This document includes a pricing schedule and details for a federal contract opportunity for construction services. The scope of work involves design-bid-build construction to provide approximately 5,500 feet of stream bank protection and stabilization of an existing levee to protect critical infrastructure against erosion for the US Army Corps of Engineers Sacramento District. Major work items defined in the pricing schedule include mobilization, temporary stormwater controls, removal and replacement of pedestrian pathways, clearing and grubbing, engineered fill, bedding and soil materials, rock protection, aggregate base course, topsoil, grass seeding, live cuttings, and in-stream wood. Pricing is provided by line item with estimated quantities. The solicitation number is W9123822B0003 for construction work along the Lower American River in Sacramento, California, with an estimated value between $25-100 million. The NAICS code is 237990 and PSC code is Y1LC. The solicitation will use a pre-qualified sources list and require subcontracting plans for large business apparent low offerors.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule

Pricing Schedule - American River Common Features 2016 - Lower American River Site 2-1
Contract Line Item Number (CLIN)DescriptionEstimated QuantityUnit of MeasureUnit PriceTotal Price
1.1Mobilization and Demobilization1Job$$
1.2Temporary Storm Water Pollution Control1Job$$
1.3Remove and Replace Existing Pedestrian Pathways1Job$$
1.4Clearing and Grubbing1Job$$
1.5Preparation of Subgrade1Job$$
1.6Engineered Fill as Backfill Over Buried Rock Toe Protection1Job$$
1.7Bedding Material for Stone Protection *38,400Ton$$
1.8Soil-Filled Rock Slope Protection *45,000Cubic Yard$$
1.9Rock Toe Protection and Soil-Filled Rock Tie-Backs *72,600Ton$$
1.10Aggregate Base Course for O&M Road Repair *2,500Ton$$
1.11Topsoil, Soil Fill, and Other Backfill in Planting Benches *15,000Cubic Yard$$
1.12Topsoil over Soil Filled Rock Slope Protection *80,200Cubic Yard$$
1.13In-Stream Wood Material *60Each$$
1.14Grass Seeding and Erosion Control *958,320Square Feet Acre$$
1.15Live Cuttings *956Each$$
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity. Bold Italic font signifies revised or newly added information
Price Schedule Roll-up
Contract
Line Item No.Item DescriptionEstimated QuantityUnitUnit PriceTotal Price
0001Lower American River Site 2-11JOB$$

File details come from the government source that posted it. Updated .