Technical_Exhibit_7.5.7.10_Line_Clearing_Specifications.docx

DOCX document 67 KB Posted

Attached to
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION Federal contract opportunity
Solicitation number
W91249-18-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Gordon

About this file

Attachment 6 - TE 7.5.7.10 - Line Clearing Specifications

View the file

Other files for this federal contract opportunity

Other files attached to FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION, newest first.
File Type Posted
W91249-18-R-0001-0004.docx DOCX document
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001_0002__and_0003.pdf PDF
Technical_Exhibit_7.5.9.8.1__Dumpster_Locations_List.docx DOCX document
Attachment_13_-_Specific_Relevant_Contract_Reference_Sheet.docx DOCX document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.6.19_Roads_&_Grounds_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.5.7.3_High_Visibilty_Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.9.3b__Plant_No._1_Operation_CEP_CHW_and_HTW_Controls.doc DOC document
Technical_Exhibit_7.5.4.4_Potable_Water_Wells.docx DOCX document
Technical_Exhibit_7.5.8.3_Bailey_Bridge_Maintenance_and_Inspection_Instructions.rtf RTF text file
Technical_Exhibit_7.5.8.2_Quarterly_Sweeping_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.14_Communication_Shelters.docx DOCX document
Attachment_7_-_Collective_Bargaining_Agreement_&_WD.pdf PDF
Technical_Exhibit_7.5.9.5_Central_Energy_Plant_No._2_Building_310_Buildings_Served.docx DOCX document
Technical_Exhibit_7.4.6__Financial_&_Plant_Management_Roles_and_Courses.docx DOCX document
Technical_Exhibit_7.5.6.8_Communication_Manholes.docx DOCX document
Technical_Exhibit_7.5.5.2_Sample_Pest_Management_Plan.docx DOCX document
Attachment_1_-_Performance_Work_Statement.docx DOCX document
Technical_Exhibit_7.5.7.4_Normal_Visibilty_Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.2__Task_Codes.docx DOCX document
Technical_Exhibit_7.5.3__Fort_Gordon_Turn_Over_Memos.docx DOCX document
Technical_Exhibit_7.5.6.9__Exterior_Lighting_(Fixtures).docx DOCX document
Technical_Exhibit_7.3.5_Estimated_U-Do-It_Workload.docx DOCX document
Technical_Exhibit_7.5.6.6_Range_Hood_Cleaning_Services.docx DOCX document
Technical_Exhibit_7.5.7.5_Range_Mowing_Map.docx DOCX document
Technical_Exhibit_7.5.9.2__Central_Energy_Plant_No._1_Building_25910_Buildings_Served.docx DOCX document
Technical_Exhibit_7.5.7.7_Flower_Beds.doc DOC document
Attachment_11_-_Sample_Past_Performance_Cover_Letter.docx DOCX document
Technical_Exhibit_7.5.4.3_Underground_Storage_Tanks.docx DOCX document
Technical_Exhibit_7.4.5__Government_Furnished_Vehicles.docx DOCX document
Technical_Exhibit_7.4.3__Fort_Gordon_Facility_Listing_(Excluding_Privatized_Facilities).docx DOCX document
Technical_Exhibit_7.5.8.5_Lakes_and_Ponds.docx DOCX document
Technical_Exhibit_7.5.6.2_Electrical_Lines_of_Demarcation.doc DOC document
Attachment_8_-_Service_Contract_Act_(SCA)_Wage_Determation_2015-4465_Rev5.pdf PDF
Technical_Exhibit_7.5.9.8_Dumpster_Container_Cleaning_List.docx DOCX document
Technical_Exhibit_7.5.6.3__Natural_Gas_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.3a__Plant_No._1_Operation_CEP_CHW_and_High_Temperature_Water_(HTW).doc DOC document
Technical_Exhibit_7.4.7_Energy_Conservation_Measures.docx DOCX document
W91249-18-R-0001.pdf PDF
Technical_Exhibit_7.4.1__Contractor_Personnel_Minimum_Qualifications.docx DOCX document
Technical_Exhibit_7.5.7.6_Semi-Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.20_Pest_Control_Services_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.7.2_Grounds_Sections.doc DOC document
Technical_Exhibit_7.4.4__Training_and_Medical_Testing.docx DOCX document
Technical_Exhibit_7.5.9.4__Central_Energy_Plant_No._2_Bldg_310_Installed_Equipment.doc DOC document
Attachment_15_-_Site_Visit_-_Access_Control_Information.pdf PDF
Attachment_2_-_Technical_Exhibit_1_-_7.1_Performance_Requirements_Summary.docx DOCX document
Technical_Exhibit_7.5.6.10__Installation_Irrigation_Systems.docx DOCX document
Technical_Exhibit_7.5.8.6._Dams.docx DOCX document
Show all 50

FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 7.5.7.10 Line Clearing Specifications

LINE CLEARING SPECIFICATIONS

THE CONTRACTOR SHALL PERFORM ALL LINE CLEARING OPERATIONS IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND SPECIFICATIONS:

1. The American National Standard C133 for Tree Workers and Line Clearing.

2. The National Arborist Association (NAA) Standards for Tree Pruning and Line Clearing.

4. The Electrical RightOfWay State and National Clearance Standards (See the following Plates 1 through 4).

5. The determining factors for each site include size and type of conductor, tree species (i.e. Dogwood, Holly, Redbud, Magnolia and Laurel are not to be cut), and location (Improved/Unimproved). Mature, healthy trees that are located within 5 feet of the limits of clearing are not to be cut without prior written approval from the COR.

6. All stumps are to be cut as low as possible (not to exceed 4 inches in height) and are to be treated with a registered and approved herbicide.

LINE CLEARING

0 TO 750 v & 13.2 Neutral 4,160 750V to 8700 V See Note #1

13.2 Phase

24/40

KV

34,500

KV

“A”

TOP OF TREE

2’ –10”

5’-0”

8’-0”

15’-0” “B”

OVERHANGING LIMB

5’-0”

10’-0”

AVOID

AVOID

SAG OF LINE PLUS

“C”

MAIN TRUNK

2’-0”

2’-0”

6’-0”

AVOID

“D”

MAIN LIMB

4’-0”

4’0”

7’-0”

AVOID

“E”

BRANCHES

5’-0”

5’-0”

8’-0”

12’-0” Note 1. Includes System Communications. Twigs or leaves shall not be allowed to touch System Communications bare wires

PLATE 1

LINE CLEARING SPECIFICATIONS

PLATE 2

PLATE 3

PLATE 4

oleObject2.bin image4.png image1.png image2.png image3.wmf

File details come from the government source that posted it.