems within the footprint of the original building that replace those demolished, eg. lighting and associated circuits and controls, panelboards and feeders, wiring devices and associated circuits, new fire alarm and mass notification systems as well as associated circuits, and telecommunications systems infrastructure. The prospective Contractor shall take note that infrastructure items such as conduit sleeves, cable trays, j‐hooks, bridle rings, device boxes, power circuits for telecommunications items, etc., are a part of the Electrical K work

L ‐ New Work Civil work – Remove vegetation as indicated in plans for elevator construction. Install silt fence and a construction exit for erosion control. Bring in structural fill as required. Compact soil before installing foundation of elevator tower. Install new sidewalk and ramp with detectable warning tiles as indicated on plans. Install topsoil as indicated on plans, fine grade soil, and install grass sod.

General L work – All building construction performed to the existing building 620 shell (building addition) as indicated on the plans.

L ‐ New Work Mechanical work – All mechanical work in the addition This includes HVAC, Plumbing and Fire Protection.

Electrical Work ‐ New Electrical L work shall comprise those systems within the footprint of the building addition performed to the existing Building 620 shell. New systems include power for elevator and sump pump, lighting and associated circuits and controls, panelboards and feeders, wiring devices and associated circuits, new fire alarm and mass notification systems as well as associated circuits, and telecommunications systems infrastructure.

The prospective Contractor shall take note that infrastructure items such as conduit sleeves, cable trays, j‐hooks, bridle rings, device boxes, power circuits for telecommunications items, etc., required for the addition construction are a part of the Electrical L work

M ‐ Furniture/Equipment Civil work – N/A

General work – All new building furnishings and window treatments.

Mechanical work ‐ N/A

Electrical Work ‐ New Electrical M Work for data, telephone, and CATV shall include low voltage wiring, jacks, cover plates, racks, rack electronics, trunk and backbone cables and fibers both interior and exterior, as well as miscellaneous telecommunications wiring. Testing of the aforementioned systems is also considered Electrical M Work.

STATEMENT OF WORK (SOW)

PROJECT TABLE OF CONTENTS

SUBMITTAL LIST

DIVISION 01 – GENERAL REQUIREMENTS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 16 19 METALLIC OXIDE WATERPROOFING

07 21 16 MINERAL FIBER BLANKET INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 51 13 BUILT-UP ASPHALT ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPET

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 23 00 REFRIGERANT PIPING

23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING

SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 16.00 40 PANELBOARDS

26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 51 00.00 40 INTERIOR LIGHTING

26 52 00.00 40 EMERGENCY LIGHTING

26 53 00.00 40 EXIT SIGNS

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents –

SUBMITTAL LIST FOR

RENOVATE BUILDING 620, FORT STEWART, GEORGIA

Listed below are contractor submittals required for above project. The Specifications shall govern in the event of conflict between this list and the specifications. The following notes apply to the submittals as indicated in the submittal schedule below.

Time of Submittal:

1. The submittal shall be furnished within 15 calendar days after notice to proceed and before the item(s) are incorporated in the work.

2. The submittal shall be furnished during the course of the work, but not later than 15 calendar days prior to beneficial use or final acceptance, whichever comes first.

Level of Review:

A. Review by Designer

B. Review by Construction Inspection/Representative

C. Review and Approval by Contractor, copies furnished For Information Only (FIO).

SUBMITTAL SCHEDULE

TP Sect/Para. No. Description of

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

01 74 19/1.4 Preconstruction Submittals

Waste Management Plan

1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

02 82 14.00 10/ 1.5

Shop Drawings Detailed Drawings 1B

Product Data Asbestos Waste Shipment Records

1B

Weight Bills and Delivery Tickets

1B

Respiratory Protection Program

1B

Cleanup and Disposal

1B

Qualifications 1B Training Program 1B Licenses, Permits and Notifications 1B

Asbestos Management Plan

1B

Test Reports Exposure Assessment and Air Monitoring

2B

Local Exhaust System

2B

Certificates Local Exhaust System

Medical Surveillance Requirements

1B

03 11 13.00 10/ 1.3

Shop Drawings Formwork 2B

Product Data Design 2C Form Materials 2B Form Releasing

Agents 2B

Test Reports Inspection 2B 03 15 00.00 10/ 1.3

Shop Drawings Waterstops 2B

Product Data Preformed Expansion Joint Filler

2B

Sealant 2B Waterstops 2B Certificates Preformed Expansion

Joint Filler 2B

Sealant 2B Waterstops 2B 03 20 00.00 10/ 1.2

Shop Drawings Reinforcement 2B

Product Data Material 2B Test Reports Material 2B Tests, Inspections, and Verifications 2B

Certificates Reinforcing Steel 2B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

03 30 00.00 10/ 1.4

Product Data Portland Cement 2B

Ready-Mixed Concrete

2B

Vapor Barrier 2B Latex Bonding Agent 2B Floor Finish 2B Chemical Admixtures 2B Epoxy Resin 2B Design Data Mixture Proportions 2B Test Reports Testing and

Inspection for CQC 2B

Certificates Qualifications 2B 04 20 00/1.3 Shop Drawings Detail Drawings 2B Design Data Pre-mixed Mortar 2B Unit Strength

Method 2B

Test Reports Field Testing of Grout

2B

Prism tests 2B Certificates Concrete Masonry

Units (CMU) 2B

Anchors, Ties, and Bar Positioners

2B

Joint Reinforcement 2B Masonry Cement 2B 05 52 00/1.2 Shop Drawings Iron and Steel

Hardware 2B

Steel Shapes, Plates, Bars and Strips

2B

Product Data Steel Railings and Handrails

2B

06 41 16.00 10/ 1.3

Shop Drawings Shop Drawings 2B

Installation 2B Product Data Wood Materials 2B Finish Schedule 2B Samples Plastic Laminates 2B Cabinet Hardware 2B 07 13 53/1.2 Product Data Elastomeric waterproofing sheet material

2B

Protection board 2B Primers, adhesives, and mastics 2B

Test Reports Elastomeric waterproofing sheet material

2B

Verification Of Conditions

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Protective Covering 2B Manufacturer’s

Instructions Primers, adhesives, and mastics

2B

07 51 13/1.3 Product Data Wind Uplift Calculations

2B

Asphalt 2B Felts 2B Granule Surface

Modified Bitumen Cap Sheet

2B

FLASHING MEMBRANE 2B

Fasteners 2B Primer 2B Asphalt Roof Cement 2B Closeout

Submittals

WARRANTY 2B

08 11 13/1.2 Shop Drawings Doors 2B Frames 2B Accessories 2B Product Data Doors 2B Frames 2B Accessories 2B 08 14 00/1.2 Shop Drawings Doors 2B Product Data Doors 2B Accessories 2B Water-resistant sealer 2B warranty 2B Sound transmission class rating 2B

Fire resistance rating

2B

08 41 13/1.3 Shop Drawings Installation Drawings

2B

Fabrication Drawings

2B

Product Data Manufacturer's Catalog Data

2B

Samples Finish and Color Samples

2B

Test Reports Certified Test Reports

2B

Certificates Manufacturer's Product Warranty

2B

08 56 53/1.2 Shop Drawings Window units 2B Product Data Window units 2B Hardware 2B Setting materials 2B Weatherstripping 2B Sample Window units 2B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Manufacturer’s Instructions

Glass 2B

Operation and Maintenance Data

Window units 2B

08 71 00/1.2 Shop Drawings Hardware schedule 2B Keying system 2B Product Data Hardware items 2B Closeout

Submittals Key Bitting 2B

08 81 00/1.2 Product Data Insulating Glass 2B Glazing Accessories 2B 09 29 00/1.2 Certificates Asbestos Free

Materials 2B

09 30 00/1.3 Product Data Tile 2B Setting-Bed 2B Mortar, Grout, and

Adhesive 2B

Samples Tile 2B Accessories 2B 09 30 00/1.3 Marble Thresholds 2B Grout 2B 09 51 00/1.3 Samples Acoustical Units 2B 09 65 00/1.3 Product Data Resilient Flooring and Accessories 2B

Adhesives 2B Samples Resilient Flooring and Accessories 2B

09 68 00/1.2 Product Data Carpet 2B Surface Preparation 2B Installation 2B Regulatory

Requirements 2B

Samples Carpet 2B 09 90 00/1.2 Product Data Coating 2B Manufacturer's

Technical Data Sheets

2B

10 14 00.20/1.2 Shop Drawings Detail Drawings 2B Product Data Installation 2B Warranty 2B 10 21 13/1.3 Shop Drawings Fabrication

Drawings 2B

Installation Drawings

2B

Product Data Cleaning and Maintenance Instructions

2B

Colors And Finishes 2B Galvanized Steel

Sheet

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Sound-Deadening Cores

2B

Anchoring Devices and Fasteners

2B

Hardware and Fittings

2B

Brackets 2B Door Hardware 2B 10 22 13/1.2 Shop Drawings Wire mesh partitions 2B

Product Data Wire mesh partitions

2B

10 28 13/1.2 Product Data Finishes 2B Accessory Items 2B Certificates Accessory Items 2B 10 44 16/1.1 Shop Drawings Cabinets 2B Wall Brackets 2B Product Data Cabinets 2B Wall Brackets 2B 10 44 16/1.1 Replacement Parts 2B 12 21 00/1.2 Product Data Window Blinds 2B Installation 2B Certification 2B Manufacturer’s

Instructions Window Blinds 2B

Operation and Maintenance Data

Window Blinds 2B

13 48 00.00 10/ 1.4

Shop Drawings Coupling and Bracing

2B

Flexible Couplings or Joints

2B

Equipment Requirements

2B

Contractor Designed Bracing

2B

Product Data Coupling and Bracing

2B

Equipment Requirements

2B

Contractor Designed Bracing

2B

13 48 00/1.4 Shop Drawings Bracing 2B Resilient Vibration

Isolation Devices 2B

Equipment Requirements

2B

Product Data Bracing 2B Equipment

Requirements 2B

Design Data Design Calculations 2B Test Reports Anchor Bolts 2C

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

14 24 00/1.3 Shop Drawings Detail Drawings 2B Product Data Passenger Elevators 2B Field Quality

Control 2B

Logic Control 2B Design Data Reaction Loads 2B Heat Loads 2B Test Reports Field Tests Reports 2B Operation and

Maintenance Data Maintenance and Diagnostic Tools

2B

Maintenance and Diagnostic Software

2B

Maintenance and Repair Action Plan

2B

Operation and Maintenance Training

2B

21 13 13.00 10/ 1.3

Shop Drawings Shop Drawings 2B

As-Built Drawings 2B Product Data Fire Protection

Related Submittals 1B

Materials and Equipment

1B

Spare Parts 1B Preliminary Tests 2B Final Acceptance

Test 2B

Onsite Training 2B Fire Protection

Specialist 1B

Sprinkler System Installer

1B

Design Data Sway Bracing 2B Hydraulic

Calculations 2B

Test Reports Preliminary Test Report

2B

Final Acceptance Test Report

2B

Certificates Inspection by Fire Protection Specialist

Operation and Maintenance Data

Operating and Maintenance Manuals

2C

22 00 00/1.2 Shop Drawings Plumbing System 1B Product Data Fixtures 1B Flush valve water closets

Flush valve urinals 1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Countertop lavatories

1B

Service sinks faucet

1B

Drinking-water coolers

1B

Water heaters 1B Pumps 1B Backflow prevention assemblies 1B

Shower Faucets 1B Welding 1B Vibration-Absorbing

Features 1B

Plumbing System 1B Test Reports Tests, Flushing and

Disinfection 2B

Test of Backflow Prevention Assemblies

2B

Certificates Materials and Equipment

1C

Bolts 1C Operations and

Maintenance Data Plumbing System 2C

23 00 00/1.3

Product Data Insulated Nonmetallic Flexible Duct Runouts

1B

Duct Connectors 1B Duct Access Doors 1B Fire Dampers 1B Manual Balancing

Dampers 1B

Sound Attenuation Equipment

1B

Acoustical Duct Liner

1B

Diffusers 1B Registers and

Grilles 1B

Louvers 1B Ceiling Exhaust

Fans 1B

Air Handling Units 1B Variable Volume, Single Duct Terminal Units

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Manufacturer’s Instructions

Manufacturer's Installation Instructions

1C

Operation and Maintenance Training

2C

Operations and Maintenance Man.

Operation and Maintenance Manuals

2C

Fire Dampers 2C Manual Balancing

Dampers 2C

Ceiling Exhaust Fans

2C

Air Handling Units 2C 23 00 00/1.3

Variable Volume, Single Duct Terminal Units

2C

23 05 93/1.4 Preconstruction Submittals

TAB Firm 1B

TAB team engineer 1B TAB Specialist 1B Shop Drawings TAB Schematic

Drawings and Report Forms

2B

Product Data Equipment and Performance Data

2B

TAB Related HVAC Submittals

2B

TAB Procedures 1B Calibration 1B Systems Readiness

Check 2B

TAB Execution 2B Test Reports Design review report 2B

TAB report 2B TAB Firm 2B Independent TAB

Agency and Personnel Qualifications

2B

TAB Submittal and Work Schedule

2B

Pre-field TAB engineering report

2B

Prerequisite HVAC Work Check Out List

2B

23 07 00/1.3 Shop Drawings Pipe Insulation Systems

1B

Duct Insulation Systems

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Equipment Insulation Systems

1B

Product Data Pipe Insulation Systems

1B

Duct Insulation Systems

1B

Equipment Insulation Systems

1B

Manufacturer’s Instructions

Pipe Insulation Systems

1B

Duct Insulation Systems

1B

23 07 00/1.3 Equipment Insulation Systems

1B

23 08 00.00 10/ 1.4

Shop Drawings Commissioning Plan 2B

Product Data Pre-Functional Performance Test Checklists

2B

Functional Performance Tests

2B

Test Reports Commissioning Report

2B

Certificates Commissioning Firm 1B Commissioning

Specialist 1B

23 09 23.13 20/1.4

Shop Drawings Control system drawings title sheet

2B

List of I/O Points 2B Control System

Components List 2B

Control system schematics

2B

HVAC Equipment Electrical Ladder diagrams

2B

Component wiring diagrams

2B

BACnet communication architecture schematic

2B

Product Data Direct Digital Controllers

2B

DDC Software 2B Sensors and Input

Hardware 2B

Output Hardware 2B Surge and transient protection

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Variable frequency (motor) drives

2B

Design Data Performance Verification Testing Plan

2C

Pre-Performance Verification Testing Checklist

2C

Test Reports Performance Verification Testing Report

2C

23 09 23.13 20/1.4

Certificates Contractor's Qualifications

2B

Manufacturer’s Field Reports

Pre-PVT Checklist 2C

Operation and Maintenance Data

BACnet Direct Digital Control Systems

2C

Controls System Operators Manuals

2C

VFD Service Manuals 2C Closeout

Submittals Training documentation

2C

23 23 00/1.2 Product Data Refrigerant Piping System

1B

23 57 10.00 10/ 1.2

Product Data Spare Parts 1B

Welding 1B Framed Instructions 1B Test Reports Testing and

Cleaning 2C

Water Treatment Testing

2C

Certificates Bolts 1B Operation and

Maintenance Data Operation and Maintenance Manuals

2C

23 64 26/1.3 Product Data Grooved Mechanical Connections For Steel

1B

Grooved Mechanical Connections For Copper

1B

Calibrated Balancing Valves

1B

Pump Discharge Valve

1B

Water Pressure Reducing Valve

1B

Pressure Relief Valve

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Combination Pressure and Temperature Relief Valves

1B

Pumps 1B Combination

Strainer and Pump Suction Diffuser

1B

Expansion Tanks 1B Air Separator Tanks 1B 23 64 26/1.3 Test Reports Piping welds NDE report 2C

Pressure tests reports

2C

Certificates Employer’s Record Documents (For Welding)

2C

Welding Procedures and Qualifications

2C

Operation and Maintenance Data

Calibrated Balancing Valves

2C

Pump Discharge Valve

2C

Water Pressure Reducing Valve

2C

Pressure Relief Valve

2C

Combination Pressure and Temperature Relief Valves

2C

Pumps 2C Combination

Strainer and Pump Suction Diffuser

2C

Expansion Tanks 2C Air Separator Tanks 2C 23 82 02.00 10/ 1.3

Shop Drawings Drawings 1B

Product Data Materials and Equipment

1B

Spare Parts 1B Verification of

Dimensions 1B

26 05 00.00 40/ 1.3

Preconstruction Submittals

Material, Equipment, and Fixture Lists

1B

Conduits, Raceway sand Fittings

Wire and Cable 1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Splices and Connectors

1B

Switches 1B Receptacles 1B Outlets, Outlet

Boxes, and Pull Boxes

1B

Circuit Breakers 1B Panelboards 1B 26 05 00.00 40/ 1.3

Lamps and Lighting Fixtures

1B

Dry-Type Distribution Transformers

1B

Product Data Conduits, Raceway sand Fittings

1B

Wire and Cable 1B Splices and

Connectors 1B

Switches 1B Receptacles 1B Outlets, Outlet

Boxes, and Pull Boxes

1B

Circuit Breakers 1B Panelboards 1B Lamps and Lighting

Fixtures 1B

Dry-Type Distribution Transformers

1B

Spare Parts 1B Certification 1B Test Reports Continuity Test 2B Phase-Rotation

Tests 2B

Insulation Resistance Test

2B

Manufacturer’s Instructions`

Manufacturer's Instructions

1C

26 05 48.00 10/ 1.4

Shop Drawings Lighting Fixtures in Buildings

1B

Equipment Requirements

1B

Product Data Lighting Fixtures in Buildings

1B

Equipment Requirements

1B

Contractor Designed Bracing

26 20 00/1.3 Shop Drawings Panelboards 1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Transformers 1B Cable trays 1B Product Data Receptacles 1B Circuit breakers 1B Switches 1B Transformers 1B Enclosed circuit breakers 1B

26 20 00/1.3 Motor controllers 1B Combination motor controllers 1B

Manual motor starters

1B

Grounding Busbar 1B Surge protective devices 1B

Test Reports 600-volt wiring test

2B

Grounding system test

2B

Transformer tests 2B Ground-fault receptacle test 2B

Certificates Fuses 2C Manufacturer’s

Field Reports Transformer factory tests

2B

Operation and Maintenance Data

Electrical Systems 2B

26 24 16.00 40/ 1.3

Shop Drawings Detail Drawings 1B

Outline Drawings 1B Product Data Panelboards 1B Directory Card and

Holder 1B

Samples Keys 1B Test Reports Continuity Tests 2B Insulation Tests 2B Certificates Statements 2B Manufacturer’s

Instructions Panelboards 1B

26 28 21.00 40/ 1.2

Shop Drawings Connection Diagrams 1B

Fabrication Drawings

1B

Installation Drawings

1B

Product Data Equipment and Performance Data

1B

Contacts 1B Indicating Lights 1B Terminal Board 1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Enclosures 1B Accessories 1B Test Reports Qualification

Testing 2B

Operation Tests 2B Certificates Listing of Product

Installations 2B

26 28 21.00 40/ 1.2

Manufacturer’s Instructions

Automatic Transfer Switch

1B

26 41 01.00 10/ 1.2

Shop Drawings Detail Drawings 1B

Certificates Materials 2B 26 51 00.00 40/ 1.4

Shop Drawings Commercial Incandescent Lighting Fixtures

1B

Lowering Devices 1B Product Data Fluorescent lighting fixtures 1B

Fluorescent electronic ballasts

1B

Fluorescent lamps 1B High-intensity-discharge (HID) lighting fixtures

1B

HID ballasts 1B High-pressure sodium (HPS) lamps 1B

Metal-halide lamps 1B Electronic dimming ballast 1B

Dimming ballast controls

1B

Light Level Sensor 1B Energy Efficiency 1B Commercial

Incandescent Lighting Fixtures

1B

Lowering Devices 1B Samples Lighting fixtures 1B Test Reports Operating test 2B Operational Tests 2B Operation and

Maintenance Data Operational Service 2C

26 52 00.00 40/ 1.3

Preconstruction Submittals

Material, Equipment, and Fixture Lists

1B sample warranty 1B Shop Drawings Central Emergency

Lighting System 1B

Product Data Emergency Lighting Egress Units

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Emergency Fluorescent Lighting

1B

Accessories 1B Test Reports System Operational

Tests 2B

26 52 00.00 40/ 1.3

Certificates Certificates of Conformance

2C

Warranty 2C 26 53 00.00 40/ 1.3

Preconstruction Submittals

Material, Equipment, and Fixture Lists

1B

Shop Drawings Exit Lighting Units 1B Exit Lighting Units

Outline Drawings 1B

Product Data Exit Lighting Units 1B Contemporary

Fixtures 1B

Accessories 1B Test Reports Operational Tests 2B Certificates Energy Efficiencies 2C 27 05 14.00 10/ 1.3

Shop Drawings Cable TV Premises Distribution System

1B

Installation 1B Product Data Spare Parts 1B Test Plan 1B Qualifications 1B Test Reports Testing 2B Certificates

Materials and Equipment

1B

Manufacturer’s Instructions

Manufacturer's Recommendations

1B

Operation and Maintenance Data

Operation and Maintenance Manuals

2C

27 05 28.36 40/ 1.3

Shop Drawings Fabrication Drawings

1B

Installation Drawings

1B

Product Data Cable Trays 1B Supports 1B Manufacturer’s

Instructions Manufacturer's Instructions

1B

27 05 29.00 10/ 1.4

Shop Drawings PDS design 1B

PDS Design Technical Review

1B

PDS Design Approval 1B Product Data PDS Hardened

Carrier 1B

Samples PDS Carrier Surface Mounted

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Pull Boxes 1B Fittings 1B Closeout

Submittals User Drop Box 1B

Other Enclosures 1B 27 10 00/1.5 Shop Drawings Telecommunications drawings 1B

Telecommunications Space Drawings

1B

Product Data Telecommunications cabling

1B

Patch panels 1B Telecommunications outlet/connector assemblies

1B

Equipment support frame

1B

Connector blocks 1B Test Reports Telecommunications cabling testing 2B

Certificates Telecommunications Contractor

1B

Key Personnel 1B Manufacturer

Qualifications 1B

Test plan 1B Manufacturer’s

Field Reports Factory reel tests

Operation and Maintenance Data

Telecommunications cabling and pathway system

2B

Closeout Submittals

Record Documentation

2C

28 31 76/1.5 Shop Drawings Nameplates 1B Instructions 1B Wiring Diagrams 1B System Layout 1B System Operation 1B Notification

Appliances 1B

Amplifiers 1B Product Data Technical Data And

Computer Software 1B

Fire Alarm Control Unit and Mass Notification Control Unit (FMCP)

1B

Terminal cabinets 1B Manual stations 1B Batteries 1B Battery chargers 1B

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Smoke sensors 1B Heat detectors 1B Notification appliances 1B

28 31 76/1.5 Amplifiers 1B Tone generators 1B Digitalized voice generators 1B

Remote Fire Alarm/Mass Notification Control Units

1B

Local Operating Console (LOC)

1B

Design Data Battery power 1B Battery chargers 1B Test Reports Field Quality

Control 2C

Testing Procedures 2C Smoke sensor testing 2B

Certificates Installer 1B Formal Inspection and Tests 1B

Final Testing 1B Manufacturer’s

Field Reports System Operation 2B

Fire Alarm/Mass Notification System

2B

Operation and Maintenance Data

Operation and Maintenance (O&M) Instructions

2B

Instruction of Government Employees

2B

Closeout Submittals

As-Built Drawings 2C

31 00 00/1.6 Preconstruction Submittals

Shoring 1B

Dewatering Work Plan

1B

Product Data Utilization of Excavated Materials

1B

Test Reports Testing 2B Borrow Site Testing 1B Certificates Testing 1B 31 16 13/1.3 Test Reports

Field Quality Control

2B

33 11 00/1.2 Product Data Piping Materials 1B Water distribution main

Data to be Submitted

Item(s) for which the Data is Required*

See Referenced Notes Above

Water service line 1B Hydrants 1B Indicator posts 1B 33 11 00/1.2 Valve boxes 1B Test Reports Disinfection 2B

Water distribution main

1C

Water service line 1C Lining 1C hydrants 1C Manufacturer’s

Instructions Delivery, storage, and handling Installation

1C

* For a full description of these item(s), see the submittals paragraph of the individual referenced technical specification section.

SECTION 01 74 19

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED (2002; R 2005) Leadership in Energy and

Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)

1.2 GOVERNMENT POLICY

Government policy is to apply sound environmental principles in the design, construction and use of facilities. As part of the implementation of that policy: (1) practice efficient waste management when sizing, cutting, and installing products and materials and (2) use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling or reuse.

1.3 MANAGEMENT

Develop and implement a waste management program. Take a pro-active, responsible role in the management of construction and demolition waste and require all subcontractors, vendors, and suppliers to participate in the effort. Construction and demolition waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the work. In the management of waste consideration shall be given to the availability of viable markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable to available markets, and time constraints imposed by internal project completion mandates. The Contractor is responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste.

Revenues or other savings obtained for salvage, or recycling accrue to the Contractor. Appropriately permit firms and facilities used for recycling, reuse, and disposal for the intended use to the extent required by federal, state, and local regulations. Also, provide on-site instruction of appropriate separation, handling, recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.

1.4 SUBMITTALS

Preconstruction Submittals

Waste Management Plan

1.5 WASTE MANAGEMENT PLAN

A waste management plan shall be submitted within 15 days after contract award and not less than ten days before the preconstruction meeting. The plan shall demonstrate how the project waste diversion goal shall be met and shall include the following:

a. Name of individuals on the Contractor's staff responsible for waste prevention and management.

b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.

c. Description of the regular meetings to be held to address waste management.

d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.

e. Characterization, including estimated types and quantities, of the waste to be generated.

f. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.

g. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. Include the name, location, and phone number for each reuse facility to be used, and provide a copy of the permit or license for each facility.

h. List of specific waste materials that will be salvaged for resale, salvaged and reused on the current project, salvaged and stored for reuse on a future project, or recycled. Recycling facilities that will be used shall be identified by name, location, and phone number, including a copy of the permit or license for each facility.

i. Identification of materials that cannot be recycled/reused with an explanation or justification, to be approved by the Contracting Officer.

j. Description of the means by which any waste materials identified in item (h) above will be protected from contamination.

k. Description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).

l. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.

Revise and resubmit Plan as required by the Contracting Officer. Approval of Contractor's Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations or meeting project cumulative waste diversion requirement. Distribute copies of the Waste Management Plan to each subcontractor, the Quality Control Manager, and the Contracting Officer.

1.6 RECORDS

Records shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Records shall be kept in accordance with the LEED Reference Guide and using the LEED Letter Template. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.

Demolition accomplished by other parties on this project site count toward the project's total waste diversion cumulative score for LEED. Information on the quantity and disposition of these materials will be provided by the Contracting Officer. Include this data in records, annotated to indicate that it was accomplished by another party.

1.7 REPORTS

Provide quarterly reports and a final report to the Fort Stewart Contracting Officer's Representative. Quarterly and final reports shall include project name, information for waste generated this quarter, and cumulative totals for the project. Each report shall include supporting documentation to include manifests, weight tickets, receipts, and invoices specifically identifying the project and waste material. Include timber harvest and demolition information, if any.

1.8 COLLECTION

Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in a manner that maximizes recyclability and salvageability of identified materials. Provide the necessary containers, bins and storage areas to facilitate effective waste management and clearly and appropriately identify them. Provide materials for barriers and enclosures around recyclable material storage areas which are nonhazardous and recyclable or reusable. Locate out of the way of construction traffic.

Provide adequate space for pick-up and delivery and convenience to subcontractors. Recycling and waste bin areas are to be kept neat and clean, and recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials. Clean contaminated materials prior to placing in collection containers. Use cleaning materials that are nonhazardous and biodegradable. Handle hazardous waste and hazardous materials in accordance with applicable regulations and coordinate with TECHNICAL PROVISIONS Paragraph 4 and Section 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES. Separate materials by one of the following methods:

1.8.1 Source Separated Method

Waste products and materials that are recyclable shall be separated from trash and sorted as described below into appropriately marked separate containers and then transported to the respective recycling facility for further processing. Deliver materials in accordance with recycling or reuse Installation requirements (e.g., free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process). Separate materials into the following category types as appropriate to the project waste and to the available recycling and reuse programs in the project area:

a. Land clearing debris.

b. Asphalt.

c. Concrete and masonry.

d. Metal (e.g. banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized, stainless steel, aluminum, copper, zinc, lead brass, bronze).

(1) Ferrous.

(2) Non-ferrous.

e. Wood (nails and staples allowed).

f. Debris.

g. Glass (colored glass allowed).

h. Paper.

(1) Bond.

(2) Newsprint.

(3) Cardboard and paper packaging materials.

i. Plastic.

(1) Type 1: Polyethylene Terephthalate (PET, PETE).

(2) Type 2: High Density Polyethylene (HDPE).

(3) Type 3: Vinyl (Polyvinyl Chloride or PVC).

(4) Type 4: Low Density Polyethylene (LDPE).

(5) Type 5: Polypropylene (PP).

(6) Type 6: Polystyrene (PS).

(7) Type 7: Other. Use of this code indicates that the package in question is made with a resin other than the six listed above, or is made of more than one resin listed above, and used in a multi-layer combination.

j. Gypsum.

k. Non-hazardous paint and paint cans.

l. Carpet.

m. Ceiling tiles.

n. Insulation.

o. Beverage containers.

1.8.2 Co-Mingled Method

Waste products and recyclable materials shall be placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed.

1.8.3 Other Methods

Other methods proposed by the Contractor may be used when approved by the

1.9 DISPOSAL

Control accumulation of waste materials and trash. Recycle or dispose of collected materials off-site at intervals approved by the Contracting Officer and in compliance with waste management procedures. Except as otherwise specified in other sections of the specifications, disposal shall be in accordance with the following:

1.9.1 Reuse

First consideration shall be given to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Coordinate reuse with the Contracting Officer. Sale or donation of waste suitable for reuse shall be considered.

1.9.2 Recycle

Waste materials not suitable for reuse, but having value as being recyclable, shall be made available for recycling. All fluorescent lamps, HID lamps, and mercury-containing thermostats removed from the site shall be recycled. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials.

1.9.3 Compost

Consider composting on site if a reasonable amount of compostable material will be available. Compostable materials include plant material, sawdust, and certain food scraps.

1.9.4 Waste

Materials with no practical use or economic benefit shall be disposed at a landfill or incinerator.

1.9.5 Return

Set aside and protect misdelivered and substandard products and materials and return to supplier for credit.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

-- End of Section --

SECTION 02 41 00

DEMOLITION AND DECONSTRUCTION

1.1 REFERENCES

The publications listed below form a part of this specification to the

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

AHRI Guideline K (2009) Guideline for Containers for Recovered

Non-Flammable Fluorocarbon Refrigerants

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition

Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;

Changes 4-6 2011) Safety and Health Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006) MILSTRIP - Military Standard

Requisitioning and Issue Procedures

MIL-STD-129 (2007; Rev P; Change 4 2007) Military Marking for Shipment and Storage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air

Pollutants

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and

Spherical Pressure Vessels

1.2 PROJECT DESCRIPTION

See the demolition drawings for the extent of all demolition operations.

1.2.1 General Requirements

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government.