W9124E-16-R-0002
W9124E-16-R-0002-0004
1. This requirement is for a single aw ard Indefinite Delivery, Indefinite Quantity (IDIQ) Job Order Contract (JOC) for the Sustainment, Restoration and Modernization of Post-Wide Construction Efforts of real property facilities located at Fort Polk, LA. The ordering period is a base period of 12 months, w ith tw o (2) one-year option periods.
2. Instructions for the preparation of proposals are located in Section L.
3. The estimated magnitude of this construction project is betw een $10,000,000 and $25,000,000.
4. The North American Industry Classification System (NAICS) code is 236220, Commercial and Institutional Building Construction, w ith a size standard of $36.5 million.
5. Block 11: Performance w ill be as negotiated on each individual task order and w ill be subject to the Davis Bacon Act.
6. This requirement is being solicited as a 100% 8(a) Competitive Set-Aside. It has been determined that competition w ill be limited to only 8(a) f irms located w ithin the geographical area services by the Louisiana SBA district.
7. All questions regarding this requirement shall be submitted in w riting to Ms. Samantha R. Davis at samantha.r.davis.civ@mail.mil no later than Wednesday, August 31, 2016 at 12:00 p.m.
ANGELINA M. CLEMENTS 910-908-3465
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Aug-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Order Lvl
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________30 Sep 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MISSION & INSTALLATION CONTRACTING CMD
FORT BRAGG
CARRIE L. NELSON
2175 REILLY RD, STOP A
FORT BRAGG NC 28310-5000
W9124E
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 910-908-3464 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section A - Solicitation/Contract Form
TABLE OF CONTENTS
TABLE OF CONTENTS
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A - Solicitation/Contract Form SECTION B – Supplies or Services and Prices/Costs SECTION C – Descriptions/Specifications/Statement of Work SECTION D – Packaging and Marking SECTION E – Inspection and Acceptance SECTION F – Description and Performance SECTION G – Contract Administration Data SECTION H – Special Contract Requirements
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses
PART III – LIST OF DOCUMENTS,EXIBITS AND OTHER ATTACHMENTS
SECTION J – List of Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors or Respondents SECTION L – Solicitation Provisions SECTION M – Evaluation Factors for Award
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 5,000,000 Job Base Ordering Period - Polk JOC
FFP
The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each task order placed against this Indefinite Delivery/Indefinite Quantity Contract in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. The annual maximum value of the Job Order Contract for the Base Year is $5M. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $20,000 for the base year.
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Each Contractor Manpower Reporting
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.
UNIT UNIT PRICE MAX AMOUNT
1001 5,000,000 Job OPTION 1st Optional Ordering Period - Polk JOC
FFP
The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each task order placed against this Indefinite Delivery/Indefinite Quantity Contract in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a maximum of $5M per year. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $20,000 for the first option period.
1002 1 Each OPTION Contractor Manpower Reporting
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from
UNIT UNIT PRICE MAX AMOUNT
2001 5,000,000 Job OPTION 2nd Optional Ordering Period - Polk JOC
FFP
The Contractor shall provide all parts, labor, tools, equipment, materials transportation and supervision necessary to complete each task order placed against this Indefinite Delivery/Indefinite Quantity Contract in accordance with the terms and conditions of the contract, each specific statement of work, specifications, and drawings. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a maximum of $5M per year. This is an IDIQ contract with fixed price (FP) job orders and the Government has established a guaranteed minimum of $20,000 for the second option period.
2002 1 Each OPTION Contractor Manpower Reporting
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from
COEFFICIENT SCHEDULE
COEFFICIENT SCHEDULE
1.1. Contractors shall submit a fixed price coefficient for the base year CLINs 0001AA through 0001AL and each ordering period. Failure to comply with the instructions may render a proposal incomplete and ineligible for possible contract award. Coefficients shall not extend beyond two (2) decimal places.
ITEM DESCRIPTION Estimated Percentage of
Work
PRE-PRICED
COEFFICIENT
0001 BASE YEAR ORDERING PERIOD
0001AA NORMAL WORKING HOURS – FORT POLK
68.22%
0001AB NORMAL WORKING HOURS – MEDICAL
FACILITIES AND CHILD DEVELOPMENT
5.30%
0001AC NORMAL WORKING HOURS – TOLEDO BEND
AND PEASON RIDGE
3.28%
0001AD NORMAL WORKING HOURS – CONTROLLED
AREAS
3.29%
0001AE NORMAL WORKING HOURS – INTERMEDIATE
STAGING BASE
2.47%
0001AF OTHER THAN NORMAL WORKING HOURS –
FORT POLK
4.99%
0001AG OTHER THAN NORMAL WORKING HOURS –
MEDICAL FACILITIES AND CHILD
DEVELOPMENT
3.35%
0001AH OTHER THAN NORMAL WORKING HOURS –
TOLEDO BEND AND PEASON RIDGE
3.32%
0001AJ OTHER THAN NORMAL WORKING HOURS –
CONTROLLED AREAS
3.33%
0001AK OTHER THAN NORMAL WORKING HOURS –
INTERMEDIATE STAGING BASE
1.17%
0001AL NON PRE-PRICED COEFFCIENT
1.29%
1001 1ST OPTIONAL ORDERING PERIOD
1001AA NORMAL WORKING HOURS – FORT POLK
1001AB NORMAL WORKING HOURS – MEDICAL
1001AC NORMAL WORKING HOURS – TOLEDO BEND
1001AD NORMAL WORKING HOURS – CONTROLLED
1001AE NORMAL WORKING HOURS – INTERMEDIATE 2.47%
1001AF OTHER THAN NORMAL WORKING HOURS –
1001AG OTHER THAN NORMAL WORKING HOURS –
1001AH OTHER THAN NORMAL WORKING HOURS –
1001AJ OTHER THAN NORMAL WORKING HOURS –
1001AK OTHER THAN NORMAL WORKING HOURS –
1001AL NON PRE-PRICED COEFFICIENT
2001 2ND OPTIONAL ORDERING PERIOD
2001AA NORMAL WORKING HOURS – FORT POLK
2001AB NORMAL WORKING HOURS – MEDICAL
2001AC NORMAL WORKING HOURS – TOLEDO BEND
2001AD NORMAL WORKING HOURS – CONTROLLED
2001AE NORMAL WORKING HOURS – INTERMEDIATE
2.47%
2001AF OTHER THAN NORMAL WORKING HOURS –
2001AG OTHER THAN NORMAL WORKING HOURS –
2001AH OTHER THAN NORMAL WORKING HOURS –
2001AJ OTHER THAN NORMAL WORKING HOURS –
2001AK OTHER THAN NORMAL WORKING HOURS –
2001AL NON PRE-PRICED COEFFICIENT
NOTES
(1) MINIMUM GUARANTEED AMOUNT: There is a guaranteed Minimum of $20,000.00 for the base ordering period and each optional ordering period. A new minimum guarantee will be obligated upon exercise of each ordering period.
a. ANNUAL MINIMUM: The total Annual Minimum is $20,000.00 per year.
b. ANNUAL MAXIMUM: The total Annual Maximum is $5,000,000.00 per year.
(2) TOTAL JOB ORDER CONTRACT (JOC) MAXIMUM: The total JOC Maximum Value is
$15,000,000.00.
(3) If the Government's requirements set forth in the solicitation do not result in orders in the amounts described as "maximum, " shall not constitute the basis for an equitable price adjustment under this contract.
Section C - Descriptions and Specifications
GENERAL STATEMENT OF WORK
The general Statement of Work (SOW) provided below sets forth the description of work to be ordered under the resulting contract.
JOB ORDER CONTRACT
INDEFINITE DELIVERY/INDEFINITE QUANTITY
GENERAL STATEMENT OF WORK (SOW)
1. GENERAL
1.1. Scope. The Contractor shall provide all materials, supplies, job site supervision, labor, construction equipment, required safety equipment, barricades both lighted and unlighted, except that specified as Government furnished, to repair, construct real property facilities and provide related work as specified, at Fort Polk, LA, and satellite facilities to include: Medical Facilities, Child Development Centers, Toledo Bend Recreation Site and Peason Ridge, Controlled Areas (Ammunition/Weapons Storage Area(s), Active Ranges, Training Areas, and Environmentally Sensitive Areas), and Intermediate Staging Base located at England Industrial Air Park (Alexandria International Airport). These facilities are in the following parishes: Vernon, Beauregard, Sabine, Rapides, and Natchitoches. All work performed by the Contractor shall be in strict accordance with all the terms, clauses, conditions, general and special contract requirements, specifications, attachments, etc., contained herein or incorporated by reference. In addition, the Contractor shall furnish shop drawing designs in cases where required per the line item in the Unit Price Book (UPB), and shall provide shop drawings which conform to the Directorate of Public Work’s (DPWs) currently utilized electronic computer aided drafting and design (CADD) software. All work performed by the Contractor shall be in strict accordance with current, published industry and trade organization standards, and adopted building and National Fire Protection Association (NFPA) codes and standards, and shall conform to the latest criteria guidance of the latest industry trade publications in accomplishing all work. All work performed by the Contractor shall also be in strict accordance with Fort Polk requirements (i.e. fire department requirements). As new standards and codes are published, they will become the mandatory reference criteria incorporated, and control subsequent work performed under this contract, without requirement of further notice or negotiation.
1.2. Technical Specifications and Construction Task Catalog. In addition to specific Job Order requirements, all work shall be accomplished in accordance with the following documents:
1.2.1. The Corps of Engineers Guide Specifications organized by the Construction Specification Institute’s (CSI) Master Format.
1.3. Job Order Contract Construction Task Catalog, or UPB. The UPB to be used in the pricing of Individual job orders associated with this contract is the current R. S. Means (RSM) Estimating Books Volumes, as of 2015, Building Construction, Electrical, Facilities Construction, Mechanical, Plumbing, and Square Foot.
1.3.1. The UPB contains pricing information for the description of work to be accomplished and for the unit of measure specified. Project drawings, Site Visit Memorandum, Scopes of Work and other letters, and the Contractor’s proposal will be used to establish the requirements of the Job Order. The contractor shall execute all line items contained in the Contractor's proposal on a Job Order.
1.4. Contractor Responsibility. The Contractor's work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide work as specified. The work shall be conducted in accordance with the contract and all applicable Federal, State and local laws, regulations, codes, or directives, to include applicable documents listed. The Contractor shall ensure that all work meets critical reliability rates or tolerances specified or included in applicable referenced documents. The Contractor shall perform all related Contractor administrative services necessary to perform the work, to include, but not be limited to, the following: supply, quality control, Contractor financial control, and maintenance of accurate and complete records, files, and libraries of documents to include Federal, State, and local laws, regulations, codes, technical manuals, and manufacturer's instructions and recommendations. The Contractor shall provide related services such as formatting data for automated systems inputs and data base maintenance, preparing and providing required reports, compiling historical data, performing administrative activities and submitting necessary information as specified. The contractor shall be responsible for making an onsite review of the site where the work is to be performed, prior to the start of any work, list any damaged areas and turn them into the Contracting Officer’s Representative (COR), so as to preclude any responsibility for damages present that are not a result of the performance of work required in the Job Order. Any other damages found after the work is completed will be investigated by the COR. If caused by the Contractor, damages shall be corrected by the contractor at no additional cost to the Government.
1.5. Response Requirement. The Contractor shall commence all operations required by the contract as of the first day of the base period of performance. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract. Prior to contract start date, the COR will provide, to key Contractor management and supervisory personnel, an orientation to properly familiarize the Contractor and Contractor's key personnel with the installation facilities and pertinent regulations.
2.0. AREA BACKGROUND INFORMATION.
2.1. Location. Fort Polk is located in west central Louisiana, about 45 miles from Alexandria, 70 miles from Lake Charles, 120 miles from Shreveport, 150 miles from Baton Rouge, 250 miles from New Orleans, and 180 from Houston.
2.2. Climatic Conditions. Fort Polk has a humid, subtropical climate. Precipitation is frequent throughout the year, although the summer is slightly wetter than the rest of the year. There is a dip in precipitation in October. Southern Louisiana receives far more copious rainfall, especially during the winter months. Summers in Louisiana are hot and humid, with high temperatures from mid-June to mid-September averaging 90 °F (32 °C) or more and overnight lows averaging above 70 °F (22 °C). In the summer, the extreme maximum temperature is much warmer in the north than in the south, with temperatures near the Gulf of Mexico occasionally reaching 100 °F (38 °C), although temperatures above 95 °F (35 °C) are commonplace. In northern Louisiana, the temperatures reach above 105 °F (41 °C) in the summer. Snow is not very common near the Gulf of Mexico, although those in the northern parts of the state can expect one to three snowfalls per year, with the frequency increasing northwards.
2.2.1. Louisiana is often affected by tropical cyclones and is vulnerable to strikes by major hurricanes, particularly the lowlands around and in the New Orleans area. The unique geography of the region with the many bayous, marshes and inlets can make major hurricanes especially destructive. The area is also prone to frequent thunderstorms, especially in the summer. The entire state averages over 60 days of thunderstorms a year, more than any other state except Florida. Louisiana averages 27 tornadoes annually. The entire state is vulnerable to a tornado strike, with the extreme southern portion of the state slightly less so than the rest of the state. Tornadoes are much more common from January to March in the southern part of the state, and from February through March in the northern part of the state.
2.3. Directorate of Public Works. The DPW acts as the Garrison Commander's installation principal staff officer for all matters pertaining to facilities engineering and housing activities. This directorate plans, programs, prioritizes, and coordinates all facilities engineering and housing activities, including Real Property Maintenance Activities (RPMA), and Government housing/buildings & structure repairs.
2.4. Management and Personnel.
2.4.1. Key Personnel.
2.4.1.1. Project Manager.
2.4.1.1.1. The Contractor shall provide a single, on-site Project Manager (PM) and an alternate (APM). The Contractor shall designate a PM/APM in writing (listing name, address, and home telephone number) within five (5) calendar days after award of the contract to the Contracting Officer (KO) and the COR. The PM shall conduct overall management coordination, and shall be the central point of contact with the Government for performance of all work under the contract. The PM shall be available, at a minimum, between 8:00 AM and 4:30 PM. The
PM/APM shall have full authority to bind the Contractor contractually for prompt action on matters pertaining to execution of the contract. The PM and any individuals designated shall be able to understand, speak, read, and write the English language and have the ability to communicate with workers on individual job orders.
2.4.1.1.1.2. The Contractor shall have a competent project manager or site superintendent with authority to provide sufficient labor, materials and equipment in accordance with requirements of this contract and authorized to act on the Contractor's behalf. At minimum, the Contractor's representative shall be available during normal working hours and shall be physically available to the KO/COR within three (3) hours during normal working hours.
Instruction given by the KO/COR to the Contractor's representative shall be considered to have been given directly to the Contractor.
2.4.1.1.1.3. The Project Manager and designated Alternate shall have a minimum of five (5) years experience in the construction field with a minimum of five (5) years experience in construction management. A summary of this experience shall indicate the candidate for PM position possesses the particular knowledge, skills, and abilities to successfully perform the duties of the position. Management experience may run concurrently with general construction experience. The education qualifications shall, at a minimum include a four (4) year course of study at an accredited college or university leading to a bachelor’s or higher degree with a major study in an appropriate field of engineering, construction, or industrial technology or shall be a registered professional engineer in a discipline appropriate to the construction field. In lieu of the preceding education requirements, the PM candidate may qualify by providing proof of a minimum fifteen (15) years of experience in the construction field, seven (7) years experience as a construction project manager, or a minimum of seven (7) years experience as a licensed general Contractor, of which may run concurrent.
2.4.1.2. Site Superintendent: The Contractor shall provide a single, Site Superintendent and an alternate. The Site Superintendent shall have a minimum of five (5) years experience in the construction field with a minimum of three (3) years experience in a supervisory position. A summary of this experience shall indicate the candidate for the superintendent position possesses the particular knowledge, skills, and abilities to successfully perform the duties of the position. The candidate shall show evidence of journeyman level experience in an accepted construction trade. Supervisory experience may run concurrent with general construction experience. The education qualifications shall, at a minimum include a graduate of an accredited technical school in an appropriate field of study relating to an accepted construction trade, equitable qualifications through a recognized union in the construction trades arena, or current or former licensed owner/operator of a business specializing in the construction field.
2.4.1.3. Quality Control (QC) Manager: The Contractor shall provide a single, Quality Control Manager who has a minimum of five (5) years experience in the construction field with a minimum of five (5) years experience in construction quality control inspection/management. A summary of this experience shall indicate the candidate for the QC representative position possesses the particular knowledge, skills, and abilities to successfully perform the duties of the position. The candidate shall show evidence of journeyman level experience in an accepted construction trade. The education qualifications shall include, at a minimum a graduate of an accredited technical school in an appropriate field of study relating to an accepted construction trade, equitable qualifications through a recognized union in the construction trades arena, or current or former licensed owner/operator of a business specializing in the construction field.
2.4.2. Personnel. The Contractor shall provide necessary personnel to accomplish all contract work within specified time frames. All personnel shall be legal residents of the United States. The Contractor shall submit, within five (5) calendar days of contract award, in writing to the COR, a copy of the final organization chart and identify the key personnel proposed to perform the contract requirements; and any changes within five (5) working days of the change.
2.4.2.1. The Contractor shall ensure employees have all required professional certifications/licenses (current and valid) for each applicable occupation category before commencement of work. The Contractor shall be proficient in WinEst Pro Plus software using latest specified RSM estimating database.
2.4.2.2. Contractor shall be responsible for ensuring all Contractor employees are trained to perform all tasks associated with this SOW.
2.4.3. Contractor In-House Workforce. The Contractor shall perform on the site, and with its own in-house workforce, work equivalent to at least fifteen (15) percent of the total amount of work to be performed under the contract. The Contractor's in house work force shall have the capability to provide skilled craft labor in general construction areas, i,e, Carpentry, electrical and painting.
2.4.4. Contractor Employee Compliance. The Contractor shall ensure that Contractor employees observe and comply with all local installation and higher headquarters' policies, regulations, and procedures concerning fire, safety, environmental protection, sanitation, security, traffic, parking, and possession of firearms or other lethal weapons.
2.4.5. Conduct of Personnel. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Government also reserves this right. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.4.6. Contractor Hiring Restrictions. The Contractor shall not hire off duty or former Government employees whose employment would result in a conflict with the Joint Ethics Regulation.
2.4.7. Qualifications/Certifications. The Contractor shall submit, within five (5) calendar days of contract award, in writing to the COR, the individual(s) tasked as key personnel who will execute the work that may be awarded under this contract and provide a summary of the minimum acceptable qualifications and experience. Any changes to the working status of these key personnel shall be transmitted to (in writing) and approved by the COR within five (5) working days of the change.
2.4.8. Planner/Estimators. Contractor planner/estimators who accomplish job cost estimates for indefinite quantity work shall use the UPB Estimating procedures.
2.4.9. Equipment Operators. The Contractor shall maintain records of licenses of Contractor personnel operating any construction equipment/vehicles to verify and document operator qualification to use the equipment/vehicles.
The Government has the right to review these records at any time.
2.4.10. Quality Control (QC) Representatives.
2.4.10.1. Personnel: A staff shall be maintained under the direction of the QC Manager, as needed, to perform all QC activities. The actual strength of the staff during any specific work period may vary to cover work phase needs, shifts, and rate of placement. The personnel of this staff shall be fully qualified by experience and technical training to perform their assigned responsibilities and shall be directly hired by and work for the prime Contractor. The inspectors shall be assigned to specific individual job orders or elements of work and shall have no other duties in relation to that individual job order or work element other than quality control. Personnel may perform other than QC duties related to individual job orders or work elements for which they are not assigned QC functions.
2.4.10.2. Qualifications: Inspectors shall have a working knowledge of general construction. The major areas of construction are electrical, mechanical, site work, masonry, finish work, and carpentry.
2.4.10.3. Staffing: Each individual job order in progress shall be comprehensively inspected at least twice daily and these inspections documented. The QC inspector shall document deficiencies discovered during the inspection and actions taken to correct, whether corrected immediately or not.
2.4.11. Identification of Employees. The Contractor shall provide each employee an identification badge. The badge shall include, as a minimum, the person's name, photograph, and the Contractor's company name and location (i.e., Fort Polk). The Contractor shall ensure that all personnel wear the badge on the left front chest of the outermost garment at all times when performing work under this contract. This requirement shall apply to all subcontractor employees if the subcontractors' work will exceed a 30 calendar day period. Subcontractors working at Fort Polk for less than 30 days shall wear an identification badge meeting the aforementioned specifications except that the location of work (Fort Polk) will not be required on the badge.
2.5. Contingencies. Sudden or unusual events could result in a great impact upon Contractor performance and contract requirements. In the event that unusual conditions develop, the Contractor shall continue, and expand performance if necessary. In all cases, the Contractor shall assume that the Army cannot provide any supplemental forces and continue to need the same or additional performance under contract, which the Contractor shall be required to meet. Examples of such events include:
A sudden build-up of military forces that increases contract requirements.
A natural disaster Special circumstances identified by the Contracting Officer.
2.6. Contractor Quality Control.
2.6.1. Quality Control. The Contractor shall establish and maintain a quality control program that has been reviewed/accepted by the Government for compliance with contract specifications and FAR Clause 52.246-12. The Contractor shall submit, in writing, to the COR a Draft copy of the QC Plan within five (5) calendar days of contract award. The final QC Plan shall be submitted to and approved by the COR within thirty (30) calendar days of contract award, and changes/revision as made. All work shall conform to the referenced Clauses, Technical Specifications and Manufacturers Recommendations, when there is a question the most stringent shall apply. The Contractor shall notify the KO, in writing, of any proposed changes to the QC plan within five (5) days of such change. The Government reserves the right to require the Contractor to make changes in its QC plan and operations as necessary to obtain the quality specified. Any changes, whether proposed by the Contractor or required by the Government, must be submitted by the Contractor and approved by the KO.
2.6.2. Coordination Meeting: Prior to the issuance of the first Individual job order, the Contractor shall meet with the KO and/or the COR to discuss the Contractor's quality control system. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the Contractor's QC operations, control activities, testing, administration of the system for both on-site and off-site work, and the relationship of Contractor's inspection and control with the Government’s Quality Assurance (QA). Minutes of the meeting shall be prepared by the Contractor and signed by both the Contractor and the KO. The minutes shall become a part of the contract file. Also, there may be occasions when subsequent conferences will be called to re-confirm mutual understandings.
2.6.3. Quality Control Plan. The Contractor's Quality Control Plan (QCP) shall include a separate section that addresses the Contractor's proposed method of managing quality of Individual Job Order work. The QCP shall address, at a minimum the following:
2.6.3.1. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the Contractor's QC staff shall report to someone higher than the project manager in the Contractor's organization.
2.6.3.2. The qualifications, duties, responsibilities, and authorities of each person assigned a QC function.
2.6.3.3. A copy of the letter to the QC manager signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the QC manager, shall be furnished.
2.6.3.4. Procedures for scheduling and managing submittals, including those of subcontractors, off-site fabricators, suppliers, and purchasing agents.
2.6.3.5. Reporting procedures including proposed reporting formats and distribution of the documents.
2.6.3.6. Procedures for managing the Quality at the individual job order level, to include:
2.6.3.6.1. The Contractor's organizational structure.
2.6.3.6.2. The QCP shall address a quality control inspection program covering all general and specific jobs included in the contract. It shall specify the manner in which inspections are to be conducted.
2.6.3.6.3. The names and minimum acceptable qualifications of individuals tasked to perform inspections and the extent of their authority shall be included in the QCP. Their functional role shall be depicted in an organization chart. No lead person or first line supervisor shall be considered a Quality Control Inspector.
2.6.3.7. Proposed test methods.
2.6.3.7.1. Method of identifying deficiencies in the quality of work to be performed, before the level of performance becomes unacceptable.
2.6.3.7.2. Method of documenting and enforcing quality control operations of both prime and any subcontractor work, including inspection and testing.
2.6.3.8. Key control as required by paragraph 2.14.
2.6.3.9. Special safety equipment/clothing required. The Contractor shall provide all supplies, tools, and clothing (including personal protective clothing and equipment for Contractor employees when required by Occupational Safety and Health Administration (OSHA) regulations, 29 CFR 1910, SUBPART I) required to meet the terms of the contract.
2.6.3.10. Detailed specifics as to how the Contractor will ensure that all personnel take required safety precautions when working with steam, chemicals, electricity, vehicles, power tools, welding equipment, etc., and when entering or working in confined spaces.
2.6.3.11. Notification of Noncompliance: The KO will notify the Contractor of any noncompliance with the foregoing requirements. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or its representative at the site of the work, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not recover through claim or other action any time extensions or compensation for excess costs or other damages as a result of its noncompliance with any such stop-work orders.
2.6.4. Quality Control Files. The Contractor shall maintain a file of all inspections or tests conducted by the Contractor, to include any corrective actions taken. This file shall be subject to Government review at the Contracting Officer's or designated representative’s discretion during the contract term.
2.6.5. Quality Control Reports. The Contractor shall submit a weekly Quality Control Report for each Job Order to the DPW by 1000 hours on the first working day of the following week. The report shall be submitted to the COR for review and approval as part of the Contractor's quality control program.
2.6.6. Acceptability. The work and any construction performed shall be accepted only when in full compliance with the contract specifications, applicable Clauses, and the Scope of Work. For purpose of acceptance, the QC program shall be subject to acceptance throughout the term of the contract. The Contractor shall notify the COR, or designated representative, in writing of any proposed change to the QC program. No change shall be implemented prior to review and approval of the change by the COR, or designated representative.
2.6.7. Performance Evaluation Meetings. The Project Manager and a Contractor QC Manager, shall meet with the COR weekly for the term of this contract.
2.7. Testing Procedure: The Contractor shall perform tests, specified or required, including all applicable communications testing, to verify that control measures are adequate to provide a product which conforms to contract requirements. The Contractor shall procure the services of an industry recognized testing Laboratory or establish an approved testing laboratory at the project site. The laboratories utilized for testing shall meet the criteria detailed in American Society for Testing and Materials (ASTM) D 3740-80, "Evaluation of Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Construction" and ASTM E 329-88, "Inspection and
Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction." The Contractor shall perform the following activities, record and provide the following data:
2.7.1. Verify that testing procedures comply with contract requirements.
2.7.2. Verify that facilities and testing equipment are available and comply with testing standards.
2.7.3. Check test instrument calibration data against certified standards.
2.7.4. Verify that recording forms, including all of the test documentation requirements, have been prepared.
2.8. Testing.
2.8.1. Capability Check: The COR will have the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques.
2.8.2. Capability Re-check: If the selected laboratory fails the capability check, the Contractor will reimburse the Government for each succeeding re-check of the laboratory or the checking of a subsequently selected laboratory at the actual costs for each re-check. Such costs will be deducted from the contract amount due the Contractor.
2.8.3. Project Laboratory: The COR will have the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.
2.8.4. Transportation of Samples for Testing: Costs incidental to the transportation of samples or materials will be borne by the Contractor.
2.9. Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government will have the following options:
2.9.1. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, or a legal public holiday and routine work is not scheduled for that day.
2.9.2 Reschedule the work on any day mutually agreed upon by the Government and the Contractor.
2.9.3. No additional payments will be due the Contractor for unscheduled closures. Additional time to accomplish the job order will be granted to coincide with the days of installation closure.
2.10. Hours of Operation. All work shall be accomplished during normal duty hours from 8:00 A.M. to 4:30 P.M.
hours, Monday through Friday (excluding federal government holidays), or as otherwise specified by the Contracting Officer. The Contractor shall submit to the COR and Contracting Officer in writing a request of any period of scheduled work at times other than normal duty hours. The Contracting Officer will approve or disapprove the request. This notice shall be submitted not less than three (3) days prior to each period of work scheduled at times other than normal duty hours.
2.11. Federal Holidays. Except as otherwise specified, routine work shall not be scheduled on holidays or holidays observed in lieu thereof. Federal Government holidays are:
New Years Day Martin Luther King Jr.'s Birthday Presidents Day Memorial Day Independence Day Labor Day Columbus Day
Veterans Day Thanksgiving Day Christmas Day
2.12. Place of Performance. The Contractor shall perform work on Fort Polk. Fort Polk means all areas within the U.S. Army installation of Fort Polk including Medical Facilities and Child Development Centers, Toledo Bend Recreation Site and Peason Ridge, Controlled Areas, and Intermediate Staging Base located at the England Industrial Air Park (Alexandria International Airport).
2.12.1. Controlled Areas: Work in controlled areas is applicable to the Weapons/Ammunition Storage Area(s), Active Ranges, Training Areas, Communications rooms, and environmentally sensitive areas. If the Contractor encounters Government delays in a controlled area, the performance period of any affected Individual job order will be extended accordingly.
2.12.2. Ammunition Storage Point (ASP): All work in the ASP may be subject to brief delays due to security processing. The Contractor will be notified of such interruptions, if required, on short notice. The Contractor and Government inspector shall keep records of any delays and the length of time involved. Any interruptions that may be experienced will be handled on an individual basis in the form of additional time. All work accomplished in the ASP will be accomplished under full time ASP personnel escort.
2.12.3. Active Ranges and Training Areas: All work in the Training Area (s) may be subject to brief delays or intermittent interruptions when training is in progress due to Safety Danger Zone Restrictions. Additional time will be handled on a case by case basis if delays are encountered. The Contractor will be notified of such interruptions, if required, on short notice. The Contractor and the Government inspector shall keep record of any delays and the length of time involved. Any interruptions that may be experienced will be handled on an individual basis in the form of additional time.
2.12.4. Environmentally Sensitive Areas: All work in the environmentally sensitive areas marked with orange carsonite signs with reflective stickers may be subject to brief delays or intermittent interruptions when specific activities cannot be performed due to restrictions. Additional time will be handled on a case by case basis if delays are encountered. The Contractor will be notified of such interruptions, if required, on short notice. The Contractor and the Government inspector shall keep record of any delays and the length of time involved. Any interruptions that may be experienced will be handled on an individual basis in the form of additional time.
2.12.5. Restricted Areas. Certain buildings and other facilities are "restricted" to the general public. Contractor personnel shall not enter any "restricted" facilities without specific permission from the COR to do so. The Contractor shall comply with restricted area procedures and instructions. Contractor personnel working in restricted areas such as computer rooms shall be required to sign in and out and state the nature of business at the entrance desk. All work in restricted areas shall be coordinated with the respective area Security Officer through the COR.
2.12.6. Secure Areas. Portions of the work under the contract are performed in secure areas. In these cases, the Contractors will be escorted by the activity or Government personnel and adequate security measures will be established, maintained, and monitored by the appropriate Government personnel. A 48 hours advance notice to the activity shall be required when the Contractor needs an escort, except in emergency or urgent work.
2.12.7. Security. At all times during the performance of work within a facility, the Contractor and his or her employees shall remain cognizant of the security restrictions existing within the facility. The Contractor’s employees shall ensure that any doors, windows or access panels which may have been opened for them during the course of the work period are secured at the end of the day. Circumstance which appear unusual, unhealthy or otherwise hazardous shall be reported to the COR immediately.
2.12.8. Administrative Office Areas. Government personnel will be working in office areas during working hours.
Contractor work shall not unduly interfere with Government work in the area. In the event a Government building supervisor so requests, the Contractor shall temporarily cease work in the area and report the instructions, to include name of the Government person involved, to the COR, or their designated representative, immediately by the most expedient means.
2.13. Installation Access. All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel must comply with all personal identity verification requirements as directed by DOD, HQDA or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.
2.13.1. Rapid Gate: The ID of all personnel entering the installation using the Rapid Gate Program will be electronically scanned at all Access Control Points (ACP). The Rapid Gate Program is a voluntary program that has a monetary fee for company and individual enrollment. Contractors desiring more information or cost of the voluntary program can call toll free: 1-877-RAPIDGate or go online to www.eidpassport.com. Participation in the Rapid Gate Program is voluntary, and an alternate means of entry is provided, therefore the Government will not reimburse Contractors for any Rapid Gate fees. Rapid Gate participants may enter and exit the installation using any ACP as long as the vehicle is not oversized and meets the size restrictions of the ACPs. Vehicles that do not meet these restrictions should coordinate with DES for entry. Personnel participating in the Rapid Gate program ARE NOT AUTHORIZED to escort other personnel within their vehicle, if their passenger is not participating in the Rapid Gate Program. Companies may enroll into the program telephonically, after which employees may register using the self-registration kiosks located at the Visitors Center (Bldg 5903) and Central In and Out Processing (Bldg 1830).
2.13.2. Vehicles that have not been registered on the installation will enter through ACPs 1, 4, and 7. Vehicles over one ton will be restricted to ACPs 4 and 7 unless registered in the Rapid Gate program. This includes registered vehicles. Vehicles over one ton are required to exit through the ACPs where they entered the installation unless registered in the Rapid Gate program. Hazardous cargo is restricted to ACPs 4 and 7, with no exceptions.
2.13.3. Search and Seizure: Contractor personnel and property shall be subject to search and seizure upon entering the confines of Fort Polk, Louisiana, while on Fort Polk, Louisiana, and upon leaving the confines of Fort Polk, Louisiana, in accordance with AR 190-22 (Search, Seizure, and Disposition of Property).
2.1…