JOC_Attachment_7_Sample_Project_Building_1310_Statement_Of_Work.pdf
PDF 43 KB Posted
- Attached to
- The U. S. Government desires to procure the Fort Knox Department of Public Works Job Order Contract (JOC)
- Solicitation number
- W9124D-17-R-0017
About this file
JOC Solicitation W9124D-17-R-0017 - Attachment 7 Sample Project Building 1310, Statement of Work
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg 1310, 3rd Floor CPCS Move SOW Date: June 16, 2017
Construction Duration: 90 days
Office Area
1. Demo 13 doors/hardware and walls shown in red on Drawing #102.
1.1. Protect and re-use doors, frames and hardware for re-installation at new locations.
1.1.1. Contractor shall replace any doors and/or frames that are damaged during demo, to match existing, at no additional cost to the Government.
1.2. Protect and re-use room number signage.
2. Construct new walls as shown on Drawing #102.
2.1. Re-install 7 doors/hardware and frames at new locations.
2.1.1. It is critical to match wall and door locations to avoid conflicts with future furniture installation.
2.1.2. Doors not re-used shall be properly disposed of by the Contractor.
2.2. Re-install room number signage to match the room numbers as shown on Drawing
#102.
3. Patch, prep, prime and paint all walls existing and new in the office area. Paint Ft. Knox standard Antique Frost.
4. Replace carpet flooring and carpet base in all areas with Fort Knox standard.
5. Replace break room flooring with Fort Knox porcelain tile standard.
6. Replace all ceiling tiles to accommodate new layouts.
7. Adjust existing lighting to fit new layouts.
7.1. Provide new light switches to accommodate new door locations as shown.
8. Adjust HVAC to accommodate new ceiling layout. Re-locate diffusers and returns, as needed.
9. Install additional duplex outlets and junction boxes as shown on Drawing #102.
9.1. It is critical to install power at the locations shown to avoid conflicts with future furniture installation.
9.2. Junction boxes must accommodate (4) duplex outlets per workstation as shown on Drawing #101.
10. At multi-purpose room, Rm. 308:
10.1. Provide (1) electrical duplex and (1) data outlet at ceiling, and ceiling panel to accommodate a ceiling mounted projector.
10.2. Provide for drop-down screen on South side of room.
10.2.1. Adjust ceiling tiles to have cut out for drop down screen.
Restrooms
1. Convert Male restroom to Female restroom as shown.
1.1. Demo urinal partition and remove existing urinals from men’s restroom. Cap plumbing connections and patch wall with 4x4 ceramic Fort Knox tile standard.
1.2. Demo (3) sinks, (3) toilets, (3) partitions.
1.3. Install (3) new sinks, toilets, and partitions as shown.
1.4. Install new Female latrine sign.
gloria.ritter Typewritten Text
JOC ATTACHMENT 7
Bldg 1310, 3rd Floor CPCS Move SOW Date: June 16, 2017
Construction Duration: 90 days
General Notes
1. Workstation Plan, Drawing #101, is provided as reference to show the workstation layout only. All construction details are shown on Drawing #102.
2. Existing Fire alarm system is adequate; no work necessary.
3. Redlined west wall in office 303 shall remain.
4. Clean up areas when project is complete.