Attachment_I_D_-_PWS_-_PRS_6-02-17.pdf
PDF 16 KB Posted
- Attached to
- TCM N&S Federal contract opportunity
- Solicitation number
- W91249-17-R-0001
About this file
W91247-17-R-0001-0002 PWS Attachment ID- PRS
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 2
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential tasks. Contractor trends of less than acceptable performance may result in reductions in monthly payments to reflect the reduced value of the services performed.
The "PROPORTION CORRECTIVE ACTION" represents the percentage of the contractor’s total payment that may be deducted for unacceptable service. Service is unacceptable if timeliness or quality was at an unsatisfactory level; or if a less than satisfactory performance issue was previously identified and the contractor failed to prevent reoccurrence.
REQUIRED
SERVICES
STANDARD PERFORMANCE
THRESHOLD
SURVEILLENCE
METHOD
INCENTIVE/
DISINCENTIVE
Execute Capabilities Analysis for TCM N&S Capabilities
PARA 5.2
The Contractor shall provide Capability Development support with 100% completeness.;
Contractor shall meet this requirement 98% of the time.
The four methods are:
periodic, random sampling, 100% inspection or customer input.
To include evaluation by
COR, IAW
PWS.
(Some or all surveillance methods)
Contractor's performance will be documented in Contractor Performance Assessment Reporting System (CPARS)
Prepare, Review, Coordinate, and Integrate TCM N&S Capabilities into Joint Capabilities Integration and Development Systems (JCIDS) Documents PARA 5.3
The contractor shall provide engineering and information assurance analysis to create and/or coordinate validated capabilities of Baseline systems, technologies and programs into
JCIDS
documentation as directed by
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be documented in
CPARS
the TCM N&S Office with 100% completeness.
Provide Acquisition and Modernization Support PARA 5.4
The contractor shall support TCM N&S in the materiel developers’ system concept, cost performance trade-off, and cost as an independent variable analyses, by providing detailed warfighting capability impact of specific system characteristics.
The contractor shall support the
TCM N&S
Office with the development of presentations of
TRADOC
recommendation
(s) at all design reviews. All done with 100% completeness.
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be
Provide Direct Support to TCM N&S to Ensure Validation of Signal Soldier Training Issues During Testing and Fielding PARA 5.5
To provide the necessary analytical and/or engineering expertise to develop and/or coordinate validated capabilities of baseline
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be systems, technologies and programs into
JCIDS
documentation as directed by the TCM N&S office with 100% completeness.
Provide Telecommunication s Engineering, NETOPS and Information Assurance Analysis Support PARA 5.6
The contractor shall provide on-site dedicated support consisting of telecommunicati ons engineering, in-depth
NETOPS
analytical support, and information assurance analysis to accomplish the integration of emerging requirements in Telecommunicat ions, Network Operations and Cyber Security.
All with 100% completeness.
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be
Participate in Current and Future Working Group Meetings and Program Reviews
PARA 5.7.
The contractor shall participate in associated working/focus group meetings and in-progress reviews for the events and systems with
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be
100% completeness
Support DOTMLPF Capabilities Integration IAW with PARA 5.8.
The contractor shall continuously identify, assess, prioritize, synchronize, and communicate required capabilities across time, WFFs, DOTMLPF, resourcing, organizations, and operational themes. With 100% completeness.
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be documented in
CPARS
Develop Operational Mission Threads IAW the U.S. Army Software Blocking Policy IAW with para 5.14.
To provide telecommunicati ons engineering expertise to develop 100% of the operational mission threads for baseline systems, technologies and programs
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be
Provide Support to Network Integration Evaluation (NIE) Events IAW with para 5.15
Provide 100% support to execute
DOTMLPF
assessments of materiel solutions under consideration to fill capability gaps
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be
Provide Training Analysis and Interactive Multimedia Instructional Support IAW with para 5.13
Develop, deploy, maintain and replace (when and where necessary) 100% of the following:
analysis of existing cyber security measures;
Design and Development of an Interface / Prototype, based on modular concepts; and, Design and Development services for web-based Interactive Instructional Methods
Contractor shall meet this requirement 98% of the time.
Daily observation, weekly and monthly evaluation by
COR, IAW PWS
Contractor's performance will be documented in
CPARS
Fill any contract key vacancies in a timely manner with qualified staff.
To provide 100% fill of key personnel; PWS IAW para 1.16
Key vacancies must be filled within 15 business days.
COR monitor staffing via weekly and monthly reports.
CDR will be completed if not delivered
File details come from the government source that posted it. Updated .