CLIN schedule - Success Lake_ Water Testing v2.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- Shafer Dam/Success Lake Water Testing
- Solicitation number
- W9123825QA006
About this file
The file is a Contract Line Item Number (CLIN) schedule for water testing services at Success Lake, covering a base year from June 2025 to May 2026 and four additional one-year option periods through May 2030. The comprehensive testing requirements include monthly coliform bacterial tests at four specific locations (Tule Day Use pump houses, Rocky Hill Day Use Area, and Administration Area pump house), with up to 48 potential coliform retests annually. Additional monthly testing encompasses nitrates, dissolved oxygen, field pH, and electrical conductivity, with an annual test for specific chemical compounds including formaldehyde, zinc, phenol, and nitrogen.
The contract, solicitation number W9123825QA006, is specifically set aside for Women-Owned Small Businesses (WOSB) under NAICS code 541380, with a size standard of $19,000,000. The testing will be performed near Porterville, California, for the U.S. Army Corps of Engineers Engineering District Sacramento. The total potential contract value is $19,000,000, with testing to be conducted first week of each month at the Tule Oxidation Pond and various pump house locations. The contract includes provisions for trip fees and requires strict compliance with California Water Quality Standards, with performance expectations of 100% task completion and 95% industry standard performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| Base Year: 01 June 2025 - 31 May 2026 | ||||||
| P/A | FC | |||||
| Water Testing | Amount of Contract | $ - 0 | ||||
| Month | Line Item | Description | Qty | Total Used to Date | $ - 0 |
| Jun-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | TOTAL LEFT IN CONTRACT | $ - 0 | ||||||
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Description | Line Items | Max Amt | Qty Used | Qty left | Line Item Price | Total | |||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||||||||||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||||||||||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | P/A | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Field Chlorine | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | Coliform Retest | 0001AB | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | Nitrates | 0001AC | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 0001AF | Trip Fee | Not to exceed 24 in contract year | Dissolved Oxygen | 0001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | ||
| Field pH | 0001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |||||
| Jul-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Electrical Conductivity (EC) | 0001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Formaldehyde, Zinc, Phenol, Nitrogen | 0001AE | 1 | 0 | 1 | $ - 0 | $ - 0 | |||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | Trip Fee | 0001AF | 24 | 0 | 24 | $ - 0 | $ - 0 | |||
| 0001AA | Coliform x 1 - Administration Area Pump House | $ - 0 | |||||||||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |||||||||
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |||||||||
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |||||||||
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Aug-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Sep-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Oct-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Nov-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Dec-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Jan-26 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Feb-25 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Mar-26 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| Apr-26 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
| May-26 | 0001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 0001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 0001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 0001AA | Coliform x 1 - Administration Area Pump House | ||
| 0001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 0001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 0001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 0001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 0001AF | Trip Fee | Not to exceed 24 in contract year |
OY1
| OY1: 01 June 2026 - 31 May 2027 | ||||||
| P/A | FC | |||||
| Water Testing | Amount of Contract | $ - 0 | ||||
| Month | Line Item | Description | Qty | Total Used to Date | $ - 0 |
| Jun-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | TOTAL LEFT IN CONTRACT | $ - 0 | ||||||
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Description | Line Items | Max Amt | Qty Used | Qty left | Line Item Price | Total | |||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||||||||||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||||||||||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | P/A | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Field Chlorine | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | Coliform Retest | 1001AB | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | Nitrates | 1001AC | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 1001AF | Trip Fee | Not to exceed 24 in contract year | Dissolved Oxygen | 1001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | ||
| Field pH | 1001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |||||
| Jul-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Electrical Conductivity (EC) | 1001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Formaldehyde, Zinc, Phenol, Nitrogen | 1001AE | 1 | 0 | 1 | $ - 0 | $ - 0 | |||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | Trip Fee | 1001AF | 24 | 0 | 24 | $ - 0 | $ - 0 | |||
| 1001AA | Coliform x 1 - Administration Area Pump House | $ - 0 | |||||||||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |||||||||
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |||||||||
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |||||||||
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Aug-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Sep-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Oct-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Nov-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Dec-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Jan-26 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Feb-25 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Mar-26 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| Apr-26 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
| May-26 | 1001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 1001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 1001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 1001AA | Coliform x 1 - Administration Area Pump House | ||
| 1001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 1001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 1001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 1001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 1001AF | Trip Fee | Not to exceed 24 in contract year |
OY2
| OY2: 01 June 2027 - 31 May 2028 | ||||||
| P/A | FC | |||||
| Water Testing | Amount of Contract | $ - 0 | ||||
| Month | Line Item | Description | Qty | Total Used to Date | $ - 0 |
| Jun-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | TOTAL LEFT IN CONTRACT | $ - 0 | ||||||
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Description | Line Items | Max Amt | Qty Used | Qty left | Line Item Price | Total | |||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||||||||||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||||||||||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | P/A | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Field Chlorine | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | Coliform Retest | 2001AB | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | Nitrates | 2001AC | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 2001AF | Trip Fee | Not to exceed 24 in contract year | Dissolved Oxygen | 2001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | ||
| Field pH | 2001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |||||
| Jul-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Electrical Conductivity (EC) | 2001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Formaldehyde, Zinc, Phenol, Nitrogen | 2001AE | 1 | 0 | 1 | $ - 0 | $ - 0 | |||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | Trip Fee | 2001AF | 24 | 0 | 24 | $ - 0 | $ - 0 | |||
| 2001AA | Coliform x 1 - Administration Area Pump House | $ - 0 | |||||||||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |||||||||
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |||||||||
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |||||||||
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Aug-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Sep-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Oct-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Nov-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Dec-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Jan-26 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Feb-25 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Mar-26 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| Apr-26 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
| May-26 | 2001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 2001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 2001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 2001AA | Coliform x 1 - Administration Area Pump House | ||
| 2001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 2001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 2001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 2001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 2001AF | Trip Fee | Not to exceed 24 in contract year |
OY3
| OY3: 01 June 2028 - 31 May 2029 | ||||||
| P/A | FC | |||||
| Water Testing | Amount of Contract | $ - 0 | ||||
| Month | Line Item | Description | Qty | Total Used to Date | $ - 0 |
| Jun-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | TOTAL LEFT IN CONTRACT | $ - 0 | ||||||
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Description | Line Items | Max Amt | Qty Used | Qty left | Line Item Price | Total | |||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||||||||||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||||||||||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | P/A | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Field Chlorine | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | Coliform Retest | 3001AB | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | Nitrates | 3001AC | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 3001AF | Trip Fee | Not to exceed 24 in contract year | Dissolved Oxygen | 3001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | ||
| Field pH | 3001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |||||
| Jul-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Electrical Conductivity (EC) | 3001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Formaldehyde, Zinc, Phenol, Nitrogen | 3001AE | 1 | 0 | 1 | $ - 0 | $ - 0 | |||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | Trip Fee | 3001AF | 24 | 0 | 24 | $ - 0 | $ - 0 | |||
| 3001AA | Coliform x 1 - Administration Area Pump House | $ - 0 | |||||||||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |||||||||
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |||||||||
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |||||||||
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Aug-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Sep-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Oct-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Nov-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Dec-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Jan-26 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Feb-25 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Mar-26 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| Apr-26 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
| May-26 | 3001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 3001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 3001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 3001AA | Coliform x 1 - Administration Area Pump House | ||
| 3001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 3001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 3001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 3001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 3001AF | Trip Fee | Not to exceed 24 in contract year |
OY4
| OY4: 01 June 2029 - 31 May 2030 | ||||||
| P/A | FC | |||||
| Water Testing | Amount of Contract | $ - 0 | ||||
| Month | Line Item | Description | Qty | Total Used to Date | $ - 0 |
| Jun-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | TOTAL LEFT IN CONTRACT | $ - 0 | ||||||
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Description | Line Items | Max Amt | Qty Used | Qty left | Line Item Price | Total | |||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||||||||||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||||||||||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | P/A | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Field Chlorine | 48 | 0 | 48 | $ - 0 | $ - 0 | |||
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | Coliform Retest | 4001AB | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | Nitrates | 4001AC | 48 | 0 | 48 | $ - 0 | $ - 0 | ||
| 4001AF | Trip Fee | Not to exceed 24 in contract year | Dissolved Oxygen | 4001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | ||
| Field pH | 4001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |||||
| Jul-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | Electrical Conductivity (EC) | 4001AD | 12 | 0 | 12 | $ - 0 | $ - 0 | |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | Formaldehyde, Zinc, Phenol, Nitrogen | 4001AE | 1 | 0 | 1 | $ - 0 | $ - 0 | |||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | Trip Fee | 4001AF | 24 | 0 | 24 | $ - 0 | $ - 0 | |||
| 4001AA | Coliform x 1 - Administration Area Pump House | $ - 0 | |||||||||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |||||||||
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |||||||||
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |||||||||
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |||||||||
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Aug-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Sep-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Oct-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Nov-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Dec-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Jan-26 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Feb-25 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) | |
| 4001AD | Dissolved Oxygen | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Field pH | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AD | Electrical Conductivity (EC) | First Week Every Month - (1 Test - Tule Oxidation Pond) | |
| 4001AE | Formaldehyde, Zinc, Phenol, Nitrogen | First Week in January ONLY - (1 Test Tule Oxidation Pond) | |
| 4001AF | Trip Fee | Not to exceed 24 in contract year |
| Mar-26 | 4001AA | Coliform x 1 - Tule Day Use (3-1 Pump House) | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
| 4001AA | Coliform x 1 - Tule Day Use (3-2 Pump House) | ||
| 4001AA | Coliform x 1 - Rocky Hill Day Use Area | ||
| 4001AA | Coliform x 1 - Administration Area Pump House | ||
| 4001AB | Coliform Re-Test | Not to exceed 60 in contract year | |
| 4001AC | Nitrates | First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin) |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .