Technical_Exhibit_7.3.3__PWO_Workload.docx

DOCX document 20 KB Posted

Attached to
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION Federal contract opportunity
Solicitation number
W91249-18-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Gordon

About this file

Technical Exhibit 7.3.3. - PWO Workload

View the file

Other files for this federal contract opportunity

Other files attached to FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION, newest first.
File Type Posted
W91249-18-R-0001-0004.docx DOCX document
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001_0002__and_0003.pdf PDF
Technical_Exhibit_7.5.9.8.1__Dumpster_Locations_List.docx DOCX document
Attachment_13_-_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
Technical_Exhibit_7.5.6.6_Range_Hood_Cleaning_Services.docx DOCX document
Technical_Exhibit_7.5.7.5_Range_Mowing_Map.docx DOCX document
Technical_Exhibit_7.5.9.2__Central_Energy_Plant_No._1_Building_25910_Buildings_Served.docx DOCX document
Technical_Exhibit_7.5.7.7_Flower_Beds.doc DOC document
Attachment_11_-_Sample_Past_Performance_Cover_Letter.docx DOCX document
Technical_Exhibit_7.5.4.3_Underground_Storage_Tanks.docx DOCX document
Technical_Exhibit_7.4.5__Government_Furnished_Vehicles.docx DOCX document
Technical_Exhibit_7.4.3__Fort_Gordon_Facility_Listing_(Excluding_Privatized_Facilities).docx DOCX document
Technical_Exhibit_7.5.8.5_Lakes_and_Ponds.docx DOCX document
Technical_Exhibit_7.5.6.2_Electrical_Lines_of_Demarcation.doc DOC document
Attachment_8_-_Service_Contract_Act_(SCA)_Wage_Determation_2015-4465_Rev5.pdf PDF
Technical_Exhibit_7.5.9.8_Dumpster_Container_Cleaning_List.docx DOCX document
Technical_Exhibit_7.5.6.3__Natural_Gas_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.3a__Plant_No._1_Operation_CEP_CHW_and_High_Temperature_Water_(HTW).doc DOC document
Technical_Exhibit_7.4.7_Energy_Conservation_Measures.docx DOCX document
W91249-18-R-0001.pdf PDF
Technical_Exhibit_7.4.1__Contractor_Personnel_Minimum_Qualifications.docx DOCX document
Technical_Exhibit_7.5.7.6_Semi-Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.20_Pest_Control_Services_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.6.19_Roads_&_Grounds_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.5.7.3_High_Visibilty_Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.9.3b__Plant_No._1_Operation_CEP_CHW_and_HTW_Controls.doc DOC document
Technical_Exhibit_7.5.4.4_Potable_Water_Wells.docx DOCX document
Technical_Exhibit_7.5.8.3_Bailey_Bridge_Maintenance_and_Inspection_Instructions.rtf RTF text file
Technical_Exhibit_7.5.8.2_Quarterly_Sweeping_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.14_Communication_Shelters.docx DOCX document
Attachment_7_-_Collective_Bargaining_Agreement_&_WD.pdf PDF
Technical_Exhibit_7.5.9.5_Central_Energy_Plant_No._2_Building_310_Buildings_Served.docx DOCX document
Technical_Exhibit_7.4.6__Financial_&_Plant_Management_Roles_and_Courses.docx DOCX document
Technical_Exhibit_7.5.6.8_Communication_Manholes.docx DOCX document
Technical_Exhibit_7.5.5.2_Sample_Pest_Management_Plan.docx DOCX document
Attachment_1_-_Performance_Work_Statement.docx DOCX document
Technical_Exhibit_7.5.7.4_Normal_Visibilty_Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.2__Task_Codes.docx DOCX document
Technical_Exhibit_7.5.3__Fort_Gordon_Turn_Over_Memos.docx DOCX document
Technical_Exhibit_7.5.6.9__Exterior_Lighting_(Fixtures).docx DOCX document
Technical_Exhibit_7.3.5_Estimated_U-Do-It_Workload.docx DOCX document
Technical_Exhibit_7.5.7.2_Grounds_Sections.doc DOC document
Technical_Exhibit_7.4.4__Training_and_Medical_Testing.docx DOCX document
Technical_Exhibit_7.5.9.4__Central_Energy_Plant_No._2_Bldg_310_Installed_Equipment.doc DOC document
Attachment_15_-_Site_Visit_-_Access_Control_Information.pdf PDF
Attachment_2_-_Technical_Exhibit_1_-_7.1_Performance_Requirements_Summary.docx DOCX document
Technical_Exhibit_7.5.6.10__Installation_Irrigation_Systems.docx DOCX document
Technical_Exhibit_7.5.7.10_Line_Clearing_Specifications.docx DOCX document
Technical_Exhibit_7.5.8.6._Dams.docx DOCX document
Show all 50

FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 7.3.3 PWO Workload

Project Work Order (PWO) Description
#Jobs
Project Work Order (PWO) Description
#Jobs
Relocate ICIDS System
1
Replace Chill Water Lines
3
Install Drainage Inlet
1
Tie Roof Drains to Storm Drains
1
Paint the Ceiling
1
Relocate Outside Refrigerators/Freezers
3
Repair Roof
1
Install Access Control and Video Surveillance System
1
Electrical Tie In
1
Insulate Metal Ducts
1
Repair Parking Lot
3
Distribute 400 Hz Power to the 2nd Floor
1
Replace or repair floor
7
Recharge Pump System
1
Replace Carpet
4
Replace Roof Drainage
1
Install Supplemental AC Unit
1
Replace Entire Roof and Air Vents
4
Replace Boiler Flue
1
Upgrade UMCS
5
Install/Replace Doors and Frames
4
Renovate Building 33800
1
Abate Asbestos Tile
1
Locate Dunwoody Monument at Myer Mall
1
Replace Pipe Insulation
1
Install CCTV Monitoring System
1
Chiller Pad and Retaining Wall
1
Replace Hot Water Storage Tank
1
Chemical Feed System
1
Replace Boiler
1
Return Air Duct Bank
1
Install 110V A/C Floor Outlets and NIPRNET Drop Boxes
1
Replace Deck and Modify Stairs
1
Connect Power Poles
1
Improvement to Weapons Storage
1
Re-key Building
5
Replace Rooftop Units
1
Install Video Surveillance Equipment
4
Install and Connect HVAC Wiring
1
Renovate Room 213 Saltzman Hall
1
Replace RTUs
1
Install Power Poles and Floor Outlets
1
Fix Walls
1
Vented Duct for Computer Rack
1
Repair Laundry Room Drain
1
Install Electrical Outlets
1
Pressure Wash Building
1
Install Supplemental AC in Data Closet
1
Replace Loading Dock
1
Install Handicap Accessible Doors
1
Electronic Interstitial Monitoring-UST
1
Install Window Units
1
Restoration of Latrine Building
2
Replace Front Desk Counter
1
Replace Overhead Pipes
1
Replace Dumpster Enclosure
1
Restripe Motorcycle Range
1
Replace Kitchen Hood
1
Replace Air Handling Units
4
Renovate Building
1
Replace Hot Water Storage Tanks
4
Paint Rooms
1
Replace Target Emplacements
1
Dual Fire Boiler Replacement
1
Replace AHU and Condenser Unit
2
Replace Cooling Tower
1
Demo Overhead Covers
1
Landscaping
4
Replace all Mirrors in Free Weight Room
1
Repair Whitmore Lake Water Control System
1
Barracks Repairs - In Between Occupancy Repairs
12
Install Crosswalk Signal
1
Install Lightning Dispersal Rod
1
Install FG Wayfinding Signs
1
Upgrade HVAC
3
Replace Target Emplacements
2

IMPORTANT NOTE:

A Project Work Order (PWO) is defined as any effort exceeding the limitations of a Demand Maintenance Order (DMO). Generally, a PWO represents requirements which exceed 32 hours of labor to accomplish. Material costs may also require that an effort be tracked as a PWO.

The solicitation includes Technical Exhibit (TE) 7.3.3, which reflect only project titles of previously tasked projects on past Base Operations and Maintenance Support Services (BASOPS) contracts. The information is limited and not sufficient for potential vendors to submit costs for PWOs. The Government doesn’t currently know the projects that will be tasked for performance on the BASOPS follow-on requirement. Therefore, the Government has provided predetermined amounts for projects to help vendors recognize the required level of effort.

The "Projects" data provided below is raw costs; it does not include "Project Staff Distribution" or fees. The Government is aware that "Project Staff Distribution", G&A, and fees may vary per vendor. The "Fixed Fee" will be negotiated at time of award. It is the vendor's choice to perform projects in-house or through a subcontractor.

Please include the following predetermined amounts for projects in your cost proposal:

PERIOD OF PERFORMANCE: 01 FEBRUARY 2019 - 30 SEPTEMBER 2019

CLINS
CLIN DESCRIPTION
AMOUNT
0002
Facilities Maintenance & Repair Services- Buildings and Structures
$919,991.00
0004
Restoration and Modernization – Minor Construction
$21,333.00
0006
Improved Grounds Maintenance Services
$2,167.00
0009
Utilities, Dams, & Other
$33,333.00
0011
Surfaced/Unsurfaced Areas
$33,333.00
0025
Facility Engineering Services
$13,333.00

OPTION YEAR 1 PERIOD OF PERFORMANCE: 01 OCTOBER 2019 - 30 SEPTEMBER 2020

CLINS
CLIN DESCRIPTION
OPTION 1
1001
Facilities Maintenance & Repair Services- Buildings and Structures
$1,379,987.00
1003
Restoration and Modernization – Minor Construction
$22,500.00
1005
Improved Grounds Maintenance Services
$63,600.00
1008
Utilities, Dams, & Other
$50,000.00
1010
Surfaced/Unsurfaced Areas
$50,000.00
1024
Facility Engineering Services
$20,000.00

OPTION YEAR 2 PERIOD OF PERFORMANCE: 01 OCTOBER 2020 - 30 SEPTEMBER 2021

CLINS
CLIN DESCRIPTION
OPTION 2
2001
Facilities Maintenance & Repair Services- Buildings and Structures
$1,400,687.00
2003
Restoration and Modernization – Minor Construction
$22,838.00
2005
Improved Grounds Maintenance Services
$64,554.00
2008
Utilities, Dams, & Other
$50,750.00
2010
Surfaced/Unsurfaced Areas
$50,750.00
2024
Facility Engineering Services
$20,300.00

OPTION YEAR 3 PERIOD OF PERFORMANCE: 01 OCTOBER 2021 - 30 SEPTEMBER 2022

CLINS
CLIN DESCRIPTION
OPTION 3
3001
Facilities Maintenance & Repair Services- Buildings and Structures
$1,421,698.00
3003
Restoration and Modernization – Minor Construction
$23,180.00
3005
Improved Grounds Maintenance Services
$65,522.00
3008
Utilities, Dams, & Other
$51,511.00
3010
Surfaced/Unsurfaced Areas
$51,511.00
3024
Facility Engineering Services
$20,604.00

OPTION YEAR 4 PERIOD OF PERFORMANCE: 01 OCTOBER 2022 - 30 SEPTEMBER 2023

CLINS
CLIN DESCRIPTION
OPTION 4
4001
Facilities Maintenance & Repair Services- Buildings and Structures
$1,443,023.00
4003
Restoration and Modernization – Minor Construction
$23,528.00
4005
Improved Grounds Maintenance Services
$66,505.00
4008
Utilities, Dams, & Other
$52,284.00
4010
Surfaced/Unsurfaced Areas
$52,284.00
4024
Facility Engineering Services
$20,914.00

File details come from the government source that posted it.