Amendment_W91243-18-B-0001-0001.pdf

PDF 152 KB Posted

Attached to
Basewide HVAC Construction Federal contract opportunity
Solicitation number
W9124318B0001
Issued by
Department of the Army Nebraska Army National Guard

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Basewide HVAC Construction, newest first.
File Type Posted
W9124319C0001_HVAC_AWARD.pdf PDF
Amendment_0002.released.pdf PDF
Updated_Drawings_Basewide_HVAC_Amend_0001.pdf PDF
Updated_Specifications_Basewide_HVAC_Amend_0001.pdf PDF
Basewide_HVAC_Site_Visit_Pictures_FBO_Post.docx DOCX document
Basewide_HVAC_Pre-Bid_Site_Visit_Sign_in_Roster_12Sep18.pdf PDF
PreBidConferenceB0001.pdf PDF
z_Specifications_NEANG__Repair_HVAC_Basewide.pdf PDF
W9124318B0001.released.pdf PDF
z_Repair_HVAC_Basewide_Drawings_B3.pdf PDF
SPEC_Section_010000_-_NGCB_15-2603.pdf PDF
NGCB_15-2603_-_AF_Form_66.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NGCB 15-2603

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 is issued to make corrections to the plans and specifications for Solicitation W91243-18-B-0001, Basew ide HVAC Repair.

No extension is given to the date and time w hen bids are due. Offerors are required to acknow ledge this amendment in w riting on the 2nd page of the SF 1442. or submit w ith their bid. Failure to comply shall cause the bid to be rejected at the time of Bid Opening. Please see Summary of Changes for additional information on this amendment. ***** Nothing Follow s *****

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124318B0001

X 9B. DATED (SEE ITEM 11)

29-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Sep-2018

CODE

USPFO FOR NEBRASKA

2433 NW 24TH ST

LINCOLN NE 68524

W91243 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124318B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

MECHANICAL GENERAL NOTES

1. All references to duct pressure testing are to be removed from the project.

2. Where plans call for louvers to be removed, at contractor’s option and approval by the architect louvers may remain and be capped with insulated metal panel.

MECHANICAL SPECIFICATIONS

Item No. SM-1, 230719. – HVAC Piping Insulation

Replace paragraph 3.14.D.1 with the following:

1. Metal Jacket

Item No. SM-1, 233300. – Air- Cooled Scroll Water Chillers

Replace paragraph 2.6.A with the following:

Brand Name Manufacturer or Equal:

Item No. SM-2, 236423.13 – Air- Cooled Scroll Water Chillers

Replace paragraph 2.2.A with the following:

Brand Name Manufacturer or Equal:

ELECTRICAL GENERAL NOTES

1. Where electrical equipment is reused, the contractor shall verify the proper code required clearances are met, and shall relocate equipment as required to meet clearances.

Drawings The following drawings (Revisions) are included as part of Amendment 0001 and have been uploaded on to FedBizOpps:

06565006-5-M0-09_Rev 1 06565006-5-MO-10_Rev 1 06565006-5-M1-02_Rev1 06565006-5-M1-04_Rev 1 06565006-5-M1-05_Rev 1 06565006-5-M1-09_Rev 1 06565006-5-M1-10_Rev 1 06565006-7-E0-00_Rev 1 06565006-7-E1-06_Rev 1

W9124318B0001

Specifications The following Specification (Revisions) are included as part of Amendment 0001 and have been uploaded on to FedBizOpps:

TOC – Table of Contents

010000 – NGCB 15-2603

012500 – Sustitution Procedures 012600 – Contract Modification Procedures 013100 – Project Management and Coordination 013200 – Construction Progress Documentation 013300-1 – Submittal Procedures 013300-2 – Attachment – AF Form 66 – Schedule of material submittal 014000 – Quality Requirements 015000 – Temporary Facilities and Controls 016000 – Product Requirements 017300 – Execution 017419-1 – Construction Waste Management and Disposal 017419-2 – Attachment Forms CMW-1 thru CMW-8 017700 – Closeout Procedures 017823 – Operation and Maintenance Data 017839 – Project Record Documents 017900 – Demonstration and Training 018113 - Sustainable Design Requirements 019113 – General Commissioning Requirements

No additional information is available.

***** Nothing Follows *****

(End of Summary of Changes)

File details come from the government source that posted it.