This document outlines a sample task order scenario for providing surge throughput at a Mobilization Force Generation Installation (MFGI) in support of the Support Base Services (SBS) contract with the Department of the Army Materiel Command Mission and Installation Contracting Command. The scenario details the additional personnel flow over 65 days for a surge of 4,236 mobilizing Soldiers arriving at the MFGI, with the daily planning throughput requirement shown for the surge. It includes the number of arriving and departing personnel each day, with the peak surge load of 4,236 personnel occurring on day 10 and remaining at that level through day 15. The scenario then shows the reduction in surge personnel as units complete post-mobilization training and depart to their mission locations through day 65, when the surge deployment is considered complete.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124J20R0005, Attachment 5: SBS Sample Task Order Scenario - Surge Throughput Listing -
REVISED, 10 FEB 20
DAY ADDITIONAL PERSONNEL FLOW FOR SURGE ARRIVALS DEPARTURES DAILY TOTALS
1 Day 1: Start of arrivals 400 0 400 2 403 0 803 3 409 0 1212 4 421 0 1633 5 415 0 2048 6 423 0 2471 7 436 0 2907 8 435 0 3342 9 441 0 3783
10 Day 10: Peak surge load 453 0 4236 11 Peak surge load 0 0 4236 12 Peak surge load 0 0 4236 13 Peak surge load 0 0 4236 14 Peak surge load 0 0 4236 15 Peak surge load 0 0 4236 16 Peak surge load 0 0 4236 17 Peak surge load 0 0 4236 18 Peak surge load 0 0 4236 19 First units completing 17-Day Post-Mob Training 0 0 4236 20 Initial surge unit departures to mission location 0 125 4111 21 0 15 4096 22 0 131 3965 23 0 0 3965 24 0 0 3965 25 0 158 3807 26 0 28 3779 27 0 112 3667 28 0 0 3667 29 0 0 3667 30 0 49 3618 31 0 51 3567 32 0 45 3522 33 0 30 3492 34 0 113 3379 35 0 45 3334 36 0 25 3309 37 0 0 3309 38 0 60 3249 39 0 0 3249 40 0 77 3172 41 0 32 3140
Monthly MFGI throughput for ongoing mobilization & demobilization at time of surge: 4310 personnel (MOB = 3634 personnel and DEMOB = 676 personnel). The surge requirement for an additional 4236 mobilizing at the MFGI. This requirement is additive to the 4310 personnel currently mobilizing or demobilizing. The daily planning throughput requirement for the surge only is shown in the table below:
SURGE FLOW THROUGH MFGI
SURGE THROUGHPUT
DAY ADDITIONAL PERSONNEL FLOW FOR SURGE ARRIVALS DEPARTURES DAILY TOTALS
42 0 51 3089 43 0 0 3089 44 0 0 3089 45 0 0 3089 46 First units completing 42-Day Post-Mob Training 0 209 2880 47 0 112 2768 48 0 183 2585 49 0 77 2508 50 0 222 2286 51 0 278 2008 52 0 252 1756 53 0 42 1714 54 0 110 1604 55 0 94 1510 56 0 0 1510 57 0 225 1285 58 0 395 890 59 0 280 610 60 0 125 485 61 All Post-Mob training for surge complete 0 42 443 62 Final out-flow of deploying units 0 226 217 63 0 201 16 64 0 16 0 65 Surge Deployment Complete 0 0 0