Amendment_0002.released.pdf

PDF 160 KB Posted

Attached to
Basewide HVAC Construction Federal contract opportunity
Solicitation number
W9124318B0001
Issued by
Department of the Army Nebraska Army National Guard

About this file

Amendment 0002. This amendment contains the Questions and Answers.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NGCB 15-2603

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 is issued to provide answ ers to Contractors questions on Solicitation W91243-18-B-0001, Basew ide HVAC Repair. No extension is given to the date and time w hen bids are due. Offerors are required to acknow ledge this amendment is w riting on the 2nd page of the SF 1442 or submit w ith their bid. Failure to comply shall cause the bid to be rejected at the time of Bid Opening. Please see Page 2 of this amendment titled Basew ide HVAC-Q&A-21Sep18. ***** Nothing Follow s *****

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124318B0001

X 9B. DATED (SEE ITEM 11)

29-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Sep-2018

CODE

USPFO FOR NEBRASKA

2433 NW 24TH ST

LINCOLN NE 68524

W91243 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124318B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Basewide HVAC – W91243-18-B-0001 Questions and Answers Document Date: 25September2018

Q1. Building 605, Combustion air piping is in the way of removal and reinstallation of the AHU Can the boiler be off while work is being completed with AHU?

A1. The contractor shall temporarily reroute combustion air piping as necessary to prevent downtime of the boiler system.

Q2. Building 608, Does the new refrigerant piping need to be feed underground similar to the existing?

A2. In lieu of a pipe rack as specified on the documents. The existing piping and PVC conduit shall be removed.

New piping shall be routed through a trench in the sidewalk with removable cover for access.

Q3. Building 635, Note 3, do new controls at the existing VAV boxes include providing new control valves?

A3.Yes, the VAV boxes are to be piped per the updated reheat coil piping detail.

Q4. Building 636 Sheet M1-05 does not show any pipe or duct sizes, please provide?

A4.Drawing has been updated and issued for clarification.

Q5. Building 636, How is the existing refrigerant piping serving the BCU routed to the condensing unit?

A5.This has been updated on the drawings and has been reissued for clarity.

Q6. Building 649, is the intent to have the new refrigerant pipes run up exposed on the outside of the building into the soffit and then into the ceiling space?

A6.Yes

Q7. Building 651, There are currently trees all around the existing RTU, Do we need to include costs to remove the trees to make room for the new RTU?

A7.The trees shall be relocated south of the sidewalk as part of the contract.

Q8. Building 652, Note 3, do new controls at the existing VAV boxes include providing new control valves?

A8. Yes, the VAV boxes are to be piped per the updated reheat coil piping detail.

Q9. Building 2500 How is the existing refrigerant pipes routed from the AHU to the condensing unit

A9.M0-09, M0-10, M1-09, and M1-10 have all been reissued for clarification.

Q10. All locations, Pressure testing the existing duct systems is quite extensive and will require the HVAC system to be down for an extended period of time, all existing opening will need to be capped off, VAV boxes will need to be capped off, Air handlers capped off etc. then pressure test and if you have a leak how do you find the leak, all the existing insulation will need to be removed. This could be a very expensive process. I would recommend that this requirement be deleted from the project. If not, and someone knows where there are leeks, maybe we include a pre-determined allowance to cover those types of repairs.

A10. Duct pressure testing has been removed from the project by previous clarification.

Q11. Would the guard consider a requirement to include an allowance for pressure testing and duct cleaning if the duct cleaning and pressure testing are required? Without complete drawings of the HVAC system in each building the pricing will be hard to determine.

A11. Duct pressure testing has been removed from the scope of the project, however duct cleaning is still required and shall be bid as described in the contract

Q12. Can more specific information be provided for pressure testing for section 230593 Paragraph 3.15

A12. Duct pressure testing has been removed from the scope of work per a previous clarification.

Q13. Are the control valves at VAV boxes that are being converted to the new Johnson Controls system to be replaced as part of the system upgrade.

A13. Yes, the VAV boxes are to be piped per the updated reheat coil piping detail.

Q14. Bldg 2500, Sheet M1-10, Existing ductwork in the truck bay was painted at one time – though the paint is peeling off. Are any new duct fittings that are required to connect the existing duct to the new AHU to be painted?

A14. No the new ductwork shall not be painted.

Q15. Bldg 636, Sheet M-105, Existing AHU to be replaced in the mezzanine is set on steel rails. Is the new AHU to be mounted on these existing steel rails or should AHU be set on floor?

A15.It is expected that the new unit will be mounted on new steel rails.

Q16. Bldg 651, Sheet E-106, Note D6 references a new 225A feeder in new 2” conduit with 3-#4/0 + #4 ground to existing distribution panel MDA. Location of existing distribution panel MDA is not identified on the plans, and we were not able to locate during the site visit today. Please identify where Distribution Panel MDA is located, and advise manufacturer and model of breaker to be provided in existing panel to maintain short circuit rating of Distribution Panel MDA.

A16. Drawing E1-06 has been updated to show the location of Panel MDA.

Q17. Can housekeeping pads stay, if they match the size of new equipment?

A17. New housekeeping pads shall be provided as specified in the plans. The only exception is that the condensing unit on the 2500 may be placed on the existing pad.

Q18. Bldg 635, what type of roof? This needs to be known to patch.

A18. EPDM, adhered.

Q19. Bldg 652, calls out demo housekeeping pad , but not installing new pad?

A19. Keynote 1 on M1-08 does require a new housekeeping pad.

Q20. During walk-thru #1, noticed electrical disconnects, fan motor starters and equipment not meeting electrical codes. Requesting clarification on how far do we need to go to meet electrical code’s. Will need Design engineers to ID and clarify all work and new locations.

A20. General Note ‘H’ was added to E0-00 to indicate that any electrical items not meeting code shall be relocated to provide necessary clearance.

Q21. Is there a LEED requirement associated with this project?

A21.No.

Q22. At buildings 605 & 608 - note 7, can we place a new MAPES panel (or equal) on the inside portion of the louver in lieu of removing the louver and patching the opening?

A22. Per a previous clarification at the contractor’s option louvers noted to be removed and wall patches may be capped off instead. Additionally, insulation behind the cap shall be a minimum of R-13.

Q23. There are notes on each building indicating that the existing housekeeping pads need to be removed and replaced with new. Would it be acceptable to extend the existing pads to accommodate the new units where it is possible?

A23. New housekeeping pads shall be provided as specified in the plans. The only exception is that the condensing unit on the 2500 may be placed on the existing pad.

Q24. Will we be responsible to remove and reinstall existing fire sprinkler heads in order to remove and install new mechanical units in building 635?

A24. Any existing conditions found that interfere with removal of existing equipment or installation of new equipment are the responsibility of the contractor to remove and reinstall.

Q25. As a general note, are there any existing roof warranties that are in place on roofs requiring patching on this contract?

A25. There are no existing roof warranties on buildings where the roof is affected by construction work.

Q26. At building 649, will new concrete pads be required under the new mechanical units? If so, are they to be poured on top of the existing sidewalk?

A26. Yes new pads shall be installed on top of existing concrete sidewalk.

Q27. At building 2500, is it necessary to remove & replace this pad as it appears to be part of a larger pad with other equipment on it?

A27. The housekeeping pad for the condensing unit may remain and be reused.

Q28. At building 2500 on the 2nd floor, can we remove and replace the existing metal handrail so that mechanical units can be demolished and a new one installed?

A28. Any existing conditions found that interfere with removal of existing equipment or installation of new equipment are the responsibility of the contractor to remove and reinstall.

End of Questions.

***** Nothing Follows *****