AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to provide clarifications per the RFIs received to date and to extend the proposal due date to 17 July 2017 at 1400 hours (2:00 p.m.) CST. Please see the additional information inlcuded.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91243-17-R-0002

X 9B. DATED (SEE ITEM 11)

08-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jul-2017

CODE

USPFO FOR NEBRASKA

2433 NW 24TH ST

LINCOLN NE 68524

W91243 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91243-17-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

1. A 3rd walk through/site visit will be held on 10 July 2017 at 09:00 a.m. CST for the purposes of previewing Building 600. All who are attending will meet at the Base Civil Engineer's Classroom, 2945 W. Furnas Avenue, Lincoln Air National Guard Base, Lincoln, Nebraska. All Interested Contractors or subcontractors are encouraged to attend.

2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the Full Name for all attendees to usaf.ne.155-arw.mbx.uspfo-contracting@mail.mil .

3. The plumbing schedule dated 6/14/2017 has been included with this document.

4. See attached RFI Anwser and questions.

END OF DOCUMENT.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 11-Jul-2017 02:00 PM to 17-Jul-2017 02:00 PM.

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Performance Relevancy

Questionnaire

2 18-APR-2017

Exhibit B Subcontractor Information and Consent Form

1 18-APR-2017

Exhibit C Reference Questionnaire 7 18-APR-2017 Exhibit D Proposal Price Breakout 1 26-APR-2017 Attachment 1 Specifications - Volume 1 674 12-MAY-2017 Attachment 2 Specifications - Volume 2 816 12-MAY-2017 Attachment 3 Drawings - Volume 1 133 12-MAY-2017 Attachment 4 Drawings - Volume 2 112 12-MAY-2017 Attachment 5 Brand Name Justification

For Monaco Fire Alarm Panels

3 27-APR-2017

W91243-17-R-0002 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Performance Relevancy

Questionnaire

2 18-APR-2017

Exhibit B Subcontractor Information and Consent Form

1 18-APR-2017

Exhibit C Reference Questionnaire 7 18-APR-2017 Exhibit D Proposal Price Breakout 1 26-APR-2017 Attachment 1 Specifications - Volume 1 674 12-MAY-2017 Attachment 2 Specifications - Volume 2 816 12-MAY-2017 Attachment 3 Drawings - Volume 1 133 12-MAY-2017 Attachment 4 Drawings - Volume 2 112 12-MAY-2017 Attachment 5 Brand Name Justification

For Monaco Fire Alarm Panels

3 27-APR-2017

Attachment 6 RFI QUESTIONS &

ANSWERS

2 06-JUL-2017

Attachment 7 20170614 B600

AMENDMENT SDP-01

1 14-JUN-2017

AMENDMENT 0002 6 July 2017 Solicitation: W91243‐17‐R‐0002 Repair Building 600

This information is provided as Amendment 0001. See the Attachments for the specifications and drawings referred to in the below information.

A1‐12 Note D – Is it the Gov’t intention to remove and replace the existing flat roofing system with a new EPDM roofing system?

Please refer to the drawing notes as to which areas are being removed and replaced.

Is the Gov’t planning on moving the staff to other buildings during the remodel construction of the Hangar?

Staff will be moved according to the Phases of the project. See clarification of Spec Section 011000 below.

S1‐05 Bridge Crane, there is reference to a bridge crane however there is not a specification section for this equipment. Is this to be provided by the Gov’t?

The bridge crane shall be provided by the contractor and shall meet the requirements listed on sheet S1‐

05. These requirements include crane type, hoist type, capacity, control, service classification, hook lift, etc. The contractor shall provide framing suspended from the existing roof structure as shown on S1‐05 for support of the bridge crane. See sheet E2‐01 for electrical requirements for the bridge crane.

Will air craft be removed during the course of the remodel construction? And will maintenance of the air craft be relocated to other facilities?

Aircraft will not occupy the building during PH I.

Once Government takes beneficial occupancy of that area maintenance of aircraft will resume.

Coordination during project will be worked with the contractor after award.

Addendum #1 indicated that there is a revised plumbing fixture schedule but it was not included in the addendum. Item No. DP‐1, Sheet P5‐01 Replace the plumbing fixture schedule with a new plumbing fixture schedule in supplemental drawing SDP‐01 dated 6/14/2017.

Revised plumbing schedule is attached.

Clarification on Phasing See Change to verbiage of Spec Section 011000, para

1.4 A & B.

AMENDMENT 0002 6 July 2017 Solicitation: W91243‐17‐R‐0002 Repair Building 600

Specification Section 011000 dated 7/06/2017

1.4 PHASED CONSTRUCTION

A. The Work shall be conducted in phases, with each phase substantially complete as indicated by the General Contractor in their proposed construction schedule for this project. Note that the Government shall occupy the site and facility throughout the construction, but shall vacate the areas indicated by the phases below for the entire period of the renovation and construction in those areas of this project, see the construction documents for notes related to the phases of construction and renovation. Actual dates and total work affected for the phasing will be coordinate by the General Contractor directly with the Government. The Government is motivated to help the General Contractor to complete the project within the established timeline, but Phase No. 1 must be substantially complete for beneficial occupancy so the Government can move building occupants from the Phase No. 2 area to the temporary facilities.

B. Phase Plan: The phasing plan for Building 600 Main Hangar is as follows:

1. Phase No. 1: This phase of construction shall include the Hangar area of the building, and timing as coordinated with the Government.

2. Phase No. 2: This phase of construction shall include the West Two Story Office Building, and the Electrical Rooms located on the first floor of the east side first floor where the new electrical service is being provided for the entire project in Building 600, which also includes the electrical duct banks located below the hangar floor.

3. Phase No. 3: This phase of construction shall include the remaining East Two Story Office Building.

4. Note that work outside the building such as the repointing of the existing masonry can happen in any phase of construction provided the contractor coordinate this work with the government through the Contracting Officer as part of the project schedule since this is a restricted area behind the security fencing.

DRAWINGS:

1. 20170614 B600 Amendment SDP‐01

END OF DOCUMENT