Attachment 16 - Questions and Responses - Revision 001. Start at Question #46
View the file
Other files for this federal contract opportunity
Show all 50
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & RESPONSES
SOLICITATION W91249-18-R-0001, AMENDMENT 0001,
AMENDMENT 0002, & AMENDMENT 0003
1. Solicitation, Section L, Paragraph 1.11.4, Page 148 of 175 reads: All comments and/or questions must be submitted via a SINGLE email per Offeror, preferably in a Microsoft Word document attached to the e-mail. Submit to the point of contact in paragraph 1.11.2 above no later than 4:00p.m. EST on 20 April 2018. Does this statement mean offerors are only allowed to submit questions one time between now and 20 April?
Government Response: Questions are to be submitted in accordance with Section L of the solicitation.
2. Solicitation, Section L – 7.2.1, 7.3.6., Section M – 2.2.2.1 – Recency Assessment. An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be substantially complete (80% or more) or must have been performed during the past three years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.
a. The instructions in Section L require the offeror to provide a minimum of 3 references for relevant contracts performed during the past 3 years. Will the Government please clarify the statement in Section M that the effort must be substantially complete (80% or more) to be evaluated?
Government Response: Please see Amendment 0001. Paragraph 7.2.1 in Section L of the solicitation speaks to Relevancy. Paragraph 2.2.2.1 in Section M of the solicitation speaks to
Recency, which states, “To be recent, the effort must be substantially complete (80% or more) or must have been performed during the past three years from the date of issuance of this solicitation.
b. Does the Government intend to limit past performance evaluations to only those efforts that have completed, for instance, at least 9.6 months (80%) of a 12-month period of performance?
Government Response: Please see Government’s response to question 2a.
3. Solicitation, Paragraph 8.2.2, Page 162 of 175 states “In order to maintain a minimum level of commonality between proposals, each offeror is required to complete (in entirety) the four (4) cost summary spreadsheets provided at Attachment 10. The cost summary spreadsheets shall be provided for the base effort and each option year.” We were unable to locate the four (4) cost summary spreadsheets in the provided Attachment 10 workbook, there is only one TAB labeled “Summary”. Secondly, as a summary spreadsheet is needed for the “base effort and each option year” should there be five (5) in total?
Government Response: Please see Amendment 0002, Section L, Paragraph 8.1.2.3
4. In the provided Attachment 10 workbook each Period TAB (Base, OY1, OY2, OY3, and
OY4) this was somewhat confusing as there are Cost only CLINS labeled in the TABS that seem to ask for the associated Labor. Secondly, the government provided template stops at CLIN 0017 and we did not see any guidance in the provided instructions suggesting offerors should add the remaining Labor CLINS (CLIN – 0019, 0021, 0023, 0025, 0027, 0029, 0030, 0031, and 0033)?
Government Response: Please see Attachment 10 issued with Amendment 0001, each period tab consists of labor CLINS only.
5. It appears that Clause 252.244-7001 is incorporated because Clause 52.244-2 is incorporated.
Would the government consider removing the requirement for an acceptable purchasing system
(252.244-7001) as long as the contractor obtains the consent to subcontract IAW 52.244-2 as this presents an undue burden on 8(a) small businesses?
Government Response: FAR 52.244-2(c) states, “If the Contractor does not have an approved purchasing system, consent to subcontract is required for any subcontract that- (1) Is of the cost-reimbursement, time-and-materials, or labor-hour type.”
6. Amendment 0001, Page 32, 7.0 Volume III – Factor 2: Past Performance and Page 34, 8.0
Volume IV – Factor 3: Cost/Price. The two volumes listed above include a “Factor” designation in the title, while Volumes I and II do not. Please clarify if the Government intends for the
“Factor” designation to be included in the titles of Volumes I – IV.
Government Response: Please see Paragraph 6.0 in Section L issued with Amendment 0002
7. Amendment 0001, Page 35 lists the title of Volume IV as “Cost/Price” while Page 25 lists the title of Volume IV as “Price.” Please clarify the title the Government prefers contractors to use for the proposal.
Government Response: Please see Paragraph 3.1.1 in Section L issued with Amendment 0002
8. Amendment 0001, Page 34, 7.2.3 states the following: “All Offerors shall submit information substantiating the Offerors’ past performance in complying with FAR 52.219-8, “Utilization of
Small Business”, maximizing opportunities for U.S. small business subcontractors. “However, the chart for Volume IV proposal instructions on Page 32 does not indicate where the above-referenced information shall be housed in the proposal. Please provide instructions as to where in the proposal contractors should provide the Utilization of Small Business Information.
Government Response: Please see Paragraph 7.1.1 in Section L issued with Amendment 0002
9. Amendment 0001, Sections 2.1.2 and 2.1.6 on Pages 23 and 24 respectively, state that each volume shall contain a detailed and a Glossary. However, Page 27-Section 5.0 does not list a
Table of Contents and Glossary for Volume I. Please clarify if a Table of Contents and Glossary should be included in Volume I.
Government Response: Yes, for each volume; please see Paragraphs 2.1.2, 2.1.4, and 2.1.6 in
Section L issued with Amendment 0001
10. Amendment 0001, Section L, Paragraph 6.3, Page 29, indicates that Volume II requires a List of Tables and Drawings but does not state if this document will be counted in the page limit.
Section 2.1.2 and 2.1.6 on Pages 23 and 24 respectively, also provides information regarding page limitations for each volume, but does not indicate if the List of Tables and Drawings is counted towards the volume page limit. Please clarify if the List of Tables and Drawings is counted toward Volume II’s page limit.
Government Response: Please see Paragraph 2.1.2 in Section L issued with Amendment 0001
11. Solicitation and Amendment 0001, Section L, Paragraph 8.1.2.2.b states that section 9.2.7.4 contains requirements for detailed basis of estimate narratives, but 9.2.7.4 is not provided.
Would the Government please provide?
Government Response: Please see Amendment 0002 for update
12. Solicitation and Amendment 0001, Section L, Paragraph 2.1.8.6 - The government requires that “… Data file should be .XLS file format (MS - Excel 2013 or earlier)…” and that “Files shall be in read-only format, using PDF files. All price breakdown information to aide in the cost/price evaluation shall be submitted in Microsoft Office Excel.” Per Section L, Table 3.1.1 –
Proposal Organization of the RFP, the government requires digital format for Price to be submitted using “MS Excel” for “Digital Format.” These requirements appear to contradict each other. Does the government intend for the offeror to submit excel and pdf version of the
Cost/price model?
13. Solicitation, Section M, Paragraph 1.2 - Relative to Rejection of Proposals in the RFP, the
Government States that “The Government may reject any proposal that is evaluated and determined to be unacceptable, fails to comply with the contract terms and conditions, or is excessively high or low in price.” What metric will be used to determine if a price is
“…excessively high or low…”? If an offeror deviates from baseline staff through application of innovations and best business practices that leads to a reduced staffing, and total price, could this endanger the offeror of being considered “excessively low in price” and therefore having their proposal rejected, if discussions are not held, and therefore a competitive range not established?
Government Response: Please see Paragraph 2.5 in Section M issued with Amendment 0001
14. Solicitation, Section L, Vol III, Factor 2: Past Performance, Paragraphs 7.1.1 & 7.3.5 –
Paragraph 7.1.1 provides a page limit for Vol III, Past Performance - the Summary Page (5 pages), Organizational Structure Change History (3 pages), and Specific Relevant Contract
Reference Sheets (5 pages for each). Yet Paragraph 7.3.5 allows an offeror to submit up to 8 relevant contract reference sheets. With these page limitations, an offeror may only be able to include four past performance write-ups if 5 pages are necessary for each reference to ensure the
Government has sufficient detail in vetting both the past performance relevance and confidence ratings of an offeror. Would the Government consider increasing the Volume III page limitations to 48 pages?
Government Response: Please see table in Paragraph 7.1.1 of Section L issued with
Amendment 0001, which shows the Exclusions from Page Limitation
15. Section F of Solicitation - Deliveries or Performance, p. 89 of 175 – p 96 of 175 – Delivery
Dates for the following are incorrect: 0033 30-SEP-2019, 1032 30-SEP-2020, 2032 30-SEP-
2021, 3032 30-SEP-2022, 4032 30-SEP-2023. Can the government please update delivery dates for CLINS 0033, 1032, 2032, 3032, and 4032?
Government Response: No change is required, these are Contractor Manpower Reporting
CLINS; please see Solicitation
16. Amendment 0001, 6.3.3 TAB C, SUBFACTOR 3: ORGANIZATION AND STAFFING
PLAN; 6.3.3.3.b.2, page 32 of 46 - If personnel have not been identified by name yet, the offerors shall provide the duties and responsibilities to be performed in that position and what experience and capabilities they will be looking for in filling these positions. Can job descriptions be excluded from the page count?
Government Response: Job descriptions shall be included in page count. Please see Paragraph
3.1.1 in Section L issued with Amendment 0002
17. Amendment 0001, Section L, page 26 of 46, 3.1.1 Proposal Volumes Organization, Number of Copies, and Page Limits; Table 3.1.1 – Proposal Organization, IV Price. Digital Format MS
Excel. Can the offeror submit the electronic copy of their Price Narrative as a supporting documents in PDF or MS Word format?
Government Response: Please see Amendment 0002
18. Amendment 0001, Section L, page 36 of 46, Paragraph 8.1.2.2, Tab 4 – Cost and Supporting
Information. The Government has stated the ceiling cost for Other Direct Costs (ODC) and
Material, fee will not be paid on materials and ODCs; funding and ceiling amount will be included on the contract when awarded. Is the government referring to Reimbursable CLINS
0003, 0005, 0008, 0010, 0012, 0014, 0016, 0018, 0020, 0022, 0024, 0026, 0028, 0032 in the
Base Period and X002, X004, X007, X009, X011, X013, X015, X017, X019, X021, X023, X025, X027, X031 in all Option Periods? Will the government allow the offeror to include indirect costs such as overhead and G&A costs in these items?
Government Response: Fee and Overhead is not allowed on any of the Base and Option year
Supplies and Materials CLINs.
19. Amendment 0001, Section L, page 37 of 46, Paragraph 8.1.2.12, Tab 4 – Cost and
Supporting Information. In order to expedite the evaluation, offerors (prime and sub) are requested to provide a copy of their cost and pricing proposal, in the same format required by this RFP, to their cognizant DCAA office upon submission of the proposal to the
Contracting Officer. The offeror shall provide information regarding its cognizant DCAA office, to include point of contact, telephone number and email address. Please clarify if this a requirement for the Subcontractor if they elected to submit their proposal with the
Prime’s.
Government Response: Yes, please see Paragraph 8.1.2.12 in Section L issued with
Amendment 0001
20. Performance Work Statement, Paragraph 1.5, Page 4 of 172, the period of performance is not accurate. Would the government please provide an updated period of performance?
Government Response: Please see Amendment 0002
21. Solicitation, Section L Paragraphs .2.1.1 and 2.1.4, Page149 of 175, Bullets are used to itemize lists, summarize steps and for other reasons that maximize the effectiveness of the message that the author is trying to get across to the reader. 1.5 line spaced bullets reduce the readability and degrade the message that is trying to be conveyed. Will the Government consider allowing bullets to be single spaced?
Government Response: Please see Paragraphs 2.1.1 and 2.1.4 in Section L issued with
22. Solicitation, Section L, Paragraph 2.1.1, Page149 of 175, For readability purposes, will the
Government consider excluding headings from the 1.5 line spacing requirement?
Government Response: Please see Paragraph 2.1.1 in Section L issued with Amendment 0001
23. Solicitation, Section L, Paragraph 5.1, Pages 153-154 of 175, states “required to submit…
Section B, Section K, and Section I.” TAB C is Section B and TAB D is Section K. Currently, there is no allocated TAB for Section I. Will the Government please assign a position for
Section I in Volume I?
Government Response: Please see Paragraph 5.1 of Section L issued with Amendment 0002
24. Solicitation, Section L, Paragraphs 7.1.1 and 7.4, Pages 158 and 160 of 175, the table in section 7.1.1 excludes Past Performance Questionnaires (PPQs) from the page limit.
a. Will the Government confirm that the PPQs do not go in the volume?
Government Response: Please see Paragraph 7.1.1 and 7.2.1.1 of Section L issued with
Amendment 0001, which state it is excluded from page limitation.
b. Will the Government confirm that the requirement is for a “List of Questionnaire
Recipients” and not the PPQs?
Government Response: Yes, please see Paragraph 7.2.2 of Section L issued with
25. Solicitation, Section L, Paragraph 7.1.1 and 7.3.4, Pages 158 and 159 of 175, In order for offerors to be compliant, will the Government clarify where the Organization Structure Change
History goes? Does it go after the Summary page (per L.7.1.1) or after the Client
Authorization Letters (per L.7.3.4)?
Government Response: Please see paragraph 7.1.1 of Section L issued with Amendment 0001
26. Solicitation, Section L, Paragraphs 5.1, 6.1, 7.1 and 8.0, Pages 153, 154, 158 and 161 of 175, Volumes I, II and III are very specific as to how each volume is to be marked. Specifically, the three volumes “must be clearly marked “VOLUME X – VOLUME TITLE, RFP W91249-18-R-
0001.”” There are no such instructions for Volume IV – FACTOR 3: COST/PRICE. Will the
Government clarify whether Volume IV should be clearly marked in any particular way?
Government Response: Please see Paragraph 8.0 of Section L issued with Amendment 0002
27. Solicitation, Section L, Paragraph 8.1.2.2, Page 161 of 175, Typically there are no amounts included on the SF33. Will the Government clarify the requirement in L.8.1.2.2: “The offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF33 and continuation sheets”?
Government Response: Please see Paragraph 8.0 in Section L issued with Amendment 0001.
Ensure the amounts in the cost/price volume is consistent (agree and not different/contradictory) with the amounts provided in the SF33.
28. Attachment 13, Page 2, item #2 requests “Completion Date/Delivery Schedule.” Item #5 requests the same information. Additionally, the instructions on page 1 do not correspond to the items listed on pages 2 – 4 and are also missing instructions for some of the items therein. Will the Government please revise the attachment to ensure all instructions are included, that they correspond with the items on pages 2 and if possible, remove any duplicated requests?
Government Response: Please see Attachment 13 issued with Amendment 0002
29. Solicitation, Section L, Paragraph 6.3.2.a, Page 156 of 175 Section M, Paragraph 2.1.2.b, Page 170 of 175 and PWS C.1.6.1, Page 9, (PWS) Key personnel resumes and position descriptions for key personnel will take up a considerable amount of pages within Volume II -
Mission Capability. Will the Government consider excluding the Key personnel resumes and position descriptions from the Volume II 75 page limit?
Government Response: Please see Paragraph 3.1.1 in Section L issued with Amendment 0002;
Page limit for Volume II has been changed from 75 pages to 150 pages
30. Solicitation, Section L, Paragraph 7.3.5, Page 160 of 175, states, “Specific Relevant Contract
Reference Sheet – Sheets shall be in accordance with Past Performance Questionnaire
Attachment and are limited to five (5) pages per reference (See Attachment 13).” Is the Offeror required to use the Relevant Contract Reference Sheets as provided, or may we put the required information into our own template? Will the Government confirm that the first page on
Attachment 13 with instructions does not count toward the five page limit?
Government Response: Yes, the offeror is required to use Specific Relevant Contract Reference
Sheet (Attachment 13) and the first page with instructions will not count.
31. Solicitation, Section L, Paragraph 7.4, Page 160 of 175, For the contracts identified on each
Specific Relevant Contract Reference, the Offeror shall forward a copy of the Past Performance
Questionnaire to the points of contact responsible for monitoring performance under such contracts.” Will the Government confirm that only one Past Performance Questionnaire is to be sent to one point of contact per reference?
Government Response: Please see Paragraph 7.2.1.1 in Section L issued with Amendment 0001
32. Solicitation, Section L, Paragraphs 2.1.1, Pages 149 of 175; Paragraph 3.1.1, Page 152 of
175, Table 3.1.1 shows Volume II – Mission Capability as having a 75 page limit. Section
L.2.1.1 requires text lines to have 1.5 line spacing. Within the last year, both Fort Benning and
Yuma Proving Grounds have issued RFPs (Solicitation #W911SF-16-R-0012, W9124R-15-R-
0001 respectively) that started out with extremely similar requirements. Both solicitations adjusted the page limitation to allow for offerors to clearly articulate their solutions and provide the vast amount of information required in this volume. In order for offerors to properly address all the requirements in sections L and M in a compliant matter, will the
Government increase Volume II – Mission Capability page limit to 100 pages and single spaced.
Government Response: Please see Paragraph 3.1.1 in Section L issued with Amendment 0002;
Page limit for Volume II has been changed from 75 pages to 150 pages
33. Solicitation, Section L, Paragraph 2.1.7, Page 149 of 175; Paragraph 2.1.4, Page 150 of 175, There are various requirements for the headers and footers such as company name, RFP number, etc. In addition to that offerors need to include disclaimer language. Will the Government consider including headers and footers into 2.1.4 “Tables, Charts, Graphs, and Figures” so as to allow headers and footers to be no smaller than Times New Roman 10 point font?
Government Response: The language will remain as is per Amendment 0001; however, headers and footers will be at the offeror’s discretion.
34. Solicitation, Section L, Paragraph 7.2.1, Page 159 of 175, Per the draft Solicitation the
Government has determined that in order for a past performance to be considered recent it shall not go back any further than three (3) years from the submittal date of proposals. The
Government has also stated that there will be a tradeoff for technically acceptable proposals that places significant importance on past performance.
Section M, Paragraph 2.2.2.1, the Government has further defined recency as a contract that is
80% or greater complete or must have been performed during the past three (3) years. Our understanding of this criteria is that the project must be in progress and 80% completed or 100% completed within the past three (3) years to be compliant. Given the importance of past performance to the source selection criteria we feel that this is highly restrictive and will not allow offerors to properly present their full capabilities depth of experience and the quality of services that they have delivered to their customers. To demonstrate how restrictive this is, we present the following: “Under this recency criteria, an offeror could have successfully completed a highly relevant U.S. Army DPW contract and been re-awarded a follow-on five (5) year contract for the same work, but if they had not completed the fourth year of performance for that follow on effort the entire project (both contracts) would have to be excluded from submission in this proposal. The original contract would be outside of the three year window and the current contract would be below the 80% completion requirement.”
Offeror’s Recommendation: “Within the last year, both Fort Benning and Yuma Proving
Grounds have issued extremely similar RFPs (Solicitation #W911SF-16-R-0012, W9124R-15-R-
0001 respectively), however, the recency requirement allowed the contractor to go back five years from the submission date of the proposal. We recommend adjusting this criteria (similar to what was done for Benning and Yuma) to defining recency as contracts that are fully completed or in progress for nine or more months but within five years. Under this criteria, the entire example above will be able to be presented to the Government to assist them in fully evaluating the capabilities of the offeror.”
Government Response: IAW FAR Part 42.1503(g) Agencies shall use the past performance information in PPIRS that is within three years (six for construction and architect-engineer contracts) of the completion of performance of the evaluated contract or order, and information contained in the Federal Awardee Performance and Integrity Information System (FAPIIS) e.g., terminations for default or cause. Therefore, wording will not change.
35. Solicitation, Section L, Paragraph 7.4, Page 160 of 175, Past Performance. Will the
Government accept CPARS in lieu of PPQs? The contractor has no ability to compel the
Government reference to provide the PPQ and the CPAR is considered the official record of contract performance.
Government Response: CPARS will not be accepted in lieu of PPQ; however, you may send it in addition to your PPQ(s).
36. Solicitation, Section B, The CLIN structure includes CPFF CLINs for labor, and Cost CLINs for supplies and materials. The CLIN description states “This is a non-fee bearing Cost
Reimbursable CLIN and shall be priced as cost only with a Not-to Exceed amount of $___, which refers to fee (i.e. profit) not allowable indirect costs or burdens.” Will the government confirm that where a contractor’s Cost Accounting system normally allocates indirect costs such as G&A or Material Handling onto direct materials, that remains an allowable cost for invoicing?
Government Response: Please see Amendment 0001; Fee and Overhead costs are not allowed on the supplies and materials CLINs.
37. Solicitation, Section B, Multiple CLINS, In some Cost CLINS the term Estimated Cost is used but in others the term Net Amount is used. Should all Cost CLINS, no matter which period use the same term? If so, please provide an amended Section B.
Government Response: The term “Estimated Cost” is reflected on Cost CLINS. The term “Net
Amount” is reflected on the Contractor Manpower Reporting Firm-Fixed Price (FFP) CLINS.
38. Solicitation, Section L, Paragraph 2.1.8.5, 151 of 175; Paragraph 3.1.1, Page 152 of 175,
2.1.8.5 states, “Each volume of the electronic proposal shall be in its own subdirectory on the
CD-ROM, sequentially labeled Volume I through Volume III. Volume IV, Price, shall be submitted on a separate CD-ROM.” Table 3.1.1 requires each volume to be submitted individually on its own CD-ROM (2 CD-ROMS per volume). Will the Government please clarify if eight (8) CD-ROMS are required (two for each volume) or four (4), two (2) containing
Volumes I – III and two (2) containing Volume IV?
Government Response: Two (2) CD-ROMS shall contain Volumes I thru III, which shall be in its own folder on the CD-ROM and labeled as Volume I, Volume II, or Volume III. Two (2) separate CD-ROMS shall be submitted for Cost/Price. Therefore, a total of 4 CD-ROMS shall be submitted.
39. Solicitation, Section L, Paragraph 2.1.8.7, Page 150 of 175; Paragraph 2.1.5 thru 2.1.6, Page
151 of 175; 2.1.8.7 states, “Proposal Table of Contents file. This file serves as a table of contents for the proposal information. Also, include the list of key terms used in the proposal with their definitions, and a list of acronyms and abbreviations used in the proposal.” L.2.1.5 and L.2.1.6 require each volume to have its own table of contents and glossary. Where does this “Proposal
Table of Contents file” go? Is it embedded in one of the volumes? Does it get its own CD-
ROM and binder? Will the Government please clarify the requirements?
Government Response: Please see Amendment 0001, Section L, Paragraph 2.1.5
40. Solicitation, Section L, Paragraph 5.1.1, Page 153 of 175 This paragraph states, “See paragraph 10.0 of Section L – Instruction, Conditions and Notices to Offerors.” Section L doesn’t have a paragraph 10.0. Please clarify the reference location.
41. Solicitation, Section L, Paragraph 3.1.1, Page 152 of 175 Table 3.1.1 shows that for Volume
IV, Price we are to submit in a Digital Format of Microsoft Excel. Will the Government allow offerors to submit their cost or pricing information narrative using Microsoft Word instead of
Microsoft Excel?
Government Response: Please see Paragraph 3.1.1 in Section L issued with Amendment 0002
42. Solicitation, Section L, Paragraph 8.1.1, Page 161 of 175, which states, “All information relating to the proposed price including all required supporting documentation must be included in the section of the proposal designated as the Cost/Price volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal.” However, the entire
Section B is required in Volume I. In order for offerors to be compliant will the Government update that language to say “except for Section B in Volume I – General & Contract
Documentation or something similar?
43. Amendment 0001, Section L, Paragraph 2.1.1, Page 23 of 46 states: “Text type shall be
Times New Roman. Except for the reproduced sections of the RFP document, the text size (font) shall be no less than 12-point with normal proportional spacing. Text lines shall have 1.5 line spacing.” Given the large amount of data and narrative required to be presented within the proposal, would the Government consider changing the requirement to 10 point font or to single
(1) line spacing, or both? This would allow offerors to better utilize the allowable page count to best present their solution for the RFP requirements.
Government Response: Amendment 0001, Section L, Paragraph 2.1.1 remains unchanged
44. Amendment 0001, Section L, Paragraph 2.1.4, Page 24 of 46 Tables, Charts, Graphs
And Figures states, “For tables, charts, graphs and figures, the text shall be no smaller than
Times New Roman 10 point.” Given the large amount of data required to be presented within the proposal, would the Government consider changing the requirement to 8 point font for tables, charts, graphs and figures? 8 point font is easily read when used on 8 ½ by 11 or 11 x 17 sized paper. This would allow offerors to better utilize the allowable page count to best present their solution for the RFP requirements.
Government Response: Amendment 0001, Section L, Paragraph 2.1.4 remains
45. Amendment 0001, Section L, Paragraphs 7.1.1 and 7.2.1.1, Page 32 - 33 of 46, Provides a table that states the Volume Total Number of Pages is to be 25 pages, but excludes Past
Performance Questionnaires and Specific Relevant Contract Reference Sheets.
a. We can find no requirement to provide Past Performance Questionnaires as part of the submitted volume. Please confirm that only a summary of the list of Past Performance
Questionnaire recipients is required to be submitted and is not subject to the pages included in the 25 page volume limitation.
Government Response: Please see Paragraph 7.2.1.1 of Section L issued with Amendment
b. Paragraph 7.2.1.1 states that the maximum allowable number of Specific Relevant
Contract Reference is a total of 8 between the prime offeror and the proposed subcontractors performing 10% or greater of the efforts. Each is limited to 5 pages. Based on this, we are assuming that total allowable pages for this volume could be as many as 66 pages. 25 for the
Volume mandated supporting documents, 40 pages for Specific Relevant Contract Reference
(8x5) and one for the summary of Past Performance Questionnaire recipients. Is this a correct assumption?
Government Response: Please see table in Paragraph 7.1.1 of Section L issued with
Amendment 0001, which shows the Exclusions from page limitation. The page limitation remains 25 pages.
46. Amendment 0001, Paragraph 8.0 VOLUME IV – FACTOR 3: COST/PRICE; 8.1 GENERAL
Section 8.1.2.5 page 36 of 46. The specific direct labor rates utilized to price the proposal must be identified in the cost and pricing proposal only….Bid codes (applicable codes used to identify a labor category in the offerors accounting system), employee names and/or other documentation (such as assigned letter of commitment for key personnel not currently employed by the offeror) to support the rates proposed shall be provided. Letters of commitment shall clearly identify the prospective employees and other pertinent conditions of employment. The same detailed support data shall be furnished for all major subcontractors (to include subsidiary or sister companies). If the Key Personnel have not been identified by the offeror, can the government accept other supporting documentation for the proposed direct labor rates in lieu of employee names and Letters of Commitment?
Government Response: Please see Paragraph 8.1.2.5, Section L, Amendment 0003
47. Solicitation and Amendment 0001, Section L, page 25 of 46, Amend 1, Paragraph 2.1.8.6, Cost/Price Data File. Submit an electronically encoded cost/price model in support of the proposed cost/price. Any cost/price model submitted must be consistent with your approved estimating system and must duplicate the logic and mathematical formulas reflected in the paper copy of your proposal. Formulas shall not be hidden and no links can exist to files not included with the submission. Is this a requirement for the Subcontractor as well if they agreed to submit their proposed cost/price with the Prime’s price cost proposal?
Government Response: Yes, the subcontractor is required to meet the same requirements as the prime contractor. Please see Paragraph 8.1.2.9, Section L, Amendment 0001
48. Amendment 0001, Section L, page 35 of 46, Paragraph 8.1.2.2, Tab 2 – Estimating System
/Methodology. Tab 2 – Estimating System/Methodology. Offerors shall provide a summary description of their standard estimating system or methods, current policies, and/or new policies. Offerors shall state whether they have Government approval of their estimating system and if so, provide evidence of such approval. Offerors shall also provide any known/cited estimating system deficiencies and identify any deviations from their established/standard estimating procedures used in preparing this proposal. Is this a requirement for the Subcontractor as well if they agreed to submit their proposed cost/price with the Prime’s price cost proposal?
Government Response: Yes, the subcontractor is required to meet the same requirements as the prime contractor. Please see Paragraph 8.1.2.9, Section L, Amendment 0001
49. Amendment 0001, Section L, page 37 of 46, Paragraph 8.1.2.8, Tab 4 – Cost and Supporting
Information. Forward-Pricing Rate Agreements (FPRA) shall be clearly documented with agreements and responsible Government officials identified. In the event that a Forward Pricing Rate Agreement is not in effect for the Prime or any subcontractor proposals, such party’s proposal shall include the following information: Fringe rates, Labor Overhead rates, and all applicable Other Indirect rates and factors (including General and Administrative (G&A) rate). All indirect rates and factors shall be supported by calculations. The components of the calculations must be broken down into the individual elements that comprise them. These elements must be fully explained, including how the amounts were computed both in text and figures. The details of each individual cost pool and base shall be provided. In addition, any services that are provided to the contract through G&A shall be listed and explained. The following data shall be provided:
Actual incurred direct rates for FY2015, FY2016 and FY2017
Year to date data for FY2018
Income statements and Balance sheets for FY2015, FY2016 and FY2017
Please clarify if this a requirement for the Subcontractor if they elected to submit their proposal with the Prime’s.
Government Response: Yes, the subcontractor is required to meet the same requirements as the prime contractor. Please see Paragraph 8.1.2.9, Section L, Amendment 0001
50. Solicitation, Section L, Paragraph 8.2.4, Page 162 of 175 "Bid codes (applicable codes used to identify a labor category in the offerors accounting system)." Is the Government stating that we must use the codes (Alpha or Numerical) from our accounting system to show if hours are Shift or
Overtime, rather than showing them as "OT" or "Shift" in our proposal? Using codes from
Offerors accounting system could lead to confusion as everyone’s will be different.
Government Response: Bid codes are no longer required, please see Paragraph 8.1.2.5, Section L, Amendment 0003
51. Attachment 10 – Pricing and Labor Matrix Worksheet Questions:
a. Should this tab contain all the CLINS listed in the Phase-In, Base Period, and Option Periods? If so, please provide an amended Attachment 10.
Government Response: Please see update to Attachment 10 with Amendment 0001
b. This instruction refers to Available Hours, but there is not a cell on the support tabs where you place available hours. Where on the tab do we show these hours?
Government Response: Please see update to Attachment 10 with Amendment 0001
c. Will the Government allow Offerors to adjust this form to allow for multiple Fringe Pool Rates?
Government Response: Yes, Offerors are allowed to input multiple rates without adding additional columns to worksheet.
d. Will the Government allow Offerors to adjust this form to allow for additional columns to the right to assist in loading the data in columns B-N?
Government Response: No; however, additional tabs can be added to the workbook to assist in loading data.
e. Cell G26 appears to be where a lump sum is entered for Overtime. Solicitation, Section L, Paragraph 8.2.4 required Offerors to show hours for Overtime. Are Offerors to add rows under
Overtime on Attachment 10 to show labor at the same level of detail as required for Section L
8.2.4 or is the Government requesting a lump sum for all job titles? If this is a lump sum then where in the proposal does the Government wish to see the detail information for overtime costs?
Government Response: Please see revised Attachment 10 issued with Amendment 0003.
f. Currently Column D, No. Emp is a formula that calculates from the Net Prod Hours. Would the
Government allow Offerors to change the formulas in Columns D and E so that Hours are calculated from No. Emp?
Government Response: Yes, that would be acceptable for this case only.
g. The net productive hours shown here reflect 10 months, but the Base POP in Section F is 8 months. Which is correct? Please provide either an amended Attachment 10 or an amended Section F.
Government Response: Please see Attachment 10 issued with Amendment 0001
52. Amendment 0001, Section L, Page 23 of 46, Paragraph, 2.1.1, Text type shall be Times New
Roman. Except for the reproduced sections of the RFP document, the text size (font) shall be no less than
12-point with normal proportional spacing. Text lines shall have 1.5 line spacing. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Question: Will the Government consider removing the 1.5 line spacing and tracking, kerning, and leading values to allow offerors to present a cleaner, more professional document?
Government’s Response: Please refer to Amendment 0001, Paragraph 2.1.1 language remains
53. Amendment 0001, Section L, Page 24 of 46, Paragraph 2.1.8.1, To enable the Government to successfully view the proposals electronically, the Offerors shall submit their proposals in Microsoft
Office, i.e. Microsoft Word or Microsoft Excel format. It has become standard government practice to request Adobe PDF documents that are searchable and NOT editable. Question: Will the government accept Adobe PDF documents instead of Microsoft Word for Volume I, II, and III to avoid the potential for manipulating text and violating the integrity of the documents offerors submit?
Government’s Response: Please refer to Paragraph 2.1.8.1 in Amendment 0001, language remains
54. Amendment 0001, Section L, Page 32 of 46, Questions: If all offerors are allowed to submit
(8) Specific Relevant Contract Reference Sheets and use the maximum of (5) pages per reference, this would immediately count as 40 pages without adding in the (5) page Summary Page and (3) page
Organizational Structure. Questions:
a. Is the 25 pages inclusive of all items of the 7.1.1 table?
b. Is the 25 pages specific to the “No Page Limits” criteria?
c. Is the Summary Page, Organizational Structure, and Attachment 13 Reference
Sheets included in the Volume III Total pages, 25 pages?
Government Response: Please see table in Paragraph 7.1.1 of Section L issued with Amendment 0001, which shows the Exclusions from page limitation. The page limitation remains 25 pages.
55. Amendment 0001, Section L, Page 28 of 46, Paragraph 5.1.4 TAB D, RFP Section K
(Representation, Certifications, and Other Statements of Offerors) "All blocks in each certification/representation completed truthfully and completely". Question: If the offeror has registered in SAM.gov and selects "( ) Paragraph (d) does apply and the offeror has completed the individual representations and certifications in the solicitation”, is a SAM report acceptable in place of marking each individual block?
Government Response: The System for Award Management (SAMS) Report shall suffice as long as it includes the required information in Paragraph 5.1.4 of Section L in Amendment 0001
56. Amendment 0001, Section L, Page 32, Paragraph 7.0 Volume III – Factor 2: Past
Performance and Page 34, Paragraph 8.0 Volume IV – Factor 3: Cost/Price. The two volumes listed above include a “Factor” designation in the title, while Volumes I and II do not. Please clarify if the
Government intends for the “Factor” designation to be included in the titles of Volumes I – IV.
Government Response: Please see Paragraph 6.0 of Section L in Amendment 0002
57. Amendment 0001, TE 7.3.3, The revised TE 7.3.3 published with Amendment 1 provides additional predetermined amounts for supplies and materials in establishing level of effort in performing PWOs for labor CLINs 0002, 0004, 0006, 0009, 0011, and 0025 and all subsequent follow-on
CLINs in the option years. Since the original plug numbers for CLINs 0005, 1004, 2004, 3004 and 4004 did not change in Amendment 1, is the offeror to add this additional funding against ODCs under the labor CLINs, or add these additional amounts to the original Restoration and Modernization CLINs?
Government Response: Per Technical Exhibit 7.3.3 issued with Amendment 0001, “Please include the following predetermined amounts for projects in your cost proposal”.
58. Solicitation, Sections L, Paragraph 7.3.5 thru 7.3.7, Page 160 of 175; Para 7.3.5 states “The Offeror shall submit a minimum of five (5) not to exceed a total of eight (8) Specific Relevant Contract Reference
Sheets identifying active or completed contracts…” Furthermore, L.7.3.6 and L.7.3.7 state “7.3.6.
Minimum of three (3) sheets identifying active or completed contracts, either Government or commercial, for the prime, team, and/or joint venture (within the same division or cost center). 7.3.7. Minimum of two
(2) sheets from each subcontractor who will be completing 10% or more of the technical work.”
The instructions as provided are extremely confusing. Is a prime offeror required to submit 5 past performances regardless of team composition? Under the requirements as written it appears that you are setting two different minimum standards for prime offerors (with or without partners). If the minimum standards are different, how can the offers be fairly evaluated with respect to “their” prime capabilities?
The Government has stated that the minimum for a prime is three and for each subcontractor (if applicable) it is two, therefore combined it is a minimum of five. Will the Government therefore confirm that if there are no subcontractors on the team performing at least 10% of the technical work, that the submission requirement for the prime is a minimum of three Specific Relevant
Contract Reference Sheets and not five? As this is a SB set aside procurement it is unlikely that SB offerors would be able to present five past performances meeting recency and relevancy requirements, especially with the highly restrictive recency requirements IAW 7.2.1. As currently written a prime offeror could submit three past performances and five additional past performances from subcontracts to achieve a total of eight past performance submissions. Under that scenario it would appear the offeror, because of their teaming arrangements, is able to provide far more past performance than would could reasonably be expected from a self-performing 8(a) and it could be reasonably concluded that this offeror is overly reliant on the subcontractors in order to demonstrate relevant past performance.
Government Response: Please see Amendment 0003 Section L paragraph 7.2.1.1.
59. It is understood that only the incumbent will have access to the number of years of service for current CBA employees. Therefore, in an effort to “promote competition to the maximum extent practicable to obtain supplies and services from the source whose offer is the most advantageous to the Government (FAR 13.104)”, will the government consider adding the following language used by the government in similar RFP’s? “All proposers, including the incumbent, are required to propose all labor at the minimum service level. A minimum level of service means that the offeror is only to propose on a union employee at a basic wage level with having less than one year of service. An adjustment will be made after award to account for actual years of service and wages in accordance with the CBA.”
Government Response: The Government may provide some information indicating the average tenure of
CBA workforce by the various tenure brackets. For example 20% with less than 5 years, 50% with 5 to 10 years, and 30% with more than 10 years of service. The brackets of course would need to coincide with the increased considerations within the CBA for the workforce. This can be done without detailing the complete current employee listing.
60. CLIN 0002 for Facility Maintenance and Repair Services requires electricians to be staffed to support normal inspection and repairs of interior electrical requirements. There is another CLIN (0019) for
Electrical Services. Is it the Government’s intention for CLIN 0019 to reflect only exterior electrical work, such as high voltage electrical work, or should interior electrical services also be included in this CLIN?
Government Response: CLIN 0002 is for SRM for buildings and structures. CLIN 0019 is for SRM for utilities.
61. CLIN 0002 references Facility Maintenance and Repair for “K” Buildings and CLIN 0004 references
Facility Maintenance and Repair for “L” buildings. Could the Government please clarify what facilities are considered “K” Buildings, and which facilities are “L” Buildings so that the offeror can properly staff these two CLINs?
Government Response: “K” and “L” are work classification codes. All facilities located in TE 7.4.3 receive “K” & “L” services.
62. CLIN 0008 states that all costs for materials and supplies are reimbursable. Does this include the fuel for mowers, tractors and hand held equipment? If so, will the contractor be able to use installation government fueling stations for grounds maintenance equipment?
Government Response: Fuel for GFE is provided.
63. Technical Exhibit 7.5.9.8 requires the cleaning and maintenance of dumpsters listed in here. Is it the responsibility of the contractor to empty these dumpsters at the prescribed time, or is that the responsibility of the refuse contractor?
Government Response: Prior to the scheduled cleaning, the BASOPS contractor will coordinate, with the COR, the emptying of the dumpsters by the Government refuse contractor.
64. TE 7.4.1 states that the Environmental/Safety/Health Manager requires a Bachelor’s Degree in
Environmental Engineering. Would a person possessing a degree in Industrial Hygiene, Occupational
Health & Safety meet this requirement?
Government Response: YES
65. Para 3.1 states that “The Government will provide the facilities, equipment, supplies, parts, and materials described herein as GFP for exclusive use in performing the requirements of the contract.”
Question: Do the supplies and materials include administrative supplies such as paper and printer cartridges?
66. PWS 5.2.1 says, When PWOs are received from the Government, the Contractor shall also utilize the
Fort Gordon’s official project management system [i.e., GFEBS-Collaboration-Projects (C-Projects)] for tracking purposes. Is C-Projects currently used as the project management system?
Government Response: Yes, Additionally see Section “L”, 6.3.2, para c.
67. PWS 5.2.6.3.1. This PWS requires that schedules be provided in electronic format compatible with the Government’s current work management system. Please clarify the work management system used, is the Government referring to GFEBS or another system?
Government Response: GFEBS
68. PWS 5.9.4.3. What are the days and hours of operation for the landfill scale?
Government Response: The operating hours of the landfill scale, 5.9.4.3 are the same as the operation of the landfill, per 5.9.4.2.4.
69. PWS 5.9.1.2.5 says, At least one operator shall be in attendance at Plant #1, Building 25910 and Plant
#2, Building 310 at all times. PWS 5.9.1.3.1.1 says, It is the goal of the Government to have the plant controlled by the UMCS contractor during normal operation and the plant personnel at other times.
Please confirm an operator is required at Plant #1 even though it is controlled by the UNCS contractor. Please define normal operation, please define the term other times.
Government Response: As stated, at least one operator shall be in attendance unless an alternate staffing proposal, meeting the requirements of AR 420-1, is submitted.
70. PWS, para 3.9 - The Government states that the GFE and GFP, to include vehicles, are provided in an
“as-is” condition. Does this mean that the contractor must price the maintenance and repair of all government furnished equipment and vehicles? If so, would the Government please provide the maintenance repair history (labor and parts) for the GFE and vehicle fleet, along with CLINs, so that we can properly price these costs?
Government Response: Maintenance and repair of all GFE and GSA provided vehicles is a cost borne by the DPW.
71. Will the Government entertain actual years of specified/defined experience in the critical areas, i.e., GFEBS/work management, contract administration/management in lieu of degreed education?
Government Response: Yes, will entertain on a case-by-case basis.
72. PWS 5.9.4.6.2.2. Cleaning Dumpsters. PWS states that contractor will clean dumpsters IAW
Technical Exhibit 7.5.9.8 Dumpster Container List at the frequencies shown. Will the government please provide the dumpster sizes, i.e, 8 yd, 30 yd, etc?
Government Response: 4 & 8 cubic yard dumpsters.
73. PWS 5.9.4.6.1. Serviceability (Dumpsters). PWS states “All containers placed at locations designated by the Government shall be maintained in a serviceable condition.” Will the government please provide the number and locations dumpsters to maintained? TE 7.5.9.8 only provides food service areas.
Government Response: Yes. TE 7.5.9.8.1 will be provided
74. CLIN 0002 and 0004 are both asking for pricing from the same portion of the PWS with the exception of the cost accounts. 0002 is a K account and 0004 is an L account. L accounts are listed as minor construction DMOs but the DMO workload data is not broken out. It is given only as number and % of DMOs per trade. Will the government provide the breakout by account code in order to accurately price?
Government Response: Requested information has been provided in the Technical Exhibits.
75. PWS 5.6.3. Unaccompanied Personnel Housing Vacancy Maintenance. Will the government provide workload data for the number of vacancy maintenance requests issued for UPH?
Government Response: Approximately 800 rooms per year.
76. PWS 5.8.2.1.2. Catch Basins. Will the government provide the number of catch basins and inlets?
Government Response:
33 detention basins
22 LID structures
Catch basin\inlets 2,720
115 miles of ditches
65.3 miles of storm drain pipe
77. PWS 5.9.1.4.1. Preventive Maintenance. The Contractor shall schedule and perform PM for all heating and cooling plants and associated facilities and system components in accordance with 5.2.5 and 5.6.1.2. To confirm our understanding of the PWS, the equipment associated with the buildings serviced by the Heating and Cooling Plants should be included in CLIN 0013 and not 0002. Is this correct?
Government Response: No, equipment associated with the facilities serviced by the plant fall under
CLIN 0002.
78. PWS 5.11.1 Furnishings Management. The TE associated with this Functional area provides workload data from FY12.