Technical Exhibit 7.3.3 PWO Workload
| Project Work Order (PWO) Description |
| #Jobs |
| Project Work Order (PWO) Description |
| #Jobs |
| Relocate ICIDS System |
| 1 |
| Replace Chill Water Lines |
| 3 |
| Install Drainage Inlet |
| 1 |
| Tie Roof Drains to Storm Drains |
| 1 |
| Paint the Ceiling |
| 1 |
| Relocate Outside Refrigerators/Freezers |
| 3 |
| Repair Roof |
| 1 |
| Install Access Control and Video Surveillance System |
| 1 |
| Electrical Tie In |
| 1 |
| Insulate Metal Ducts |
| 1 |
| Repair Parking Lot |
| 3 |
| Distribute 400 Hz Power to the 2nd Floor |
| 1 |
| Replace or repair floor |
| 7 |
| Recharge Pump System |
| 1 |
| Replace Carpet |
| 4 |
| Replace Roof Drainage |
| 1 |
| Install Supplemental AC Unit |
| 1 |
| Replace Entire Roof and Air Vents |
| 4 |
| Replace Boiler Flue |
| 1 |
| Upgrade UMCS |
| 5 |
| Install/Replace Doors and Frames |
| 4 |
| Renovate Building 33800 |
| 1 |
| Abate Asbestos Tile |
| 1 |
| Locate Dunwoody Monument at Myer Mall |
| 1 |
| Replace Pipe Insulation |
| 1 |
| Install CCTV Monitoring System |
| 1 |
| Chiller Pad and Retaining Wall |
| 1 |
| Replace Hot Water Storage Tank |
| 1 |
| Chemical Feed System |
| 1 |
| Replace Boiler |
| 1 |
| Return Air Duct Bank |
| 1 |
| Install 110V A/C Floor Outlets and NIPRNET Drop Boxes |
| 1 |
| Replace Deck and Modify Stairs |
| 1 |
| Connect Power Poles |
| 1 |
| Improvement to Weapons Storage |
| 1 |
| Re-key Building |
| 5 |
| Replace Rooftop Units |
| 1 |
| Install Video Surveillance Equipment |
| 4 |
| Install and Connect HVAC Wiring |
| 1 |
| Renovate Room 213 Saltzman Hall |
| 1 |
| Replace RTUs |
| 1 |
| Install Power Poles and Floor Outlets |
| 1 |
| Fix Walls |
| 1 |
| Vented Duct for Computer Rack |
| 1 |
| Repair Laundry Room Drain |
| 1 |
| Install Electrical Outlets |
| 1 |
| Pressure Wash Building |
| 1 |
| Install Supplemental AC in Data Closet |
| 1 |
| Replace Loading Dock |
| 1 |
| Install Handicap Accessible Doors |
| 1 |
| Electronic Interstitial Monitoring-UST |
| 1 |
| Install Window Units |
| 1 |
| Restoration of Latrine Building |
| 2 |
| Replace Front Desk Counter |
| 1 |
| Replace Overhead Pipes |
| 1 |
| Replace Dumpster Enclosure |
| 1 |
| Restripe Motorcycle Range |
| 1 |
| Replace Kitchen Hood |
| 1 |
| Replace Air Handling Units |
| 4 |
| Renovate Building |
| 1 |
| Replace Hot Water Storage Tanks |
| 4 |
| Paint Rooms |
| 1 |
| Replace Target Emplacements |
| 1 |
| Dual Fire Boiler Replacement |
| 1 |
| Replace AHU and Condenser Unit |
| 2 |
| Replace Cooling Tower |
| 1 |
| Demo Overhead Covers |
| 1 |
| Landscaping |
| 4 |
| Replace all Mirrors in Free Weight Room |
| 1 |
| Repair Whitmore Lake Water Control System |
| 1 |
| Barracks Repairs - In Between Occupancy Repairs |
| 12 |
| Install Crosswalk Signal |
| 1 |
| Install Lightning Dispersal Rod |
| 1 |
| Install FG Wayfinding Signs |
| 1 |
| Upgrade HVAC |
| 3 |
| Replace Target Emplacements |
| 2 |
IMPORTANT NOTE:
A Project Work Order (PWO) is defined as any effort exceeding the limitations of a Demand Maintenance Order (DMO). Generally, a PWO represents requirements which exceed 32 hours of labor to accomplish. Material costs may also require that an effort be tracked as a PWO.
The solicitation includes Technical Exhibit (TE) 7.3.3, which reflect only project titles of previously tasked projects on past Base Operations and Maintenance Support Services (BASOPS) contracts. The information is limited and not sufficient for potential vendors to submit costs for PWOs. The Government doesn’t currently know the projects that will be tasked for performance on the BASOPS follow-on requirement. Therefore, the Government has provided predetermined amounts for projects to help vendors recognize the required level of effort.
The "Projects" data provided below is raw costs; it does not include "Project Staff Distribution" or fees. The Government is aware that "Project Staff Distribution", G&A, and fees may vary per vendor. The "Fixed Fee" will be negotiated at time of award. It is the vendor's choice to perform projects in-house or through a subcontractor.
Please include the following predetermined amounts for projects in your cost proposal:
PERIOD OF PERFORMANCE: 01 FEBRUARY 2019 - 30 SEPTEMBER 2019
| CLINS |
| CLIN DESCRIPTION |
| AMOUNT |
| 0002 |
| Facilities Maintenance & Repair Services- Buildings and Structures |
| $919,991.00 |
| 0004 |
| Restoration and Modernization – Minor Construction |
| $21,333.00 |
| 0006 |
| Improved Grounds Maintenance Services |
| $2,167.00 |
| 0009 |
| Utilities, Dams, & Other |
| $33,333.00 |
| 0011 |
| Surfaced/Unsurfaced Areas |
| $33,333.00 |
| 0025 |
| Facility Engineering Services |
| $13,333.00 |
OPTION YEAR 1 PERIOD OF PERFORMANCE: 01 OCTOBER 2019 - 30 SEPTEMBER 2020
| CLINS |
| CLIN DESCRIPTION |
| OPTION 1 |
| 1001 |
| Facilities Maintenance & Repair Services- Buildings and Structures |
| $1,379,987.00 |
| 1003 |
| Restoration and Modernization – Minor Construction |
| $22,500.00 |
| 1005 |
| Improved Grounds Maintenance Services |
| $63,600.00 |
| 1008 |
| Utilities, Dams, & Other |
| $50,000.00 |
| 1010 |
| Surfaced/Unsurfaced Areas |
| $50,000.00 |
| 1024 |
| Facility Engineering Services |
| $20,000.00 |
OPTION YEAR 2 PERIOD OF PERFORMANCE: 01 OCTOBER 2020 - 30 SEPTEMBER 2021
| CLINS |
| CLIN DESCRIPTION |
| OPTION 2 |
| 2001 |
| Facilities Maintenance & Repair Services- Buildings and Structures |
| $1,400,687.00 |
| 2003 |
| Restoration and Modernization – Minor Construction |
| $22,838.00 |
| 2005 |
| Improved Grounds Maintenance Services |
| $64,554.00 |
| 2008 |
| Utilities, Dams, & Other |
| $50,750.00 |
| 2010 |
| Surfaced/Unsurfaced Areas |
| $50,750.00 |
| 2024 |
| Facility Engineering Services |
| $20,300.00 |
OPTION YEAR 3 PERIOD OF PERFORMANCE: 01 OCTOBER 2021 - 30 SEPTEMBER 2022
| CLINS |
| CLIN DESCRIPTION |
| OPTION 3 |
| 3001 |
| Facilities Maintenance & Repair Services- Buildings and Structures |
| $1,421,698.00 |
| 3003 |
| Restoration and Modernization – Minor Construction |
| $23,180.00 |
| 3005 |
| Improved Grounds Maintenance Services |
| $65,522.00 |
| 3008 |
| Utilities, Dams, & Other |
| $51,511.00 |
| 3010 |
| Surfaced/Unsurfaced Areas |
| $51,511.00 |
| 3024 |
| Facility Engineering Services |
| $20,604.00 |
OPTION YEAR 4 PERIOD OF PERFORMANCE: 01 OCTOBER 2022 - 30 SEPTEMBER 2023
| CLINS |
| CLIN DESCRIPTION |
| OPTION 4 |
| 4001 |
| Facilities Maintenance & Repair Services- Buildings and Structures |
| $1,443,023.00 |
| 4003 |
| Restoration and Modernization – Minor Construction |
| $23,528.00 |
| 4005 |
| Improved Grounds Maintenance Services |
| $66,505.00 |
| 4008 |
| Utilities, Dams, & Other |
| $52,284.00 |
| 4010 |
| Surfaced/Unsurfaced Areas |
| $52,284.00 |
| 4024 |
| Facility Engineering Services |
| $20,914.00 |