TE1-004_DELIVERABLES.DOC
DOC document 56 KB Posted
- Attached to
- Post HVAC Maintenance and Service
- Solicitation number
- W9124D-19-B-0001
About this file
Technical Exhibit TE1-004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mock_Bill_-_Sample_Energy_Scorecard.pdf | ||
| Conformed_IFB,_19-B-0001,_HVAC_Services,_20190208.pdf | ||
| Revised_TE1-004_DELIVERABLES_20190208_(002).pdf | ||
| IFB_Amendment_00001,_19-B-0001,_HVAC_Services,_20190208.pdf | ||
| TE5_1-002_PM_HISTORICAL_WORKLOAD_SUMMARY.XLSX | XLSX spreadsheet | |
| TE5_1-001_DMO_HISTORICAL_CALL_LOG_2016.xlsx | XLSX spreadsheet | |
| TE3-001_How_to_Obtain_CAC_Email_&_Computer.doc | DOC document | |
| TE1-002_DoD_ODS_Turn-In_Procedure.doc | DOC document | |
| TE1-001_ODS_and_Refrigerants.docx | DOCX document | |
| TE5_2-001_thru_TE5_2-035.docx | DOCX document | |
| I.B.7._W9124D-19-B-0001_IFB_HVAC_Services_Fort_Knox_29_Jan_19.pdf | ||
| TE3-002_GFEBS_TRAINING.DOC | DOC document | |
| TE5_2-040_Contractor_Self-Evaluation.docx | DOCX document | |
| TE1-003_EPA_ODS_Regulation,_Parts_82_150_TO_82_166.pdf | ||
| TE5_2-038_Building_List.xlsx | XLSX spreadsheet | |
| TE5_2-039_Critical_Alarming_List.xlsx | XLSX spreadsheet | |
| TE5_2-037_Deliverables.docx | DOCX document | |
| TE5_2-036_Performance_Requirements_20190124.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT NO. 1-004
DELIVERABLES
The Contractor shall furnish all recurring data and information as specified in this Technical Exhibit or as elsewhere required in section 1, General Information.
SPECIFIC
REQUIRED
TASK
TITLE
DATE
FREQUENCY
DISTRIBUTION
PARA
1.2.2 Phase-In Plan
15 Days after award of Once
Contracting Officer
Contract and COR
1.2.2.2 Phase-Out Plan
120 Days prior to contract Once
Contract completion
1.2.3.1.1 Designation of POC
Upon contract award and As required on contract matters and upon change in designation
1.2.3.2.2 Meeting Reports
Within two work days after meeting
1.2.3.2.3 Command Interest
Within one work day of
Notices discovery
1.2.6.1 Key Personnel Resumes
With proposal
Initially Contracting Officer
1.2.6.4 Organizational Chart
With proposal
Initially and within 3 work days and upon of any change change
1.2.6.5 Employee Roster
At contract start date
Monthly and monthly thereafter
1.2.6.7
List of Mission
Within one work day of joint Initially, Contracting Officer Essential Personnel determination; NLT than monthly thereafter, 1st work day of each month and upon change and upon change
DATE
FREQUENCY
DISTRIBUTION
PARA
1.2.6.11.1 Training and
NLT 30 calendar days after Initially and 60
Recruitment Plan contract start date and 60 calendar days before calendar days prior to each option start of each option 1.2.8.1
Contingency/
30 calendar days
Initially and
Mobilization POC after award and upon change
1.2.9.1
Standing Operating Procedures Within 45 calendar days of contract start date and 10 calendar days prior to change effective date
1.2.9.1.1 Management Controls Report
IAW AR 11-2
As required
Contracting Officer
1.2.9.1.2 Installation Status Report As required
As required
Contracting Officer
1.2.9.1.5 Workload Data Report
NLT the 15th calendar day of the following month
1.2.9.1.6 Contractor Manpower NLT 31 Oct Annually Designated Website
Reporting
1.2.9.2
Management Plan
30 calendar days prior to contract start date and
1.2.10.4 PWS Annual Update
By 3rd quarter of each fiscal year Annually
DATE
FREQUENCY
DISTRIBUTION
PARA
1.3.2.1 Quality Control Plan
Within 30 calendar days after contract start date and within
5 work days prior to change implementation
1.3.3.
Meeting Minutes
Within 3 work days after meeting
1.3.4 Corrective Action Report Within 5 work days after
CDR issuance
1.4.3.1 Safety Plan
30 calendar days prior to contract start and NLT 30 calendar days prior to change effective date
1.4.3.3.2.
Notification of
Verbally within 30 minutes after
Hazardous Conditions discovery and in writing within one work day of discovery
1.4.3.4 Safety Training Notification Within 10 calendar days after training completion
1.4.3.5.1 Fire Prevention and
Within 30 calendar days after
Protection Plan contract award and NLT 30 calendar days prior to change effective date
1.4.3.6.1 Monthly Fire Inspection
NLT 5th work day of following
Report month
1.4.3.6.3 Damage Reports
Within two work days of
Occurrence
1.4.3.6.4 Accident Report
Verbally within 2 hours of occurrence and written within two work days of occurrence
1.4.3.6.4 U.S. Army Abbreviated Within 30 days of As required Installation Safety
Ground Accident Report occurrence Office and COR 1.4.3.6.6 Third Party Accident
Within 24 hrs after initiation
Claim of claim
DATE
FREQUENCY
DISTRIBUTION
PARA
1.4.3.6.7 OSHA Form 300
NLT 1 February
Annually
1.4.3.6.8 Hot Work Permit As required As required Installation Fire Department 1.4.4.1.3 Energy Officer
Within 10 work days of
Designation contract start and within 5 work days prior to change
1.4.5.1.1 List of HAZMAT
Upon contract start date Initially and
Ft. Knox Env.
Used/Stored and upon change upon change
Coordinator
1.4.5.1.1 HAZMAT Training
Within 30 calendar days
Documentation of contract start date as required and/or change in
HAZMAT personnel
1.4.5.1.3(e) Refrigerant Recovery NLT 15th calendar day Monthly DPW EMD
And Usage Log of the following month
1.4.5.1.5 Contractor Caused Spills Within 30 minutes of spill Per occurrence Ft. Knox Fire Chief/
Ft. Knox Env.
Coordinator
1.4.5.1.5 Spill Report Within 5 days of spill Per occurrence Contracting Officer
1.4.5.3 Environmental
As required
DPW EMD
Regulatory Agencies
Requirements
DATE
FREQUENCY
DISTRIBUTION
PARA
1.4.7.2.1 Warranty Enforcement Within 10 work days of Initially and Contracting Officer
Officer Designation contract start date and NLT upon change and COR 5 work days prior to change
1.4.7.2.3 Warranty Actions
As required
Report
1.4.7 Key Control Plan
30 calendar days prior to contract start date and 30 calendar days prior to change implementation
1.4.7.2 Key Inventory Records
Within 5 work days of request As required
Contracting Officer
1.4.7.5 Lost Key Notification
Verbal notification within 30 minutes of loss discovery and written report NLT COB next day
1.4.11.3.1 AT Level I Training
Within 30 days of start of Once per employee
Certificate contract
PAGE