Attachment_3_-_Technical_Exhibit__2_-_7.2__Deliverables.docx

DOCX document 70 KB Posted

Attached to
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION Federal contract opportunity
Solicitation number
W91249-18-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Gordon

About this file

Attachment 3 - Technical Exhibit 2 - Deliverables

View the file

Other files for this federal contract opportunity

Other files attached to FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION, newest first.
File Type Posted
W91249-18-R-0001-0004.docx DOCX document
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001_0002__and_0003.pdf PDF
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet_(Revision_2).xlsx XLSX spreadsheet
CONFORMED_COPY_W91249-18-R-0001.docx DOCX document
Technical_Exhibit_7.5.9.8.1__Dumpster_Locations_List.docx DOCX document
W91249-18-R-0001-0002.docx DOCX document
Attachment_1_-_Performance_Work_Statement.docx DOCX document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.6.6_Range_Hood_Cleaning_Services.docx DOCX document
Technical_Exhibit_7.5.7.5_Range_Mowing_Map.docx DOCX document
Technical_Exhibit_7.5.9.2__Central_Energy_Plant_No._1_Building_25910_Buildings_Served.docx DOCX document
Technical_Exhibit_7.5.7.7_Flower_Beds.doc DOC document
Attachment_11_-_Sample_Past_Performance_Cover_Letter.docx DOCX document
Technical_Exhibit_7.5.4.3_Underground_Storage_Tanks.docx DOCX document
Technical_Exhibit_7.4.5__Government_Furnished_Vehicles.docx DOCX document
Technical_Exhibit_7.4.3__Fort_Gordon_Facility_Listing_(Excluding_Privatized_Facilities).docx DOCX document
Technical_Exhibit_7.5.8.5_Lakes_and_Ponds.docx DOCX document
Technical_Exhibit_7.5.6.2_Electrical_Lines_of_Demarcation.doc DOC document
Attachment_8_-_Service_Contract_Act_(SCA)_Wage_Determation_2015-4465_Rev5.pdf PDF
Technical_Exhibit_7.5.9.8_Dumpster_Container_Cleaning_List.docx DOCX document
Technical_Exhibit_7.5.6.3__Natural_Gas_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.3a__Plant_No._1_Operation_CEP_CHW_and_High_Temperature_Water_(HTW).doc DOC document
Technical_Exhibit_7.4.7_Energy_Conservation_Measures.docx DOCX document
W91249-18-R-0001.pdf PDF
Technical_Exhibit_7.4.1__Contractor_Personnel_Minimum_Qualifications.docx DOCX document
Technical_Exhibit_7.5.7.6_Semi-Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.20_Pest_Control_Services_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.7.2_Grounds_Sections.doc DOC document
Technical_Exhibit_7.4.4__Training_and_Medical_Testing.docx DOCX document
Technical_Exhibit_7.5.9.4__Central_Energy_Plant_No._2_Bldg_310_Installed_Equipment.doc DOC document
Attachment_15_-_Site_Visit_-_Access_Control_Information.pdf PDF
Attachment_2_-_Technical_Exhibit_1_-_7.1_Performance_Requirements_Summary.docx DOCX document
Technical_Exhibit_7.5.6.10__Installation_Irrigation_Systems.docx DOCX document
Technical_Exhibit_7.5.7.10_Line_Clearing_Specifications.docx DOCX document
Technical_Exhibit_7.5.8.6._Dams.docx DOCX document
Technical_Exhibit_7.5.6.4__Wastewater_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.6__Bureau_of_Mine_Standards_for_Water_Treatment.doc DOC document
Technical_Exhibit_7.5.6.13_Communcation_Towers.docx DOCX document
Attachment_13_-_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
Attachment_14_-_Questions_and_Responses_to_DRAFT_Solicitation.pdf PDF
Technical_Exhibit_7.5.6.5_Water_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.5.3_Estimated_Annual_Pesticide_Usage.docx DOCX document
Technical_Exhibit_7.5.6.1_Preventive_Maintenance_Equipment.docx DOCX document
Technical_Exhibit_7.3.6__Estimated_U-Do-It_Training_Workload.docx DOCX document
Technical_Exhibit_7.5.6.15_Playground_Equipment.docx DOCX document
Technical_Exhibit_7.5.6.17_DMO_Barracks_Report_Template.doc DOC document
Attachment_12_-_Sample_Past_Performance_Evaluation_Questionnaire_Form.docx DOCX document
Technical_Exhibit_7.5.4.1_Visible_Emission_Form.docx DOCX document
Technical_Exhibit_7.5.6.16_Facilities_M&R_Services_Performance_Metrics_Template.doc DOC document
Show all 50

FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 7.2 Deliverables

ITEM #
DELIVER-ABLE NUMBER
TITLE
DESCRIPTION/ PURPOSE
FORMAT
REFERENCE
RESPONSIBLE OFFICE
PREPARATION INSTRUCTIONS
FREQUENCY
AS OF DATE
DATE OF SUBMISSION
DISTRIBUTION
1
1001
MONTHLY FUNCTIONAL WORKLOAD UPDATE IN GFEBS
UPDATED FUNCTIONAL WORKLOAD IN GFEBS.
GFEBS
1.4
WORK CONTROL
FUNCTIONAL WORKLOAD UPDATES ENTERED INTO GFEBS THROUGHOUT THE MONTH
UPDATES AS REQUIRED THROUGHOUT MONTH
CONTRACT START DATE
ALL DATA FOR PREVIOUS MONTH IN GFEBS 5 WORKING DAYS FOLLOWING THE LAST DAY OF THE MONTH
COR-BOID
2
1002
MEETING MINUTES
THE CONTRACTOR SHALL PREPARE MINUTES, AS DIRECTED, FOR MEETINGS ATTENDED AND PROVIDE COPIES (HARD COPY OR ELECTRONIC AS PREFERRED BY THE CONTRACTING OFFICER) TO THE CONTRACTING OFFICER OR COR.
N/A
1.4.1
BUSINESS MANAGEMENT

AS REQUIRED

NLT 2 WORKING DAYS FOLLOWING THE MEETING
CORs BOID/O&M, DPW
3
1003
WEEKLY DPW STAFF MEETING
ATTEND WEEKLY DPW STAFF MEETINGS AND PROVIDE STATUS OF PROJECTS AND OTHER WORK IN PROGRESS.
ORAL BRIEF
1.4.2
BUSINESS MANAGEMENT

WEEKLY

WEEKLY DPW STAFF MEETING
CORs BOID/O&M, DPW
4
1004
MANAGEMENT PLAN
INITIAL MANAGEMENT PLAN WITH ANNUALS UPDATES.
CHANGE PAGES
1.4.3
BUSINESS MANAGEMENT
IDENTIFICATION OR ORGANIZATIONAL AND MANAGEMENT APPROACH CHANGES IN THE CONTRACTORS BUSINESS MANAGEMENT APPROACH
UPDATED ANNUALLY
CONTRACT START DATE
INITIAL PLAN WITH PROPOSAL WITH ANNUAL UPDATES ON THE CONTRACT START DATE
MICC
5
1005
LICENSES AND CERTIFICATIONS
TO PROVIDE A COPY OF LICENSES AND CERTIFICATIONS FOR ALL EMPLOYEES WHOSE POSITIONS REQUIRE LICENSES AND CERTIFICATIONS.
N/A
1.6.8
BUSINESS MANAGEMENT
N/A
AS REQUIRED
CONTRACT START DATE.
INITIAL SUBMISSION NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START DATE; NLT 5 WORKING DAYS AFTER ANY NEW HIRE OF EMPLOYEE OR RECERTIFICATION.
MICC
6
1006
KEY PERSONNEL EMERGENCY CONTACT LIST
TO PROVIDE EMERGENCY TELEPHONE NUMBERS TO THE CONTRACTING OFFICER WHERE KEY PERSONNEL MAY BE CONTACTED WHEN NOT PRESENT AT THE WORK SITE.
N/A
1.6.11
BUSINESS MANAGEMENT
N/A
AS CHANGES OCCUR
CONTRACT START DATE.
NLT 5 CALENDAR DAYS PRIOR TO CONTRACT START
MICC
7
1007
KEY PERSONNEL CHANGE NOTIFICATION
SUBMIT INFORMATION TO SUPPORT THE PROPOSED KEY PERSONNEL CHANGE ACTION TO ENABLE THE CONTRACTING OFFICER TO EVALUATE THE POTENTIAL IMPACT OF THE CHANGE ON THE CONTRACT
1.6.11
BUSINESS MANAGEMENT
AS REQUIRED
CONTRACT START DATE.
NLT 15 CALENDAR DAYS PRIOR TO A SUBSTITUTION BECOMING EFFECTIVE
MICC
8
1008
PERSONNEL ROSTER
TO PROVIDE PERSONNEL ROSTER LISTING ALL CONTRACTOR PERSONNEL BY FUNCTIONAL AREA
N/A
1.6.11.1
BUSINESS MANAGEMENT
PROVIDE THE EMPLOYEE NAME, FUNCTIONAL AREA ASSIGNED, POSITION ASSIGNED, CLEARANCE LEVEL (IF APPLICABLE), NAC FOR NETWORK CLEARANCES, EMERGENCY CONTACT NAME AND PHONE NUMBER, AND THE INDIVIDUAL’S CONTACT PHONE NUMBER. THE EMPLOYEE ROSTER SHALL LIST ALL EMPLOYEES AND THEIR JOB TITLES BY FUNCTIONAL AREA, SECURITY CLEARANCE LEVEL TO INCLUDE NAC FOR NETWORK CLEARANCES.
AS REQUIRED
CONTRACT START DATE
INITIAL SUBMISSION AT CONTRACT START DATE; NLT 3 WORKING DAYS AFTER ANY CHANGE
MICC
9
1009
SAMPLE EMPLOYEE ID BADGE
SUBMIT A SAMPLE EMPLOYEE ID BADGE FOR CONTRACTING OFFICER APPROVAL
N/A
1.6..12
BUSINESS MANAGEMENT
BADGES SHALL BE APPROXIMATELY 2-1/2 X 3-1/2 INCHES FOR USE IN IDENTIFYING CONTRACTOR EMPLOYEES. THE ID BADGE SHALL BE MADE OF NONMETALLIC MATERIAL TO PREVENT ELECTRICAL SHOCK. THE CONTRACTOR SHALL ENSURE THAT EACH BADGE INCLUDES, AS A MINIMUM, THE EMPLOYEE'S FULL NAME, THE CONTRACTOR'S COMPANY NAME, ISSUE DATE, EXPIRATION DATE, FUNCTIONAL AREA OF ASSIGNMENT, CLEARANCE LEVEL, AND COLORED PHOTOGRAPH.
N/A
CONTRACT AWARD
NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START DATE
MICC
10
1010
REQUEST FOR GOVERNMENT ISSUED CAC CARD FOR CONTRACTOR
TO PROVIDE COMPUTER ACCESS
N/A
3.3.4
BUSINESS MANAGEMENT
IAW COR PROVIDED TEMPLATE
AS NEEDED
DURING TRANSITION PERIOD AND AS NEEDED
DURING TRANSITION PERIOD AND AS NEEDED
COR - BOID
11
1011
TRAINING PLAN
TO PROVIDE CONTRACT TRAINING PLAN
N/A
1.6.8.1
BUSINESS MANAGEMENT
PROVIDE EMPLOYEE TRAINING PLAN
PRIOR TO CONTRACT START AND UPDATED ANNUALLY
CONTRACT AWARD
NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START DATE
MICC
12
1012
EMPLOYEE REIMBURSABLE TRAINING STATUS REPORT
TO IDENTIFY EMPLOYEES WHO RECEIVED REIMBURSABLE TRAINING BUT DID NOT REMAIN IN THE POSITION FOR WHICH THE TRAINING WAS PROVIDED FOR MORE THAN ONE YEAR
N/a
1.6.8.2
BUSINESS MANAGEMENT
PROVIDE LIST OF EMPLOYEES WHO HAVE RECEIVED REIMBURSABLE TRAINING BY DATE TRAINING COMPLETED AND THEIR CURRENT EMPLOYMENT STATUS RELATIVE TO THE TRAINING
ANNUALLY
CONTRACT START DATE
NLT 30 CALENDAR DAYS FOLLOWING THE CONTRACT START DATE ANNIVERSARY
MICC
13
1013
iWATCH TRAINING
TO PROVIDE A CERTIFICATION OF COMPLETION FOR ALL PERSONNEL, BOTH PRIME AND SUBCONTRACTORS.
N/A
1.6.19.4
BUSINESS MANAGEMENT
N/A
WITHIN 30 DAYS OF RERPRTING TO DUTY ND ANNUAL REFRESHER
CONTRACT AWARD
NLT 5 CALENDAR DAYS AFTER CERTIFICATE RECEIPT
MICC
14
1014
ANTI-TERRORISM (AT) AND OPERATIONS SECURITY (OPSEC) AWARENESS TRAINING CERTIFICATION – THREAT AWARENESS AND REPORTING TRAINGIN (TARP)
TO PROVIDE A CERTIFICATION OF COMPLETION FOR ALL PERSONNEL, BOTH PRIME AND SUBCONTRACTORS. ALL CONTRACTOR PERSONNEL ASSIGNED TO THIS CONTRACT MUST COMPLETE BOTH TRAININGS ANNUALLY. SECURITY AND INTELLIGENCE DIVISION, DPTMS WILL ANNOUNCE THE TRAINING IN ADVANCE. CONTRACTOR PERSONNEL MUST ATTEND ONE TRAINING SESSION EACH YEAR.
N/A
1.6.19.1
BUSINESS MANAGEMENT
N/A
ANNUALLY
CONTRACT AWARD
DPTMS WILL ANNOUNCE THE TRAINING IN ADVANCE. CONTRACTOR PERSONNEL MUST ATTEND INITIAL TRAINING AFTER CONTRACT START AND THEN COMPLETE ANNUAL TRAINING THEREAFTER.
MICC
15
1015
SECURITY PLAN
PROVIDE A SCURITY PLAN INCLUDING A PHYSICAL SECURITY PLAN; A KEY CONTROL PLAN; A FIRE PREVENTION AND PROTECTION PLAN; AND A SECURED AREA ACCESS AND CLASSIFIED INFORMATION SECURITY PLAN.
N/A
1.6.7

1.6.7.1 1.6.7.2

BUSINESS MANAGEMENT
PROVIDE SECURITY PLAN TO ADDRESS PREVENTING UNAUTHORIZED ACCESS, VANDALISM, PILFERAGE, LARCENY, SABOTAGE OF GOVERNMENT FURNISHED PROPERTY IN A PHYSICAL SECURITY PLAN; KEY CONTROL THAT DESIGNATES AUTHORIZED PERSONNEL KEY ACCESS TO BUILDINGS, VEHICLES, AND FACILITIES IN A KEY CONTROL PLAN; PLAN TO MINIMIZE RISK TO PHYSICAL PROPERTY AND PERSONNEL IN A FIRE PREVENTION AND PROTECTION PLAN; AND PREVENTION OF CONTRACTOR EMPLOYEE IMPROPER ACCESS TO SECURE SPACES AND THE MISHANDLING OF CLASSIFIED INFORMATION SECURED AREA ACCESS AND CLASSIFIED INFORMATION SECURITY PLAN
INITIAL PLAN AND UPDATES AS MADE
CONTRACT AWARD
NLT 30 DAYS PRIOR TO CONTRACT START DATE; CHANGES SUBMITTED FOR REVIEW AND APPROVAL NLT 15 WORKING DAYS PRIOR TO CHANGE IMPLEMENTATION.
MICC
16
1016
COMPLETED TYPED DAMAGE REPORTS
DA FORM 7306, WORKSHEET FOR TELEPHONIC NOTIFICATION OF GROUND ACCIDENT & DA FORM 285AB, U.S. ARMY ABBREVIATED GROUND ACIDENT REPORT (SUBMITTED AND PREPARED THROUGH REPORT IT)
DA FORMS 7306 & 285AB
3.4.1
BUSINESS MANAGEMENT
EXPLAINING THE CIRCUMSTANCES OF THE ACCIDENT AND THE EXTENT OF DAMAGE
AFTER ACCIDENT
CONTRACT START
NLT 5 CALENDAR DAYS AFTER OCCURRENCE
MICC
17
1017
KEY INVENTORY
PROVIDE KEY INVENTORIES AS REQUIRED BY AR 190-51
AS REQUIRED BY AR 190-51
1..6.7.2

1.6.7.2.1

BUSINESS MANAGEMENT
IN ACCORDANCE WITH AR 190-51
QUARTERLY
CONTRACT START
NLT 5 WORKING DAYS FOLLOWING THE END OF THE REPORTING PERIOD
COR - O&M DIVISION
18
1018
LOST KEY REPORT
REPORT LOST KEY
WRITTEN REPORT
1.6.7.2.1.1
BUSINESS MANAGEMENT
PROVIDE ALL DETAILS OF LOST KEY OCCURRENCES (I.E. KEY NUMBER, LOCATION(S) ACCESSED BY THE KEY, DATE THE KEY WAS DISCOVERED MISSING, NAME OF PERSON SIGNING FOR THE KEY, AND ANY OTHER RELEVANT DETAILS)
AFTER KEY IS LOST
CONTRACT START
BY CLOSE OF BUSINESS THE NEXT DAY FOLLOWING KEY LOSS
COR - O&M DIVISION

MICC

19
1020
FACILITY ACCESS AND COMMAND INSPECTION
TO PROVIDE RESULTS OF INSPECTIONS/VISITS BY ALL REGULATORY AGENCIES
N/A
1.4.4
BUSINESS MANAGEMENT
SUBMIT A WRITTEN REPORT IN ACCORDANCE WITH AR 385-40, ACCIDENT REPORTING AND RECORDS, BY CLOSE OF BUSINESS OF THE NEXT WORKING DAY FOLLOWING COMPLETION OF THE INSPECTION OR VISIT, TO INCLUDE THE NAME(S), IDENTIFICATION NUMBER(S), AGENCY(S) OF THE INSPECTOR(S), AND THE REASON FOR THE VISIT
AS OCCURS
AS OCCURS
CLOSE OF BUSINESS NEXT WORKING DAY FOLLOWING COMPLETION OF INSPECTION/VISIT
MICC
20
1021
ACCIDENT REPORT (DA FORM 285)
PROVIDE A VERBAL REPORT TO THE CONTRACTING OFFICER WITHIN ONE HOUR OF OCCURRENCE AND A WRITTEN FOLLOW UP ACCIDENT REPORT (DA FORM 285) WITHIN THREE WORKING DAYS OF OCCURRENCE WHENEVER AN ACCIDENT INVOLVING CONTRACTOR PERSONNEL OCCURS
DA FORM 285
3.9.2
BUSINESS MANAGEMENT
IN ACCORDANCE WITH DOD MANUAL 4161. 2M, PERFORMANCE OF CONTRACT PROPERTY ADMINISTRATION; AR 385-40, ACCIDENT REPORTING AND RECORDS
PER ACCIDENT
DATE OF ACCIDENT
VERBAL REPORT WITHIN ONE HOUR OF OCCURRENCE; WRITTEN FOLLOW UP ACCIDENT REPORT (DA FORM 285) NLT 3 WORKING DAYS FOLLOWING OCCURRENCE
MICC
21
1022
VEHICULAR ACCIDENT REPORT
VEHICULAR ACCIDENTS REPORTED TO THE FORT GORDON PROVOST MARSHAL AT THE SCENE
DA FORM 285
3.9.3
BUSINESS MANAGEMENT
IN ACCORDANCE WITH AR 385-40
PER ACCIDENT
DATE OF ACCIDENT
IN ACCORDANCE WITH AR 385-40
MICC
22
1023
OCCUPATIONAL SAFETY AND HEALTH PLAN
PROVIDE OCCUPATIONAL SAFETY AND HEALTH PLAN TO ENSURE PROPER SAFETY AND HEALTH PRECAUTIONS ARE TAKEN TO PROTECT THE WORK, THE EMPLOYEES, THE PUBLIC, AND PROPERTY OF OTHERS
N/A
1.4.5
BUSINESS MANAGEMENT

ES&H MANAGER

PROVIDE PLAN IN ACCORDANCE WITH AR 385-10, ARMY SAFETY PROGRAM; AR 385-40, ACCIDENT REPORTING AND RECORDS, AR 385-55, PREVENTION OF MOTOR-VEHICLE ACCIDENTS WITH TRADOC AND USASC&FG SUPPLEMENTS THERETO; AND AR 385-63, RANGE SAFETY, AR 600-63, ARMY HEALTH PROMOTION AND USASC&FG SUPPLEMENT THERETO, AND AR 385-64, AND U.S. ARMY EXPLOSIVES SAFETY PROGRAM WITH TRADOC SUPPLEMENT.
N/A
CONTRACT AWARD
NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START DATE
MICC
23
1024
DRAFT ENERGY AND FINAL CONSERVATION PROGRESS REPORT
DISCUSSION AND ANALYSIS OF THE ENERGY CONSERVATION EFFORTS OF THE PAST YEAR AND NECESSARY IMPROVEMENTS FOR THE NEXT YEAR
N/A
3.8.1
BUSINESS MANAGEMENT
A DRAFT ENERGY CONSERVATION PROGRESS REPORT SHALL BE SUBMITTED 30 DAYS PRIOR TO THE END OF THE FISCAL YEAR AND THE FINAL AND DETAILED REPORT, INCORPORATING GOVERNMENT COMMENTS, SUBMITTED 15 DAYS AFTER THE END OF EACH FISCAL YEAR.
ANNUAL
CONTRACT START DATE
DRAFT NLT 30 CALENDAR DAYS PRIOR TO END OF FISCAL YEAR; FINAL NLT 15 CALENDAR DAYS AFTER THE END OF FISCAL YEAR
COR-O&M DIV/DPW
24
1025
ENERGY AND UTILITY CONSERVATION PLAN
TO SUPPORT THE INSTALLATION CONSERVATION PROGRAM FOR FACILITIES ASSIGNED TO THE CONTRACTOR AND IN THOSE AREAS WHERE THE CONTRACTOR PERFORMS WORK UNDER THIS CONTRACT
N/A
3.8.1
BUSINESS MANAGEMENT
INCLUDE CONSERVATION OF UTILITY/ENERGY USAGE AS PRESCRIBED IN AR 420-1, ARMY ENERGY PROGRAM, AND AR 420-54, AIR CONDITIONING AND REFRIGERATION AND TRADOC SUPPLEMENTS
N/A
CONTRACT AWARD
NLT 30 CALENDAR DAYS AFTER CONTRACT AWARD DATE
COR-O&M DIV/DPW
25
1026
ENVIRONMENTAL PROTECTION PLAN
ENVIRONMENTAL PROTECTION PLAN TO COMPLY WITH GOVERNING ENVIRONMENTAL REGULATIONS AND FORT GORDON ENVIRONMENTAL PLANS
N/A
5.4.2.1
ENVIRONMENTAL EFFECTS
PLAN MUST COMPLY WITH AR 40-5, PREVENTIVE MEDICINE, AR 200-1, ENVIRONMENTAL PROTECTION AND ENHANCEMENT, AR 200-2, ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS, AR 200-3, NATURAL RESOURCES-LAND, FOREST AND WILDLIFE MANAGEMENT, AR 200-4, CULTURAL RESOURCES. MANAGEMENT, TRADOC SUPPLEMENTS, AND WITH ALL FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, AND INSTALLATION PLANS REGARDING POLLUTION CONTROL, CLEAN AIR, CLEAN WATER, TOXIC SUBSTANCES CONTROL, RESOURCE CONSERVATION AND RECOVERY, AND OTHER ENVIRONMENTAL MATTERS, THE INSTALLATION SPILL CONTINGENCY PLAN, THE INSTALLATION HAZARDOUS WASTE MINIMIZATION AND HAZARDOUS WASTE MANAGEMENT PLAN.
N/A
CONTRACT AWARD
NLT 120 CALENDAR DAYS AFTER CONTRACT AWARD DATE
COR - ENRMO
26
1027
CITATIONS, NOTICES OF VIOLATION, AND OTHER NOTICES OF NONCOMPLIANCE
PROVIDE A COPY OF ANY SUCH WRITTEN NOTICE OF NONCOMPLIANCE TO NOTIFY CONTRACTING OFFICER AND DPW ENVIRONMENTAL REPRESENTATIVE OF ISSUE
N/A
5.4.1.2
BUSINESS MANAGEMENT
NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY VERBAL NOTICE OF NONCOMPLIANCE. THE CONTRACTOR SHALL PROVIDE PRIOR NOTICE TO THE CONTRACTING OFFICER OF ALL MEETINGS WITH THE REGULATORY AGENCY RELATED TO THE RESOLUTION OF SUCH NOTICE OF NONCOMPLIANCE.
AS OCCURS
CONTRACT START
IMMEDIATELY UPON RECEIPT
MICC

COR - ENRMO

27
1028
QUALITY CONTROL PLAN
SUBMIT COMPREHENSIVE QCP DESCRIBING THE QUALITY CONTROL PROGRAM
1.6.4
BUSINESS MANAGEMENT

QC MGR

CONSTRUCTED IN SUCH A MANNER THAT EACH FUNCTIONAL AREA HAS A STANDALONE PLAN THAT MAY BE EXTRACTED AND USED FOR THAT FUNCTION. THE PLAN SHALL INCLUDE THE NAMES AND MINIMUM ACCEPTABLE QUALIFICATIONS OF FIRMS OR INDIVIDUALS TASKED TO PERFORM INSPECTIONS AND THE EXTENT OF THEIR AUTHORITY, THEIR FUNCTIONAL ROLES SHALL BE DEPICTED IN A QUALITY CONTROL PLAN ORGANIZATION CHART. DISCUSS PROPOSED TEST METHODS, INCLUDING NAMES AND QUALIFICATIONS OF TECHNICIANS OR QUALIFIED TESTING LABORATORIES TO BE USED. EXPLAIN THE MANNER IN WHICH THE CONTRACTOR WILL ENSURE THAT ALL CONTRACT REQUIREMENTS ARE BEING ACCOMPLISHED IN ACCORDANCE WITH THE PWS, PERFORMANCE REQUIREMENTS SUMMARY (PRS) ATTACHMENT J- C1 02 PRS, AND INDUSTRY STANDARDS.
N/A
CONTRACT AWARD
GENERAL DESCRIPTION OF QUALITY CONTROL PLAN WITH OFFEROR'S PROPOSAL; COMPREHENSIVE QUALITY CONTROL PLAN NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START DATE; UPDATED COPY OF THE PLAN NLT 20 WORKING DAYS PRIOR TO THE IMPLEMENTATION OF CHANGES
MICC
28
1029
QUALITY CONTROL REPORT
QUALITY CONTROL REPORT BY FUNCTIONAL AREA
N/A
1.6.4.6
BUSINESS MANAGEMENT

QC MGR

HIGHLIGHT THE NUMBER OF DEFICIENCIES/CUSTOMER FEEDBACK FORMS THAT WERE DISCOVERED/RECEIVED IN THE PREVIOUS WEEK AND PRESENT SOLUTIONS THAT RESOLVED OR WILL POTENTIALLY RESOLVE FUTURE DEFICIENCIES
WEEKLY WITH SUMMARY REPORT MOTHLY
CONTRACT START DATE
NLT 1 WORKING DAY FOLLOWING CONCLUSION OF THE WEEK; MONHLY SUMMARY NLT 5 WORKING DAYS AFTER THE LAST DAY OF THE MONTH
CORs – BOID

O&M DIV/DPW

29
1030
SUBCONTRACTING LOG
TO ENABLE PROPER SURVEILLANCE OF SUBCONTRACT ACTIVITIES: INVITATIONS FOR BID, REQUESTS FOR QUOTATIONS, REQUEST FOR PROPOSALS, PURCHASE ORDERS, SUBCONTRACTS AND MODIFICATIONS
N/A
1.3.1.
PROCUREMENT OFFICE
CONTRACTOR DEVELOPED LIST OF ALL ACTIONS IN ABOVE DESCRIPTIONS/PURPOSE
MONTHLY
FIRST DAY TO THE LAST DAY OF THE MONTH
NLT 5 WORKING DAYS FROM THE LAST DAY OF THE MONTH
MICC
30
1031
SUBCONTRACTING ACTIONS
TO ENABLE PROPER SURVEILLANCE OF SUBCONTRACT ACTIVITIES: PURCHASE ORDERS AND SUBCONTRACTS
N/A
1.3.1
PROCUREMENT OFFICE
COPY OF EACH PURCHASE ORDER AND SUBCONTRACT
AS INITIATED
AS REQUIRED
AS INITIATED: FOR MAINT BR, LOG DIV, DPW NLT 3 WORKING DAYS AFTER ISSUING TO VENDOR
COR BOID/DPW
31
1032
CONTRACTOR ACQUIRED MATERIAL (CAM) SUMMARY
TO ENABLE PROPER SURVEILLANCE OF CAM ACTIVITIES: PURCHASE ORDERS AND MICROPURCHASES
N/A
1.3.1
PROVUREMENT OFFICE
CONTRACTOR DEVELOPED LIST OF ALL ACTIONS IN ABOVE DESCRIPTION/PURPOSE. LISTING OF ALL PROCUREMENT INSTRUMENTS/PURCHASES – CAN INCLUDE SUMMARIES OF ACTIONS AGAINST PROCUREMENT INSTRUMENTS
MONTHLY
FROM FIRST DAY TO LAST DAY OF THE MONTH
NLT 5 WORKING DAYS FROM LAST DAY OF THE MONTH
COR BOID/DPW
32
1033
DPW WORKLOAD DATA
TO PROVIDE WORKLOAD DATA FOR ALL FUNCTIONS PERFORMED BY CONTRACTOR
N/A
1.4.6
WORK CONTROL
GFEBS WORKLOAD DATA REPORTS REFLECTING ALL WORK ACCOMPLUSHED BY THE CONTRACTOR’S CONTRACT STAFF DIRECTLY COSTED TO APPROPRIATE FUNCTIONAL AREAS AND CLS.
MONTHLY
END OF THE MONTH
17TH OF THE MONTH
COR – BOID/DPW
33
1034
WARRANTY PLAN
ESTABLISH AND MAINTAIN A WARRANTY PROGRAM TO WARRANT ALL EQUIPMENT, PARTS, COMPONENTS, WHERE THE MANUFACTURER'S PROVIDE A WARRANTY AND SHALL BE EXERCISED FOR THE DURATION OF THIS CONTRACT.
N/A
1.4.7
BUSINESS MANAGEMENT
PROVIDE A PLAN TO ESTABLISH AND MAINTAIN A WARRANTY PROGRAM TO WARRANT ALL EQUIPMENT, PARTS, COMPONENTS, WHERE THE MANUFACTURER'S PROVIDE A WARRANTY AND SHALL BE EXERCISED FOR THE DURATION OF THIS CONTRACT.
N/A
CONTRACT AWARD
NLT 30 CALENDAR DAYS PRIOR TO CONTRACT START
MICC
34
3001
GOVERNMENT FURNISHED PROPERTY MANAGEMENT PLAN
WARRANTY METHODOLOGY, PROPERTY CONTROL SYSTEM, PURCHASING SYSTEM PLAN, AND GFM/CAMPS.
N/A
3.1.3
BUSINESS MANAGEMENT
DESCRIBE THE CONTRACTOR’S METHODOLOGY FOR CONTROLLING, UTILIZING, MAINTAINING, REPAIRING, PROTECTING, PRESERVING, ACCOUNTING FOR AND DISPOSING OF GFP IN ACCORDANCE WITH SOUND BUSINESS PRACTICE, THE APPLICABLE PROVISIONS OF FAR CLAUSE 52.245-1, GOVERNMENT PROPERTY, AND OTHER REQUIREMENTS OF THE CONTRACT AND INCLUDE THE WRITTEN PROPERTY CONTROL SYSTEM (PCS), CONTRACTOR’S PURCHASING SYSTEM PLAN (CPSP), AND GOVERNMENT FURNISHED MATERIALS/CONTRACTOR ACQUIRED MATERIALS PURCHASING SYSTEM.(GFM/CAMPS)
N/A
CONTRACT AWARD
NLT 30 CALENDAR DAYS PRIOR TO THE END OF THE TRANSITION PERIOD
PROPERTY ADMINISTRATOR

MICC

35
3002
TRANSITION OF PROPERTY TO THE CUSTODY OF CONTRACTOR AND FOLLOW-UP INVENTORIES
TO PROVIDE INITIAL , SPECIAL, AND ANNUAL REPORT FOR ALL DOD PROPERTY FOR WHICH THE CONTRACTOR IS ACCOUNTABLE UNDER THE CONTRACT
N/A
3.1..3.1,

.3.2, .3.2.1.

BUSINESS MANAGEMENT
DD FORM 1662 (to be revised by UID regulations)
DURING CONTRACTOR TRANSITION AND THEN ANNUALLY
30 SEP EACH YEAR
NLT 31 OCT AFTER FY BEING REPORTED; NLT 5 WORKING DAYS AFTER SPECIAL REQUEST INVENTORY AGREED UPON COMPLETION DATE
DPW

MICC

36
3003
RECORD DRAWINGS
PROVIDE UPDATES AND NEW RECORD DRAWINGS WHEN CONTRACTOR IDENTIFIED CHANGES ARE REQUIRED
N/A
3.10.3
PROJECT ACCOMPLSIHMENT
PROVIDE DETAILED ENGINEERING DATA TO THE PA IN EACH INSTANCE WHERE THE CONTRACTOR FINDS THE DRAWINGS ARE NOT ACCURATE OR WHEN THE CONTRACTOR PERFORMS WORK THAT MODIFIES DATA CONTAINED IN THE ENGINEERING DRAWINGS
AS CHANGES IDENTIFIED
CONTRACT START
UPON COMPLETION OF WORK
COR – O&M DIV/DPW
37
3004
DISPOSITION OF CONTRACTOR’S INVENTORY
TO REPORT THE DISPOSITION OF EXCESS AND UNDER UTILIZED GOVERNMENT-OWNED PROPERTY IN THE POSSESSION OF DEFENSE CONTRACTORS
N/A
3.2
BUSINESS MANAGEMENT
DD FORM 1638 AND IAW PROPERTY CONTROL SYSTEM
QUARTERLY
LAST DAY OF QUARTER
NLT 2 WORKING DAYS FOLLOWING THE REPORTING PERIOD
MICC
38
3005
REPORT OF LOST, DAMAGED OR DESTROYED (LDD) GOVERNMENT PROPERTY
TO PROVIDE FACTUAL DATA ON CIRCUMSTANCES SURROUNDING THE LOSS, DAMAGE OR DESTRUCTION OF GFP UNDER THE CONTROL OF THE CONTRACTOR OR SUBCONTRACTORS
N/A
3.1.3.7
BUSINESS MANAGEMENT
IAW REFERENCED PARA AND APPROVED PROPERTY CONTROL SYSTEM
AS REQUIRED
AS REQUIRED
NLT 5 CALENDAR DAYS AFTER KNOWLEDGE OF LOSS, DAMAGE OR DESTRUCTION
MICC
39
3006
UTILIZATION OF GFF PLAN
PROVIDE A PLAN RELATIVE TO HOW THE GOVERNMENT PROVIDED FACILITIES WILL BE MAINTAINED AND UTILIZED
N/A
3.7.2
BUSINESS MANAGEMENT
DESCRIBE THE MANNER IN WHICH THE FACILITIES WILL BE UTILIZED TO MEET THE CONTRACTOR'S NEED FOR ON-SITE FACILITIES; ADDRESS CONTINGENCIES SHOULD THE SPACE BECOME UNAVAILABLE; DISCUSS HOW THE CONTRACTOR PLANS TO BE RESPONSIBLE FOR AND ACCOUNTABILITY OF THE GFF AND TAKE ADEQUATE PRECAUTIONS TO PREVENT FIRE HAZARDS, ODORS, CHEMICAL SPILLS AND VERMIN
N/A
CONTRACT START DATE
NLT 30 DAYS AFTER CONTRACT AWARD DATE
MICC
40
3008
HEAVY EQUIPMENT REPORT
WEEKLY HEAVY EQUIPMENT STATUS REPORT
N/A
3.9.4
BUSINESS MANAGEMENT
PROVIDE A WEEKLY HEAVY EQUIPMENT STATUS REPORT OF ALL ASSIGNED VEHICLES AND EQUIPMENT
WEEKLY
CONTRACT START DATE
NLT 3 WORKING DAYS AFTER THE CLOSE OF BUSINESS THE LAST DAY OF WEEK
41
4001
CERTIFICATES OF COMPLIANCE, MANUFACTURER'S DESCRIPTIVE DATA AND PRODUCT SAMPLES
CERTIFICATES OF COMPLIANCE OBTAINED FROM MATERIAL MANUFACTURERS, ATTESTING THAT THE MATERIALS MEET THE REQUIREMENTS SPECIFIED
N/A
4.2.3
BUSINESS MANAGEMENT
MANUFACTURER'S DESCRIPTIVE DATA INCLUDE THE NAME OF THE MANUFACTURER, MODEL NUMBER OR OTHER IDENTIFYING INFORMATION, CATALOG CUT AND OTHER IDENTIFYING DATA, AND INFORMATION DESCRIBING THE PERFORMANCE CAPACITY, RATING, AND APPLICATION/INSTALLATION INSTRUCTIONS, WHICH CLEARLY ILLUSTRATE THAT THE PROPOSED ITEM MEETS THE APPLICABLE STANDARDS. PRODUCT SAMPLES INCLUDE A SUFFICIENT QUANTITY OF MATERIAL TO ALLOW FOR COMPLETE ANALYSIS AND EVALUATION BY THE GOVERNMENT.
AS REQUESTED BY DGR
CONTRACT START DATE
UPON RECEIPT FROM MANUFACTURER
COR – O&M DIV/DPW
42
4002
CONTRACTOR FURNISHED EQUIPMENT, DEPRECIATION SCHEDULE
TO PROVIDE THE GOVERNMENT WITH A DESCRIPTION AND DEPRECIATION SCHEDULE FOR EACH PIECE OF CONTRACTOR FURNISHED EQUIPMENT
N/A
4.3
BUSINESS MANAGEMENT
AS DETERMINED BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING OFFICER
ANNUAL
END OF THE YEAR
15 OCTOBER
COR - O&M DIVISION
43
5101
PERSONNEL NOTIFICATION ROSTER
TO PROVIDE NAMES, TELEPHONE NUMBERS OF KEY PERSONNEL WHO WOULD BE CONTACTED FOR EMERGENCY ACTIONS OR PARTICIPATE IN IOC, MCC AND SRP SITE EVENTS
N/A
5.1.1.1.3 AND PERTINENT GOVERNMENT PLANS
MOBILIZATION, DEPLOYMENT, AND CONTINGENCY PLANNING SERVICES
IAW REFERENCES
AS CHANGES OCCUR
CONTRACT START DATE
INITIAL SUBMISSION NLT 15 CALENDAR DAYS PRIOR TO CONTRACT START DATE; UPDATES NLT 1 WORKING DAY AFTER EACH CHANGE IN KEY PERSONNEL
MICC
44
5201
PUBLIC WORKS DIVISION WORK LOAD DATA (SUBCONTRACTS)
PROVIDE A SEQUENTIALLY NUMBERED LISTING OF ALL IN PROCESS AND COMPLETED SUBCONTRACTS
N/A
5.2.6.2.2.5
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL INSTRUCTIONS – PROVIDE A SEQUENTIALLY LISTED REPORT OF ALL COMPLETED SUBCONTRACTS
WEEKLY
CONTRACT EFFECTIVE DATE
WEDNESDAY OF EACH WEEK
MICC
45
5202
PUBLIC WORKS DIVISION WORK LOAD DATA (DMOs)
TO PROVIDE SEQUENTIALLY NUMBERED LISTING OF COMPLETED K & L ACCOUNT SERVICE ORDERS, ROUTINE & EMERGENCY.
N/A
5.2.7.3
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL INSTRUCTIONS
WEEKLY
CONTRACT EFFECTIVE DATE
WEDNESDAY OF EACH WEEK
CORS BOID/ O&M DIV/DPW
45
5203
PUBLIC WORKS DIVISION WORK LOAD DATA (OWOs)
TO PROVIDE SEQUENTIALLY NUMBERED LIST OF ALL OWOs WITH CURRENT YTD LABOR AND MATERIAL COSTS
N/A
5.2.7.3
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL MEMORANDUM
WEEKLY
CONTRACT EFFECTIVE DATE
WEDNESDAY OF EACH WEEK
CORS BOID/ O&M DIV/DPW
47
5204
PUBLIC WORKS DIVISION WORK LOAD DATA (EMERGENCY DMOs)
PROVIDE A SEQUENTIALLY NUMBERED LISTING OF EMERGENCY DMOs FROM THE PREVIOUS DAY. LIST DATE, DESCRIPTION, POC/PHONE #, FACILITY, TIME REC’D/ DISPATCHED, STATUS, OVERTIME HOURS. COPIES OF ACTUALCOMPLETED SERVICE ORDERS WILL BE REQUESTED ON A CASE BY CASE BASIS.
N/A
5.2.3
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL MEMORANDUM/SPREADSHEET FORMAT
DAILY
PREVIOUS DAY
DAILY
CORS BOID/ O&M DIV/DPW
48
5205
ENGINEER WORK ORDER TRACKING
TO TRACK THE STATUS OF ONGOING PWOS
N/A
5.2.6.6
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL MEMORANDUM/SPREADSHEET FORMAT
MONTHLY
CONTRACT START DATE
NLT THE 5TH CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
CORS BOID/ O&M DIV/DPW
49
5206
UNLIQUIDATED CONTRACT OBLIGATIONS
TO TRACK THE STATUS UNLIQUIDATED CONTRACT OBLIGATIONS
N/A
5.2.7.6
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL MEMORANDUM/SPREADSHEET FORMAT
AS CHANGES OCCUR
CONTRACT EFFECTIVE DATE
IMMEDIATELY WHEN KNOWN
CORS BOID/ O&M DIV/DPW
50
5207
PUBLIC WORKS DIVISION WORK LOAD DATA (PWO TASKINGS – ESTIMATES & ACCOMPLISHMENT)
PROVIDE THE NUMBER OF PWOS TASKED AND COMPLETED DURING THE MONTH FOR DETAILED ESTIMATES AND PROJECT EXECUTION.
N/A
5.2.6.3.1
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
INFORMAL MEMORANDUM
WEEKLY
PREVIOUS WEEK
WEDNESDAY OF EACH WEEK
CORS BOID /DPW
51
5208
ISR SERVICES (ISR-S) PERFORMANCE DATA
TO PROVIDE PERFORMANCE DATA FOR ISR REPORTING PER A52R 210-14
AR 210-14
5.2.7.7.1
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
SUBMITTED ON INPUT FORMS PROVIDED BY DPW
QUARTERLY
1-Oct-10
THE LAST WORK DAY OF THE MONTH FOLLOWING THE END OF EACH QUARTER
CORS BOID/ O&M DIV/DPW
52
5209
ISR INFRASTRUCTURE DATA
PROVIDES ISR INFRASTRUCURE REPORTING DATA.
N/A
5.2.7.7.2
FACILITIES M&R
FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY
31 MARCH
NLT 30 APRIL
CORS – BOID/

ENRMO/O&M DIV/DPW

53
5214
COST TRANSFER VOUCHER
TRANSFER COST TO ACTIVITIES WITHIN THE SAME APPROPRIATION AND OPERATING AGENCY. COST IS TRANSFERRED FOR ONCE REIMBURSABLES SERVICES ARE EARNED.ACCOUNTS. AND GOVERNMENT BILLINGS.
N/A
5.2.7.4.2
BUSINESS MANAGEMENT
3046 OR FORM DESIGNATED BY THE GOVERNMENT
MONTHLY OR AS REQUIRED
N/A
MONTHLY REQUIREMENTS WILL BE RECEIVED BY CUTOFF FOR MONTH END; AS REQUIRED NLT 5 WORKING DAYS AFTER REQUEST
COR-BOID-

O&M DIV/DPW

54
5210
CONTRACTOR MANPOWER REPORTING
TO REPORT ALL CONTRACTOR MANPOWER (INCLUDING SUBCONTRACTOR MANPOWER) REQUIRED FOR PERFORMANCE OF CONTRACT TO INCLUDE ESTIMATED TOTAL COSTS INCURRED (if any) TO COMPLY WITH THIS REPORTING REQUIREMENT.
N/A
5.12
BUSINESS MANAGEMENT
PROVIDE COMPLETE INFORMATIONELECTRONICALLY USING FORMAT IN GOVERNMENT WEB SITE AS STATED IN REFERENCE
ANNUALLY
END OF FISCAL YEAR – 30 SEP
31 OCTOBER OF EACH CALENDAR YEAR
COR-BOID DPW
55
5211
CONTRACTOR’S OPERATING BUDGET

NEGOTIATED COST VARIANCE REPORT

DISTRIBUTE NEGOTIATED CONTRACT AMOUNT BY FUNCTIONAL AREA AND ELEMENTS OF EXPENSE CLS/SSP SHOWING ESTIMATED EXPENDITURES CUMULATIVE COSTS FOR EACH MONTH OF THE FISCAL YEAR. BY ELEMENTS OF EXPENSE ARESUCH AS:: LABOR COSTS, HOLIDAY PAY, OVERTIME, EXTENDED WORK WEEK, VACATION ACCRUAL, PAYROLL RELATED COSTS, TRAVEL AND TRAINING, CONTRACTOR FURNISHED EQUIPMENT, OTHER DIRECT COSTS, CAM/GFM, SUBCONTRACTS, PROJECT STAFF DISTRIBUTION, G&A, STATE TAX, BASE FEE, AWARD FEE. (INCLUDE MONTHLY LABOR (MAN HOURS) ON REPORT)
N/A
5.2.7.1.1.4
BUSINESS MANAGEMENT
CONTRACT DESIGNED FORMAT AS APPROVED BY CONTRACTING OFFICER REPRESENTATIVE.
MONTHLY
LAST DAY OF THE MONTH
NLT 15 CALENDAR DAYS FOLLOWING THE END OF THE REPORTING PERIOD
COR – BOID/DPW
56
5212
ANNUAL WORK PLAN (AWP) INPUT

ANNUAL PREVENTIVE MAINTENANCE (PM) SCHEDULE

PROVIDES INPUT DATA FOR ALL CLS TO SUPPORT DEVELOPMENT OF THE AWP PROVIDES THE ANNUAL PM SCHEDULE IN GFEBS TO THE COR FOR REVIEW.
N/A
5.2.7.8.3

5.6.1.2

BUSINESS MANAGEMENTENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY
DATE OF REQUESTBEGINNING OF SUBJECT FISCAL YEAR
WITHIN ONE WEEK OF GOVERNMENT REQUESTINITIAL SUBMISSION NLT TWO WEEKS PRIOR TO THE FIRST DAY OF FULL CONTRACT PERFORMANCE; SUBSEQUENT SUBMISSIONS NLT 30 CALENDAR DAYS PRIOR TO THE START OF THE FISCAL YEAR
COR – BOID/DPW
57
5301
PROJECT SCHEDULE
FLOW DIAGRAM SCHEDULE, MICROSOFT PROJECT OR SIMILAR, DEMONSTRATING THE LOGICAL PREDECESSORS, SUCCESSORS AND CONSTRAINST/RESTRAINTS OF EACH SIGNIFICANT ACTIVITY FO TRHE PWO.
N/A
5.3.2.1.1
PROJECTS ACCOMPLISHMENT
MICROSOFT PROJECT OR SIMILAR, ELECTRONIC SUBMISSION
PER TASKED PWO
CONTRACST EFFECTIVE DATE
PER TASKED PWO
CORS - BOID - O&M DIV/DPW
58
5302
WARRANTY PLAN
WARRANTY PLAN , PER EACH INSTALLED EQUIPMENT/COMPONENT
N/A
5.3.2.1.4
PROJECTS ACCOMPLISHMENT
ELECTRONIC FORMAT
PER EACH INSTALLED COMPONENT/EQUIPMENT
CONTRACT EFFECTIVE DATE
COMPLETION OF PWO
CORS- BOID/O&M DIV/DPW
59
5303
OPERATIONS & MAINTENACE MANUALS
O&M MANUALS PER EACH INSTALLED EQUIPMENT/COMPONENT
N/A
5.3.2.1.5
PROJECTS ACCOMPLISHMENT
ELECTRONIC FORMAT
PER EACH INSTALLED EQUIPMENT/COMPONENT
CONTRACT EFFECTIVE DATE
COMPLETION OF PWO
CORS- O&M DIV/DPW
60
5304
SUBMITTAL REQUIREMENTS PER PARA 5.3.6.1
SUBMITTALS PER EACH INSTALLED EQUIPMENT/COMPONENT
N/A
5.3.6.1
PROJECTS ACCOMPLISHMENT
PER THE REQUIREMENTS OF 5.3.6.1
PER EACH INSTALLED EQUIPMENT/COMPONENT
CONTRACT EFFECTIVE DATE
COMPLETION OF PWO
COR - O&M DIVI/DPW
61
5305
LEAD BASED PAINT PERMITS
LEAD BASED PAINT PERMITS SUBMITTED PER 5.3.12.1
N/A
5.3.12.1
PROJECTS ACCOMPLISHMENT
PER THE REQUIREMENTS OF 5.3.12.1
PER ISSUE OF EACH PERMIT
CONTRACT EFFECTIVE DATE
WHEN PERMIT IS ISSUED
COR - O&M DIVI/DPW
62
5306
ASBESTOS PERMITS
ASBESTOS PERMITS PER 5.3.12.2
N/A
5.3.12.2
PROJECTS ACCOMPLISHMENT
PER THE REQUIREMENTS OF5.3.12.2
PER ISSUE OF EACH PERMIT
CONTRACT EFFECTIVE DATE
CONTRACT EFFECTIVE DATE
CORS - ENRMO/ O&M DIVISIONS
63
5402
EROSION CONTROL AND WETLANDS PLANS
PROVIDE PLANS THAT MEET THE STATE AND FEDERAL REQUIREMENTS AS TASKED
N/A
5.4.2.1.5.
ENVIRONMENTAL EFFECTS SERVICES
UTILIZE GEORGIA GREEN BOOK AND 404 MPERMITTING GUIDELINES
AS TASKED
CONTRACT EFFECTIVE DATE
NLT 1 MONTH PRIOR TO PROJECT COMMENCEMENT
CORS - ENRMO/ O&M DIVISIONS
64
5403
HAZARDOUS MATERIALS MANAGEMENT PLAN
TO PROVIDE A STRUCTURED WRITTEN PLAN FOR THE CONTRACTOR'S MANAGEMENT OF HAZARDOUS MATERIALS AND PROCEDURES TO BE FOLLOWED REGARDING STORAGE, HANDLING,TRANSPORTATION, AND DISPOSAL.
N/A
5.4.2.4
ENVIRONMENTAL EFFECTS SERVICES
FORMAT APPROVED BY THE GOVERNMENT
ONCE
CONTRACT EFFECTIVE DATE
DRAFT NLT 30 CALENDAR DAYS AFTER CONTRACT AWARD; FINAL WITHIN 15 CALENDAR DAYS OF RECEIPT OF GOV'T COMMENTS
COR - ENVIRONMENTAL DIVISION
65
5404
HAZARDOUS MATERIAL/HAZARDOUS WASTE TRAINING ROSTER AND CERTIFICATES
TO INSURE THAT THE WORKERS HANDLING HAZARDOUS MATERIAL/HAZARDOUS WASTE ARE TRAINED IN ACCORDANCE WITH STATE, LOCAL & FEDERAL REGULATIONS AND ARE KNOWLEDGEABLE OF THE IMPACT THEIR WORK MAY HAVE ON THE ENVIRONMENT. PROVIDE AN UPDATED LIST OF WORKERS AS NEEDED WHEN ADDITIONS AND/OR CHANGES OCCUR IN THEIR HAZARDOUS MATERIAL/HAZARDOUS DUTIES.
N/A
5.4.2.4.2
ENVIRONMENTAL EFFECTS SERVICES
FORMS PROVIDED BY THE GOVERNMENT
QUARTERLY
LAST DAY OF EACH QUARTER
NLT 3 WORKING DAYS FOLLOWING THE END OF THE REPORTING PERIOD
COR - ENVIRONMENTAL DIVISION
66
5405
HAZARDOUS MATERIAL INVENTORY
TO PROVIDE AN UPDATED LISTING OF ALL HAZARDOUS MATERIALS STORED AND USED BY THE CONTRACTOR FOR EACH PRECEDING CALENDAR YEAR
N/A
5.4.2.4
ENVIRONMENTAL EFFECTS SERVICES
FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY
END OF CALENDAR YEAR
NLT 30 JANUARY
COR - ENVIRONMENTAL DIVISION
67
5406
ASBESTOS OPERATIONS AND MAINTENANCE PLAN
TO ENSURE THAT ALL EMPLOYEES ARE TRAINED TO IDENTIFY SUSPECT ASBESTOS AND TO ESTABLISH OPERATING PROCEDURES FOR WORKING AROUND AND REMOVING THIS MATERIAL.
N/A
5.4.3.1 AND OSHA REG TITLE 29, PART 1926.58
ENVIRONMENTAL EFFECTS SERVICES
DETERMINED BY CERTIFIED INDUSTRIAL HYGIENIST TO COMPLY WITH OSHA REGULATIONS
ANNUALLY
1 OCTOBER OF EACH YEAR
NLT 1 DECEMBER OF EACH YEAR
COR - ENVIRONMENTAL DIVISION
68
5407
ASBESTOS SURVEY
TO MAINTAIN AN ACCURATE RECORD OF THE LOCATIONS AND QUANTITY OF ASBESTOS IN EACH BUILDING ON POST, DELETING FROM THE SURVEY AS REMOVALS ARE PERFORMED.
N/A
5.4.3.4 AND OSHA LAWS ON ASBESTOS
ENVIRONMENTAL EFFECTS SERVICES
IAW TRADOC ASBESTOS MANAGEMENT AND CONTROL HANDBOOK
ANNUALLY
31 DECEMBER OF EACH YEAR
NLT 1 JANUARY OF EACH YEAR
COR - ENVIRONMENTAL DIVISION
69
5408
ASBESTOS PROJECT FOLDERS
TO INSURE THAT QUALIFIED SUBCONTRACTORS ARE HIRED TO REMOVE ASBESTOS AND TO INSURE THAT ALL DOCUMENTS ARE CORRECT AND COMPLETE.
N/A
5.4.3.5
ENVIRONMENTAL EFFECTS SERVICES
ASBESTOS CHECKLIST PROVIDED BY THE GOVERNMENT
PER ASBESTOS ABATEMENT JOB
NO SPECIFIC DATE NECESSARY OR POSSIBLE. VARIES BASED UPON EACH ASBESTOS ABATEMENT JOB
AT SPECIFICATION WRITING, AT SUBMITTAL SUBMISSION, AND UPON JOB COMPLETION
COR - ENVIRONMENTAL DIVISION
70
5409
ASBESTOS TRAINING LIST/ROSTER
TO INSURE THAT THE WORKERS PERFORMING THE WORK HAVE KNOWLEDGE OF THE IMPACT OF THEIR WORK ON THE ENVIRONMENT
N/A
5.4.3.7
ENVIRONMENTAL EFFECTS SERVICES
IAW ASBESTOS OPERATIONS AND MAINTENANCE PLAN
ANNUALLY
31 DECEMBER OF EACH YEAR
NLT 1 JANUARY OF EACH YEAR
COR - ENVIRONMENTAL DIVISION
71
5410
SPILL REPORT
TO INQUIRE HOW AND WHY THE INCIDENT OCCURRED, TO OBTAIN ANY KNOWN INFORMATION ABOUT THE SPILL, TO QUALIFY AND QUANTIFY THE MATERIAL SPILLED, AND TO RECORD CORRECTIVE ACTIONS TAKEN, ESTIMATED COST OF LABOR AND MATERIALS EXPENDED.
N/A
5.4.10.1.
ENVIRONMENTAL EFFECTS SERVICES
FORM PROVIDED BY THE GOVERNMENT
AT EACH SPILL
DATE OF THE SPILL
NLT CLOSE OF BUSINESS 1 WORKING DAY FOLLOWING THE INCIDENT
COR - ENVIRONMENTAL DIVISION
72
5411
SPILL CONTROL RESPOSNE MATERIALS
TO PROVIDE A MATERIALS LIST AND ASSOCIATED COSTS FOR RESPONSE OPERATIONS IN ACCORDANCE WITH THE SPILL CONTROL RESPONSE AND CONTINGENCY PLANS
N/A
5.4.10.2
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
MONTHLY
CONTRACT EFFECTIVE DATE
5TH WORKING DAY OF THE MONTH
COR - ENVIRONMENTAL DIVISION
73
5412
UNDERGROUND STORAGE TANK INSPECTIONS AND TESTING
DOCUMENT ANNUAL UST TIGHTNESS TESTING, NOTIFICATIONS, AND REPORTING
N/A
5.4.5
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
ANNUALLY
BY DEC 15 OF EACH YEAR
NLT 2 WORKING DAYS FOLLOWING COMPLETION OF INSPECTION/TESTING
COR - ENVIRONMENTAL DIVISION
73
5413
LEAD ABATEMENT OPERATIONS PLAN
PROVIDE PROCEDURES FOR WORKERS IN THE HANDLING OF MATERIALS CONTAINING LEAD, E.G. LEAD-BASED PAINT
N/A
5.4.6.1
ENVIRONMENTAL EFFECTS SERVICES
CONTRACTOR DEVELOPED
ONE TIME WITH ANNUAL UPDATES
CONTRACT EFFECTIVE DATE
NLT 7 CALENDAR DAYS PRIOR TO END OF TRANSITION PERIOD; UPDATES ANNUALLY THEREAFTER
COR - ENVIRONMENTAL DIVISION
75
5414
RECORD KEEPING REQUIREMENTS
THE CONTRACTOR SHALL REOCRD MONTHLY HOURS OF OPERATION, MAINTAIN FUEL SUPLPIER CERTIFICATIONS OR FUEL SAMPLING ANALYSIS. MAINTAIN ALL FUEL USEE, ENERGY OUTPUT, PERFORMANCE TESTING, MONITORING, CALIBRATION AND MAINTENANCE RECORDS FOR 5 YEARS.

5.4.7.2.1 5.4.7.2.2.

5.4.7.3.3.

PLANT OPERATIONS SERVICES
PROVIDE DATE PER REFERENCED PARAGRAPHS.
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH CALENDAR DAY OF EACH MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

76
5415
FUEL SAMPLING ANALYSIS
FUEL SUPPLIER CERTIFICATION AND FUEL SAMPLING ANALYSIS FOR FUEL USED BY EMERGENCY GENERATOR G028 CENTRAL POWER PLANT, PEAKING GENERATOR G002 HOSPITAL, BOILERS B012, B013 BUILDING 25330, BOILERS B014, B015, B016 BUILDING 310, AND BOILERS B003, B004, B005 BUILDING 25910.
N/A
5.4.7.2.1

5.4.7.2.2.

5.4.7.3.3

PLANT OPERATIONS SERVICES
PROVIDE A COPY OF THE “BILL OF LADING” STATING THE SULFUR CONTENT IN THE DIESEL FUEL OFF LOADED.
AFTER EACH FUEL DELIVERY
CONTRACT EFFECTIVE DATE
NLT 5 WORKING DAYS AFTER EACH DELIVERY; FAX REQUESTED INFORMATION TO 791-4222, OR HAND DELIVER TO DPW AIR MONITOR PROGRM MANAGER, BUILDING 14600.
CORS - ENVIRONMENTAL & O?M DIVISIONS
77
5416
GROUND WATER SAMPLING
PERFORM SEMIANNUAL SAMPLING AND ANALYSIS FOR ALL MONITORING WELLS AT THE GIBSON ROAD LANDFILL AND ALL MONITORING WELLS AT THE 17TH STREET LANDFILL.
N/A
5.4.11.1
PLANT OPERATIONS SERVICES
FORWARD 3 ORIGINAL WRITTEN REPORTS WITH PROFESSIONAL GEOLOGIST (PG) SEAL AND SIGNATURE ON ALL MAPS AND TESTS.
SEMI-ANNUAL
1 MARCH AND 1 SEPTEMBER ANNUALLY
NLT 31 MARCH AND 30 SEPTEMBER ANNUALLY
COR - ENVIRONMENTAL DIVISION
78
5417
EEOH-MIS TRACKING REPORT
PROVIDE SUMMARY OF ALL EEOH-MIS MANAGED MATERIALS AT THE HMCP
N/A
5.4.2.4.5
ENVIRONMENTAL EFFECTS SERVICES
REPORT GGENERATED BY EEOH-MMIS
MONHTLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH CALENDAR DAY OF EACH MONTH
COR - ENVIRONMENTAL DIVISION
79
5423
QUARTERLY TONNAGE REPORTS
PROVIDE QUARTERLY TONNAGE REPORTS FOR WASTE BEING DEPOSITED INTO PERMITTED LANDFILLS
N/A
5.4.11.5
ENVIRONMENTAL EFFECTS SERVICES
STATE FORM FOR TONNAGE REPORTING FORM
QUARTERLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH CALENDAR DAY OF APRIL, AUGUST, OCTOBER, AND JANUARY
COR - ENVIRONMENTAL DIVISION
80
5424
MONTHLY WASTE INSPECTIONS REPORTS
PROVIDE MONTHLY WASTE INSPECTIONS REPORTS FOR LOADS ENTERING GIBSON ROAD LANDFILL
N/A
5.4.11.6
ENVIRONMENTAL EFFECTS SERVICES
FORM FOR WASTE INSPECTION
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH CALENDAR DAY OF EACH MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

81
5425
REMAINING CAPACITY REPORT
PROVIDE ANNUAL REMAINING CAPACITY REPORT FOR GIBSON ROAD LANDFILL
N/A
5.4.11.7
ENVIRONMENTAL EFFECTS SERVICES
STATE FORM FOR REMAINING CAPACITY
ANNUALLY
CONTRACT EFFECTIVE DATE
15 JULY
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

82
5426
FUEL DELIVERY REPORT
PROVIDE A REPORT OF THE QUANTITY, COMPONENT, AND LOCATION DIESEL FUEL DELIVERED, PER OCCURANCE.
N/A
5.4.12
GROUNDS AND SURFACES AREAS
INFORMAL MEMORANDUM/ELECTRONIC

SUBMISSION

PER OCCURANCE
CONTRACT EFFECTIVE DATE
FIRST WORKDAY OF FOLLOWING MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

83
5427
ASBESTSO MANIFEST REPORTS
PROVIDE A COPY OF EACH ASBESTOS MANIFEST REPORT
N/A
5.4.3.8
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
PER OCCURANCE
CONTRACT EFFECETIVE DATE
DATE OF EACH SHIPMENT
COR - ENVIRONMENTAL DIVISION

DPW UTILITY SALES AGENT – 1 COPY

84
5428
OPACITY READING REPORT
DOCUMENT READINGS PER PART 70 OPERATING PERMIT-TITLE V
EPA METHOD 9 VISIBLE E OBSERVATION FORM
5.4.7.2.1
PLANT OPERATIONS SERVICES
IAW REFERENCES
WEELKY OBSERVATIONS
CONTRACT EFFECETIVE DATE
SUBMITTED BY 10TH OF EACH MONTH
COR - ENVIRONMENTAL DIVISION
85
5429
VEHICLE PAINT AND SPRAY BOOTH OPERATION
RECORD OF ALL FILTER CHANGES
N/A
5.4.7.4.1
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
ANNUALLY
CONTRACST EFFECTIVE DATE
ANNUALLY
COR - ENVIRONMENTAL DIVISION
86
5430
MSDS FOR ALL PAINT/ MATERIALS USED
COPIES OF ALL ASSOCIATED LOGS
N/A
5.4.7.4.3
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
PER OCCURANCE
CONTRACST EFFECTIVE DATE
SUBMITTED BY 10TH OF EACH MONTH
COR - ENVIRONMENTAL DIVISION
87
5431
OZONE DEPLETING CHEMICALS
LEAK RATE RECORD, TYPE OF SERVICE AND AMOUTN OF REFRIGERANT ADDED
5.4.7.5.2 & 5.4.7.5.4
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
PER OCCURANCE
CONTRACT EFFECTIVE DATE
SUBMITTED BY 10TH OF EACH MONTH
COR - ENVIRONMENTAL DIVISION
88
5432
SURFACE MINE CAPACITY REPORT
ESTIAMTOISN OF SOILRE MOAVAL AT SURFACE MINES
N/A
5.4.11.8
ENVIRONMENTAL EFFECTS SERVICES
IAW REFERENCES
ANNUALLY
CONTRACT EFFECTIVE DATE
26 FEBRUARY EACH YEAR
COR - ENVIRONMENTAL DIVISION
89
5501
RECERTIFICATION OF APPLICATORS
TO ENSURE THAT APPLICATORS CERTIFICATIONS ARE VALID
N/A
5.5.2.2
PEST CONTROL SERVICES
IAW REFERENCES
ANNUALLY, OR UPON EXPIRATION OF CURRENT CERTIFICATION
CONTRACT EFFECTIVE DATE
1 OCTOBER
COR - ENVIRONMENTAL DIVISION
90
5502
PEST MANAGEMENT PLAN
TO PROVIDE A DETAILED SCHEDULE OF THE TYPE AND AREAS OF PEST MANAGEMENT WORK TO BE PERFORMED, AND AN ESTIMATED TIME TO COMPLETE THE WORK IN EACH AREA.
N/A
5.5.3
PEST CONTROL SERVICES
IAW REFERENCES
ANNUALLY
SUBMIT AS PART OF PROPOSAL
PLAN SUBMITTED WITH PROPOSAL; ANNUAL UPDATES NLT 30 OCTOBER
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

91
5503
PEST CONTROL CHEMICAL LISTING
TO IDENTIFY THE CHEMICALS TO BE STOCKED AND USED ON THE INSTALLATION FOR PEST CONTROL SERVICES
N/A
5.5.5.2
PEST CONTROL SERVICES
IAW REFERENCES
ANNUALLY
CONTRACT EFFECTIVE DATE
NLT 30 CALENDAR DAYS PRIOR TO THE END OF THE PHASE-IN PERIOD; UPDATES NLT 30 OCTOBER
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

92
5504
PESTICIDE INVENTORY
TO PROVIDE AN ACCURATE ACCOUNT OF ALL PESTICIDES ON THE INSTALLATION
N/A
5.5.5.4
PEST CONTROL SERVICES
IAW REFERENCES
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH CALENDAR DAY OF EACH MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

93
5505
REPORT OF PEST PROBLEMS NOT CITED IN CONTRACT
TO ADVISE THE COR OF EVIDENCE OF PEST PROBLEMS NOT COVERED IN THE CONTRACT OR CONDITIONS CONDUCIVE TO PEST INFESTATION
N/A
5.5.8.1
PEST CONTROL SERVICES
FORMAT APPROVED BY THE GOVERNMENT
AS REQUIRED
CONTRACT EFFECTIVE DATE
NLT 3 CALENDAR DAYS AFTER DISCOVERY
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

94
5506
PEST CONTROL STANDARD OPERATING PROCEDURES (SOP)
TO PROVIDE SPECIAL INSTRUCTIONS TO EMPLOYEES IN SELECTED FACILITES PRIOR TO THE APPLICATION OF PEST CONTROL TREATMENTS.
N/A
5.5.8.2
PEST CONTROL SERVICES
IAW REFERENCES;

SUBMIT TO CONTRACTING OFFICER FOR REVIEW AND APPROVAL AT LEAST 15 DAYS PRIOR TO PHASE-IN

AS REQUIRED
CONTRACT EFFECTIVE DATE
NLT 5 CALENDAR DAYS PRIOR TO INITIAL PEST CONTROL TREATMENT APPLICATIONS
COR - ENVIRONMENTAL DIVISION
95
5507
TERMITE AND WOOD DECAY INSPECTION
TO INDICATE THE CONDITION OF VARIOUS FACILITIES THAT HAVE BEEN INSPECTED AND TO DETERMINE THE PRIORITY OF TREATMENT AND /OR FACILITY REPAIR.
N/A
5.5.9.6
PEST CONTROL SERVICES
2710-500 FGSP, TERMITE AND WOOD DECAY INSPECTION RUN SHEET
ANNUALLY
CONTRACT EFFECTIVE DATE
AS REQUIRED
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

96
5508
PEST CONTROL OUTSIDE PESTICIDE APPLICATION REPORT
TO PROVIDE A SCHEDULE OF ALL OUTDOOR PESTICIDE APPLICATIONS IN ARMY FAMILY HOUSING.
N/A
5.5.9.12.1
PEST CONTROL SERVICES
IAW REFERENCES
AS REQUIRED
CONTRACT EFFECTIVE DATE
FOUR WEEKS PRIOR TO SCHEDULED TREATMENTS
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

97
5509
TREE INSPECTION REPORT
DOCUMENTS THE MONTHLY TREE INSPECTIONS FOR DEAD, DAMAGED, AND DISEASED TREES
N/A
5.5.9.15
PEST CONTROL SERVICES
IAW FORMAT PROVIDED IN THE ASSOCIATION OF VIRGINIA ARBORISTS GUIDE OR AS SPECIFIED BY THE COR
MONTHLY
END OF THE PREVIOUS MONTH
NLT THE FIFTH WORKING DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

98
5510
TREE WORK SCHEDULE
SUBMITS THE SCHEDULE FOR TREE WORK PLANNED FOR THE NEXT MONTH FOR APPROVAL BY THE DPW ENVIRONMENTAL AND NATURAL RESOURCE DIVISION
N/A
5.5.9.15
PEST CONTROL SERVICES
FORMAT APPROVED BY THE GOVERNMENT
MONTHLY
BEGINNING OF UPCOMING MONTH
NLT THE 15TH CALENDAR DAY OF THE MONTH FOR THE UPCOMING MONTH
COR - ENVIRONMENTAL DIVISION
99
5511
PEST MANAGEMENT REPORT (MONTHLY)
PROVIDES A WRITTEN RECORD OF PEST APPLICATIONS PERFORMED
N/A
5.5.10
PEST CONTROL SERVICES
DD FORM 1532, PEST MANAGEMENT REPORT
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 10TH WORKING DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
COR - ENVIRONMENTAL DIVISION
100
5600
ANNUAL PM SCHEDULE
SCHEDULE OF ALL FACLIITRES TO RECEIVE PM, PER c.5.6.1.2
N/A
5.6.1.2
FACILITIES MAINTENANCE AND REPAIR
INFORMAL MEMORANDUMELECTRONIC SUBMISSION
ANNUALLY
CONTRACT EFFECTIVE DATE
30 DAYS PRIOR TO STRT OF EACH FISCAL YEAR
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

101
5601
ONYX FRONT END TROUBLES REPORT
IDNETIFY ALL IMPAIRMENTS TO LIFE ASFETY SYSTEMS TO INLCUDE ALL AUTOMATIC FIRE ALARM /MASS NOTIFICATIONS SYSTTEMS, WATER BASED AND CHEMICAL FIRE SUPPRESION (HOOD& SPRINKLER) AND CLEAN AGENT SYSTEMS.
N/A
5.6.1.5.8.4
FACILITIES MAINTENANCE AND REPAIR
INFORMAL MEMORANDUMELECTRONIC SUBMISSION
WEELKY
CONTRACT EFFECTIVE DATE
0800HRS EVERY TUESDAY
COR - O&M DIVISION
102
5602
NOTIFICATION OF EMERGENCIES/UNSCHEDULED INTERRUPTIONS OF UTILITY SERVICES
TO PROVIDE INFORMATION ON THE PROBLEM (TIME, DURATION, LOCATION, TYPE OF INCIDENT, CAUSE OF THE PROBLEM, AREAS/EQUIPMENT EFFECTED, CORRECTIVE ACTION TAKEN, TIME SERVICE WAS RESTORED).
N/A
5.6.1.1.3
FACILITIES MAINTENANCE AND REPAIR
ELECTRONIC SUBMISSION
EACH INTERRUPTION OF SERVICE OR EMERGENCY INCIDENT
CONTRACT EFFECTIVE DATE
NLT 1 WORKING DAY FOLLOWING THE INITIAL INCIDENT
COR - O&M DIVISION
103
5603
COMMUNICATION MANHOLES INSPECTION
PROVIDE A LISTING OF THE MANHOLES INSPECTED, TO INCLUDE MANHOLE LOCATION, DATE OF INSPECTION, AND CONDITION OF MANHOLE.
N/A
5.6.1.5
FACILITIES MAINTENANCE AND REPAIR
INFORMAL MEMORANDUM/SPREADSHEET FORMAT
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH WORKING DAY OF THE MONTH
COR - O&M DIVISION
104
5604
CENTRAL WASH FACILITY TRAINING ROSTER
PROVIDES A ROSTER OF ATTENDEES FOR NEW USER AND UPDATE TRAINING FOR APPOINTED PERSONNEL OF THE USING UNITS AND ACTIVITIES
N/A
5.6.6
FACILITIES MAINTENANCE AND REPAIR
FORMAT APPROVED BY THE GOVERNMENT
MONTHLY
LAST DAY OF THE MONTH
NLT THE 5TH WORKING DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
COR - O&M DIVISION
105
5605
KEY CONTROL CUSTODIAN AND UNIT ARMORER ROSTER
PROVIDES A LIST OF ALL CURRENT KEY CONTROL CUSTODIANS AND UNIT ARMORERS PLUS A COPY OF NEWLY RECEIVED APPOINTMENT ORDERS
N/A
5.6.1.3.2
FACILITIES MAINTENANCE AND REPAIR
FORMAT APPROVED BY THE GOVERNMENT
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 5TH WORKING DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
COR - O&M DIVISION
106
5606
CERTIFICATION COMPLETION REPORT
PROVIDES REPORT OF PM TASK COMPLETIONS FOR EQUIPMENT REQUIRING CERTIFICATION TESTING
N/A
5.6.1.2.5.4
ENGINEER WORK ORDER RECEPTION AND TRACKING SERVICES
FORMAT APPROVED BY THE GOVERNMENT
WEEKLY
FRIDAY OF THE PREVIOUS WEEK
NLT 10:00 AM THE FIRST WORKING DAY OF THE WEEK
COR - O&M DIVISION
107
5607
FIRE ALARM TECHNICIAN QUALIFICATIONS
TO PROVIDE A LISTING OF CURRENT CERTIFICATIONS AND TRAINING FOR PERSONNEL TASKED WITH INSTALLATION, MAINTENANCE, TESTING, AND REPAIR OF FIRE DETECTION, SUPPRESSION, AND ALARM SYSTEMS AND EQUIPMENT.
N/A
5.6.1.5.8
FACILITIES MAINTENANCE AND REPAIR
FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY
CONTRACT EFFECTIVE DATE
INITIAL SUBMISSION NLT THE 1ST WORKING DAY OF THE CONTRACT PHASE-IN PERIOD; ANNUAL UPDATES NLT THE 5TH WORKING DAY OF JANUARY
COR - BOID
108
5608
FACILITIES M&R SERVICES PERFORMANCE METRICS
PROVIDES WEEKLY FACILITIES M&R SERVICES PERFORMANCE METRICS FOR DMOs AND PMOs TO THE COR
N/A
5.6.8
FACILITIES MAINTENANCE AND REPAIR
IN ACCORDANCE WITH TEMPLATE PROVIDED IN ATTACHMENT J- 5.6 19 FACILITIES M&R SERVICES PERFORMANCE METRICS TEMPLATES
WEEKLY
CONTRACT EFFECTIVE DATE
NLT CLOSE OF BUSINESS FRIDAY
COR - O&M DIVISION
109
5610
PUBLIC WORKS LOOK AHEAD REPORT
PROVIDES REPORT OF PLANNED PUBLIC WORKS RELATED WORK FOR THE FOLLOWING WEEK
N/A
5.6.9
FACILITIES MAINTENANCE AND REPAIR
IN ACCORDANCE WITH TEMPLATE PROVIDED IN ATTACHMENT J- 5.6 21 PUBLIC WORKS LOOK AHEAD REPORT TEMPLATE
WEEKLY
CONTRACT EFFECTIVE DATE
NLT CLOSE OF BUSINESS FRIDAY FOR FOLLOWING WEEK
COR - O&M DIVISION
110
5611
ROADS & GROUNDS LOOK AHEAD REPORT
PROVIDES REPORT OF PLANNED ROADS & GROUNDS RELATED WORK FOR THE FOLLOWING WEEK
N/A
5.6.9
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

IN ACCORDANCE WITH TEMPLATE PROVIDED IN ATTACHMENT J- 5.6 22 ROADS & GROUNDS LOOK AHEAD REPORT TEMPLATE
WEEKLY
CONTRACT EFFECTIVE DATE
NLT CLOSE OF BUSINESS FRIDAY FOR FOLLOWING WEEK
COR - O&M DIVISION
111
5612
PEST CONTROL SERVICES LOOK AHEAD REPORT
PROVIDES REPORT OF PLANNED PEST CONTROL SERVICES WORK FOR THE FOLLOWING WEEK
N/A
5.6.9
ENVIRONMENTAL EFFECTS SERVICES
IN ACCORDANCE WITH TEMPLATE PROVIDED IN ATTACHMENT J- 5.6 23 PEST CONTROL SERVICES LOOK AHEAD REPORT TEMPLATE
WEEKLY
CONTRACT EFFECTIVE DATE
NLT CLOSE OF BUSINESS FRIDAY FOR FOLLOWING WEEK
COR - O&M DIVISION
112
5613
PROVIDE FUEL DELIVER INFORMATION
TO ENSURE THE FUEL ORDERED IS THE FUEL RECEIVED.
N/A
5.6.1.12
FACILITIES MAINTENANCE AND REPAIR
E-MAIL
AS REQUIRED
WITH EACH FUEL DELIVERY
WITHIN ONE WORKDAY AFTER OCCURRENCE
COR - O&M DIVISION
113
5614
PROVIDE HOOD CLEANING CONDITION
ESTABLISH BEFORE AND AFTER CONDITIONS
N/A
5.6.1.1.5.2
FACILITIES MAINTENANCE AND REPAIR
E-MAIL
PER SCHEDULE
WITH EACH CLEANING
WITHIN 7 DAYS OF CLEANING
COR - O&M DIVISION
114
5615
HOOD CLEANING SCHEDULE
COORDINATION OF WORK WITH CUSTOMERS
N/A
5.6.1.1.5.3.1
FACILITIES MAINTENANCE AND REPAIR
E-MAIL
PER SCHEDULE
WITH EACH CLEANING
AT LEAST 14 DAYS PRIOR TO CLEANING
COR - O&M DIVISION
115
5701
LIME AND FERTILIZER APPLICATION SCHEDULE
PROVIDE THE SCHEDULE FOR LIME AND FERTILIZER TREATMENT
N/A
5.7.6.10
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

INFORMAL MEMORANDUM
ANNUALLY
CONTRACT EFFECTIVE DATE
1 JANUARY
COR - O&M DIVISION
116
5702
LAWN TREATMENT SERVICES SCHEDULE
TO PROVIDE A YEARLY SCHEDULE FOR LAWN TREATMENT SERVICES.
N/A
5.7.5.1.8.6
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

INFORMAL MEMORANDUM
ANNUALLY
CONTRACT EFFECTIVE DATE
31 OCTOBER
COR - BOID

COR - O&M DIVISION

117
5703
DAILY PROGRESS REPORT
PROVIDES A LIST OF THE AREAS CUT ON THE PREVIOUS DAY THAT ARE READY FOR INSPECTION
N/A
5.7.2.10
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

E-MAIL
DAILY, MONDAY THROUGH FRIDAY
CONTRACT EFFECTIVE DATE
NLT 8:00 AM THE WORKING DAY FOLLOWING THE DAY THE AREA WAS CUT
COR - BOID

COR - O&M DIVISION

5704
REQUEST TO PERFORM WORK DURING NON-OPERATING HOURS
TO OBTAIN APPROVAL TO PERFORM WORK DURING NON-OPERATING HOURS; MUST INCLUDE TYPE OF WORK, AREAS WHERE WORK IS TO BE PERFORMED, AND HOURS OF PERFORMANCE
N/A
5.7.3.2
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
AS REQUIRED
CONTRACT EFFECTIVE DATE
MINIMUM OF TWO WORKING DAYS
COR - BOID
119
5801
INSTALLATION STREET AND PARKING LOT STRIPING PLAN
TO PROVIDE AN ANNUAL STREET AND PARKING LOT STRIPING PLAN
N/A
5.8.1.9.1 & 5.8.1.9.2
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

INFORMAL MEMORANDUM/ELECTRONIC SUBMISSION
ANNUALLY
CONTRACT EFFECTIVE DATE
30 OCTOBER
COR - O&M DIVISION
120
5802
REPORT OF QUARTERLY INSPECTION OF GRAVEL AND EARTH-SURFACED ROADS
TO REPORT IDENTIFIED INSPECTION DEFICIENCIES AND RECOMMEND CORRECTIVE ACTIONS
N/A
5.8.1.7.7
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
QUARTERLY
END OF THE PREVIOUS QTR
NLT THE 5TH WORKING DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD
COR - BOID

COR - O&M DIVISION

121
5803
MAINTENANCE OF TRAFFIC (MOT) PLAN
PROVIDES CONTRACTOR PLAN FOR MAINTENANCE OF TRAFFIC DURING UTILITY CUTS AND PAVEMENT REPAIRS FOR GOVERNMENT REVIEW AND APPROVAL
N/A
5.8.1.7.5 &

5.8.1.7.6

IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
AS REQUIRED
AS REQUIRED
MINIMUM OF 14 DAYS PRIOR TO SCHEDULED WORK
COR - BOID

COR - O&M DIVISION

122
5804
DAM INSPECTION REPORT
PROVIDES THE FINDINGS OF THE ANNUAL DAM INSPECTIONS
N/A
5.8.2.3.1
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY
CONTRACT EFFECTIVE DATE
NLT 5 WORKING DAYS FOLLOWING COMPLETION OF THE INSPECTION
COR - O&M DIVISION
123
5805
INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN (INRMP) INPUT
PROVIDES RECOMMENDATIONS FOR UPDATE AND OTHER IMPROVEMENETS IN THE LAND MANAGEMENT AREA
N/A
5.8.2.5
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

ANNOTATED COPY OF THE EXISTING INRMP
AS REQUIRED
DATE OF REQUEST
WITHIN TWO WEEKS OF GOVERNMENT REQUEST
COR - BOID

COR - O&M DIVISION

124
5806
CONDITION INSPECTION REPORT
PROVIDES A REPORT OF THE PAVEMENT NETWORK CONDITION INSPECTION FINDINGS
N/A
5.8.1.2
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
AS REQUIRED BY AR 420-1
CONTRACT EFFECTIVE DATE
NLT 10 WORKING DAYS FOLLOWING COMPLETION OF THE INSPECTION
COR - ENVIRONMENTAL DIVISION
125
5807
BRIDGE INSPECTION REPORT
PROVIDES A REPORT OF BRIDGE INSPECTION FINDINGS
N/A
5.8.1.8.1
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

FORMAT APPROVED BY THE GOVERNMENT
ANNUALLY OR AS DIRECTED BY THE CONTRACTING OFFICER
CONTRACT EFFECTIVE DATE
NLT 5 WORKING DAYS FOLLOWING COMPLETION OF THE INSPECTION
COR - O&M DIVISION
126
5808
BORROW PIT OPERATIONS
PROVIDE A REPORT OF BORROW PIT OPERATIONS TO INCLUDE DATES OF OPERATION, CUBIC YDS OF MATERIAL REMOVED.
N/A
5.8.2.4.5
IMPROVED GROUNDS, SURFACED/

UNSURFACED AREAS AND BRIDGES

INFORMAL MEMORANDUM/ELECTRONIC SUBMISSION
WEEKLY
CONTRACT EFFECTIVE DATE
THURSDAY OF EACH WEEK
COR - BOID

COR - O&M DIVISION

127
5901
BOILER WATER ANALYSIS REPORT
FOR RECORDING ANALYSIS OF WATER SAMPLES TAKEN FROM BOILERS BETWEEN THE 3RD AND 10TH OF EACH MONTH
N/A
5.9.1.3.4.14 AND BUREAU OF MINES SPEC LISTED IN J- 5.9 06
PLANT OPERATIONS SERVICES
FORM 6-205A REV APR 79 IAW REFERENCES
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 15TH CALENDAR DAY OF THE MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

128
5902
FACILITY ENGINEER OPERATING LOGS (BOILER PLANT)
PROVIDES FOR DAILY ENTRIES OF DATA TO ASSIST SUPERVISORY PERSONNEL AND TRADOC PERSONNEL IN REVIEWING BOILER PLANT PERFORMANCE AND OPERATION
N/A
5.9.1.3.4.15 AND BUREAU OF MINES SPEC LISTED IN J- 5.9 06
PLANT OPERATIONS SERVICES
DA FORM 3967 IAW REFERENCES OR CONTRACTOR EQUIVALENT FORM
MONTHLY
LAST DAY OF EACH MONTH
NLT THE 5TH WORKING DAY OF THE MONTH
COR - O&M DIVISION
129
5903
MONTHLY STANDBY GENERATOR EXERCISE, BLDG 310
PROVIDE BEGINNING /ENDING DIESEL HOUR READINGS AND MONTHLY DIESEL FUEL USAGE WHEN THE 2100KW STANDBY GENERATOR UNDERGOES MONTHLY TEST RUNS UNDER LOAD, AS REQUIRED BY JACHO (BACKUP FOR THE EAMC 800KW GENERATOR
N/A
5.9.1.5.4
PLANT OPERATIONS SERVICES
FORM FGSP-190
MONTHLY
CONTRACT EFFECTIVE DATE
NLT THE 1ST WEDNESDAY OF THE MONTH
COR - ENVIRONMENTAL DIVISION

COR - O&M DIVISION

130
5904
MICRO-BIO LAB RESULTS
PROVIDES FOR RECORDING BACTERIOLOGICAL TEST DATA FOR REPORTING TO THE STATE OF GEORGIA AS REQUIRED BY EPD PERMIT TO OPERATE THE REMOTELY LOCATED WELLS
N/A
5.9.3.2 AND STATE OF GEORGIA REG, CHAPTER 391-3-5
PLANT OPERATIONS SERVICES
LABSUM – 12/93