The file is a Contract Line Item Number (CLIN) schedule for water testing services at Success Lake, covering a base year from June 2025 to May 2026 and four additional one-year option periods through May 2030. The comprehensive testing requirements include monthly coliform bacterial tests at four specific locations (Tule Day Use pump houses, Rocky Hill Day Use Area, and Administration Area pump house), with up to 48 potential coliform retests annually. Additional monthly testing encompasses nitrates, dissolved oxygen, field pH, and electrical conductivity, with an annual test for specific chemical compounds including formaldehyde, zinc, phenol, and nitrogen.

The contract, solicitation number W9123825QA006, is specifically set aside for Women-Owned Small Businesses (WOSB) under NAICS code 541380, with a size standard of $19,000,000. The testing will be performed near Porterville, California, for the U.S. Army Corps of Engineers Engineering District Sacramento. The total potential contract value is $19,000,000, with testing to be conducted first week of each month at the Tule Oxidation Pond and various pump house locations. The contract includes provisions for trip fees and requires strict compliance with California Water Quality Standards, with performance expectations of 100% task completion and 95% industry standard performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

Base Year: 01 June 2025 - 31 May 2026
P/AFC
Water TestingAmount of Contract$ - 0
MonthLine ItemDescriptionQtyTotal Used to Date$ - 0
Jun-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)TOTAL LEFT IN CONTRACT$ - 0
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)DescriptionLine ItemsMax AmtQty UsedQty leftLine Item PriceTotal
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract yearP/A48048$ - 0$ - 0
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Field Chlorine48048$ - 0$ - 0
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)Coliform Retest0001AB48048$ - 0$ - 0
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)Nitrates0001AC48048$ - 0$ - 0
0001AFTrip FeeNot to exceed 24 in contract yearDissolved Oxygen0001AD12012$ - 0$ - 0
Field pH0001AD12012$ - 0$ - 0
Jul-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Electrical Conductivity (EC)0001AD12012$ - 0$ - 0
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)Formaldehyde, Zinc, Phenol, Nitrogen0001AE101$ - 0$ - 0
0001AAColiform x 1 - Rocky Hill Day Use AreaTrip Fee0001AF24024$ - 0$ - 0
0001AAColiform x 1 - Administration Area Pump House$ - 0
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Aug-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Sep-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Oct-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Nov-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Dec-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Jan-260001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Feb-250001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Mar-260001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
Apr-260001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year
May-260001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001AAColiform x 1 - Tule Day Use (3-2 Pump House)
0001AAColiform x 1 - Rocky Hill Day Use Area
0001AAColiform x 1 - Administration Area Pump House
0001ABColiform Re-TestNot to exceed 60 in contract year
0001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
0001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
0001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
0001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
0001AFTrip FeeNot to exceed 24 in contract year

OY1

OY1: 01 June 2026 - 31 May 2027
P/AFC
Water TestingAmount of Contract$ - 0
MonthLine ItemDescriptionQtyTotal Used to Date$ - 0
Jun-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)TOTAL LEFT IN CONTRACT$ - 0
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)DescriptionLine ItemsMax AmtQty UsedQty leftLine Item PriceTotal
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract yearP/A48048$ - 0$ - 0
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Field Chlorine48048$ - 0$ - 0
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)Coliform Retest1001AB48048$ - 0$ - 0
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)Nitrates1001AC48048$ - 0$ - 0
1001AFTrip FeeNot to exceed 24 in contract yearDissolved Oxygen1001AD12012$ - 0$ - 0
Field pH1001AD12012$ - 0$ - 0
Jul-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Electrical Conductivity (EC)1001AD12012$ - 0$ - 0
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)Formaldehyde, Zinc, Phenol, Nitrogen1001AE101$ - 0$ - 0
1001AAColiform x 1 - Rocky Hill Day Use AreaTrip Fee1001AF24024$ - 0$ - 0
1001AAColiform x 1 - Administration Area Pump House$ - 0
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Aug-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Sep-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Oct-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Nov-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Dec-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Jan-261001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Feb-251001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Mar-261001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
Apr-261001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year
May-261001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001AAColiform x 1 - Tule Day Use (3-2 Pump House)
1001AAColiform x 1 - Rocky Hill Day Use Area
1001AAColiform x 1 - Administration Area Pump House
1001ABColiform Re-TestNot to exceed 60 in contract year
1001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
1001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
1001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
1001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
1001AFTrip FeeNot to exceed 24 in contract year

OY2

OY2: 01 June 2027 - 31 May 2028
P/AFC
Water TestingAmount of Contract$ - 0
MonthLine ItemDescriptionQtyTotal Used to Date$ - 0
Jun-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)TOTAL LEFT IN CONTRACT$ - 0
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)DescriptionLine ItemsMax AmtQty UsedQty leftLine Item PriceTotal
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract yearP/A48048$ - 0$ - 0
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Field Chlorine48048$ - 0$ - 0
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)Coliform Retest2001AB48048$ - 0$ - 0
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)Nitrates2001AC48048$ - 0$ - 0
2001AFTrip FeeNot to exceed 24 in contract yearDissolved Oxygen2001AD12012$ - 0$ - 0
Field pH2001AD12012$ - 0$ - 0
Jul-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Electrical Conductivity (EC)2001AD12012$ - 0$ - 0
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)Formaldehyde, Zinc, Phenol, Nitrogen2001AE101$ - 0$ - 0
2001AAColiform x 1 - Rocky Hill Day Use AreaTrip Fee2001AF24024$ - 0$ - 0
2001AAColiform x 1 - Administration Area Pump House$ - 0
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Aug-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Sep-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Oct-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Nov-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Dec-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Jan-262001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Feb-252001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Mar-262001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
Apr-262001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year
May-262001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001AAColiform x 1 - Tule Day Use (3-2 Pump House)
2001AAColiform x 1 - Rocky Hill Day Use Area
2001AAColiform x 1 - Administration Area Pump House
2001ABColiform Re-TestNot to exceed 60 in contract year
2001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
2001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
2001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
2001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
2001AFTrip FeeNot to exceed 24 in contract year

OY3

OY3: 01 June 2028 - 31 May 2029
P/AFC
Water TestingAmount of Contract$ - 0
MonthLine ItemDescriptionQtyTotal Used to Date$ - 0
Jun-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)TOTAL LEFT IN CONTRACT$ - 0
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)DescriptionLine ItemsMax AmtQty UsedQty leftLine Item PriceTotal
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract yearP/A48048$ - 0$ - 0
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Field Chlorine48048$ - 0$ - 0
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)Coliform Retest3001AB48048$ - 0$ - 0
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)Nitrates3001AC48048$ - 0$ - 0
3001AFTrip FeeNot to exceed 24 in contract yearDissolved Oxygen3001AD12012$ - 0$ - 0
Field pH3001AD12012$ - 0$ - 0
Jul-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Electrical Conductivity (EC)3001AD12012$ - 0$ - 0
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)Formaldehyde, Zinc, Phenol, Nitrogen3001AE101$ - 0$ - 0
3001AAColiform x 1 - Rocky Hill Day Use AreaTrip Fee3001AF24024$ - 0$ - 0
3001AAColiform x 1 - Administration Area Pump House$ - 0
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Aug-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Sep-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Oct-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Nov-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Dec-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Jan-263001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Feb-253001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Mar-263001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
Apr-263001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year
May-263001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001AAColiform x 1 - Tule Day Use (3-2 Pump House)
3001AAColiform x 1 - Rocky Hill Day Use Area
3001AAColiform x 1 - Administration Area Pump House
3001ABColiform Re-TestNot to exceed 60 in contract year
3001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
3001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
3001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
3001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
3001AFTrip FeeNot to exceed 24 in contract year

OY4

OY4: 01 June 2029 - 31 May 2030
P/AFC
Water TestingAmount of Contract$ - 0
MonthLine ItemDescriptionQtyTotal Used to Date$ - 0
Jun-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)TOTAL LEFT IN CONTRACT$ - 0
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)DescriptionLine ItemsMax AmtQty UsedQty leftLine Item PriceTotal
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract yearP/A48048$ - 0$ - 0
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Field Chlorine48048$ - 0$ - 0
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)Coliform Retest4001AB48048$ - 0$ - 0
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)Nitrates4001AC48048$ - 0$ - 0
4001AFTrip FeeNot to exceed 24 in contract yearDissolved Oxygen4001AD12012$ - 0$ - 0
Field pH4001AD12012$ - 0$ - 0
Jul-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)Electrical Conductivity (EC)4001AD12012$ - 0$ - 0
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)Formaldehyde, Zinc, Phenol, Nitrogen4001AE101$ - 0$ - 0
4001AAColiform x 1 - Rocky Hill Day Use AreaTrip Fee4001AF24024$ - 0$ - 0
4001AAColiform x 1 - Administration Area Pump House$ - 0
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Aug-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Sep-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Oct-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Nov-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Dec-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Jan-264001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Feb-254001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001ADDissolved OxygenFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADField pHFirst Week Every Month - (1 Test - Tule Oxidation Pond)
4001ADElectrical Conductivity (EC)First Week Every Month - (1 Test - Tule Oxidation Pond)
4001AEFormaldehyde, Zinc, Phenol, NitrogenFirst Week in January ONLY - (1 Test Tule Oxidation Pond)
4001AFTrip FeeNot to exceed 24 in contract year
Mar-264001AAColiform x 1 - Tule Day Use (3-1 Pump House)First Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)
4001AAColiform x 1 - Tule Day Use (3-2 Pump House)
4001AAColiform x 1 - Rocky Hill Day Use Area
4001AAColiform x 1 - Administration Area Pump House
4001ABColiform Re-TestNot to exceed 60 in contract year
4001ACNitratesFirst Week Every Month - (5 Tests: 3-1, 3-2, 4-2, RH, Admin)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .