Attachment_15_-_Site_Visit_-_Access_Control_Information.pdf

PDF 184 KB Posted

Attached to
FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION Federal contract opportunity
Solicitation number
W91249-18-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Gordon

About this file

Attachment 15 - Site Visit - Access Control Information

View the file

Other files for this federal contract opportunity

Other files attached to FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION, newest first.
File Type Posted
W91249-18-R-0001-0004.docx DOCX document
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001_0002__and_0003.pdf PDF
Technical_Exhibit_7.5.9.8.1__Dumpster_Locations_List.docx DOCX document
W91249-18-R-0001-0003.pdf PDF
Attachment_16_-_Revised_Questions_&_Responses_to_Solicitation_&_Amendment_0001.pdf PDF
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet_(Revision_1).xlsx XLSX spreadsheet
Attachment_16_-_Questions_&_Responses_to_Solicitation_&_Amendment_0001.pdf PDF
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Amendment_W91249-18-R-0001-0001.pdf PDF
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet.xlsx XLSX spreadsheet
Technical_Exhibit_7.5.6.6_Range_Hood_Cleaning_Services.docx DOCX document
Technical_Exhibit_7.5.7.5_Range_Mowing_Map.docx DOCX document
Technical_Exhibit_7.5.9.2__Central_Energy_Plant_No._1_Building_25910_Buildings_Served.docx DOCX document
Technical_Exhibit_7.5.7.7_Flower_Beds.doc DOC document
Attachment_11_-_Sample_Past_Performance_Cover_Letter.docx DOCX document
Technical_Exhibit_7.5.4.3_Underground_Storage_Tanks.docx DOCX document
Technical_Exhibit_7.4.5__Government_Furnished_Vehicles.docx DOCX document
Technical_Exhibit_7.4.3__Fort_Gordon_Facility_Listing_(Excluding_Privatized_Facilities).docx DOCX document
Technical_Exhibit_7.5.8.5_Lakes_and_Ponds.docx DOCX document
Technical_Exhibit_7.5.6.2_Electrical_Lines_of_Demarcation.doc DOC document
Attachment_8_-_Service_Contract_Act_(SCA)_Wage_Determation_2015-4465_Rev5.pdf PDF
Technical_Exhibit_7.5.9.8_Dumpster_Container_Cleaning_List.docx DOCX document
Technical_Exhibit_7.5.6.3__Natural_Gas_Lines_of_Demarcation.doc DOC document
Technical_Exhibit_7.5.9.3a__Plant_No._1_Operation_CEP_CHW_and_High_Temperature_Water_(HTW).doc DOC document
Technical_Exhibit_7.4.7_Energy_Conservation_Measures.docx DOCX document
W91249-18-R-0001.pdf PDF
Technical_Exhibit_7.4.1__Contractor_Personnel_Minimum_Qualifications.docx DOCX document
Technical_Exhibit_7.5.7.6_Semi-Improved_Grounds_Maintenance_Areas_Frequency_Schedule.docx DOCX document
Technical_Exhibit_7.5.6.20_Pest_Control_Services_Look_Ahead_Report_Template.doc DOC document
Technical_Exhibit_7.3.3__PWO_Workload.docx DOCX document
Technical_Exhibit_7.5.9.1__Central_Energy_Plant_No__1_Bldg_25910_Installed_Equipment.docx DOCX document
Technical_Exhibit_7.3.1__DMO_Workload.docx DOCX document
Technical_Exhibit_7.5.7.8_Fort_Gordon_Cemeteries.doc DOC document
Technical_Exhibit_7.5.9.7_Fuel_Oil_Tanks_At_Dual_Fired_Facilities.doc DOC document
Technical_Exhibit_7.5.6.12_Emergency_Generators.docx DOCX document
Technical_Exhibit_7.3.4__RPMA_Supply_Operations_Estimated_Workload.docx DOCX document
Technical_Exhibit_7.5.6.7_Lifts_and_Cranes_Inventory.docx DOCX document
Technical_Exhibit_7.3.2__OWO_Workload.docx DOCX document
Technical_Exhibit_7.3.7_Estimated_Furniture_Management_Workload.docx DOCX document
Technical_Exhibit_7.5.4.2_Water_Monitoring_Wells_Requiring_Sampling_and_Analysis.docx DOCX document
Technical_Exhibit_7.5.7.1_Ft._Gordon_Grounds_Mowing_Map.docx DOCX document
Attachments_4_-_6_-_DRAFT_Technical_Exhibits_7.3_7.4_7.5.docx DOCX document
Technical_Exhibit_7.5.6.18_Public_Works_Look_Ahead_Report_Template.doc DOC document
Attachment_10_-_Pricing_and_Labor_Matrix_Worksheet.xlsx XLSX spreadsheet
Technical_Exhibit_7.5.7.9_Pruning_Standards.docx DOCX document
Technical_Exhibit_7.5.8.1_Recreation_and_Athletic_Fields.docx DOCX document
Technical_Exhibit_7.5.8.4_Special_Events_Taskings.doc DOC document
Technical_Exhibit_7.5.5.1._Pest_Control_Amplifying_Information.docx DOCX document
Technical_Exhibit_7.4.2_Government_Furnsihed_Equipment.docx DOCX document
Technical_Exhibit_7.5.7.7.1_Estimated_IDIQ_Qunatities.docx DOCX document
Show all 50

FORT GORDON BASE OPERATIONS AND MAINTENANCE SUPPORT SERVICES REQUEST FOR PROPOSAL - SOLICITATION has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Mission and Installation Contracting Command

Directorate of Emergency Services - Physical Security

Access Control

30 Mar 18

Mission and Installation Contracting Command

Access Control

FORT GORDON PASS PROCEDURES

CONTRACTORS

Individual contractor must coordinate through Government Sponsor (john.l.ramey2.civ@mail.mil & Jacqueline.Westmoreland.civ@mail.mil), mailto:john.l.ramey2.civ@mail.mil mailto:Jacqueline.Westmoreland.civ@mail.mil

Mission and Installation Contracting Command

Access Control

FORT GORDON PASS PROCEDURES

Step 1

Have 2 Forms of Identification:

Valid Drivers License

Social Security Card Passport

Mission and Installation Contracting Command

Access Control

FORT GORDON PASS PROCEDURES

Step 2

Contractor will download Physical Security Consent Form 190-6, from http://gordon.army.mil/visitors/ fill out, provide 2 forms of ID and return to Government Sponsor.

(a) The contractor’s designated representative will upload completed consent form with 2 forms of ID online via Safe Access File Exchange (SAFE) to Government Sponsor.

(b)Upon Receipt of Physical Consent Form 190-6, contractor will be added to the access roster authorizing a pass within 24-72 hours.

Pick up pass before 2000 hours on 17 Apr 18 due to anticipated wait times on 18 Apr 18.

Slide Number 1
Access Control
Access Control
Access Control

File details come from the government source that posted it.