Technical_Exhibit_7.5.9.4__Central_Energy_Plant_No._2_Bldg_310_Installed_Equipment.doc

DOC document 36 KB Posted

Attached to
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION
Solicitation number
W91249-18-R-0001
Issued by

About this file

Attachment 6 - TE 7.5.9.4 - Central Energy Plant No. 2 Bldg. 310 Installed Equipment

View the file

Other files

File Type Posted
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet_(Revision_2).xlsx XLSX spreadsheet
W91249-18-R-0001-0004.docx DOCX document
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001_0002__and_0003.pdf PDF
CONFORMED_COPY_W91249-18-R-0001.docx DOCX document
Technical_Exhibit_7.5.9.8.1__Dumpster_Locations_List.docx DOCX document
W91249-18-R-0001-0003.pdf PDF
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001.pdf PDF
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet_(Revision_1).xlsx XLSX spreadsheet
Attachment_1_-_Performance_Work_Statement.docx DOCX document
Attachment_13_-_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
W91249-18-R-0001-0002.docx DOCX document
Attachment_16_-_Questions_&_Responses_to_Solicitation_&_Amendment_0001.pdf PDF
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet.xlsx XLSX spreadsheet
Amendment_W91249-18-R-0001-0001.pdf PDF
W91249-18-R-0001.pdf PDF
Technical_Exhibit_7.5.7.6_Semi-Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.20_Pest_Control_Services_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.4.1__Contractor_Personnel_Minimum_Qualifications.docx DOCX document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Attachment_9_-_Davis_Bacon_Act_(DBA)_Wage_determination_GA165.pdf PDF
Technical_Exhibit_7.5.7.7.1_Estimated_IDIQ_Qunatities.docx DOCX document
Attachment_3_-_Technical_Exhibit__2_-_7.2__Deliverables.docx DOCX document
Technical_Exhibit_7.5.4.1_Visible_Emission_Form.docx DOCX document
Technical_Exhibit_7.4.7_Energy_Conservation_Measures.docx DOCX document
Technical_Exhibit_7.4.2_Government_Furnsihed_Equipment.docx DOCX document
Technical_Exhibit_7.5.6.16_Facilities_M&R_Services_Performance_Metrics_Template.doc DOC document
Technical_Exhibit_7.5.6.11_UMCS_Demarcation_List.docx DOCX document
Technical_Exhibit_7.4.4__Training_and_Medical_Testing.docx DOCX document
Technical_Exhibit_7.5.7.2_Grounds_Sections.doc DOC document
Technical_Exhibit_7.5.6.19_Roads_&_Grounds_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.5.7.3_High_Visibilty_Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.7.5_Range_Mowing_Map.docx DOCX document
Technical_Exhibit_7.5.9.2__Central_Energy_Plant_No._1_Building_25910_Buildings_Served.docx DOCX document
Technical_Exhibit_7.5.6.6_Range_Hood_Cleaning_Services.docx DOCX document
Technical_Exhibit_7.5.9.3b__Plant_No._1_Operation_CEP_CHW_and_HTW_Controls.doc DOC document
Technical_Exhibit_7.5.4.4_Potable_Water_Wells.docx DOCX document
Technical_Exhibit_7.5.8.3_Bailey_Bridge_Maintenance_and_Inspection_Instructions.rtf RTF text file
Technical_Exhibit_7.5.8.2_Quarterly_Sweeping_Schedule.docx DOCX document
Attachment_2_-_Technical_Exhibit_1_-_7.1_Performance_Requirements_Summary.docx DOCX document
Attachment_15_-_Site_Visit_-_Access_Control_Information.pdf PDF
Technical_Exhibit_7.5.7.7_Flower_Beds.doc DOC document
Technical_Exhibit_7.5.7.10_Line_Clearing_Specifications.docx DOCX document
Technical_Exhibit_7.5.6.10__Installation_Irrigation_Systems.docx DOCX document
Technical_Exhibit_7.5.8.6._Dams.docx DOCX document
Technical_Exhibit_7.5.6.13_Communcation_Towers.docx DOCX document
Technical_Exhibit_7.5.6.4__Wastewater_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.6__Bureau_of_Mine_Standards_for_Water_Treatment.doc DOC document
Technical_Exhibit_7.5.6.14_Communication_Shelters.docx DOCX document
Attachment_7_-_Collective_Bargaining_Agreement_&_WD.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 7.5.9.4 Central Energy Plant #2 Bldg 310 Installed Equipment name

ITEM # COMPONENT QTY MANUFACTURER DATE

INSTALLED

1 Boiler 3 Cleaver-Brooks 1998

2 Boiler Feed Water pumps 4 Bell-Gossett 1997

3 Feed Water pump motors 4 Marathon 1997

4 Transfer Pump motors 2 Bell=-Gossett/U.S. Motors 1997

5 Chemical Feed Pump & Tanks 4 GE 1974

6 Air Compressors 1 Ingersoll-Rand

8 Water Softener 2 Anco

9 Brine Ttank 1 Anco

10 Deaerator Heater 1 Great lakes Water 1974

11 Centrifugal Chiller 2 York 1997

12 Absorber 1 Trane 1996

13 Chill Water Pump 3 Bell-Gossett

14 Cooling Towers 3 Marley 1997

15 Emergency Power 1 Asco 1997

16 Variabelk Speed Control 4 ABB 1998

17 Metasys System 1 Johnson Controls 1998

&16Attachment J- C5.9 04 Central Energy Plant #2 Bldg 310 Installed Equipment

&11PAGE &P of &N

File details come from the government source that posted it.