The U. S. Government desires to procure the Fort Knox Department of Public Works Job Order Contract (JOC)
Solicitation number
W9124D-17-R-0017
Issued by

About this file

JOC Solicitation W9124D-17-R-0017 - Attachment 1 Divisions 1 through 8

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01200

WARRANTY OF CONSTRUCTION

1.0 WARRANTY OF CONSTRUCTION (APR 1984):

1.1 In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph 1.10 below, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

1.2 This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the

Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

1.3 The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of:

1.3.1 The Contractor's failure to conform to contract requirements and/or

1.3.2 Any defect of equipment, material, workmanship, or design furnished.

1.4 The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The

Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

1.5 The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

1.6 If the Contractor fails to remedy any failure, defect, or damage the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

1.7 With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall:

01200-1

1.7.1 Obtain all warranties that would be given in normal commercial practice;

1.7.2 Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting officer, and

1.7.3 Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

1.8 In the event the Contractor's warranty under paragraph 1.2 above has expired, the Government may bring suit at its expense to enforce a subcontractors, manufacturer's, or supplier's warranty.

1.9 Unless a defect is caused by the negligence of the Contractor or subcontracts, or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government furnished material or design.

1.10 This warranty shall not limit the Government rights under the inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

01200-2

SECTION 01562

DUST PROTECTION

1.0 DESCRIPTION OF WORK: This specification covers the protection of work areas by the furnishing and installation of a temporary framework covered by polyethylene sheeting around the area where work is being performed or around the area that requires protection.

2.0 PRODUCTS:

2.1 Framework shall be of sturdy wood or metal composition.

2.2 Polyethylene Film shall comply with ASTM D 2103, shall have a minimum density of 0.910 and an impact strength greater than 70.

2.3 Adhesive Tape for sealing seams and edges shall meet the polyethylene manufacturer's recommendations.

2.4 Sealing Compound shall comply with recommended practices for use of latex compounds as prescribed by

ASTM C 790.

3.0 EXECUTION:

3.1 Installation: Dust protection enclosures shall be installed according to the manufacturer's recommendations.

3.2 Repairs: Any accidental penetrations of the enclosures shall be repaired swiftly and adequately to prevent dust intrusion.

01562-1

SECTION 02012

STANDARD PENETRATION TESTS

1.0 DESCRIPTION OF WORK: This specification covers core drilling and borings for subsurface investigation of soils.

2.0 PRODUCTS: (Section not used.)

3.1 Auger Borings: ASTM D 1452.

3.2 Soil Samples: ASTM D 1586, ASTM D 1587.

3.3 Rock Cores: ASTM D 2113, Size BX and NX.

3.4 Bearing Capacity: AST!/, D 1349.

3.5 Soils Classification: ASTM D 2487, D 2488, MIL-STD-619.

3.6 Boring Logs: Boring report shall include, but not be limited to, a boring location plan locating and numbering boring and boring logs. Log of borings shall have boring number; date of start and finish of boring; rig type, job number and name; sample number, depth, and type; depth of strata changes, soil description and classification, surface elevation, depth of boring, and depth of water table.

02012-1

SECTION 02050

DEMOLITION

PART I - GENERAL

1. SUBMITTAL. The procedures proposed for the accomplishment of salvage and demolition work shall be submitted, when requested by the Contracting Officer, for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which in to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of methods and equipment to be used for each operation, and the sequence of operation. operations which involve the handling of toxic or hazardous materials shall be approved by DPW Environmental Management Division (EMD) prior to start of the operation.

2. GENERAL REQUIREMENTS. The work includes demolition and/or removal of all construction indicated or specified. All materials resulting from demolition work, except an indicated or specified otherwise, shall became the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily unless otherwise directed so as to not allow accumulation inside or outside the buildings in which work is being performed. Material that cannot be removed daily shall be stored in areas specified by the contraction officer.

3. DUST CONTROL. The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the building and to avoid creation of a nuisance in the surrounding area.

Use of water will not be permitted when it will result in, or create, hazardous or objectional conditions such as ice, flooding and pollution.

4. PROTECTION.

4.1 Protection of Existing work: Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing work and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to ensure against damage to existing work to remain in place, to be roused, or to remain the property of the Government, and any damage to such work shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The Contractor shall carefully coordinate the work of this section with all other work and construct and maintain shoring, bracing and supports, as required. The Contractor shall ensure that structural elements are not overloaded and be responsible for increasing structural supports or addling new supports as may be required as a result of any cutting, removal or demolition work performed under any part of this contract.

4.2 Protection of Buildings from the Weather: The interior of the building and all materials and equipment shall be protected from the weather at all times.

PART 2 - EXECUTION

5. EXISTING UTILITIES

5.1 Removal of Utilities: Existing utilities shall be removed as indicated. When utility lines are encountered that are not indicated on the drawing the Contracting officer shall be notified.

02050-1

6. DISPOSITION OF MATERIAL

6.1 Title to Materials: Title to all materials and equipment to be demolished, except Government salvage and historical items, is vented in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.

6.2 Material for Contractor Salvage: Material for salvage shall be stored as approved by the Contracting officer. Salvage materials shall be removed from Government property before completion of the contract. Material for salvage shall not be sold on site.

6.3 All materials must be disposed of off-post by the Contractor at his own expense except as otherwise specified. Government landfills are not available.

6.4 Materials for Government Salvage: Salvageable items shall be removed in a manner to prevent damage. Salvageable materials and/or equipment will be identified by the Contracting Officer and shall be delivered to the area or building designated by the Contracting Officer. Examples of possible salvageable materials are: window AC units, mechanical system parts, etc.

7. CLEARANCES AND PERMITS:

7.1 Clearances and permits shall be obtained as required from local authorities.

8. BURNING:

8.1 Burning at the project site for the disposal of refuse and debris shall not be permitted.

9. EXPLOSIVIES:

9.1 The use of explosives shall not be permitted.

10. HAZARDOUS MATERIALS:

10.1 Extreme care and caution shall be exercised at all times when handling toxic or hazardous materials in order to prevent harm to personnel and property and to prevent environmental contamination. Federal and state regulations governing handling, transportation, and disposal of such materials shall be rigidly adhered to.

11. CLEAN-UP.

11.1 Debris and Rubbish: Debris and rubbish shall be removed from job site daily unless otherwise specified by the Contracting Officer.

11.2 Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas.

11.3 Regulations: Local regulations regarding hauling and disposal of debris shall be followed.

02050-2

SECTION 02075

CONCRETE CORE DRILLING

1.0 DESCRIPTION OF WORK: This specification covers the furnishing of equipment and labor for core drilling of existing concrete. Procedures shall be in accordance with the equipment manufacturer's recommendations.

Demolition and removal of materials shall be as required to support the work.

2.0 PRODUCTS: (Section not used)

3.1 Preparation:

3.1.1 Equipment shall be of shot-drill or diamond-drill type and shall be acceptable to the Contracting Officer.

Shot drilling shall be used on horizontal surfaces only.

3.1.2 Location and Size of Cores shall be as directed by the Contracting Officer.

3.2 Core Drilling:

3.2.1 Drilling shall be performed in a neat manner providing a smooth, clean hole perpendicular to the surface.

3.2.2 Equipment shall be rigidly affixed to the surface to prevent drifting or misalignment of the hole.

3.2.3 Work shall be planned and executed so that dust and rubble are held to a minimum.

3.2.4 Surrounding Surfaces, Material, and Equipment shall be protected from damage from dust, water, and flying debris.

3.3 Test Samples:

3.3.1 Where Cores from Drilling are to be used for testing of existing concrete, the resulting core shall meet the requirements of ASTM C 42.

3.3.2 Test Cores shall be taken at locations as directed by the Contracting Officer.

02075-1

SECTION 02080

ASBESTOS REMOVAL SPECIFICATION

1. APPLICABLE REGULATIONS AND PUBLICATIONS: The regulations and publications listed below form a part of this specification.

1.1 Environmental Protection Agency (EPA):

Title 40, Code of Federal Regulations, Part 61, Subpart M, I July 1992. [National Emission Standards Hazardous Air Pollutants (NESEIAP), Revised 20 November, 1990.1

Title 40, Code of Federal Regulations, Part 763, Subparts D, E, F, G, H, 1 July 1992.

1.2 Occupational Safety and Health Administration (OSHA):

Title 29, Code of Federal Regulations, Part 1910.1001, 1 July 1992.

Title 29, Code of Federal Regulations, Part 1926, 1 July 1992.

Title 29, Code of Federal Regulations, Part 1926.58 Construction Industry Standard, 1 July 1992.

1.3 Department of Transportation (DOT):

Title 49, Code of Federal Regulations, Parts 171-173, 31 December 1991.

1.4 Title 401, Kentucky Administrative Regulations (KAR), Chapter 47, 2 December, 1986.

Chapters 50-65, 2 December, 1986.

1.5 Memorandum dated 6 July, 1990, Applicability

Information; Potentially Friable Asbestos-Containing Material by Parker H. Moore, Asbestos Abatement Branch, Division for Air Quality (DAQ), Natural Resources and Environmental Protection Cabinet (NREPC), Frankfort, KY.

02080-1

1.6 Memorandum dated 15 September, 1992, Addendum to

6 July, 1990, Memorandum on Potentially Friable Asbestos-Containing Material to Clarify Requirements for Removing Resilient Floor Coverings by Parker S. Moore, Asbestos Abatement Branch, Kentucky Division for Air Quality (DAQ), Natural Resources and Environmental Protection Cabinet (NREPC), Frankfort, KY.

1.7 American National Standards Institute (ANSI):

ANSI Z9.2, Fundamentals Governing the Design and Operation of Local Exhaust Systems, 1979.

2. COORDINATION:

2.1 All asbestos work per the Fort Knox Asbestos Management

Plan must be coordinated through the Fort Knox Asbestos Coordinator hereafter referred to as the Asbestos Coordinator. This must include a pre-project conference meeting which includes the Asbestos Coordinator.

2.2 Reference Part or Section 7. “Summary of Submittals". These submittals are required to be approved by the Asbestos Coordinator. Submittals listed in paragraph 7.1 are required to be approved by the Asbestos Coordinator before the contractor can begin work. Submittals listed in paragraph 7.2 must be approved as the monitoring is completed. Air clearances are to be reported immediately to the Asbestos Coordinator. Submittals listed in paragraph 7.3 precludes disposal of any asbestos waste from Fort Knox. Submittals listed in paragraph 7.4 shall be approved by the Asbestos Coordinator before the contract commences.

3. INTRODUCTION:

3.1 Removal of Asbestos: The possibility of exposure to respirable asbestos fibers makes asbestos projects inherently hazardous. Employees shall be trained in accordance with 401 KAR 63:042 and made aware of the requirements of EPA, OSHA, and applicable Department of the Army regulations and standards. Personnel protective equipment and personal hygiene requirements are described in the regulations referenced above. While performing asbestos removal work, the asbestos removal contractor shall be subject to on-site inspection by the Contracting Officer who may be accompanied by the Asbestos Coordinator, safety or health personnel. If the work is in violation of specification requirements or federal, state, or local regulations, the Contracting Officer will stop work until the violation is resolved.

02080-2

3.2 Special Requirements for Asbestos Workers: OSHA has promulgated regulations pertaining to medical surveillance, employee training, respiratory protection, personal protective clothing and equipment, airborne asbestos monitoring, housekeeping, methods of compliance, record keeping, emergency procedures, and other measures that must be taken when working with or around asbestos friable insulating material (FIM).

3.3 Summary of Work Contractor shall Perform to Remove Asbestos.

3.3.1 Control access to work areas.

3.3.2 Deliver tools, equipment and materials to the job site.

3.3.3 Perform air monitoring.

3.3.4 Remove asbestos PIM in 6 mil plastic bags or the equivalent and package bagged asbestos FIM in labeled fiber drums.

3.3.5 Dispose of asbestos FIM at an approved permitted landfill. An asbestos Waste

Shipment Record Manifest is required for proper disposal. This manifest record is available at the Environmental Management Division, 624-3629/8185.

4. DEFINITIONS:

4.1 HEPA Vacuum Equipment: High efficiency particulate absolute filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall be of 99.97 percent efficiency for retaining fibers of 0.3 microns or larger.

4.2 Surfactant: A chemical wetting agent added to water to improve penetration, thus reducing the quantity of water required for a given operation or area.

4.3 Amended Water: Water to which a surfactant is added.

4.4 Wet Cleaning: The process of eliminating asbestos

contamination from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with amended water, and subsequently disposing of these cleaning tools as asbestos-containing waste.

4.5 Clearance Air Monitoring: The monitoring of air conducted inside the work area after cleanup of an asbestos abatement project has been completed.

02080-3

5. SPECIAL REQUIREMENTS FOR ASBESTOS WORKERS:

5.1 EXPOSURE TO ASBESTOS HAS BEEN ASSOCIATED WITH FOUR

DISEASES: LUNG CANCER, CERTAIN GASTROINTESTINAL CANCERS,

PLEURAL OR PERITONEAL MESOTHELIOMA, AND ASBESTOSIS. Studies indicate there are significantly increased health dangers to persons exposed to asbestos who smoke and further, to family members and other persons who become indirectly exposed as a result of the exposed worker bringing asbestos-laden work clothing home to be laundered.

5.2 Asbestos Removal Contractor Qualifications: Bidders shall demonstrate prior experience on asbestos abatement projects through the submission of letters of reference for at least three previous projects which include the name, address, and telephone number of a contact person familiar with the contractor's work. Include descriptions of projects, locations, and records of all air monitoring data generated during the project.

5.3 The contractor shall submit a notarized statement, signed by an officer of the company, which contains a record of any citations issued by Federal, State, or local regulatory agencies relating to asbestos abatement activity. Include project dates, locations, and resolutions. The contractor shall submit a listing of any asbestos-related legal proceedings or claims in which the asbestos removal contractor currently is or has been involved with to include description of role, issue, and resolution to date. If there are no legal proceedings or claims and have been none in the past, the contractor shall submit a notarized statement which relates this fact. This statement must be received by the Asbestos Coordinator as part of the submittal package.

5.4 The contractor shall be certified by the Kentucky Division for Air Quality in accordance with 401 K.AR 63.042. The contractor shall submit proof of such certification to the contracting officer and the Asbestos Coordinator prior to award of a contract.

5.5 The contractor shall submit proof of insurance coverage. Several insurers now have asbestos work exclusions in their policies. The contractor shall submit a certification from the insurer that asbestos abatement work is included in the coverage.

5.6 The contractor shall avoid releasing, or causing to be released, asbestos fibers into the atmosphere where they may be inhaled or ingested. OSHA has set standards in 29 CFR 1910.1001, for exposure to airborne concentrations of asbestos fibers, methods of compliance, medical surveillance, housekeeping procedures, and other measures that shall be taken when working with or around asbestos containing materials which release airborne asbestos fibers at concentrations in excess of those established in 29 CFR 1910.1001.

5.7 The contractor shall provide effective protection to persons from exposure to asbestos fibers.

5.8 The contractor shall comply with the provisions of 29 CFR 1910. Contractor's attention is directed to the following:

02080-4

5.8.1 Medical Surveillance: (29 CFR 1910.1001 (1)).

5.8.2 Employee Training: Must be completed prior to beginning work in asbestos containing material areas (29 CFR 1910.1001 (j)).

5.8.3 Respiratory Protection: (29 CFR 1910.1001 and 29 CFR 1910.134).

5.8.4 Personal Protective Clothing and Equipment: (29 CFR 1910.1001 (h)). The use of compressed air to remove asbestos from worker's clothing is prohibited.

5.8.5 Airborne Asbestos Sampling: The contractor shall submit the name, address, and telephone number of the testing laboratory selected to perform the monitoring, testing, and reporting of asbestos fibers along with certification that persons counting the samples have been judged proficient by successful participation within the last year in the National Institute of Occupational Safety and Health (NIOSE) Proficiency Analytical Testing (PAT) Program.

5.8.5.1 Exposure monitoring shall be conducted as specified in 29 CFR 1910.1001 (d).

The contractor shall submit a copy of all monitoring results to the contracting officer.

5.8.5.2 Clearance air monitoring shall be performed as specified in 401 KAR 63:042, Section 4. At least five samples of air per work area, or one sample per room, whichever is greater, shall be obtained for the clearance air monitoring. A sample volume of 3000-liters of air shall be used. The air samples shall be obtained when the air is being artificially circulated so that fibers remain airborne during the sampling. Barriers shall not be dismantled, and openings shall not be uncovered until the final samples show total fiber concentrations of less than or equal to 0.01 fibers per cubic centimeter of air. Clearance air samples shall be submitted to the Contracting Officer, the Asbestos Coordinator for approval, and to the Kentucky Division for Air Quality.

5.8.6 Housekeeping: (29 CPR 1910.1001 (k)). Dry sweeping of contract work areas contaminated with asbestos containing material is prohibited.

5.8.7 Methods of compliance: (29 CPR 1910.1001 (f)). Procedures relating to engineering controls, local exhaust ventilation, particular tools to be used, and work practices (1910.10crI (c)) .

5.8.8 Methods and materials to be used to decontaminate any property, materials, supplies, equipment, and the environment if asbestos contamination results (29 CPR

1910.1001 (f)).

5.8.9 Record keeping procedures shall comply with 29 CPR 1910.1001 (m) and

1910.20.

02080-5

5.9 The contractor shall comply with the following worker protection requirements:

5.9.1 Prior to commencement of work, the workers shall be instructed and shall be knowledgeable in, asbestos removal and handling procedures. The contractor shall submit proof satisfactory to the Contracting Officer and the Asbestos Coordinator that all employees have had instruction on the hazards of asbestos exposure, use and fittings of respirators, protective dress, entry and exit from work areas, and all aspects of work procedures and protective measures.

5.9.2 The contractor shall provide and post, at the job site, the decontamination and work procedures to be followed by workers, as described in these specifications. The contractor shall also post the OSHA regulations concerning asbestos abatement procedures at the job site.

5.9.3 Supervision: The contractor shall provide at least one supervisory person with current certification as specified by 401 KAR 63:042, Section 10(l). The supervisor shall be in attendance during the execution of each asbestos abatement project.

5.9.4 The contractor shall submit proof to the Contracting Officer and the Asbestos Coordinator that all workers for the project have been examined by a physician in accordance with 29 CPR 1910.1001 (1). The examination must have consisted of a chest x-ray and a pulmonary function test. These records shall be maintained by the contractor for the duration of employment plus 30 years in accordance with 29 CPR 1910.20.

5.9.5 The contractor shall submit to the Contracting Officer and the Asbestos Coordinator manufacturer's certification that vacuums and other equipment required to contain airborne fibers conform to ANSI Z9.2.

5.9.6 Respirators: The contractor shall provide workers with personally issued and marked respiratory equipment approved by the National Institute of Occupational Safety and Health (NIOSE) and the Mine Safety and Health Administration (MSHA) and suitable for the asbestos exposure level in the work area according to OSHA standards in 29 CFR 1910.1001.

The contractor shall submit to the Contracting Officer and the Asbestos Coordinator a copy of his respiratory protection program which sets forth the standard operating procedures concerning the use and maintenance of respiratory equipment as required by 29 CFR 1910.1001, 1910.134, and 1926.58.

5.9.7 Clothing: The contractor shall provide workers with protective full body coveralls and headgear. The contractor shall provide eye protection and hard hats as required by safety regulations. Disposable clothing, headgear, and footwear shall be provided by the contractor.

5.9.8 Site visitation: No visitors shall be allowed in the work area, except as authorized by Contracting Officer.

02080-6

5.9.9 Workers shall not eat, drink, smoke, or chew tobacco at the work site.

6. ASBESTOS REMOVAL AND INDEMNIFICATION REQUIREMENTS:

6.1 Indemnification: The contractor shall be liable for any and all fines assessed the government as a result of the contractor's failure to comply with any of the Title 401 Kentucky Administrative Regulations (KAR), chapters 50-65.

6.2 Plan of Work: The contractor shall submit a plan of work describing the procedures to be used in the removal and demolition of materials containing asbestos to the Contracting Officer and the Asbestos Coordinator. The work practice requirements set forth in 401 KAR 63:042, Section 4, are applicable. The plan of work shall be reviewed by the Asbestos Coordinator prior to commencement of work.

6.2.1 Movable Objects: All objects and exposed surfaces in the work area shall be cleaned. Movable objects shall then be removed. Objects not removed from the work area shall be covered with polyethylene sheeting and secured in place.

6.2.2 Small-scale, Short-duration Activities: Small-scale, short-duration activities as defined in 29 CFR 1926.58, appendix G, must be accomplished as specified therein. The ten day notification requirement, however, will still be required.

6.2.3 Non-friable Asbestos Removals: Removal of non-friable asbestos materials such as floor tile and shingles may be accomplished by wetting the material edges with amended water. Procedures outlined in Reference 1.2 should be followed. Being careful to avoid breakage, the material can then be removed. Manageable sized stacks of the material shall be double-wrapped in 6 mil plastic, securely sealed with tape, labeled, and properly-disposed of.

Workers shall, at a minimum, wear half face respirators.

6.2.4 Large-scale Removals: Large-scale removals are removals of asbestos FIK of more than 260 linear feet or 160 square feet. The construction of negative pressure enclosures and full-scale decontamination facilities is required, unless granted prior approval for alternate methods by the Kentucky Division of Air Quality.

6.2.5 Clearance Air Monitoring: If there are other asbestos materials not addressed by the project, theme materials may compromise the ability of obtaining clearance samples of fiber concentrations of less than or equal to 0.01 fibers per cubic centimeter of air. A request for variance from clearance air sampling shall be approved by the Kentucky Division for Air Quality prior to initiation of the abatement project.

02080-7

6.3 Notification Requirements: The contractor shall notify the Kentucky Division for Air

Quality prior to the commencement of work in accordance with 401 KAR 57:011 and 40 CPR 61, Subpart M. Copies of the form shall also be furnished to the Kentucky Occupational Safety and Health Division (KOSED), the Asbestos Coordinator, and the Contracting Officer. The notification must be received prior to the commencement of the project. Work cannot commence on any date other than that stated on the notification without rectification of all parties. For purposes of this contract, the notification requirement of ten (10) days shall apply.

The contractor shall be liable for any and all fines assessed the government as a result of the contractor's failure to comply with notification procedures as prescribed in 401 KAR 57:011 and 40 CFR 61, Subpart M.

6.4 Access Control: The contractor shall control access to the work area. A barrier fence shall be established and nonasbestos workers shall not be allowed within the job site. The barrier fence shall consist of yellow plastic tape with black lettering "CAUTION ASBESTOS REMOVAL" continuously printed on the tape. The barrier fence shall be placed at a nominal height of 30 inches. The contractor shall provide and display warning signs at each regulated area. Warning signs shall be posted at all approaches to regulated areas. The signs shall bear the following information:

DANGER

ASBESTOS

CANCER AND LUNG DISEASE HAZARD

AUTHORIZED PERSONNEL ONLY

RESPIRATORS AND PROTECTIVE CLOTHING ARE

REQUIRED IN THIS AREA.

Throughout the project, the barrier and signs shall be monitored and maintained. Only personnel on official business shall be allowed in the area enclosed by the barrier fence. If unauthorized personnel will not leave the work area, the contractor shall immediately notify the Contracting Officer. The contractor shall ensure that all entrances to the job site except the designated work entrance are locked.

6.5 The contractor shall deliver tools, equipment, and materials to the job site. The contractor shall provide secure storage of all tools, equipment, and materials.

6.6 The contractor shall spray asbestos material with amended water, using airless spray equipment or compressed air with low pressure capable of providing a “mist" application to prevent release of airborne fibers. Saturate the material sufficiently to wet it to the substrate without causing excess dripping. Spray the asbestos materials repeatedly during the work process to maintain wet condition and to minimize asbestos fiber dispersion.

Remove the asbestos material after the water has had time to penetrate completely. The wet material shall be enclosed in 6 mil plastic and taped securely.

02080-8

6.7 If there in any accidental release of asbestos FIX during removal, the asbestos FIX shall be immediately and completely cleaned up using HEPA vacuum equipment or wet cleaning methods. Any problems must be reported immediately to the Asbestos Coordinator.

6.8 The contractor shall pack the sealed asbestos material in fiber drums which meet DOT specifications. Drums shall be sealed with a lid and retaining ring. The contractor shall clean external surfaces thoroughly by wet sponging and marking drums with approved OSHA labels and DOT labeling. The contractor shall also affix a label with the contractor's name and building number. The warning sign shall be legible and printed with waterproof ink. The signs shall contain the following warning:

CAUTION

DO NOT OPEN

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

BREATHING ASBESTOS DUST MAY CAUSE

SERIOUS BODILY HARM

DOT LABEL

RQ Hazardous Substance Solid, N.O.S. (asbestos)

ORM-E, NA-9188

6.9 The contractor shall remove sealed and labeled containers of contaminated waste and shall dispose of as contaminated waste at the Fort Knox Sanitary Landfill. The contractor shall notify the landfill operator, (502)-942-9511, at least 24 hours prior to taking asbestos to the landfill. A waste shipment record is required from the Environmental Management Division prior to disposal.

6.10 The contractor shall treat all polyethylene sheeting, disposable clothing, filters, or other disposable equipment and supplies used in an asbestos abatement project as asbestos contaminated waste.

6.11 The contractor a hall submit disposal certificates to the contracting officer, the

Environmental Management Division, and the Kentucky Division for Air Quality.

6.12 All asbestos materials shall be disposed in accordance with all requirements of Federal, State, and local regulations.

7. SUMMARY OF SUBMITTALS:

02080-9

7.1 The following submittals shall be sent to the Contracting Officer with a copy furnished to the Directorate of Engineering and Housing - Environmental Management Division, ATZX-EK-EN, Fort Knox, Kentucky 40121-5000. ATTN: Asbestos Coordinator.

Submittals shall be received at least ten days prior to commencement of work.

7.1.1 Asbestos Removal Contractor Qualifications

7.1.2 Record of Citations and Summary of Legal Proceedings

7.1.3 Proof of Certification by the Kentucky Division for

Air Quality

7.1.4 Proof of Insurance

7.1.5 Plan of Work

7.1.6 Testing Laboratory Certification

7.1.7 Certification of Employee Training

7.1.8 Proof of Employee Medical Exams

7.1.9 Manufacturer's Certificates of Compliance for Local Exhausts, Vacuum Filters, and Respirators

7.1.10 Respiratory Protection Program

7.2 Monitoring results shall be submitted prior to project completion.

7.3 Disposal certificates shall be submitted prior to project completion. Asbestos Waste Shipment Record is required for proper disposal.

7.4 Copy of all notifications to the State of Kentucky.

02080-10

SECTION 02090

LEAD-BASED PAINT ABATEMENT/IN-PLACE

MANAGEMENT PLAN

1. Applicable Regulations and Guidelines: The regulations and Publications listed below form a part of this specification.

Occupational Safety and Health Administration (OSHA):

29 CFR 1926.62, 3 June 1993

Housing and Urban Development (HUD):

“Interim Guidelines for Hazard Identification and Abatement in Public and Indian Housing”

Army Environmental Hygiene Agency (AERA)

“Testing of Construction Debris”

Resource and Recovery Act (RCRA)

40 CFR Parts 124, 260-268, 270 and 271

Lead-Based Paint Poisoning Prevention Act (LBPPA) of

TRADOC Policy for the Removal of Lead-based Paint

28 June 1993

2. Introduction: The possibility of exposure to high levels of airborne lead particles makes lead-based paint abatement projects inherently hazardous. Employees shall be trained and made aware of the requirements of EPA, OSHA, and all applicable Department of the Army regulations and standards. Personnel protective equipment and personal hygiene requirements are described in the regulations referenced above. While performing lead-based paint abatement work, the lead-based paint abatement contractor shall be subject to on-site inspections by the Contracting Officer or his authorized, representative, who may be accompanied by the Lead Coordinator, Safety, or Health personnel. If the work being done is in violation of specification requirements or Federal, State, or local regulations, the Contracting Officer or his authorized representative, will stop the work process until the violation is resolved.

3. Coordination: All lead-based paint abatement work conducted under this contract shall be coordinated through the Environmental Management Division, Directorate of Public Works.

This shall include a preconstruction conference prior to the first DO being issued which includes the Lead Coordinator. The preconstruction conference shall be held to acquaint the Contractor with Government personnel associated with lead abatement and/or management at Fort Knox.

02090-1

4. Indemnification: The Contractor shall be liable for any and all fines assessed the Government as a result of the contractor's failure to comply with any of the Occupational

Safety and Health Administration (OSHA), Environmental Protection Agency (EPA), or any

State or Federal agency guidelines that may apply to the abatement project(s).

5. Plan of Work Submittal: The Contractor shall submit a detailed Plan of Work for each

Individual DO that has materials contaminated with lead paint. The plan shall describe the work process to be used in the removal and disposal of the lead-based paint wastes. The plan shall be submitted to the Contracting Officer or his authorized representative, and the Lead Coordinator. The Plan of work shall be reviewed and approved by the Lead Coordinator prior to the commencement of work.

6. Definitions:

6.1 Abatement - is a comprehensive process of eliminating exposure or potential exposure to lead paint and lead containing soil and dust which must include testing, measures for worker protection, containment of dust and debris, cleanup and disposal of wasteland clearance testing.

6.2 Encapsulation involves resurfacing or covering surfaces, and sealing or caulking with durable materials, Bo as to prevent or control chalking, flaking lead-containing substances from becoming part of house dust or accessible to children. Painting or wallpapering in not considered to be encapsulation.

6.3 High Efficiency Particle Air Filter (MCPJL) - means a filter capable of filtering out particles of 0.3 microns or greater from a body of air at 99.97% efficiency or greater.

6.4 High Phosphate Detergent - detergent which contains at least 5% trisodium phosphate (TSP).

6.5 In-Place Management - a series of recurrent actions to reduce the lead hazard until such time as abatement can be carried out. Usually involves paint stabilization and regular cleaning of the premises.

6.6 Toxicity Characteristic Leaching Procedure (TCLP) is one of the tests for the determinations of whether a solid waste is classified as a hazardous substance.

7.0 Requirements for Lead Abatement/In-Place Management Contractors:

7.1 Exposure to lead has been associated with numerous medical related problems. Studies indicate there are significantly increased health dangers to persons exposed to lead who smoke and further, to family members and other persons who become indirectly exposed

02090-2 as a result of the exposed worker bringing lead-laden work clothing home to be laundered.

OSHA has promulgated regulations pertaining to medical surveillance, employee training, respiratory protection, personal protective clothing and equipment, airborne lead monitoring, housekeeping, method of compliance, record keeping, emergency procedures, and other measures that must be taken when working with or around lead or lead-based products and debris or materials. Task triggers have been developed to protect workers performing tasks where high levels of airborne lead particles have been documented (These triggers are included in Enclosure 1.).

7.2 Three main areas of concern when working with lead-based paint, and/or lead containing materials are:

A. Occupant Protection B. Worker Protection C. Lead-based paint debris disposal

8.0 Specific Qualifications for Lead Abatement/In-Place Management Contractors: The

Contractor shall submit for approval the items listed below prior to beginning any lead abatement work. The information shall be submitted for any subcontractors employed and shall be submitted to the Contracting Officer or his authorized representative and the Lead Coordinator.

8.1 The Contractor shall submit demonstrated prior experience on lead abatement projects through the submission of letters of reference for at least three previous projects which include the name, address, and telephone number of a contact familiar with the contractor's work.

Include descriptions of projects, locations, and records of all lead monitoring data generated during the projects.

8.2 The Contractor shall submit a notarized statement signed by an officer of the company, which contains a record of any citations issued by Federal, State, or local regulatory agencies relating to lead abatement activities. The record shall include project dates, locations, and resolutions. The Contractor shall submit a listing of any lead-related legal proceedings or claims in which the Contractor or sub-contractor currently is or has been involved with to include description of role, issue, and resolution to date. If there are no legal proceedings or claims; and have been none in the past, the Contractor shall submit a notarized statement which relates this fact. This statement must be received by the Lead Coordinator as part of the submittal package.

8.3 The Contractor shall submit proof of insurance coverage. The Contractor shall submit a certification from the insurer that lead abatement work is included in the coverage.

02090-3

8.4 The Contractor shall avoid releasing, or causing to be released, lead dust into the atmosphere where they may be inhaled or ingested. OSELA has set standards in 29 CPR 1926.62, for exposure to airborne concentrations of lead, methods of compliance, medical surveillance, housekeeping procedures, and other measures that shall be taken when working with or around lead or lead containing material which releases lead containing particles at concentrations in excess of those established in 29 CPR 1926.62.

8.5 The Contractor shall provide effective protection to persons from exposure to lead-laden materials.

8.6 The Contractor shall comply with the provisions of 29 CPR 1926 (Key provisions of

29 CFR 1926..62 are summarized in Appendix A).

CONTRACTOR’S ATTENTION IS DIRECTED TO THE FOLLOWING:

8.6.1 The Contracting Officer may require the Contractor to have workers obtain initial Blood Lead Level (BLL) tests before beginning work on the abatement/management project, and after completion of the project (Refer to 29 CPR 1926.62 SEC.8 PARA J Medical Surveillance for additional information on this subject).

8.6.2 Employee training is a responsibility of the Contractor, and is to be completed prior to the beginning of work in and/or around lead or lead-containing materials (Refer to 29 CPR

1926.62 SEC.3 PARA L).

8.6.3 Respiratory protection (29 CPR 1926.62 SEC.3 PARA F)

8.6.4 Personal Protective Clothing and Equipment (29 CPR 1926.62 SEC.3 PARA G).

The use of compressed air to remove lead dust from worker's clothing is strictly prohibited.

8.6.5 Lead Dust Sampling: The Contractor shall submit the name, address, and telephone number, of the laboratory selected and the analytical method to be used in determining the lead concentration of air samples and/or dust wipe samples. . Selected laboratory shall be a participant in the Environmental Laboratory Proficiency Analytical (ELPAT) program.

8.6.5.1 Exposure monitoring shall be conducted as specified in 29 CPR 1926.62 SEC.3 PARA D. The Contractor shall submit a copy of all monitoring records to the Contracting Officer or his authorized representative and the Lead Coordinator.

8.6.5.2 Clearance air monitoring/dust wipe samples shall be conducted as per "Lead- Based Paint Policy Guidance, TRADOC, June 1993. There are separate clearance standards for floors, window sills, and window wells, because of differences in lead levels, abatement techniques, and ease of cleanup on the three types of surfaces. The clearance standards are:

02090-4

FLOORS: 200 micrograms/square foot WINDOW SILLS: 500 micrograms/square foot WINDOW WELLS: 800 micrograms/square foot

The Contractor shall ensure that these samples are collected not sooner than 24 hours after the final cleaning process has been completed, and not later than 7 days after the final cleaning process. The recommended sampling method for testing these surfaces is wipe sampling.

8.6.6 Housekeeping: Dry sweeping of work area contaminated with lead-based paint debris or dust is prohibited (29 CPR 1926.62 PARA K).

8.6.7 Methods of Compliance: Procedures relating to engineering controls, local exhaust ventilation, specific tools to be used, and work practices to be employed (29 CFR

1926.62 PARA E).

8.6.8 Record keeping procedures shall comply with 29 CFR 1926.62 PARA K.

8.7 Worker Protection:

8.7.1 At a minimum, the Contractor shall comply with the following worker protection requirements:

8.7.1.1 Prior to commencement of work, the workers shall be instructed and shall be knowledgeable in lead-based paint abatement, and handling of lead-based paint wastes. The Contractor shall submit proof satisfactory to the Contracting Officer or his authorized representative, and the Lead Coordinator that all employees have had training on the hazards of lead exposure, use and fitting of respirators, protective clothing, entry and exit from work areas, and all aspects of work procedures and protective measures.

8.7.1.2 The Contractor shall provide and post, at the job site, the decontamination and work procedures to be followed by workers, as described in theme specifications. The Contractor shall also post the OSHA regulation concerning lead-based paint abatement at the job site.

8.7.1.3 The Contractor shall submit proof to the Contracting Officer or his authorized representative, and the Lead Coordinator that all workers for the project have been examined by a physician in accordance with 29 CPR 1926.62 Sec 3B, PARA J. This examination in to include at a mining, a Blood Lead Level test. These medical records are to be maintained by the contractor for the duration of employment plus 30 years in accordance with 29 CPR 1926.62 SEC 3B, PARA N.

8.7.1.4 The Contractor shall submit to the Contracting Officer or his authorized representative and the Lead Coordinator manufacturer's certification that vacuums and other equipment that are intended for use on the lead abatement project meet the criteria set forth in 29 CPR 1926.62.

02090-5

8.7.1.5 The Contractor shall provide workers with personally issued and marked respiratory equipment approved by the National Institute of Occupational Safety and Health (NIOSE), and the Mine Safety and Health Administration (MSHA), and suitable for airborne lead level concentration in the work area according to OSHA standards in 30 CPR part II. The Contractor shall submit to the Contracting officer or his authorized representative, and the Lead Coordinator a copy of the respiratory protection program which sets forth the Standard Operating Procedures concerning the use and maintenance of respiratory equipment as required by 29 CPR 1910.134, and 29 CPR 1926.62 SEC.3 PARA P.

8.7.1.6 The Contractor shall provide workers with protective full body coveralls and headgear. The Contractor shall provide eye, ear protection, and hard hats as required by safety regulations.

8.7.1.7 No visitors shall be allowed in the work area except as authorized by the Contracting officer or his authorized representative.

8.7.1.8. Workers shall not eat, drink, smoke, chew gum, chew tobacco, or apply cosmetics at the work site. Hand washing facilities shall be provided for all workers in a lead contaminated area. Workers shall wash their hands and face before consuming foodstuffs.

The Contractor shall ensure that all provisions get forth in 29 CPR 1926.62 SEC.3 PARA I are strictly enforced.

8.7.1.9 All movable objects shall be removed from the premises being abated. objects not removed from the abatement work area shall be covered with polyethylene sheeting and secured in place.

8.7.1.10 The Contractor shall control access to the work area. A barrier fence shall be established and non-abatement workers shall not be allowed within the abatement area. The barrier fence shall be placed at a nominal height of 30 inches. The Contractor shall provide and display warning signs at each regulated area. Warning signs shall be posted at all approaches to regulated areas. The warning signs shall bear the following information:

WARNING

LEAD WORK AREA

POISON

NO SMOKING OR RATING

The warning signs are to be illuminated and cleaned as necessary so that the information is clearly, and readily visible. Throughout the abatement project the barrier fence and signs shall be maintained and monitored. Only personnel on official business shall be allowed in the area enclosed by the barrier fence. If unauthorized personnel will not leave the work area, the Contractor shall immediately notify the Contracting officer. The Contractor shall ensure that all entrances to the job site except the designated work entrance are locked.

02090-6

8.7.1.11 The Contractor shall deliver tools, equipment, and materials to the job site. The Contractor shall provide secure storage of all tools, equipment, and materials.

8.8 Occupant Protection:

8.8.1 All work which disturbs lead-based paint should be accomplished in the absence of occupants. When this is not practical, containment must be provided to assure complete isolation of the occupants.

8.9 Debris Disposal:

8.9.1 Miscellaneous construction debris and material from demolition, remodeling, and/or renovation projects shall be tested as per USAERA Sampling-Protocol for Building Demolition Debris and Buildings Painted with Lead-Based Paint which is contained in Appendix B.

8.9.2 All debris generated from the abatement project will need to be tested using the Toxicity Characteristic Leaching Procedure (TCLP) to determine if the waste is hazardous. If the waste is determined to be hazardous, it will need to be disposed of through Ft. Knox Directorate of Resource Management (DRMO). Disposal procedure is enclosed in Appendix C.

8.9.3 Contractor is responsible for proper disposal for all wastes generated during the abatement process. This includes labeling, packaging, and the documentation procedures for disposal of the wastes.

9.0 Abatement/In-Place Management of Lead-Based Paint On Exterior Surfaces:

9.1 Procedures for abatement/in-place management of exterior surfaces with lead-based paint are outlined in Appendix D.

10.0 Abatement/In-Place Management of Lead-based Paint On Interior Surfaces:

10.1 Procedures for abatement/in-place management of interior surfaces with lead-based paint are outlined in Appendix E.

11.0 Summary of Submittals:

11.1 The following submittals shall be sent to the Contracting Officer or his authorized representative with a copy furnished to the Directorate of Public Works, Environmental Management Division, ATZK-PWE, Fort Knox, Kentucky 40121-5000.

ATTN: Lead Coordinator submittals shall be received prior to work beginning on any Do known to contain lead contaminated materials.

02090-7

11.1.1 Lead Abatement Contractor Qualifications

11.1.2 Record of Citations and Summary of Legal Proceedings

11.1.3 Proof of Insurance

11.1.4 Plan of Work

11.1.5 Testing Laboratory Certification

11.1.6 Certification of Employee Training

11.1.7 Proof of Employee Medical Examinations

11.1.8 Manufacturer's Certificates of Compliance for Local Exhausts, Vacuum Filters, and Respirators

11.1.9 Respiratory Protection Program

11.10 Air monitoring results, and dust wipe sampling

results shall be silh-4tted prior to project completion.

11.1.11 Disposal certificates if required, shall be submitted to the Environmental

Management Division prior to project completion.

EMPLOYEE PROTECTION DURING EXPOSURE ASSESSMENT

TASK…