FS-3670_Drawings_combined.pdf
PDF 24 MB Posted
- Attached to
- Renovation of BLDG 620 Federal contract opportunity
- Solicitation number
- W9124M-16-B-0020
About this file
Drawings
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR CONSTRUCTION 4/21/2016
INDEX OF DRAWINGS
PLATE No. SHEET No. FILE No. TITLE
M-002
M-101
M-102
M-201
M-202
M-401
M-501
INDEX OF DRAWINGS
LOCATION MAP
PLATE No. SHEET No. FILE No. TITLE
G-001
INDEX SHEETG-002
C-100
S-1
S-2
S-3
A-001
A-002
A-003
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
FS-3670
ARCHITECTURAL GENERAL INFORMATION SHEET
BASEMENT & FIRST FLOOR LIFE SAFETY PLANS
SECOND & THIRD FLOOR LIFE SAFETY PLANS
A-004 FS-3670
A-100 FS-3670
A-101 FS-3670
A-102 FS-3670
A-201 FS-3670
A-202 FS-3670
A-301 FS-3670
A-401 FS-3670
FIRST, SECOND AND THIRD FLOOR ABATEMENT PLAN
BASEMENT - FLOOR PLAN AND DEMOLITION PLAN
FIRST FLOOR - FLOOR PLAN AND DEMOLITION PLAN
SECOND FLOOR - FLOOR PLAN AND DEMOLITION PLAN
EXTERIOR ELEVATION REPAIRS & ELEVATOR TOWER ELEVATIONS
EXTERIOR ELEVATION REPAIRS
ELEVATOR TOWER SECTIONS
ENLARGED PLANS & DETAILS
M-001 MECHANICAL LEGEND & SCHEDULES
MECHANICAL SCHEDULES
BASEMENT & 1st FLOOR DEMOLITION PLAN
2nd & 3rd FLOOR DEMOLITION PLAN
MECHANICAL BASEMENT & 1st FLOOR DUCTWORK PLAN
MECHANICAL 2ND & 3RD FLOOR DUCTWORK PLAN
MECHANICAL DETAILS
F-102
FS-3670
FS-3670
F-101 BASEMENT & 1st FLOOR FIRE PROTECTION PLANS
2nd & 3rd FLOOR FIRE PROTECTION PLANS
MECHANICAL PIPING DETAILS
M-601 FS-3670
E-001 FS-3670
MECHANICAL CONTROLS
ELECTRICAL LEGEND
E-002 FS-3670 LIGHTING FIXTURE SCHEDULE AND DETAILS
E-101 FS-3670
E-102 FS-3670
E-201 FS-3670 BASEMENT & 1st FLOOR POWER PLANS
E-202 FS-3670
E-301 FS-3670
E-302 FS-3670
E-401 FS-3670
E-402 FS-3670
E-501
FS-3670
BASEMENT & 1st FLOOR LIGHTING PLANS
2nd & 3rd FLOOR LIGHTING PLANS
2nd & 3rd FLOOR POWER PLANS
BASEMENT & 1st FLOOR COMMUNICATIONS PLANS
2nd & 3rd FLOOR COMMUNICATIONS PLANS
BASEMENT & FIRST FLOOR FIRE ALARM PLANS
2nd & 3rd FLOOR FIRE ALARM PLANS
ONE-LINE DIAGRAM AND DETAILS
CONSTRUCTION NOTES, LEGEND & VICINITY MAP
S-4
P-104
P-105
FS-3670
FS-3670
FS-3670
P-106
P-601
F-001
FS-3670
FS-3670
FS-3670
STRUCTURAL GENERAL NOTES
STRUCTURAL BASEMENT & FLOOR PLANS
STRUCTURAL ELEVATOR SECTIONS
STRUCTURAL DETAILS
2nd & 3rd FLOOR DRAINAGE & VENT PLANS
BASEMENT & 1st FLOOR HOT & COLD WATER PLANS
2nd & 3rd FLOOR HOT & COLD WATER PLANS
PLUMBING RISER DIAGRAMS
FIRE PROTECTION NOTES & DETAILS
A-103 FS-3670 THIRD FLOOR - FLOOR PLAN AND DEMOLITION PLAN
FS-3670C-200 TOPOGRAPHIC SURVEY
FS-3670C-201 DEMOLITION PLAN
FS-3670C-202 EROSION & SEDIMENT CONTROL PLAN
FS-3670C-203 GRADING AND DRAINAGE PLAN
FS-3670C-204 UTILITY PLAN
FS-3670C-300 SITE DETAILS
10 FS-3670C-301 SITE DETAILS
15S-5 STRUCTURAL DETAILSFS-3670
A-501 FS-3670 DOOR & WINDOW DETAILS
A-601 FS-3670 DOOR SCHEDULES AND DETAILS31
32A-602 FS-3670 FINISH SCHEDULES
33P-001 FS-3670 PLUMBING LEGEND & SCHEDULES
34P-101 FS-3670 BASEMENT & 1st FLOOR PLUMBING DEMOLITION PLANS
35P-102 FS-3670 2nd & 3rd FLOOR PLUMBING DEMOLITION PLANS
36P-103 FS-3670 BASEMENT & 1st FLOOR DRAINAGE & VENT PLANS
E-502 FS-3670 ELECTRICAL SYSTEMS DETAILS
E-503 FS-3670 ELECTRICAL SYSTEM DETAILS
E-601
ELECTRICAL SCHEDULESE-602
FS-3670
ELECTRICAL SCHEDULES
FS-3670
G-002
A-104 FS-3670 BASEMENT AND FIRST FLOOR REFLECTED CEILING PLANS
A-105 FS-3670 SECOND AND THIRD FLOOR REFLECTED CEILING PLANS
FS-3670M-203 MECHANICAL BASEMENT & 1ST FLOOR PIPING PLAN
51 FS-3670M-204 MECHANICAL 2ND & 3R FLOOR PIPING PLAN
52 FS-3670M-301 ENLARGED MECHANICAL ROOM PLAN
E-011 FS-3670 ELECTRICAL BASEMENT & 1ST FLOOR DEMOLITION PLAN
E-012 FS-3670 ELECTRICAL 2ND & 3RD FLOOR DEMOLITION PLAN
INDEX SHEET
E-003 FS-3670 ELECTRICAL SITE PLAN
E-504 FS-3670
E-505 FS-3670 TELECOMMUNICATIONS DETAILS
TELECOMMUNICATIONS DETAILS
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE: AS NOTED
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
DEM
IJO#:WG-33-8J FS-36704/15/13BP
THE BUILDING. SEE FIRE PROTECTION PLAN SHEET F101.
8. BACKFLOW PREVENTION DEVICE SHALL BE PROVIDED ON THE NEW FIRE SPRINKLE SERVICE SYSTEM INSIDE
LENGTH, INCLUDING LATERALS UP TO THE METER OR BACKFLOW PREVENTER.
WATER DISTRIBUTION PIPE SHALL HAVE A #12 GAUGE COPPER TRACING WIRE INSTALLED ALONG ITS 7.
WATER TIGHT SEAL AT BOTH ENDS OF THE LINE BEING INSTALLED.
WHEN PIPE LAYING IS NOT IN PROGRESS, A MECHANICAL JOINT PLUG OR CAP WILL BE USED TO FORM A 6.
UNLESS OTHERWISE SHOWN.
MAINTAIN A MINIMUM HORIZONTAL SEPARATION OF 10 FEET BETWEEN WATER, SEWER, AND DRAINAGE LINES 5.
AND MAINTAIN COVER,
SHALL BE INSTALLED 18" (PIPE TO PIPE) BELOW THE OTHER UTILITY LINES AS REQUIRED TO AVOID CONFLICTS
. WHERE THE WATER MAIN CROSSES OTHER UTILITY LINES, THE WATER MAIN FINISHED GRADEMEASURED FROM
ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF 3 FEET AND A MAXIMUM COVER OF 4 FEET 4.
SPECIFICATIONS.
ALL WATER AND SEWER PIPE MATERIALS SHALL BE IN ACCORDANCE WITH THE WATER AND SEWER 3.
FOR WATER AND SEWER SYSTEM IMPROVEMENTS.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE WATER AND SEWER SPECIFICATIONS AND DETAILS 2.
UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
BEGINNING CONSTRUCTION ACTIVITIES AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UNDERGROUND UTILITIES PRIOR TO 1.
UTILITY PLAN
COLLECTION SYSTEM.
CONNECTIONS SHOWN ON THE PLANS AND NEEDED TO PROVIDE A COMPLETE FUNCTIONAL ROOF DRAINAGE
11. THE CONTRACTOR SHALL USE STANDARD MANUFACTURED FITTINGS TO MAKE ALL BENDS, TEES, AND
THE PIPE.
RECOMMENDATIONS. THE CONTRACTOR SHALL CHECK AND AVOID CONDITIONS THAT MAY CAUSE FLOATATION OF
10. HDPE PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS AND
THE CONTRACTING OFFICER.
PERMISSABLE TO AVOID EXISTING UNDERGROUND UTILITIES THAT MUST REMAIN WITH PRIOR AUTHORIZATION OF
GRADED” BETWEEN POINTS WHERE INVERT ELEVATIONS ARE PROVIDED. SOME ADJUSTMENT OF HDPE SLOPE IS
9. THE MINIMUM SLOPE FOR NEW ROOF DRAIN HDPE PIPE SHALL BE 0.5%. PIPE SHALL BE “STRAIGHT
PIPE SHALL BE 8” DIAMETER PIPE.
8. ALL HDPE PIPE FROM THE DOWNSPOUT ADAPTER TO THE FIRST CONNECTION WITH ANOTHER DOWNSPOUT
EQUIVALENT WITH SOIL-TIGHT JOINTS) AS INDICATED.
ALL STORM DRAINAGE PIPE SHALL BE CLASS III REINFORCED CONCRETE PIPE OR HDPE (ADS N-12 OR 7.
INVERT ELEVATIONS SHOWN ON THE PLANS ARE TO THE INVERT OF THE LOWEST PIPE.6.
CONCRETE SIDEWALKS AND PARKING PADS.
SEE SPECIFICATIONS FOR REQUIREMENTS FOR CONTROL, CONSTRUCTION AND EXPANSION JOINTS IN 5.
ADJUSTED DURING CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING PROPER DRAINAGE OF ANY AREAS WHICH ARE FIELD 4.
THE REQUIRED DEGREE OF COMPACTION.
PEDESTRIAN OR LANDSCAPED AREAS IF THEY CAN BE STABILIZED AND WILL SUPPORT PLANT GROWTH AND MEET
GEOTECHICAL REPORT. WASTE MATERIALS MAY BE USED FOR FLUSHING OF SHOULDER OR CONSTRUCTION OF
LOAD BEARING AND STRUCTURAL FILLS SHALL BE APPROVED SUITABLE MATERIAL AS DEFINED IN THE 3.
BETWEEN SPOT ELEVATIONS AND CONTOURS THE SPOT ELEVATIONS WILL GOVERN.
CONTRACTOR SHALL GRADE THE SITE IN ACCORDANCE WITH ELEVATIONS SHOWN. IN CASES OF CONFLICT
CONTOURS SHOWN ON THIS SHEET ARE FOR GENERAL GUIDANCE AND INFORMATIONAL PURPOSES. THE 2.
UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
BEGINNING CONSTRUCTION ACTIVITIES AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UNDERGROUND UTILITIES PRIOR TO 1.
GRADING AND DRAINAGE NOTES:
CONFLICTS WITH PROPOSED NEW STORM AND UTILITY PIPING.
THE VICINITY OF THE WORK. THE CONTRACTOR SHALL ADJUST EXISTING WATER SERVICE PIPE TO AVOID
8. THE CONTRACTOR IS ADVISED THAT NUMEROUS UNDERGROUND UTILITIES SHOWN AND NOT SHOWN ARE IN
OWNER AND ENGINEER.
PROVIDE THE LOCATION, IDENTIFICATION AND ELEVATION OF ANY TEMPORARY BENCHMARK ESTABLISHED TO THE
BENCHMARKS AS HE MAY REQUIRE PRIOR TO REMOVING THE PERMANENT BENCHMARK. THE CONTRACTOR SHALL
MUST BE REMOVED TO COMPLETE THE PROJECT, THE CONTRACTOR SHALL ESTABLISH SUCH TEMPORARY
REMOVAL OR REPLACEMENT OF BENCHMARKS. WHEN A PERMANENT BENCHMARK IS LOCATED SUCH THAT IT
DURING THE CONSTRUCTION PROJECT AND FOR BEARING ANY EXPENSE RESULTING FROM UNAUTHORIZED
CONTROL ON THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THESE BENCHMARKS
THE CONTRACTOR SHALL UTILIZE EXISTING BENCHMARKS SHOWN ON THE PLANS TO ESTABLISH VERTICAL 7.
STRUCTURES CAN BE PROVIDED TO THE SELECTED CONTRACTOR UPON REQUEST.
LAYOUT FOR MANHOLES, INLETS, ETC., ARE NOT SHOWN ON THIS PLAN. COORDINATES FOR SUCH 6.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT/STONE UNLESS SHOWN OTHERWISE ON THE PLANS.5.
EROSION CONTROL MEASURES.
PATTERS ARE MAINTAINED. ALL EXCAVATED MATERIAL SHALL BE PROPERLY MAINTAINED WITH APPROPRIATE
EXCAVATION SPOILS ALONG THE LIMITS OF CONSTRUCTION FOR EXCAVATION WORK PROVIDED THAT DRAINAGE
OFF-POST LANDFILL AND DISPOSED OF PROPERLY. THE CONTRACTOR MAY TEMPORARILY STORE LIMITED
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND HAULED TO AN
ALL DEMOLITION MATERIALS, UNLESS SPECIFIED FOR RECYCLING, AND EXCAVATION SPOILS BECOME THE 4.
SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
CONSTRUCTION ACTIVITIES AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING 3.
THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL THE PROPER PERMITS HAVE BEEN ISSUED.2.
ALL ELEVATIONS ARE BASED ON NAVD 1988 DATUM.1.
GENERAL NOTES:
S
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE: AS NOTED
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
DEM
IJO#:WG-33-8J FS-36704/15/13BP
6"CLAY
REVIEWING STAND
CHAPEL
601J
601I
601H
601G
601F 601B
601A W
T H
S T
W
T H
S T
G U L
IC
K
A
V E
PKG
PKG
PKG
SITE
G
U L
IC
K
A
V E W
T H
S T
G U L
IC
K
A
V E
W
T H
S T
SITE DATA
ZONING................................................... MILITARY INSTALLATION
DISTURBED AREA................................... 0.8 ACRES
EXPENSE.
CONFLICTS, THE CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT THEIR OWN RISK AND
OFFICER PRIOR TO COMMENCING. FAILING TO NOTIFY THE CONTRACTING OFFICER AND RESOLVE ANY
RECOMMENDATIONS CONTESTED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE CONTRACTING
FROM THE CONTRACTING OFFICER IF IT HAS NOT BEEN FURNISHED IN THE BID DOCUMENTS. ANY
HGB&D, INC. AND DATED FEBRUARY 15, 2013. THE CONTRACTOR SHALL REQUEST THIS REPORT
1. ALL EARTHWORK SHALL BE IN CONFORMANCE WITH THE GEOTECHNICAL REPORT PREPARED BY
EXPENSE."
THE CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT THEIR OWN RISK AND
DISCREPANCY. FAILING TO NOTIFY THE CONTRACTING OFFICER AND SECURING SUCH INSTRUCTION, IN ORDER TO DETERMINE THE COURSE OF ACTION NECESSARY TO CORRECT FOR SUCH A
TOPOGRAPHIC SURVEY, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER
ARE ANY DISCREPANCIES WITH WHAT IS SHOWN ON THE CONSTRUCTION DRAWING OR
DIMENSIONS AND CONDITIONS AFFECTING HIS WORK, INCLUDING EXISTING TOPOGRAPHY. IF THERE
2. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL
SPECIAL NOTES:
ENGINEER AS REQUIRED BY THE INSTALLATION.
3. CONTRACTOR SHALL FURNISH AS-BUILT DATA FOR THE WATER AND SEWER MAINS TO THE
FLOOD ZONE NOTE:
CONSTRUCTION NOTES, LEGEND
& VICINITY MAP
C-100
CONC WALK
STORM DRAINAGE PIPE
STORM DRAINAGE INLET
SANITARY SEWER PIPE
SANITARY SEWER MANHOLE
DOMESTIC WATER MAIN
WATER VALVE
CONTOURS
(TYPE "A")
SILT FENCE
EXISTING
LEGEND:
PROPOSED
UGT
S
Ds4
Sd1-A
SILT FENCE, TYPE "A"
TEMPORARY SEDIMENT BARRIER
DISTURBED AREA STABILIZATION
WITH TEMPORARY SEEDING Ds2
DISTURBED AREA STABILIZATION
WITH SOD
UNDERGROUND TELEPHONE LINE
TOP OF CONCRETE
.9
Du
DISTURBED AREA STABILIZATION
WITH DUST CONTROL
FINISHED GRADE FG25.0
OVERHEAD POWER LINE
FENCE XX
STORM DRAINAGE INLET PROTECTION Sd2-F
TOTAL AREA........................................... 0.8 ACRES
Ds1
DISTURBED AREA STABILIZATION
WITH MULCH
SF SF
SD
W X
W X
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
SPECIAL NOTES:
EROSION & SEDIMENTATION CONTROL NOTES
XSD
SSX SS
FFIRE HYDRANT & FIRE LINE
SLOPE DIRECTION FROM BUILDING
noC
10 Lbs./Ac
10 Lbs./Ac
10 Lbs./Ac
1/2 Bu./Ac
10 Lbs./Ac
COMMON BERMUDA
BROWN TOP MILLET
RYE GRASS
TEMPORARY GRASS
COASTAL PLAIN VEGETATIVE COVERS
JUNE (HULLED)
FEBRUARY
SEPTEMBER-
AUGUST
APRIL-
MONTH OF
PLANTING
MARCH- MARCH-
FEBRUARY
SEPTEMBER-
PLANTING
MONTH OF
JUNE 10 Lbs./Ac
40 Lbs./Ac
40 Lbs./Ac
AUGUST
JULY-
RATE
BROWN TOP MILLET
COMMON BERMUDA (HULLED)
COMMON BERMUDA (UNHULLED)
RYE
COMMON BERMUDA (HULLED)
PERMANENT GRASS RATE
DOMESTIC WASTE HAULER.
QUALIFIED PUMPING OF SANITARY AND SEPTIC WASTE (AS APPROPRIATE - IF USED) MUST BE REGULARLY SERVICED BY A
RECOMMENDED DISTANCE OF APPROXIMATELY 100' (30 METERS) SHOULD BE MAINTAINED FROM ANY WATER SOURCE. LATRINE
DITCHES AND/OR STORM DRAIN INLETS/CULVERTS) WITHIN OR IN THE VICINITY OF THE CONSTRUCTION SITE/LIMITS.
LOCATED OUT OF HIGH FLOW AREAS, AWAY FROM ANY WATER WELLS, STATE WATERS, AND WATERWAYS (INCLUDING DRAINAGE
ALL PORTABLE LATRINES, FOOD SERVICE FACILITIES AND WASTE COLLECTION AREAS (INCLUDING PORTA-POTTYS) MUST BE
D. SANITARY SEWER OR SEPTIC SYSTEM REGULATIONS: FOR ENVIRONMENTAL CONSIDERATIONS TO PROTECT WATER QUALITY, CONTAINED WITHIN THE SITE AND NOT DISCHARGED INTO A WATERWAY.
APPROVED SANITARY SEWER LINE. VEHICLE EXTERIOR WASHING MAY BE ALLOWED AS LONG AS SEDIMENT OR DIRT IS
PRETREATMENT DEVICE MUST BE ABLE TO HOLD ALL CONTAMINANTS PRIOR TO WASTEWATERS BEING DISCHARGED INTO AN
A DESIGNATED FACILITY/AREA WITH AN OIL/GREASE/SAND TRAP INTERCEPTOR OR AN OIL/WATER SEPARATOR. THE
C. VEHICLE WASHING: VEHICLE ENGINE WASHING WITHIN THE CONSTRUCTION SITE IS NOT AUTHORIZED UNLESS CONDUCTED IN
AIRFILELD REGULATIONS.
HAZARDOUS WASTE IS GENERATED IT MUST BE MANAGED IN ACCORDANCE WITH FEDERAL, STATE, ARMY AND HUNTER ARMY
GENERATED MUST UNDERGO A WASTE STREAM ANALYSIS TO DETERMINE APPROPRIATE MANAGEMENT REQUIREMENTS. IF ANY
REQUIREMENTS TO PROPERLY MANAGE HAZARDOUS WASTE GENERATED DURING CONSTRUCTION ACTIVITIES. ANY WASTE
B. HAZARDOUS WASTE: PERMITTEE SHALL FOLLOW HUNTER ARMY AIRFIELD HAZARDOUS WASTE MANAGEMENT PLAN (HWMP)
RED-LINE ITS LOCATION ON THE RECORD PLAN SET.
APPROPRIATE BMP AND SITE, HE MUST DESIGNATE A PROPER WASH AREA FOR THIS TYPE OF OPERATION AND INSTALL AN
INTO SANITARY OR STORM WATER SEWER SYSTEM OR DRAINS. IF CONTRACTOR PLANS TO WASH OUT CONCRETE TRUCKS ON
4. CONCRETE TRUCK PROHIBITIONS AND WASH OUT AREAS: DO NOT DISCHARGE ANY CONCRETE WASTEWATER (WASH OUT)
DISPOSED OF. DO NOT DISCHARGE ANY WASTEWATER INTO STORM WATER SYSTEM OR DRAINS.
AND 3. ENSURE ALL WASTEWATER FROM CONSTRUCTION ACTIVITIES AND OR CLEANING OPERATIONS IS PROPERLY MANAGED
REUSED OR RECYCLED TO THE MAXIMUM EXTENT POSSIBLE.
AIRFIELD WILL BE ALLOWED. CONSTRUCTION DEBRIS FROM RENOVATION, DEMOLITION, OR NEW CONSTRUCTION SHOULD BE
PROPERLY PERMITTED LANDFILL LOCATED OFF OF HUNTER ARMY AIRFIELD. NO DISPOSAL OF WASTE ON HUNTER ARMY
STEWART PROJECTS UNLESS NOTIFIED OTHERWISE BY THE CONTRACTING OFFICER. THIS WASTE IS TO BE TAKEN TO A
2. THE PROJECT CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEMOLITION/CONSTRUCTION GENERATED WASTE FROM FT.
SHALL NOT BE DISCHARGED INTO WATERS OF THE STATE.
BUILDING MATERIALS, CONSTRUCTION WASTE SHALL BE REMOVED ON A CONSISTENT SCHEDULE. SOLID MATERIALS, INCLUDING
1. THE CONTRACTOR SHALL SELECT A DESIGNATED WASTE COLLECTION AREA AND PROVIDE LIDS FOR WASTE CONTAINERS.
CONTRACT SPECIFICATIONS FOR PROPER DISPOSAL REQUIREMENTS.
BY REFERENCE PERMITTEE SHALL FOLLOW HUNTER ARMY AIRFIELD REQUIREMENTS FOR THIS PROJECT AND INCORPORATED
IN COMPLIANCE WITH APPLICABLE STATE AND LOCAL WASTE DISPOSAL, SANITARY SEWER OR SEPTIC SYSTEM REGULATIONS.
A. WASTE DISPOSAL: PRIMARY PERMITTEE (OPERATOR/CONTRACTOR) SHALL ENSURE AND DEMONSTRATE THAT THEIR ESPCP IS
CORROSION INHIBITOR, CLEANING COMPOUNDS, HERBICIDES, TERMITICIDES, FUNGICIDE, WEED KILLERS, OR PESTICIDES.
SOLDER, CAULKING, GROUT, PUTTY, WAXES, SHEET ROCK, INSULATION, CARPET, CARPET PADDING, ACETATE, TILE, COOLANT, PRIMER, PAINT THINNER, PAINT STRIPPER, SOLVENTS, ACIDS, BASES, OILS, GREASES, ADHESIVES, GLUES, PASTES, SEALANTS, SANITARY SEWER SYSTEM, THE STORM SEWER SYSTEM, OR BE DISPOSED OF TO THE GROUND INCLUDING PAINT, PAINT
NO DEMOLITION/CONSTRUCTION WASTE OR EXCESS CONSTRUCTION MATERIALS OF ANY KIND SHALL BE DUMPED INTO THE
STEWART SPILL/EPCRA PROGRAM MANAGER OR AUTHORIZED REPRESENTATIVE.
HAZARDOUS SUBSTANCES, HAZARDOUS MATERIALS/CHEMICAL, HAZARDOUS WASTE AND/OR OIL WILL BE MADE BY THE FORT
NOTE: ALL EXTERNAL NOTIFICATIONS TO GA EPD AND/OR THE NATIONAL RESPONSE CENTER FOR DISCHARGES OF
PLAN (EPP). ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY.
PROVIDE SPECIFIC INFORMATION OF THEIR EMERGENCY RESPONSE TEAM FOR CLEAN-UP IN THE ENVIRONMENTAL PROTECTION
CONTRACTOR TO DESCRIBE SPECIFIC MEASUREMENTS AT THE SITE, AND TO SHOW LOCATION IN MAP. CONTRACTOR TO
DISPOSAL OF CONTAMINATED MATERIALS.
CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL EMERGENCY RESPONSE ACTIONS AT THE SITE, TO INCLUDE REMOVAL AND
B. EMERGENCY RESPONSE AND CLEAN-UP PROCEDURES: ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY.
1. TO BE ESTABLISHED BY CONTRACTOR IF NEEDED
LOCATION OF HAZARDOUS MATERIALS STORAGE AREAS, INCLUDING TANKS AND REFUELING OPERATIONS:
3. PROVIDE DRIP PANS FOR ALL FUELING AND OILING OF MACHINERY.
2. STORE MATERIALS IN DESIGNATED/MARKED LOW-TRAFFIC AREAS.
1. STORE LIQUIDS IN COVERED/SEALED CONTAINERS.
AT THE SITE DURING CONSTRUCTION ACTIVITIES:
DESCRIPTION OF MEASURES TO REDUCE/PREVENT/MINIMIZE SPILL/RELEASES OF HAZARDOUS MATERIALS STORED AND USED
BY THE CONTRACTOR/PROPONENT ON HUNTER ARMY AIRFIELD.
AND/OR STORED HERBICIDES, PESTICIDES, FERTILIZERS, DETERGENTS, PAINTS AND ANY OTHER HAZARDOUS SUBSTANCES USED
TIMES FOR SPCC/ISCP AND EPCRA REQUIREMENTS. THE INVENTORY MUST INCLUDE ALL PETROLEUM PRODUCTS, CHEMICAL, A. HAZARDOUS MATERIALS INVENTORY: A HAZARDOUS MATERIAL INVENTORY AND MSDS SHOULD BE KEPT ON RECORD AT ALL
PROVIDE SECONDARY CONTAINMENT, AND TO BE COVERED.
FOR HAZARDOUS MATERIALS/CHEMICALS/WASTE SHOULD BE DESIGNED TO ALLOW FOR SECURE PRODUCT STORAGE, TO
SOIL OR WATER. SECONDARY CONTAINMENT IS REQUIRED FOR ANY REFUELING/ TRANSFERRING ACTIVITIES. STORAGE AREAS
AVAILABLE FOR VEHICLES AND EQUIPMENT TO PREVENT OIL AND OTHER PETROLEUM PRODUCTS FROM SPILLING ONTO THE
WITH HUNTER ARMY AIRFIELD REGULATIONS, INCLUDING SECONDARY CONTAINMENT AS REQUIRED. DRIP PANS SHOULD BE
TRANSPORTATION OF ANY HAZARDOUS MATERIALS. STORAGE OF HAZARDOUS MATERIAL/CHEMICALS AND WASTE MUST COMPLY
AND FOLLOW ALL HUNTER ARMY AIRFIELD AND DEPARTMENT OF TRANSPORTATION (DOT) REGULATIONS ASSOCIATED WITH
(CONSTRUCTION/OPERATION) PHASE(S) OF THIS PROJECT, THE CONTRACTOR AND/OR PROPONENT MUST HAVE A SPCC PLAN, SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) REQUIREMENTS: DURING THE IMPLEMENTATION
AREAS, BY HAND OR MECHANICAL MEANS AS APPROPRIATE.
AFFECTED 25. AFTER EVERY RAIN EVENT, CONTRACTOR SHALL MONITOR EACH OUTFALL AND REMOVE ANY SEDIMENT AND RESTORE THE
DESCRIBED ABOVE (NOTE 32).
24. THE LENGTH OF OPEN TRENCH SHALL BE LIMITED TO THE MINIMUM LENGTH NEEDED TO REMOVE AND REPLACE PIPE, AS
BACK FILLING NEW PIPE AT THE CLOSE OF EACH DAY'S WORK.
23. CONTRACTOR SHALL PROTECT HIS WORK FROM RUNOFF BY INSTALLING SEDIMENT BARRIERS AROUND OPEN TRENCHES AND BY
ERODED AREAS SHALL BE RESTORED AND STABILIZED AS QUICKLY AS PRACTICABLE.
22. CONTRACTOR SHALL CHECK ALL DRAINAGE OUTFALLS AFTER EVERY RAIN EVENT AND REMOVE ANY ACCUMULATED SEDIMENT.
BMP'S.LOCATIONS WILL BE CONFIRMED WITH THE CONTRACTING OFFICER AND ESPC PLANS WILL BE "RED-LINED" WITH APPROPRIATE
21. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY MATERIAL STOCKPILE LOCATION(S) PRIOR TO COMMENCING WORK. THE
OR CAN BE AFFECTED BY SEDIMENT RUNOFF FROM THE PROJECT SITE.
WILL 20. THE CONTRACTOR SHALL PROVIDE STORM INLET PROTECTION AT ALL INLETS (WITHIN AND WITHOUT THE PROJECT LIMITS THAT
19. ALL TEMPORARY BMP'S SHALL BE REMOVED BY THE CONTRACTOR ONCE THE AREA HAS BEEN STABILIZED.
SEDIMENT OFF OF THE SITE AND ONTO ADJACENT PAVEMENT.
18. THE CONTRACTOR SHALL EMPLOY THE USE OF A STREET SWEEPER ON A REGULAR BASIS TO CONTROL THE TRACKING OF
17. WASTE MATERIALS SHALL BE DISCHARGED TO WATER OF THE STATE EXCEPT AS AUTHORIZED BT A SECTION 404 PERMIT.
MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
16. ANY AMENDMENT TO THE EROSION CONTROL PLANS WHICH HAS A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT
WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.
15. NON EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN ANY 25' UNDISTURBED BUFFER AS MEASURED FROM THE POINT OF
WETLAND.
14. THE PROJECT SITE IS NOT WITHIN 200 FEET OF STATE WATERS. THE PROJECT SITE IS NOT WITHIN 200 FEET OF DESIGNATED
WIND OR WATER. THIS MAY BE DONE BY PEG AND TWINE METHOD, MULCH ANCHORING TOOL, NETTING OR LIQUID MULCH BINDERS.
UNIFORMLY BY HAND; MULCH ANCHORING SHALL BE ACCOMPLISHED IMMEDIATELY AFTER MULCH PLACEMENT TO MINIMIZE LOSS BY
PROHIBITED NOXIOUS WEEDS WHICH ARE: CANADA THISTLE, JOHNSON GRASS AND QUACK GRASS. SPREAD MULCH MECHANICALLY OR
OF 2 TONS PER ACRE. MULCH MATERIAL SHALL BE RELATIVELY FREE FROM ALL KINDS OF WEEDS AND SHALL BE FREE OF
13. MULCH: MULCH, IF REQUIRED OR NECESSARY, SHALL BE UNCHOPPED, UNROTTED, DRY SMALL GRAIN STRAW APPLIED AT A RATE
(d) LIME RATE: 1 TO 2 TONS/ACRE.
(c) WEEKLY INSPECTION OF THE GRASS COVER SHALL BE PERFORMED TO IDENTIFY AREAS REQUIRING RE-ESTABLISHMENT.
(b) VEGETATIVE COVER SHALL BE IN ACCORDANCE WITH THE COASTAL VEGETATIVE COVERS TABLE LOCATED ON THESE PLANS.
(a) A VEGETATIVE COVER SHALL BE ESTABLISHED AND MAINTAINED OVER ALL FINAL GRADING AND OTHER DISTURBED AREAS.
12. VEGETATIVE METHODS:
BEEN ESTABLISHED.
HAS 11. STORM DRAINAGE INLET STRUCTURES SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT AFTER PERMANENT GROUND COVER
THAT DRAINAGE FROM THE SITE IS NOT IMPAIRED.
SO 10. TEMPORARY EROSION CONTROL DEVICES SHALL BE MAINTAINED UNTIL PERMANENT COVER IS ESTABLISHED AND THEN REMOVED
9. EROSION CONTROL DEVICES SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A FUNCTIONING EROSION CONTROL SYSTEM.
8. EROSION CONTROL DEVICES SHALL BE CLEANED WHEN THEY BECOME HALF FILLED WITH SEDIMENT.
OF CONTINUOUS RAINFALL.
PERIODS 7. EROSION CONTROL DEVICES SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND AT LEAST DAILY DURING PROLONGED
CONTRACTING OFFICER IMMEDIATELY.
6. THE FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED, FOR ANY REASON, SHALL BE REPORTED TO THE
FUNCTIONING EROSION CONTROL SYSTEM.
5. THE LOCATIONS OF EROSION CONTROL DEVICES SHALL BE ADJUSTED AS CONSTRUCTION PROGRESSES IN ORDER TO MAINTAIN A
IMMEDIATELY.CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE CONTRACTING OFFICER
EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING ANY PHASE OF CONSTRUCTION. DIFFICULTY IN
CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL
THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING
4. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF
WATER MANAGEMENT DEVICES SHALL BE INSTALLED.
3. IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION EXITS (IF REQUIRED), ALL PERIMETER EROSION CONTROL DEVICES AND
OF EXIT FROM THE SITE. ALL EXITS FROM THE SITE WHICH ARE NOT PROTECTED SHALL BE BARRICADED.
2. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION EXIT SHALL BE CONSTRUCTED (IF REQUIRED) AT EACH POINT
CONTROL IN GEORGIA".
EROSION 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN CONFORMANCE WITH THE CURRENT GEORGIA "MANUAL FOR
(N.T.S.)
VICINITY MAP FT. STEWART
100 - YEAR FLOOD PLAIN. (ZONE "X")
SEPTEMBER 26, 2008. THIS PROPERTY DOES NOT FALL WITHIN THE LIMITS OF THE
IN MY OPINION, IN ACCORDANCE WITH FIRM MAP No. 13179C0226D, EFFECTIVE DATE:
SEEDING.
WITH MULCH OR TEMPORARY FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED
TO CONTROL OR TREAT THE SEDIMENT SOURCE. 3. ANY DISTURBED AREA LEFT EXPOSED
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
ACTIVITIES.CONCURRENT WITH, LAND DISTURBING
OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR
1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION
75SHEET OF
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE: AS NOTED
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
DEM
IJO#:WG-33-8J FS-36704/15/13BP
G R A P H I C S C A L E
1" = 20'
0' 10' 20' 30' 40' 50' 100'
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
I.E. 81.66
TOP 88.43
CURB INLET
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
I.E. 83.82
TOP 89.77
SAN. M.H.
APPEARS ABANDONED
UNKNOWN UTILITY VAULT
TOP APPROX. 3.3' DEEP
UNKNOWN UTILITY w/ GRATE
W.V.
W.V.
F.H.
SIGNS
METAL
CONC. WALK
C O
N C
W A
L K
F.F.E. 89.73
BLDG. #620
25"GU
M
11"LIVE O
A K
14"H O
LLY
3"DO
GW
O O D
8"LIVE O
A K
3"DO
GW
O O D
7"LIVE O
A K
13"LIVE O
A K
6"DO
GW
O O D
8"LIVE O
A K
7"LIVE O
A K
9"LIVE O
A K
34"CEDA
R
14"LIVE O
A K
41"LIVE O
A K
12"LIVE O
A K
CLU
STER
6-
8"DO
GW
O O D
M
YRTLE
5"CRA
PE
M
YRTLE
6"CRA
PE
M
YRTLE
4"CRA
PE M
YRTLE
4"CRA
PE
M
YRTLE
5"CRA
PE
M
YRTLE
4"CRA
PE
M
YRTLE
4"CRA
PE M
YRTLE
5"CRA
PE
M
YRTLE
4"CRA
PE
CONC. WALK
CONC. WALK CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
I.E. 82.95
FULL OF DIRT
BOT. EL. 84.17
TOP 87.27
GRATE INLET
I.E. 79.51
TOP 85.28
GRATE INLET
I.E. 81.34
12" RCP
EXT'G. 6" CLAY PIPE
C L A
Y
A
Y
A Y
10" CONC.
18" RCP
18" RCP
24" RCP
F.H.
W.V.
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
I.E. 84.37
TOP 88.19
SAN. M.H.
I.E. 84.00
TOP 87.38
STORM. M.H.
I.E.84.20
I.
E .8
.2
I.E.84.18
C
L A
Y
6"CLAY
C
L A
Y
6"
TYPICAL
CONC. BENCH
TYPICAL
CONC. BENCH
SLAB
CONC.
SLAB
CONC.
ROOF
METAL
RAMP
CONC.
LINE PIT
HOT/CHILL WATER
ABANDONED
WATER LINE PIT
HOT/CHILL
TO BASEMENT
STEPS DOWN
I.E. 84.24
TOP 87.17
STORM M.H.
WALL
BRICK
POSTS
GUARD
METAL
DRAIN
FRENCH
12"CMP
89 88.99
87.28
87.80
88.75
86.63
88.30
89.06
87.62
88.83
87.37
88.12
87.70
87.21
88.87
88.46
88.95
87.48
87.55
88.80
88.92
88.08
88.24
87.97
89.63
89.71
86.34
78.74
86.37
87.02
89.02
89.05
88.84
88.73
86.55
89.17
88.72
88.93
87.64
88.84 87.33
88.11
88.04
88.31
89.09
88.97
89.12
88.42
89.18
88.06
89.53
89.62
89.72
86.54
88.82
86.53
88.96
88.89 88.7087.55
87.05
88.97
89.31
88.81
85.95
86.36
88.11
88.96
87.37
87.56
87.63
88.68
87.94
88.06
89.65
89.73
88.59
86.51
87.67
89.05
90.31
79.03
86.58
89.05
88.78
88.98
87.49
86.91
88.51
89.33
88.84
87.95
86.34
88.19
88.67
87.39
89.25
87.31
87.39
88.35
89.59
87.70
88.70
89.09
87.79
89.78
88.96
86.42
88.94
88.83
78.66
86.95
88.46
88.80
88.80 88.93
86.35
85.95
88.45
87.39
89.63
89.32
88.25
89.20
86.71
88.23
88.77
88.99
88.60
88.38
88.95
86.49
88.55
89.06
78.69
86.56
87.82
89.71
87.77
86.49 88.30
88.75
88.84 89.05
88.57
86.28
86.46
88.58
88.86
87.47
89.58
88.81 88.97
87.78
88.28
88.33
86.67
89.23
88.99
89.61
88.85
86.39
87.89
88.69
88.84
89.22
86.57
89.09
88.78
87.12
89.00
87.99
88.08
88.94
87.76
86.85
88.74
89.34
87.48
87.83
88.24
89.15
88.34
87.56
89.18
89.12
89.73
89.70
88.93
88.78
86.52
87.93
88.97
89.02
86.57
89.04
88.74
88.81
87.90
89.36
88.78
87.78
86.78
88.99
88.81
87.91
87.45
89.73
88.28
88.23
86.70
87.86
88.99
89.71
87.91
89.59
88.76
86.36
87.66
88.99
88.87
88.76
89.03
88.75
87.82
87.90
88.79
89.02
87.74
86.96
88.54 88.21
87.52
88.99
88.97
88.29
89.56
88.92
86.51
89.04
88.56
87.11
78.65
85.88
89.32
87.69
86.60
88.76
89.69
89.25
88.78
87.38
87.90
88.76
89.03
89.73
86.78
88.59
88.75
87.63
87.53
88.35
87.40
88.13
88.32
88.89
89.75
88.53
78.69
85.84
86.54
NAVD 1988
ELEV. 85.38
E=826415.592 N=680584.559
5/8" REBAR
BENCHMARK GPS-1
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
(NOT FIELD VERIFIED)
BLDG. #608
(NOT FIELD VERIFIED)
BLDG. #621
PARKING LOT
CONC. WALK
(NOT FIELD VERIFIED)
CONC. WALK
(NOT FIELD VERIFIED)
OPEN FIELD
OPEN FIELD
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
TOPOGRAPHIC SURVEY
C-200
T
T
T
T
AC
AC
AC
E
E
1" = 20'
(TYP.)(NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
@ 0.5%
30 L.F. 12" HDPE
I.E. 85.49
TOP 88.00
INLINE DRAIN No.1
6" CHWS&R
6" CHWS&R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
TEE
I.E. 85.35
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
I.E. 85.43
TOP 88.00
INLINE DRAIN No.2
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
REMOVE EXT'G. 34" CEDAR
S
S
S
S
REMOVE EXT'G. METAL
SIGNS
@ I.E. 85.31
50 L.F. 12" HDPE
@ 1.90%
SWALE
SWALE
CONNECT TO EXT'G. M.H.
G R A P H I C S C A L E
1" = 20'
0' 10' 20' 30' 40' 50' 100'
DEMOLITION PLAN
1" = 20'
NOTES
C-201
1. INITIAL BMP'S FOR EXISTING INLETS (Sd2-F) SHALL BE INSTALLED AROUND INLETS PRIOR TO
DEMOLITION.
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE:
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
IJO#:WG-33-8J FS-3670
V. SMITH
4/15/13H. KRAFT
A T
F P
A T
F P
30' AT/FP
2 1/2" HTWS & R
1 1/4" HTWS & R
VP 29
EXT'G.
CONNECTION
6" CAP FOR FUTURE
H
W S
R
W S
R
6" CHWS&R
W S
R
W S
R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
1.5" CHWS&R
3" CHWS&R
HTWS & RHTWS & R
& R
2 1/2" HTWS
R
W S
& R
10" HTWS
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
REMOVE EXT'G. CONC. RAMP,
STAIRS AND RAILING
X X
XX
I.E. 83.61
TOP 87.00
I.E. 79.75
TEE
I.E. 83.21
63 L.F. 12"
66 L.F. 12"
80 L.F. 12"
36 L.F. 15"
61 L.F. 12"
15 L.F. 12" HDPE
61 L.F. 12" HDPE
@ 2.15%
REPLACE
5 S.Y. CONC. WALK
REPLACE
14 S.Y. CONC. WALK
8 L.F. 15" HDPE
TYPICAL EL. 86.80
TYPICAL EL. 86.80
Ds1
Ds2
Du
Ds2
Ds4
Ds1
Ds1
Ds2
Du
Ds1
Ds2
Du
Ds1
Ds2
Du
Ds1
Ds2
Du
X
X
X
X
Sd2-F
Ds4
Ds4
Du
Ds4
Ds4
Ds4
Ds1
Ds2
Du
Ds4
Sd2-F
Sd2-F
Sd1-A
Sd1-A
Sd1-A
Sd1-A
Sd1-A
TREE PROTECTION BARRICADE (TYP.)
TREE PROTECTION BARRICADE (TYP.)
R A
M P
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
TEE I.E. 85.22
TEE I.E. 84.81
13 L.F. 12"
47 L.F. 12"
TEE I.E. 83.52
TEE I.E. 84.93
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
REMOVE
5 S.Y. CONC. WALK
REMOVE
14 S.Y. CONC. WALK
REMOVE 65 L.F. EXT'G. 6" CLAY
PIPE & SANITARY MANHOLE. CAP
W S
R
4" CHWS&R
OVER EXT'G. 18" PIPE
I.E. 82.49
82 L.F. 8"
CONSTRUCT NEW MANHOLE
M.H. No.1
HDPE @ 2.1%
72 L.F. 8" HDPE
23 L.F. 8" HDPE
@ 1.90%
I.E. 83.76
REMOVE
FRENCH DRAIN
@ 0.5%
SS
S
S
S
EXT'G SANITARY SEWER UNTIL NEW
CONNECTION IS MADE.
X X
XX
X X
XX
Sd2-F
30' AT/FP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
I.E. 81.66
TOP 88.43
CURB INLET
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
I.E. 83.82
TOP 89.77
SAN. M.H.
APPEARS ABANDONED
UNKNOWN UTILITY VAULT
W.V.
W.V.
F.H.
SIGNS
METAL
CONC. WALK
C O
N C
W A
L K
F.F.E. 89.73
BLDG. #620
"G
U M
11"LIV
E
O
A K
"H
O
LLY
"D
O G
W O
O D
"LIV
E
O
A K
"D
O G
W O
O D
"D
O G
W O
O D 8
"LIV
E
O
A K
"LIV
E
O
A K
"C
E D
A R
"LIV
E
O
A K
1"LIV
E
O
A K
"LIV
E
O
A K
CONC. WALK
CONC. WALK CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
I.E. 82.95
FULL OF DIRT
BOT. EL. 84.17
TOP 87.27
GRATE INLET
I.E. 81.34
12" RCP
EXT'G. 6" CLAY PIPE
A Y
A
Y
A Y
10" CONC.
18" RCP
18" RCP
24" RCP
F.H.
W.V.
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
I.E. 84.37
TOP 88.19
SAN. M.H.
I.E. 84.00
TOP 87.38
STORM. M.H.
I.E.84.20
I.
E .8
.2
I.E.84.18
C
L A
Y
6"CLAY
C
L A
Y
6"
TYPICAL
CONC. BENCH
SLAB
CONC.
SLAB
CONC.
ROOF
METAL
RAMP
CONC.
LINE PIT
HOT/CHILL WATER
ABANDONED
WATER LINE PIT
HOT/CHILL
TO BASEMENT
STEPS DOWN
I.E. 84.24
TOP 87.17
STORM M.H.
WALL
BRICK
POSTS
GUARD
METAL
12"CMP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
(NOT FIELD VERIFIED)
BLDG. #608
(NOT FIELD VERIFIED)
BLDG. #621
PARKING LOT
CONC. WALK
(NOT FIELD VERIFIED)
CONC. WALK
(NOT FIELD VERIFIED)
OPEN FIELD
OPEN FIELD
TOP APPROX. 3.3' DEEP (TYP.)
UNKNOWN UTILITY w/ GRATE
LOCATION (TYP.)
EXISTING DOWNSPOUT
C
LU
S T E R
"D
O G
W O
O D
M Y R T
LE
"C
R A P E
M Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A P E M
Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
T
T
AC
AC
AC
E
E
S S
FG 89.0
FG 89.0
"LIV
E
O
A K
"LIV
E
O
A K
"LIV
E
O
A K
I.E. 79.51
TOP 85.28
GRATE INLET
TYPICAL
CONC. BENCH
DRAIN
FRENCH
NAVD 1988
ELEV. 85.38
E=826415.592 N=680584.559
5/8" REBAR
BENCHMARK GPS-1
W.V.
F.H.
W.V.
F.H.
APPROX. LOCATION
@ 0.5%
30 L.F. 12" HDPE
I.E. 85.49
TOP 88.00
INLINE DRAIN No.1
6" CHWS&R
6" CHWS&R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
TEE
I.E. 85.35
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
I.E. 85.43
TOP 88.00
INLINE DRAIN No.2
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
S
S
S
S
@ I.E. 85.31
50 L.F. 12" HDPE
@ 1.90%
SWALE
SWALE
CONNECT TO EXT'G. M.H.
A T
F P
A T
F P
30' AT/FP
2 1/2" HTWS & R
1 1/4" HTWS & R
VP 29
EXT'G.
CONNECTION
6" CAP FOR FUTURE
W S
R
W S
R
6" CHWS&R
W S
R
W S
R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
1.5" CHWS&R
3" CHWS&R
HTWS & RHTWS & R
& R
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
I.E. 83.61
TOP 87.00
I.E. 79.75
TEE
I.E. 83.21
63 L.F. 12"
66 L.F. 12"
80 L.F. 12"
36 L.F. 15"
61 L.F. 12"
15 L.F. 12" HDPE
61 L.F. 12" HDPE
@ 2.15%
REPLACE
5 S.Y. CONC. WALK
REPLACE
14 S.Y. CONC. WALK
8 L.F. 15" HDPE
TYPICAL EL. 86.80
TYPICAL EL. 86.80
TREE PROTECTION BARRICADE (TYP.)
TREE PROTECTION BARRICADE (TYP.)
R A
M P
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
TEE I.E. 85.22
TEE I.E. 84.81
13 L.F. 12"
47 L.F. 12"
TEE I.E. 83.52
TEE I.E. 84.93
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
W S
R
4" CHWS&R
OVER EXT'G. 18" PIPE
I.E. 82.49
82 L.F. 8"
CONSTRUCT NEW MANHOLE
M.H. No.1
HDPE @ 2.1%
72 L.F. 8" HDPE
23 L.F. 8" HDPE
@ 1.90%
I.E. 83.76
@ 0.5%
SS
S
S
S
30' AT/FP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
I.E. 81.66
TOP 88.43
CURB INLET
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
I.E. 83.82
TOP 89.77
SAN. M.H.
APPEARS ABANDONED
UNKNOWN UTILITY VAULT
W.V.
W.V.
F.H.
SIGNS
METAL
CONC. WALK
C O
N C
W A
L K
F.F.E. 89.73
BLDG. #620
"G
U M
11"LIV
E
O
A K
"H
O
LLY
"D
O G
W O
O D
"LIV
E
O
A K
"D
O G
W O
O D
"D
O G
W O
O D 8
"LIV
E
O
A K
"LIV
E
O
A K
"LIV
E
O
A K
1"LIV
E
O
A K
"LIV
E
O
A K
CONC. WALK
CONC. WALK CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
I.E. 82.95
FULL OF DIRT
BOT. EL. 84.17
TOP 87.27
GRATE INLET
I.E. 81.34
12" RCP
EXT'G. 6" CLAY PIPE
A Y
A
Y
A Y
10" CONC.
18" RCP
18" RCP
24" RCP
F.H.
W.V.
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
I.E. 84.00
TOP 87.38
STORM. M.H.
I.E.84.20
I.
E .8
.2
I.E.84.18
C
L A
Y
6"CLAY
C
L A
Y
6"
TYPICAL
CONC. BENCH
SLAB
CONC.
SLAB
CONC.
ROOF
METAL
LINE PIT
HOT/CHILL WATER
ABANDONED
WATER LINE PIT
HOT/CHILL
TO BASEMENT
STEPS DOWN
I.E. 84.24
TOP 87.17
STORM M.H.
WALL
BRICK
POSTS
GUARD
METAL
12"CMP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
(NOT FIELD VERIFIED)
BLDG. #608
(NOT FIELD VERIFIED)
BLDG. #621
PARKING LOT
CONC. WALK
(NOT FIELD VERIFIED)
CONC. WALK
(NOT FIELD VERIFIED)
OPEN FIELD
OPEN FIELD
TOP APPROX. 3.3' DEEP (TYP.)
UNKNOWN UTILITY w/ GRATE
LOCATION (TYP.)
EXISTING DOWNSPOUT
C
LU
S T E R
"D
O G
W O
O D
M Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A P E M
Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
T
T
AC
AC
AC
E
E
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE:
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
IJO#:WG-33-8J FS-3670
V. SMITH
4/15/13H. KRAFT
G R A P H I C S C A L E
1" = 20'
0' 10' 20' 30' 40' 50' 100' C-202 1" = 20'
EROSION & SEDIMENT CONTROL PLAN
S S
FG 89.0
FG 89.0
"LIV
E
O
A K
"LIV
E
O
A K
"LIV
E
O
A K
I.E. 79.51
TOP 85.28
GRATE INLET
TYPICAL
CONC. BENCH
NAVD 1988
ELEV. 85.38
E=826415.592 N=680584.559
5/8" REBAR
BENCHMARK GPS-1
W.V.
F.H.
W.V.
F.H.
APPROX. LOCATION
@ 0.5%
30 L.F. 12" HDPE
I.E. 85.49
TOP 88.00
INLINE DRAIN No.1
6" CHWS&R
6" CHWS&R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
TEE
I.E. 85.35
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
I.E. 85.43
TOP 88.00
INLINE DRAIN No.2
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
S
S
S
S
@ I.E. 85.31
50 L.F. 12" HDPE
@ 1.90%
SWALE
SWALE
CONNECT TO EXT'G. M.H.
OFFICER.
WITH A PERMANENT STAND OF GRASS SUITABLE TO THE CONTRACTING
IS GRADED SHALL BE STABILIZED AFTER ALL WORK IS COMPLETE
LESS THAN 1% NOR GREATER THAN 5%. THE ENTIRE AREA THAT
AND A SLOPE DOWN AND AWAY FROM THE BUILDING OF NOT
BUILDING FINISHED FLOOR ELEVATION TO THE GROUND SURFACE
BUILDING PERIMETER TO PROVIDE AN 8" DROP FROM THE
NOTE: THE CONTRACTOR SHALL REGRADE AROUND THE ENTIRE
SEE NOTE BELOW
A T
F P
A T
F P
30' AT/FP
2 1/2" HTWS & R
1 1/4" HTWS & R
VP 29
EXT'G.
CONNECTION
6" CAP FOR FUTURE
W S
R
W S
R
6" CHWS&R
W S
R
W S
R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
1.5" CHWS&R
3" CHWS&R
HTWS & RHTWS & R
& R
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
LIMITS OF DISTURBANCE/
CHAINLINK CONSTR. FENCE
I.E. 83.61
TOP 87.00
I.E. 79.75
TEE
I.E. 83.21
63 L.F. 12"
66 L.F. 12"
80 L.F. 12"
36 L.F. 15"
61 L.F. 12"
15 L.F. 12" HDPE
61 L.F. 12" HDPE
@ 2.15%
REPLACE
5 S.Y. CONC. WALK
REPLACE
14 S.Y. CONC. WALK
8 L.F. 15" HDPE
TYPICAL EL. 86.80
TYPICAL EL. 86.80
TREE PROTECTION BARRICADE (TYP.)
TREE PROTECTION BARRICADE (TYP.)
R A
M P
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G. WATERMAIN
APPROX. LOCATION
TEE I.E. 85.22
TEE I.E. 84.81
13 L.F. 12"
47 L.F. 12"
TEE I.E. 83.52
TEE I.E. 84.93
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
W S
R
4" CHWS&R
OVER EXT'G. 18" PIPE
I.E. 82.49
82 L.F. 8"
CONSTRUCT NEW MANHOLE
M.H. No.1
HDPE @ 2.1%
72 L.F. 8" HDPE
23 L.F. 8" HDPE
@ 1.90%
I.E. 83.76
@ 0.5%
SS
S
S
S
30' AT/FP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
I.E. 81.66
TOP 88.43
CURB INLET
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
I.E. 83.82
TOP 89.77
SAN. M.H.
APPEARS ABANDONED
UNKNOWN UTILITY VAULT
W.V.
W.V.
F.H.
SIGNS
METAL
CONC. WALK
C O
N C
W A
L K
F.F.E. 89.73
BLDG. #620
"G
U M
11"LIV
E
O
A K
"H
O
LLY
"D
O G
W O
O D
"LIV
E
O
A K
"D
O G
W O
O D
"D
O G
W O
O D 8
"LIV
E
O
A K
"LIV
E
O
A K
"LIV
E
O
A K
1"LIV
E
O
A K
"LIV
E
O
A K
CONC. WALK
CONC. WALK CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
I.E. 82.95
FULL OF DIRT
BOT. EL. 84.17
TOP 87.27
GRATE INLET
I.E. 81.34
12" RCP
EXT'G. 6" CLAY PIPE
A Y
A
Y
A Y
10" CONC.
18" RCP
18" RCP
24" RCP
F.H.
W.V.
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
I.E. 84.00
TOP 87.38
STORM. M.H.
I.E.84.20
I.
E .8
.2
I.E.84.18
C
L A
Y
6"CLAY
C
L A
Y
6"
TYPICAL
CONC. BENCH
SLAB
CONC.
SLAB
CONC.
ROOF
METAL
LINE PIT
HOT/CHILL WATER
ABANDONED
WATER LINE PIT
HOT/CHILL
TO BASEMENT
STEPS DOWN
I.E. 84.24
TOP 87.17
STORM M.H.
WALL
BRICK
POSTS
GUARD
METAL
12"CMP
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
(NOT FIELD VERIFIED)
BLDG. #608
(NOT FIELD VERIFIED)
BLDG. #621
PARKING LOT
CONC. WALK
(NOT FIELD VERIFIED)
CONC. WALK
(NOT FIELD VERIFIED)
OPEN FIELD
OPEN FIELD
TOP APPROX. 3.3' DEEP (TYP.)
UNKNOWN UTILITY w/ GRATE
LOCATION (TYP.)
EXISTING DOWNSPOUT
C
LU
S T E R
"D
O G
W O
O D
M Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A P E M
Y R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
R T
LE
"C
R A
T
T
AC
AC
AC
E
E
G R A P H I C S C A L E
1" = 20'
0' 10' 20' 30' 40' 50' 100'
1" = 20'
C-203
GRADING AND DRAINAGE PLAN
S
S
FG 89.0
FG 89.0
"LIV
E
O
A K
"LIV
E
O
A K
"LIV
E
O
A K
I.E. 79.51
TOP 85.28
GRATE INLET
TYPICAL
CONC. BENCH
NAVD 1988
ELEV. 85.38
E=826415.592 N=680584.559
5/8" REBAR
BENCHMARK GPS-1
W.V.
F.H.
W.V.
F.H.
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE:
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
IJO#:WG-33-8J FS-3670
V. SMITH
4/15/13H. KRAFT
13"LIVE O
A K
7"LIVE O
A K
9"LIVE O
A K
A Y
CONNECTION
6" CAP FOR FUTURE
E X
IS
T
IN
G
T
IN
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
SANITARY SEWER SERVICE PLAN
22-00-00 FOR PVC PIPING.
SEE SPECIFICATION SECTION
SPECIAL NOTES:
UTILITY LOCATION INDEX
UTILITY PLAN
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
ABANDONED
APPEARS
VAULT
UTILITY
UNKNOWN
W.V.
F.F.E. 89.73
BLDG. #620
8"LIVE O
A K
6"DO
GW
O O D
M
YRTLE
5"CRA
PE
M
YRTLE
6"CRA
PE
M
YRTLE
4"CRA
PE M
YRTLE
4"CRA
PE
CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
EXT'G. 6" CLAY PIPE
A
Y
18" RCP
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
TYPICAL
CONC. BENCH
SLAB
CONC.
LINE PIT
HOT/CHILL WATER
ABANDONED
WALL
BRICK
12"CMP
W S
R
(TYP.) (NOT FIELD VERIFIED)
OF EXT'G HTWS & CHWS LINES
APPROX. LOCATION
F.F.E. 89.73
BLDG. #620
ELEVATOR
PROPOSED
R A
M P
T
AC
AC
CONNECT TO EXT'G.
8" WATER MAIN W/8"x6"
TAPPING SLEEVE AND
6" TAPPING VALVE IN
BOX
FIRE HYDRANT
W/6" V&B
POST INDICATOR
3" PVC
2" PVC
PLUMBING FROM
BUILDING
CONNECT TO
SCALE: 1" = 10'
6" PVC C-900 FIRE LINE
VALVE
22-00-00 FOR PVC PIPING.
SEE SPECIFICATION SECTION
SPECIAL NOTES:
FIRE SERVICE PLAN
SCALE: 1" = 10'
N.T.S.
SERVICE
FOR SANITARY SEWER
SEE ABOVE LEFT
FOR FIRE SERVICE
SEE BELOW LEFT
@ 0.20%
3 L.F. 6" PVC
TOP 89.23
SAN. MANHOLE
CONNECT TO SAN
SIAMESE CONNECTION
FREE STANDING
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
I.E. 81.66
TOP 88.43
CURB INLET
I.E. 84.34
TOP 88.99
STORM M.H.
I.E. 83.47
TOP 89.34
SAN. M.H.
I.E. 83.82
TOP 89.77
SAN. M.H.
APPEARS ABANDONED
UNKNOWN UTILITY VAULT
TOP APPROX. 3.3' DEEP
UNKNOWN UTILITY w/ GRATE
W.V.
W.V.
F.H.
SIGNS
METAL
CONC. WALK
C O
N C
W A
L K
F.F.E. 89.73
BLDG. #620
25"GU
M
11"LIVE O
A K
14"H O
LLY
3"DO
GW
O O D
8"LIVE O
A K
3"DO
GW
O O D
7"LIVE O
A K
13"LIVE O
A K
6"DO
GW
O O D
8"LIVE O
A K
7"LIVE O
A K
9"LIVE O
A K
34"CEDA
R
14"LIVE O
A K
41"LIVE O
A K
12"LIVE O
A K
CLU
STER
6-
8"DO
GW
O O D
M
YRTLE
5"CRA
PE
M
YRTLE
6"CRA
PE
M
YRTLE
4"CRA
PE M
YRTLE
4"CRA
PE
M
YRTLE
5"CRA
PE
M
YRTLE
4"CRA
PE
M
YRTLE
4"CRA
PE M
YRTLE
5"CRA
PE
M
YRTLE
4"CRA
PE
CONC. WALK
CONC. WALK CONC. WALK
ELEV. = 84.97
INTERF. PIPE
TOP 12" CMP
I.E. 82.95
FULL OF DIRT
BOT. EL. 84.17
TOP 87.27
GRATE INLET
I.E. 79.51
TOP 85.28
GRATE INLET
I.E. 81.34
12" RCP
EXT'G. 6" CLAY PIPE
A
Y
A
Y
A Y
10" CONC.
18" RCP
18" RCP
24" RCP
F.H.
W.V.
WITH VALVES.
LINE - ABOVE GROUND
6" METAL WATER
I.E. 84.37
TOP 88.19
SAN. M.H.
I.E. 84.00
TOP 87.38
STORM. M.H.
I.E.84.20
I.
E .8
.2
I.E.84.18
C
L A
Y
6"CLAY
C
L A
Y
6"
TYPICAL
CONC. BENCH
TYPICAL
CONC. BENCH
SLAB
CONC.
SLAB
CONC.
ROOF
METAL
RAMP
CONC.
LINE PIT
HOT/CHILL WATER
ABANDONED
WATER LINE PIT
HOT/CHILL
TO BASEMENT
STEPS DOWN
I.E. 84.24
TOP 87.17
STORM M.H.
WALL
BRICK
POSTS
GUARD
METAL
DRAIN
FRENCH
12"CMP
89 88.99
87.28
87.80
88.75
86.63
88.30
89.06
87.62
88.83
87.37
88.12
87.70
87.21
88.87
88.46
88.95
87.48
87.55
88.80
88.92
88.08
88.24
87.97
89.63
89.71
86.34
78.74
86.37
87.02
89.02
89.05
88.84
88.73
86.55
89.17
88.72
88.93
87.64
88.84 87.33
88.11
88.04
88.31
89.09
88.97
89.12
88.42
89.18
88.06
89.53
89.62
89.72
86.54
88.82
86.53
88.96
88.89 88.7087.55
87.05
88.97
89.31
88.81
85.95
86.36
88.11
88.96
87.37
87.56
87.63
88.68
87.94
88.06
89.65
89.73
88.59
86.51
87.67
89.05
90.31
79.03
86.58
89.05
88.78
88.98
87.49
86.91
88.51
89.33
88.84
87.95
86.34
88.19
88.67
87.39
89.25
87.31
87.39
88.35
89.59
87.70
88.70
89.09
87.79
89.78
88.96
86.42
88.94
88.83
78.66
86.95
88.46
88.80
88.80 88.93
86.35
85.95
88.45
87.39
89.63
89.32
88.25
89.20
86.71
88.23
88.77
88.99
88.60
88.38
88.95
86.49
88.55
89.06
78.69
86.56
87.82
89.71
87.77
86.49 88.30
88.75
88.84 89.05
88.57
86.28
86.46
88.58
88.86
87.47
89.58
88.81 88.97
87.78
88.28
88.33
86.67
89.23
88.99
89.61
88.85
86.39
87.89
88.69
88.84
89.22
86.57
89.09
88.78
87.12
89.00
87.99
88.08
88.94
87.76
86.85
88.74
89.34
87.48
87.83
88.24
89.15
88.34
87.56
89.18
89.12
89.73
89.70
88.93
88.78
86.52
87.93
88.97
89.02
86.57
89.04
88.74
88.81
87.90
89.36
88.78
87.78
86.78
88.99
88.81
87.91
87.45
89.73
88.28
88.23
86.70
87.86
88.99
89.71
87.91
89.59
88.76
86.36
87.66
88.99
88.87
88.76
89.03
88.75
87.82
87.90
88.79
89.02
87.74
86.96
88.54 88.21
87.52
88.99
88.97
88.29
89.56
88.92
86.51
89.04
88.56
87.11
78.65
85.88
89.32
87.69
86.60
88.76
89.69
89.25
88.78
87.38
87.90
88.76
89.03
89.73
86.78
88.59
88.75
87.63
87.53
88.35
87.40
88.13
88.32
88.89
89.75
88.53
78.69
85.84
86.54
NAVD 1988
ELEV. 85.38
E=826415.592 N=680584.559
5/8" REBAR
BENCHMARK GPS-1
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
C ir c u la r b lo c k r e f
"A
P O
IN
T
(NOT FIELD VERIFIED)
BLDG. #608
(NOT FIELD VERIFIED)
BLDG. #621
PARKING LOT
CONC. WALK
(NOT FIELD VERIFIED)
CONC. WALK
(NOT FIELD VERIFIED)
OPEN FIELD
OPEN FIELD
HORIZONTAL DATUM IS BASED ON GA.
STATE PLANE NAD 1983 EAST ZONE.
VERTICAL DATUM IS BASED ON NAVD 1988.
T
T
T
T
AC
AC
AC
E
E
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE:
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
IJO#:WG-33-8J FS-3670
V. SMITH
4/15/13H. KRAFT
AS SHOWN
G R A P H I C S C A L E
1" = 10'
0' 5' 10' 15' 20' 25' 50' C-204
CONNECT TO EXT'G.
6" CLAY PIPE W/6"
PVC, FERNCO COUPLING
AND ENCASE IN CONCRETE
CONNECT TO
PLUMBING FROM
BUILDING
2" PVC
CONNECT TO SAN
D
.6
4'-0" MIN.
N.T.S.
STANDARD CONCRETE SIDEWALK
NOTE: PROVIDE CONTROL JOINTS 4'-0" ON CENTER
ALL SIDES
EDGE 1/4" RAD.
4" THICK CLASS "A" 4,000 P.S.I. CONC.
BOLTS, & WASHERS
WELDED WATERTIGHT CAP. PAINT P&L
CONC. FILLED PIPE 2'-0" PROVIDE
ACCESSIBLE
N.T.S.
TYPICAL HANDICAPPED PARKING SIGN
INITIAL BACKFILL: USE CLASS I, II OR III MATERIALS
COMPACT CLASS II OR III MATERIALS TO 90% OF
STANDARD PROCTOR DENSITY, IN TWO LIFTS MINIMUM.
HAUNCHING: USE CLASS I MATERIAL TO SPRING LINE OF
PIPE IN DRY TRENCH CONDITIONS, AND TO TOP OF PIPE
IN WET TRENCH CONDITIONS.
BEDDING: USE CLASS I, II OR III MATERIALS. COMPACT
CLASS II OR III MATERIALS TO 90% OF STANDARD
PROCTOR DENSITY, IN MAXIMUM 6" LIFTS.
NOTE: REFER TO ASTM D2321 FOR DESCRIPTION OF
CLASS I, II AND III MATERIALS.
1) Bd = TRENCH WIDTH, MAX = Bc + 18", MIN = Bc + 12"
2) Bc = OUTSIDE DIAMETER OF PIPE BARREL
BELOW THIS LEVEL SHALL
BE CUT OFF AND LEFT
APPROVED OR DIRECTED.
BRACED
Bd
UNBRACED
SLOPED OR VERTICAL (SEE SPECS)
BACK FILL (THOROUGHLY COMPACTED IN 6" LIFTS)ORIGINAL GROUND
CLOSE SHEETING WHEN USED
TOP OF BARREL
SPRING LINE
Bc
12" MIN.
N.T.S.
TYPICAL TRENCH DETAIL
WOOD SHEETING OR TIMBERING
IN PLACE UNLESS OTHERWISE
EXISTING GROUND
SWALE SECTION
N.T.S.
2' BOTTOM WIDTH
S
A N
D E
P
R
IE
S
*HORIZ.
*HORIZ.
*HORIZONTAL DIMENSION SHALL BE 5' WHERE ATTAINABLE
AND NOT LESS THAN 3' WHERE LESS ROOM IS AVAILABLE.
NOTE:
WATERTIGHT (WT) JOINTS.
INSERT,
GASKETED SPIGOT BY
BELL REDUCER
WT TEE
8" HDPE PIPE (TYP.)
WT BELL-BELL
COUPLER (TYP)
FABRICATED HDPE
DBL. MITER 90° BEND
DOWNSPOUT ADAPTER
INSERTED IN RISER
PIPE
BUILDING
FACE
F.F.E.
89.73
ROOF DRAIN HEADER PIPE
(SEE PLAN FOR SIZES)
8" RISER
EXT'G. DOWNSPOUT
ROOF DRAIN CONNECTION DETAIL
N.T.S.
VARIES (SEE PLAN)
EXT'G. FLASHING
REMOVE & REPLACE DOWNSPOUT AS NEEDED
TO PROVIDE A COMPLETE & UNIFORM DOWNSPOUT
WITH CONNECTION TO DOWNSPOUT ADAPTER.
(MATCH EXISTING)
54"
D2321
LIFTS AND COMPACTED
BACKFILL MATERIAL SHALL BE
MATERIAL MEETING CLASS 1
CRUSHED STONE OR GRAVEL
BACKFILL MATERIAL SHALL BE
OR 2 AS SPECIFIED IN ASTM
PLACED UNIFORMLY IN 12"
CONCRETE SLAB
PAVEMENT
8" MIN.
24" CAST IRON GRATE
12" RISER
PVC OR HDPE PIPE
25.75"
5.75"
GRATE HAS H-20 (HEAVY TRAFFIC)
DOT RATING
QUALITY: MATERIAL SHALL
CONFORM TO ASTM A48 - CLASS 30B
PAINT: FURNISH CASTINGS
WITH BLACK PAINT
1.25"
1.50"
12" PVC/HDPE
FINISHED GRADE
ADAPTOR
ADAPTOR
TEE
90 DEG. BEND.
24" GRATE
INSTALLATION
24" CAST IRON GRATE
SECTION
PLAN
SHALL BE IN CONFORMANCE WITH THE MANUFACTURERS SPECIFICATIONS
ALL MATERIALS AND WORK
AND RECOMMENDATIONS.
NOTES:
INLINE DRAIN
RISER
INLINE DRAIN WITH
N.T.S.
STANDARD STORM MANHOLE
PLAN
(HEIGHT VARIES)
BRICK-UP TO GRADE
PLASTER JOINTS W/
MORTAR ON OUTSIDE
OR NEOPRENE RING
JOINT DETAIL
DEEP MANHOLE
V A
R I E
S
B A
S E
R I S
E R
S
A N
O
U
I
A I L
A B
L E
I N
V A
R I O
I G
H T
S
BRICK AND MORTAR
FILLET
PIPE OPENING CAST
TO JOB REQUIREMENT
FRAME AND COVER
D 3/4"D
4'- 0"
DIAMETER
STEPS TO BE INSTALLED
IN A VERTICAL ROW ON
16" CENTERS
CONCENTRIC
TOP MAY BE
USED
8"8"
1:2 MORTAR
1/2" THICK
(WITH NEOPRENE
SEAL, ONLY)
GASKET, OR EQUAL,
DOUBLE RAM-NEK
NOTE:
POSITION OF JOINT IS
OPTIONAL BUT DETAIL
AS SHOWN IS PREFERED.
CHANNEL
BENCH
BENCH
34"
25 3/4"
22 1/4"
23 3/4"
PLAN
SECTION
MANHOLE RIM & COVER SIMILAR TO NEENAH
FOUNDRY CO. R-1412-A4. TOTAL WEIGHT 310#.
TYPE "C" LID TO HAVE MACHINED BEARING
SURFACES. LID TO BE LETTERED "STORM".
NOTE:
STORM MANHOLE RING & COVER
MANHOLE STEP-POLYPROPYLENE
A
A
COPOLYMER POLYPROPYLENE PLASTIC
1/2" GRADE 60 STEEL REINFORCEMENT
SECTION A-A
N.T.S.
N.T.S.
N.T.S.
INLINE DRAIN
NOTE: THE CONTRACTOR SHALL REGRADE AROUND THE ENTIRE
BUILDING PERIMETER TO PROVIDE AN 8" DROP FROM THE
BUILDING FINISHED FLOOR ELEVATION TO THE GROUND SURFACE
AND A SLOPE DOWN AND AWAY FROM THE BUILDING OF NOT
IS GRADED SHALL BE STABILIZED AFTER ALL WORK IS COMPLETE
WITH A PERMANENT STAND OF GRASS SUITABLE TO THE CONTRACTING
OFFICER.
16" TYP.5" MIN.
1 1/8" 9 1/8"
10 3/4"
12"
1 1/4"
3 3/8"
5 3/4"
4' MAX.
SITE DETAILS
N.T.S.
C-501
REVISION DATE DESCRIPTION BY
DRAWING NUMBER
SHEET OF
OFFICE OF THE ENGINEER
FORT STEWART, GEORGIA
LIBERTY COUNTY GEORGIA
DESIGN BY:
SCALE:
SHEET NUMBER
DRAWN BY:
DATE:
RENOVATE BUILDING 620
IJO#:WG-33-8J FS-3670
V. SMITH
4/15/13H. KRAFT
FOUNDATION)
BLDG.
(TYPICAL AT
I.E. 86.80
6"
6"
6"
18"
SELECTED BY THE OWNER
RUST INHIBITING PAINT IN THE COLOR
SHALL BE PAINTED WITH TWO COATS OF
6" INTERNAL DIAMETER STEEL PIPE. PIPE
B U
IL
D
IN
G
PAD
UTILITY EQUIPMENT
FINISHED GRADE
CONCRETE SUPPORT BLOCK
BLOCK TO CARRY WATER AWAY FROM PIPE.
SPACE FILLED WITH FRESH CONCRETE. SLIGHTLY ROLL TOP OF SUPPORT
WET PIPE WILL BE INSERTED INTO BLOCK AND REMAINING ANNULAR
OF 3000 PSI. SUPPORT BLOCK SHALL BE POURED IN PLACE WHILE
CONCRETE SHALL HAVE A DESIGN 28 DAY COMPRESSIVE STRENGTH
NOTE:
ROUND TOP.
FILL PIPE WITH CONCRETE AND
BOLLARD DETAIL
N.T.S.
PLAN
SELECTED BY THE OWNER
THE COLOR
RUST INHIBITING PAINT IN
TWO COATS OF
SHALL BE PAINTED WITH
STEEL PIPE. PIPE
6" INTERNAL DIAMETER
DRAIN AREA = 161.4 SQ. INCH
ALL STREET SIGNS SHALL CONFORM TO THE MUTCD
NOTE:
2"x2"x.188" STL. TUBE EXTEND INTO
TUBE WITH 3/8" CADMIUM. PLATED NUTS,
1'-6"x 1'-0"x .080" STANDARD ALUM.
IDENTIFICATION SYMBOL. BOLT TO STL.
HANDICAPPED PARKING SIGN WITH
#6118 "BLACK COFFEE"
FINISHED GRADE
1" TYP.
12"
P
PROVIDE AT VAN
VAN ACCESSIBLE
"TOW-AWAY ZONE"
"PERMIT PARKING ONLY"
"MAXIMUM FINE $500.00"
SPACES ONLY
"MAXIMUM FINE $500.00"
"PERMIT PARKING ONLY"
"TOW-AWAY ZONE"
VAN ACCESSIBLE
EXISTING GRADE
TRANSITION TO MATCH
EACH DOWNSPOUT LOCATION)
(PROVIDE CLEAN-OUT AT
(H-20) W/8" ADAPTOR
12" CAST IRON GRATE
CLEAN-OUT (C.O.)
RISER
8" DIA. HDPE
HDPE TEE
FABRICATED
CAST IRON COVER
MARKED WATER CONCRETE COLLAR
(2'X 2'X 4")
V A
R
IE
S
NOTES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .