W9124J12R00170001.pdf
PDF 717 KB Posted
- Solicitation number
- W9124J-12-R-0017
About this file
Conform Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| L_and_M_crosswalk_8_Novemeber_2012.docx | DOCX document | |
| SF_30.pdf | ||
| Region_2_Map.pdf | ||
| Industry_Questions.pdf | ||
| W9124J12R0017-0002.pdf | ||
| Amendment_0002.pdf | ||
| Attachment3Drawing2.pdf | ||
| Attachment3Drawing4.pdf | ||
| Attachment3Drawing3.pdf | ||
| Attachment3SOW.pdf | ||
| Attachment3.pdf | ||
| Attachment3Drawing.pdf | ||
| Attachment2PPQ.pdf | ||
| Attachment4.pdf | ||
| Attachment1PPI.pdf | ||
| W9124J12R0017.pdf | ||
| Amendment0001.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124J-12-R-0017
W9124J-12-R-0017-0001
Multiple Aw ard Task Order Contract (MATOC) in support of the US Army Reserve 63rd RSC, Region Tw o (TX, AR, OK, and NM). This solicitation w ill result in tw o to three aw ards and is 100% set-aside for SBA Certif ied 8(a) companies. The period of performance w ill be a f ive year ordering period. The maximum amount of all task orders over the life of the contract w ill not exceed $16,500,000.00
"Geographic Restrictions" for this procurement, the Offers w ill be limited to 8(a) contractors w ho are located in, or have a bona fide off ice location w ithin SBA Region Six.
The Davis Bacon Act applies to all w ork performed under this contract and w ill be strictly enforced. A current w age determination w ill be furnished for each task order.
KIMBERLY A. MILLER 210-466-2221
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Sep-2012
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________16 Nov 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2145
FORT SAM HOUSTON TX 78234-1361
W9124J
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
210-466-2183FAX:TEL: 210-466-2145 (DSN 450) TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section A - Solicitation/Contract Form
SOLICITATION NOTES
A1. This Multiple Award Task Order Contract (MATOC) will cover facilities across a four state region: Texas, New Mexico, Arkansas and Oklahoma (collectively, Region Two). This requirement is for a broad range of maintenance and repair of real property and minor construction on buildings to include some design/build and construction efforts. The contractors shall provide labor, equipment, materials, and supervision necessary to perform interior/exterior painting and disposal, minor construction, maintenance and repair in accordance with the Statement of Work (SOW) and each individual Task Order.
A2. This acquisition is set-aside for 8(a) contractors with a bona fide place of business (as defined by the SBA) in Texas, Oklahoma, Arkansas, or New Mexico.
A3. Reference SF1442, Block 13D, the minimum proposal acceptance period is 120 calendar days from the receipt date of Offerors.
A4. This solicitation is for a MATOC. The Government intends to make two to three awards from this solicitation. The Government reserves the right to make more or less awards. The estimated program ceiling for
Region Two is $16.5 Million.
A5. The guaranteed minimum for each awarded MATOC is $10,000.00 and is applicable only for the first year of the five year ordering period.
A6. Applicable Davis Bacon Wage Determinations will be included on the individual task order level.
A7. The provisions of FAR 9.5, "Organizational Conflict of Interest" (OCI), apply to any award under this solicitation. A significant conflict of interest has been identified which may prohibit Chenega Global Services, from participating in any form to this solicitation and resulting contract. The reason for this potential prohibition is that
Chenega Global Services provides general engineering technical support to the 63 rd
RSC. All potential offerors, subcontractors, or any other contractor having a business relationship with Chenega Global Services shall identify any current and/or potential conflict of interest and any plans to mitigate any such conflict. Offerors should review their current and planned participation in any other Government contracts, subcontracts, consulting, or teaming arrangements where they may be in a position of actual or perceived bias or unfair competitive advantage. Offerors are required to identify organizational conflicts of interest and present mitigation plans, as part of their offer.
Conflict-free performance is a requirement of this contract.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
General Construction
FFP
General construction to include maintenance, repair, and alteration of real property as well as minor new construction of facilities supported by the 63rd Regional Support Command across Texas, Oklahoma, New Mexico and Arkansas
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Design-Build
FFP
Contractors will develop project design documentation of facilities supported by the 63rd Regional Support Command across Texas, Oklahoma, New Mexico, and
Arkansas. Upon completion of the design, and upon Government acceptance, construction shall commence and be completed in accordance with the task order requirements.
FOB: Destination
NET AMT
GENERAL PROVISIONS
NOTE: Prices are not required in this section. Offeror shall complete the Coefficient Schedule included in this section.
COEFFICIENT SCHEDULE
CLIN DESCRIPTION COEFFICIENT
The Contractor shall provide S/R/M construction services in accordance with the
Scope of Work, specifications, and as may be otherwise noted on individual task orders.
CONTRACT ORDERING PERIOD: 1 MARCH 2013 (OR DATE OF AWARD,
THROUGH 28 FEBRUARY 2018
0001AA Standard Working Hours For Projects ranging from $3,000.00 - $25,000.00
0001AB Standard Working Hours for Projects ranging from $25,001.00 - $100,000.00
0001AC Standard Working Hours for Projects ranging from $100,001.00 - $250,000.00
0001AD Standard Working Hours for Projects ranging from $250,001.00- $500,000.00
0001AE Standard Working Hours for Projects greater than $500,001.00
0001AF Non-Standard Working Hours For Projects ranging from $3,000.00 - $25,000.00
0001AG Non-Standard Working Hours for Projects ranging from $25,001.00 - $100,000.00
0001AH
Non-Standard Working Hours for Projects ranging from $100,001.00 -
$250,000.00
0001AJ Non-Standard Working Hours for Projects ranging from $250,001.00- $500,000.00
0001AK Non-Standard Working Hours for Projects greater than $500,001.00
The Contractor shall provide design-build construction services in accordance with the Scope of Work, specifications, and as may be otherwise noted on individual task orders.
CONTRACT ORDERING PERIOD: 1 MARCH 2013 (OR DATE OF AWARD,
THROUGH 28 FEBRUARY 2018
0002AA Standard Working Hours For Projects ranging from $3,000.00 - $25,000.00
0002AB Standard Working Hours for Projects ranging from $25,001.00 - $100,000.00
0002AC Standard Working Hours for Projects ranging from $100,001.00 - $250,000.00
0002AD Standard Working Hours for Projects ranging from $250,001.00- $500,000.00
0002AE Standard Working Hours for Projects greater than $500,000.00
0001AF Non-Standard Working Hours For Projects ranging from $10,001.00 - $25,000.00
0001AG Non-Standard Working Hours for Projects ranging from $25,001.00 - $100,000.00
0001AH
Non-Standard Working Hours for Projects ranging from $100,001.00 -
$250,000.00
0001AJ Non-Standard Working Hours for Projects ranging from $250,001.00- $500,000.00
0001AK Non-Standard Working Hours for Projects greater than $500,000.00
Non-Priced Item (NPI) Coefficient
Note: Coefficients shall be carried to no more than three decimal places.
B1. PROPOSED COEFFICIENTS ARE EFFECTIVE FOR THE ENTIRE CONTRACT ORDERING
PERIOD. Coefficients shall be expressed in the form of a unit multiplication factor. For example, the unit price plus a ten percent (10%) increase factor is expressed as “1.100.” Conversely, the unit price plus a ten percent (10%) decrease factor is expressed as “0.900.” The contractor should thoroughly consider all potential costs and future implications before submitting a coefficient less than 1.000 for any item in the Coefficient Schedule.
B1.1 Task orders (TOs) may be competed amongst MATOC holders in accordance with the ordering procedures in the resultant contract. The contractor will not be awarded any projects in any particular order nor is the contractor guaranteed any work above the minimum amount guaranteed in the contract. The contract will be a Multiple Award
Task Order Contract.
B1.2 Task Orders shall be priced by using the bare rate of the UPB with the addition of the coefficient. The coefficient will be based upon the rate established in this Base Contract.
B1.3 Coefficients. Coefficient means a numerical factor that represents costs (generally, but not exclusively, indirect costs) not in the Unit Price Book (UPB), e.g., general and administrative costs and other overhead costs, insurance costs, protective clothing, equipment rental, contractor’s profit and other costs.
B1.3.1 The offeror’s Coefficients shall be all inclusive and may include, but not be limited to, the following costs:
General and Administrative and other Overhead
Profit and risk
Social security contributions
Insurance Costs
Employee Payroll Taxes
Insurance and Fringe Benefits
Subcontractors’ Overhead and
Profit
Mobilization and demobilization costs
Site cleanup
Quality control
Any markups for materials and all contingencies
Corporate Headquarters support
(legal, financial, etc.)
Waste and excess material
Sales tax on material and equipment costs
Compliance with EPA/OSHA regulations and protection and safety laws
B1.3.2 The City Cost Index (CCI) shall not be included in the coefficient. The CCI will be added to individual
Task Orders depending on the location of the project.
B2. Unit Price Book (UPB): The UPB for this contract is the most current RS MEANS Facilities Construction
Cost Data Book. The unit prices stated in the UPB is for complete and in-place construction unless explicitly described otherwise. The contractor shall assume all risk for labor rate increases after award of the contract, except adjustments based on delays in performance due to Government delay.
B2.1 Labor. Bare costs line items in the UPB contains allowances for the basic hourly rate and fringe benefits, but does not include allowances as required by federal, state, or local law such as workers compensation, unemployment and disability insurance, Social Security, Medicare, etc. No allowance has been made for overtime in the labor rates factored into the UPB. Furthermore, wages for management, supervisory or administrative personnel have not been factored into the labor rates used in the UPB.
B2.1.1 Bare costs are defined as: Material costs, which may include freight, but may not include any other overhead or associated costs by the prime and/or a subcontractor; Labor costs by the prime and/or a subcontractor;
and Equipment that is to be used solely as a result of inclusion of the non-prepriced item, by the prime and/or a subcontractor.
B2.2 Material: Material costs factored into the UPB were determined by contacting manufacturers, dealers, distributors, and contractors throughout the United States.
B2.3 Equipment: Equipment costs within the UPB include not only rental costs but also operating cost.
B3. Non Pre-Priced Item (NPI): For individual task orders, items of work not covered by the RS MEANS, but within the scope and general intent of the contract, may be added by the Contracting Officer. These items may then be incorporated into and made part of the basic contract at the government’s option. For individual task orders, the items shall be provided at the negotiated price, and multiplied by the applicable NPI coefficient listed in the contract schedule. The RS MEANS shall be used to the maximum extent practical. For each task order proposal, NPIs shall be supported by two competitive quotes unless waived by the applicable Contracting Officer. NPI may not exceed
25% of the total dollar value of the task order without the approval of the Contracting Officer. Each situation where
NPI items may exceed 25% of the total priced order shall be thoroughly justified by the contractor as part of their proposal, for the requested work.
B4. WAGE DETERMINATIONS: The Contracting Officer shall incorporate the most current wage determinations for each Request for Task Order Proposal (RTOP) issued. The Contracting Officer shall identify the applicable wage determination(s) to be incorporated into each task order issued. The wage determinations will be effective for the complete period of performance of those task orders without further revision.
Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
STATEMENT OF WORK
MATOC CONTRACT
Overview: The primary objective of this indefinite delivery, indefinite quantity (ID/IQ) firm-fixed priced contract is to provide maintenance, repair and rehabilitation work, minor new construction and minor design-build services on an as-needed basis. All work will be at a fair and reasonable price and in a prompt and timely manner. Some work will require both design and construction efforts.
1. General. Work under this contract will be ordered by issuance of individual task orders. Task orders will be in the form of Requests for Task Order Proposal (RTOPs). Contractors will compete for work by responding to issued RTOPs. All RTOPs issued for Design/Build task orders will utilize 2 Phase Design/Build procedures.
Award of each task order will be based on either price or best value to the government. The contractor shall, upon acceptance of a proposal by the government, furnish all labor, material, equipment, transportation, and supervision to accomplish the required work described in the RTOP. The contractor shall also be responsible for all site visits, investigations, feasibility studies, designs, calculations, work plans, equipment startup and testing and/or repair, warranties, and training, when required. Each contractor may be required to accomplish work on several task orders at one time. It is critical that the contractors diligently execute all work under this contract and meet all project schedules and completion dates.
2. Task Orders Categories. Types of work to be performed under this contract will vary and will fall into one of two task orders categories: construction only and/or design/build. The following types of work will be required:
a. Construction. Contractors will be required to perform a variety of common construction tasks. Work involving all 50 divisions of the Construction Specification Institute (CSI) may be required. Other types of construction expertise may be required on a limited basis and will be identified at the task order level.
b. Design-Build. Contractors will develop project design documentation to include drawings, scope of work, cost estimate broken out by CSI division, and submittal register. Upon completion of the design, and upon Government acceptance, construction shall commence and be completed in accordance with the task order requirements.
3. Codes and Standards. Work to be accomplished under this contract shall conform to all applicable current industry standards and/or nationally recognized publication governing application, performance, quality and safety. Specific standards and publications may be identified, as required, by each task order. The contractor is responsible for ensuring compliance with each standard or publication. The contractor shall utilize the latest issue of the standard or publication as of the date of task order award. All work shall adhere to any and all applicable local, state and federal codes and regulations. All work shall comply with the latest edition of the applicable codes. Whenever a conflict occurs, the most stringent shall apply. When engineering and/or design work is required by the task order, licensed professional engineers, architects, and industrial hygienists shall certify that efforts meet all appropriate codes and standards.
4. Project Locations. The contractor shall accomplish the work under this contract at various 63rd Regional
Support Command locations across the western United States. This contract will encompass the states of:
Arkansas, Oklahoma, New Mexico and Texas.
5. Permits. The contractor is responsible for identifying, obtaining and bearing the cost of all required federal, state, local, or installation permits.
6. Contractor Organization. Contractors must be diversified. Each contractor shall maintain the capability to provide a quick response to all task orders issued throughout the contract period. The contractor shall provide the following for the life of the contract and for each task order:
a. Project Manager. All work shall be accomplished under the direction of the contractor’s project managers. Project managers will be identified, in writing, to the contracting officer prior to commencement of work under each task order. Should there be a need to change project managers during task order performance; the contractor will notify the contracting officer in writing of the change. The project managers shall be experienced in the construction field and shall oversee task accomplishment, administer all instructions, and answer questions from the contracting officer or his/her designated representative. Additionally, the project manager shall be responsible for complete coordination of all work.
b. Quality Control Program. Each contractor shall be responsible for implementing an effective quality control program. The quality control program shall ensure that all work conforms to the task order requirements, whether performed by the contractor, subcontractors or suppliers. Each contractor shall designate a qualified quality control person who shall have the authority to act in all quality control matters for the contractor. This person shall be on-site while work is in progress or shall have a qualified designated alternate to act in his/her absence. The contractor shall be responsible for performing all necessary inspections and tests. Records shall be maintained of all inspections and test performed. These records shall be turned over to the contracting officer or authorized representative at the completion of the respective task order.
c. Product Removal. The contractor shall be responsible for transporting of all debris/disposable waste, in accordance with local, state and federal environmental regulations. If necessary, the contractor will prepare manifests and/or appropriate shipping documents for all items removed for disposal in accordance with 49 CFR 100-185 and 40 CFR 260-265. Transporters must have registered EPA
Identification numbers and all waste will be disposed of in approved disposal facilities in accordance with EPA regulations approved to accept identified wastes. All disposal facilities for material and wastes shall be identified in the Work Plan for acceptance prior to removal. Copies of manifests or other disposal documents are required and will be included in the final report. All shipping papers will be prepared for a certified government representative signature. The contractor shall notify the project manager who in-turn will contact an environmental representative from the 63d RSC, 5 working days in advance of any projected shipment needing off-site disposal.
d. Asbestos Abatement: Work will be performed in accordance with, and in most cases exceed, standards set by EPA, OSHA, NIOSH, and AQMD. In particular, the work will comply with EPA, NIOSH and OSHA asbestos worker protection regulations (e.g. 29 CFR OSHA 1926.1101). Asbestos containing materials will be detailed on provided asbestos surveys if available and any other material found during demolition of the project shall adhere to the aforementioned standards and follow the criteria shown in this section as a minimum. An asbestos abatement plan shall be submitted and approved before any work shall be allowed to be scheduled.
e. Solid Waste: IAW EO 13514 A&E shall promote pollution prevention and eliminate waste by following Command Policy to: (ii) diverting at least 50 percent of non-hazardous solid waste, excluding construction and demolition debris, by the end of fiscal year 2015; (iii) diverting at least 50 percent of construction and demolition materials and debris by the end of fiscal year 2015. The 63d
RSC is required to comply with Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, which requires diversion from landfills of 50% of construction and demolition debris by the end of fiscal year 2015. In order to meet this requirement, the 63d RSC must track total weights of materials disposed in, as well as, diverted from landfills. Therefore, Contractor shall be required to report separately weights of C&D materials sent to landfills versus those recycled.
Contractor shall endeavor to use recycling as a first option whenever economically feasible
f. Pest Management: Contractor must comply with all applicable aspects of FIFRA and the 63D RSC
Integrated Pest Management Plan (IPMP).
7. Environmental Compliance:
a. Contractor shall be knowledgeable of all applicable Federal, state, and local permit/notification requirements inherent in a given individual task order, including permits specific to environmental media
(i.e., hazardous wastes, water, air, soil, flora, fauna, etc.), cultural resources, and indoor air quality. The term permit will be broadly defined, to include any such documentation, data, or submission required pursuant to regulatory requirements or guidance. Contractor shall prepare required permits and notifications IAW regulatory agency requirements. Under no circumstance shall Contractor provide such permits and notifications to the regulatory agency or any other organization outside the U.S. Army prior to 63d RSC approval of same. Contractor shall also be responsible for payment of any fees associated with permits and notifications.
b. The parties understand that certain task orders under this effort may require personnel assigned to the project to have specialized training and/or licensing; for example, licensed asbestos workers and supervisors during an asbestos abatement. It shall be the Contractor's duty and expense to ensure that all personnel are properly trained and current with any licensing requirements.
c. Contractor maintain a clean, safe, and orderly work site, free of excessive debris, trash, and construction-generated waste, and adopt acceptable good housekeeping practices and best management practices to prevent any negative impact on adjacent natural habitat and/or public domain.
d. The contractor employees must be adequately trained in the handling and disposal of hazardous waste, in particular, lead paint and asbestos. Hazardous materials must be handled and disposed of appropriately by the contractor. Disposal is at contractor’s expense. The contractor must comply with all local, state, and federal environmental laws, regulations, and policies prior to final approval of work completed.
National Environmental Policy Act (NEPA) documents must be completed prior to award of the contract or notice to proceed.
8. Conservation - Work will be performed in accordance with, and in most cases exceed, standards set by
USFWS, NMFS, SHPO, ACHP. Impacts to resources will be preceded by notifications in writing to appropriate regulatory agencies and notification to the COR. Any mitigation that must be resolved prior to work will be approved by the Contracting Officer.
9. General Preaward:
a. The Contractor shall visit the work site to verify the site condition. If the Contractor discovers any errors or omissions in the SOW, Plans or Specifications, the Contractor shall immediately call it to the attention of the Contracting Officer (KO) and the Contracting Officer Representative (COR)/Quality Assurance
Evaluator (QAE).
b. Where the Specifications and Plans describe portions of the work in general terms, but not in complete detail, it is understood that all work and materials will be of the highest standard using generally accepted industry practices.
c. The Contractor shall not interrupt the service function or disturb the support of any utilities without prior coordination with the QAE. If any utilities are disturbed or damaged, the Contractor shall bear costs of repair and or replacement.
d. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. This can include stormwater permits, US
Army Corps of Engineers permits, state water resources permits, US fish and wildlife permits, etc.
10. General Post-Award:
a. Where any conflict occurs between the requirements of federal, state, and local laws, codes, ordinances, rules and regulations, the most stringent shall govern.
b. The Contractor shall, at all times, keep all premises free from accumulation of waste material and rubbish caused by his work, or his subcontractors. At the completion of work, the Contractor shall thoroughly clean the work site. All debris, rubbish, and waste material shall be removed from the property at the
Contractor’s expense and disposed of in an official disposal site.
c. The Contractor shall make no changes or deviate from the approved design of a project without written permission from the KO.
d. Contractor shall warranty all work.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
52.246-21 Warranty of Construction MAR 1994
CLASSIFICATION
E1. GOVERNMENT INSPECTOR
The Chief of the Engineering and Operations Branch of the 63 rd
RSC will designate a Government Inspector for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the CONTRACTING OFFICER to commit the
Government to changes in the terms of the contract. The Government Inspector is not authorized or required to perform the quality control for the contract.
E2. FINAL INSPECTION FOR TASK ORDER
(a) The contractor shall request a final inspection in writing to the Administrating Contracting Officer (ACO) when the contractor is near completion of the work called for in the task order. The final inspection will normally be requested five days prior to the completion date or as otherwise negotiated with the Contracting Officer.
(b) Once the contractor has requested a final inspection, the Government will conduct a final inspection. Should discrepancies be noted, the inspection will be considered a pre-final inspection and the contractor will correct the problems prior to final inspection. The ACO reserves the right to decline the contractor’s request for an inspection when it is evident that the contractor is not ready for an inspection.
(c) The final inspection will be performed with representation from Contracting, Engineering and Operations Branch and the contractor (other government personnel may be in attendance). Should discrepancies be noted, the punch list items are to be corrected within the established performance period on the task order and prior to final payment.
Section F - Deliveries or Performance
52.211-12 Liquidated Damages--Construction SEP 2000
52.211-13 Time Extensions SEP 2000
52.242-14 Suspension of Work APR 1984
252.219-7011 Notification to Delay Performance JUN 1998
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (**as specified in each issued task order) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (**as specified in each issued task order). The time stated for completion shall include final cleanup of the premises.
(End of clause)
F1. CONTRACT PERIOD
Any contract awarded as a result of offers submitted under this solicitation becomes effective from the date of award for a period of sixty months unless sooner terminated under the terms of the contract.
F2. DELIVERABLES
Except as specified or directed otherwise, the Contractor shall provide all deliverables, reports, plans, schedules, etc., through the Contracting Officer’s Representative (COR) to the Contracting Officer. All plans, schedules, etc., must be reviewed and approved in writing by the Contracting Officer except as specified otherwise herein or as otherwise delegated by the Contracting Officer.
F3. TASK ORDERS (CONSTRUCTION)
Performance of construction will be accomplished by the contractor after issuance of task orders against the
MATOC. The contractor will be required to perform the work as specified in each task order.
F4. NOTICE TO PROCEED FOR TASK ORDERS
Notice to Proceed will be issued to the successful contractor upon receipt of acceptable submittals required to work and after approval of the contractor’s performance and payment bonds.
F5. PERFORMANCE PERIOD
(a) When the notice to proceed for a task order is issued, it will specify a required start date and a completion date.
For task orders not requiring a notice to proceed, the contractor may start work at an earlier date and complete at an earlier date than specified provided the contractor gives a written notice to the Contracting Officer at least two (2) working days in advance of desired start date. If an earlier start date is approved by the Contracting Officer, the required completion date will be recomputed.
(b) Work for task orders issued during the last quarter of the fiscal year shall begin before January 1 st of the following calendar year. Beginning work is evidenced by:
(1) A visual inspection of the work site which discloses that significant work has been accomplished or that contractor employees are actually engaged in work.
(2) Documentary evidence that costs have been incurred or material has been order for this task order.
Section G - Contract Administration Data
G1. CONTRACT ADMINISTRATION
(a) All matters pertaining to Government administration of this contract should be directed to:
Mission and Installation Contracting Command – Fort Sam Houston
IMCOM Support Division
2205 Infantry Post Road, BLDG 604
Fort Sam Houston, TX 78234-1361
(b) Mission and Installation Contracting Command – Contracting Officers are authorized to place task orders against this contract. Any additional authorizations will be issued by unilateral modification.
(c) All matters pertaining to the administration of each task order should be directed to the pertinent Contract
Specialist. Each task order may be signed by any Contracting Officer within the Mission and Installation
Contracting Command. However, this does not preclude another Contracting Officer within the MICC from signing any documents or attending any meetings in matters pertaining to the task order from the primary Contracting
Officer.
G2. FINAL PAYMENT FOR TASK ORDERS
Before final payment for task orders will be made, all contractors’ payrolls to include their subcontractors, SF 1413
Statement of Acknowledgement for each subcontractor, material submittals, progress reports, daily reports, test reports, as-built drawings, and release of claims must be received by the Government.
G3. ORDERING OFFICER
An Ordering Officer may be designated with the authority of the Director of Contracting to negotiate task orders against this contract. The authority and limitations placed upon the Ordering Officer will be stated in the appointment letter.
5152.233-4000 AMC-LEVEL PROTEST PROGRAM (Sep 2011) (LOCAL CLAUSE)
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters (HQ), Army Materiel Command
(AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government
Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below. All other agency-level protests should be sent to the contracting officer for resolution.
Headquarters U.S. Army Materiel Command
Office of Command Counsel
4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
Packages sent by FedEx or UPS should be addressed to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel
4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
The AMC-Level Protest procedures are found at: http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp.
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the HQ AMC-Level Protest
Procedures.
(End of Clause)
WAWF Electronic Invoicing Instructions
Contractor shall submit payment request using the following method(s) as mutually agreed to by the Contractor, the
Contracting Officer, the contract administration office, and the payment office.
____X____ Wide Area Work Flow (WAWF) (see instructions below)
_________ Other (please specify) ________________________________
DFAS POC and Phone: Customer Service @ 1-888-332-7366
WAWF is the preferred method to electronically process vendor request for payment. This application allows DOD vendors to submit and track Invoices and Receipt/Acceptance documents electronically. Contractors using WAWF shall (i) register to use WAWF-RA at https://wawf.eb.mil and (ii) ensure an electronic business point of contact
(POC) is designated in the Central Contractor Registration site at http://www.ccr.gov within ten (10) calendar days after award of this contract/order.
WAWF Instructions
Questions concerning payments should be directed to the Defense Finance and Accounting Service (DFAS) –
Indianapolis, Department 3800, 8899 E. 56 th
Street, Indianapolis, IN 46249-3800 at 1-888-332-7366 or faxed to
1-877-701-5069 (ATTN: Vendor Pay – Indianapolis). Please have your purchase order/contract number ready when calling about payments.
http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp
You can easily access payment and receipt information using the DFAS web site at http://www.dfas.mil/money/vendor. Your purchase order/contract number or invoice number will be required to inquire about the status of your payment.
The following codes and information will be required to assure successful flow of WAWF documents.
TYPE OF DOCUMENT
_____ Invoice as Combo (Supplies)
_____ Invoice as 2-in-1 (Services)
__X__ Construction Invoice
CAGE CODE:
ISSUE BY DODAAC: W9124J
ADMIN BY DODAAC: TBD
INSPECT BY DODAAC: W90XCV
ACCEPT BY DODAAC: W90XCV
SHIP TO DODAAC: W90XCV
PAYMENT OFFICE FISCAL STATION CODE: HQ0105
E-MAIL POINTS OF CONTACT LISTING:
INSPECTOR: [To be cited on individual task orders]
ACCEPTOR: [To be cited on individual task orders]
RECEIVING OFFICE POC: [To be cited on individual task orders]
CONTRACT SPECIALIST: [To be cited on individual task orders]
CONTRACTING OFFICER: [To be cited on individual task orders]
ADDITIONAL CONTACT: [To be cited on individual task orders]
Section H - Special Contract Requirements
H1. Scope.
Except as otherwise provided in this contract,
a. The Contractor shall furnish all plant, labor, supervision, equipment, transportation, and materials necessary to accomplish the required work, and
b. The Contract price as stated in the Schedule shall constitute the only compensation for the contractor’s fulfillment of all the requirements of this contract.
H2. Minimum / Maximum Contract Amounts. The Government makes no representation as to the number of Task Orders or actual amount of work to be ordered in excess of the minimum guarantees specified herein. The minimum guarantee for this contract is $10,000.00. The maximum aggregate amount of the MATOC program, inclusive of all awarded MATOC contracts and task orders, including options, shall not exceed
$16,500,000.
H3. Proposal Guarantee (Bid Bond). Subsequent Task Orders: Individual proposal guarantees (bid bonds) may be required from all offerors competing for award of any subsequent Task Orders. The requirement for a guarantee will be included in the Task Order Request for Proposal. Bid Bonds will only be waived at the discretion of the Contracting Officer.
H4. Commencement of Work. No work under this contract will commence until such time as the
Contracting Officer issues a written Task Order.
H5. Proposal Preparation Costs. The costs for preparation of Task Order proposals shall be the responsibility of the contractor and not directly reimbursable. Each Task Order awarded will include at a minimum all labor wages, management, supervision, mobilization, material and equipment costs, and any costs associated with any required design effort. The contractor shall furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirements of the Task Order.
H6. Insurance – Work On A Government Installation (Jan 1997) – Supplemental Information To Far
Clause 52.228-5
a. The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
b. Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
c. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
TYPE AMOUNT
Workers’ Compensation -- The required Workmen’s
Compensation Insurance shall extend to cover employees liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.00
Comprehensive General Liability with minimum limits of
Per accident or occurrence for bodily injury $500,000.00
This insurance shall include Contractor’s protective liability and contractual liability.
Comprehensive Automobile Liability
Insurance with minimum limits of
Per Person $200,000.00
Per Occurrence for Bodily Injury $500,000.00
Per Occurrence for Property Damage $ 20,000.00
H7. Normal Duty Hours. Normal duty hours are 7:30 AM to 4:00 PM, Monday through Friday, except holidays observed by the Government. The Contractor shall submit to the Contracting Officer in writing a notice of any period of scheduled work at times other than normal duty hours. This notice shall be submitted not less than three (3) days prior to each period of work scheduled at times other than normal duty hours
H8. Government Holidays
The following legal holidays are observed:
New Year’s Day, January 1
Dr. Martin Luther King, Jr. Day, 3 rd
Monday in January
Washington’s Day, 3 rd
Monday in February
Memorial Day, Last Monday in May
Independence Day, July 4 th
Labor Day, 1
Monday in September
Columbus Day, 2 nd
Monday in October
Veterans Day, November 11
Thanksgiving Day, 4
Thursday in November
Christmas Day, December 25
a. The Federal holidays listed above are subject to changes that may be enacted by Congress.
b. When any of the above holidays falls on a Saturday, the preceding Friday will be observed as the legal holiday; holidays falling on a Sunday will be observed on the following Monday.
c. Any work on Saturdays, Sundays, or Federal holidays that is required to maintain construction schedules, shall be performed without additional cost to the Government. The Contractor shall notify the Contracting
Officer, in writing, a minimum of two working days in advance when the Contractor anticipates weekend or holiday work. The Contractor shall not schedule weekend or holiday work that requires observation by the
Government’s representative(s).
H9. Government Liability – Equipment on Site
a. The Contractor shall safeguard government equipment that is to remain in place within the area of contract operations to protect it against damage or loss. The Contractor shall store equipment that is removed in performance of work where directed or reused in work as required by drawings and specifications.
Equipment temporarily removed shall be protected, cleaned and replaced equal to its condition prior to starting work. Security for equipment or material that is to be reused and is removed for temporary storage shall be the sole responsibility of the Contractor.
b. The Government shall not be liable for any loss or damage to the Contractor’s property or for expenses incidental to such loss or damage unless it is proven that the loss was due to negligence of Government employees acting within the scope of their employment
H10. Davis Bacon Wage Determination. Individual task orders will be subject to one or more of the applicable Wage Determinations as the work dictates at the time of task order award.
H11. Subcontracting Responsibilities. The contractor shall be responsible for the management and performance of all subcontractors. The contractor shall ensure Task Orders are completed within the stated requirements.
H12. Notice Of Constructive Changes. No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
H13. Pre-Design and/or Pre-Construction Conference. Prior to commencing work under a Task Order, the Contractor shall meet with the Contracting Officer and/or designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning schedule and administering work.
H14. Performance Bonds And Payment Protections
a. Task orders exceeding $150,000.00, FAR clause 52.228-15 is applicable.
b. Task orders exceeding $30,000.00 but less than $150,000.00, FAR clause 52.228-13 is applicable.
c. Within ten (10) days after award of a task order, if required the Contractor shall furnish a Performance
Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A) or an Irrevocable Letter of
Credit, each with good and sufficient surety or sureties acceptable to the Government. The penal sums of these bonds shall be as follow:
(1) Performance Bond - When the task order amount is $150,000.00 or more, the penal sum of the performance bond shall equal one hundred percent (100%) of the task order amount.
(2) Payment Bond/Protection - When the task order amount is between $30,000.00 and $150,000.00, the penal sum of the irrevocable letter of credit or payment bond shall equal 100% of the task order amount. When the task order amount is over $150,000.00 the penal sum of the payment bond shall equal 100% of the task order amount.
d. The Government may require additional performance and payment bond protection if the task order amount is increased. The increase in protection generally will equal 100% of the increase in task order amount.
H15. Performance Period. The period of performance will be cited on each individual task order. The periods of performance on task orders are independent of each other and may run concurrently.
H16. Statutory Cost Limitations. Some task orders may be subject to statutory cost limits. If so, this limitation will be cited in the applicable task order.
H17. Performance Evaluations. For any construction task order $650,000 or more ($10k if terminated for default), a contractors performance evaluation will be completed and entered into the Construction Contractor
Appraisal Support System (CCASS). At the discretion of the Contracting Officer, a CCASS can be prepared for any lesser amount contract. The evaluation will take into account all aspects of the Contractor’s performance.
Performance evaluations may be completed at any time. Contractors will be provided a copy of the performance evaluation and an opportunity to discuss the evaluation. The performance evaluations will have an impact on the award of future task orders.
H18. Identification Of Government-Furnished Property. Pursuant to the “Government Property” clause, Government furnished property will be specified in each task order, as applicable.
H19. In-House Performance Plan. In accordance with FAR 52.219-14 – Limitations on Subcontracting, the
Contractor is responsible for performing 15% of work using its own employees, not to include the cost of materials.
Each task order proposal shall include a plan on accomplishment of the 15% in-house workforce utilization. Final payment requests for individual task orders shall include a certified statement indicating the percentage of work performed by the in-house workforce.
H20. Bound Unit Price Books. The Contractor shall provide one (1) copy of the most current version of the bound RS MEANS Facilities Construction Cost Data Book (UPB).