This federal contract opportunity solicitation seeks design-bid-build construction services for stream bank protection and stabilization of an existing levee along the Lower American River in Sacramento, California. The scope of work includes roughly 5,500 feet of stream bank protection and levee stabilization to protect critical infrastructure against erosion during large flood events. Multiple concurrent efforts will be required to complete defined work items within associated periods of performance. The solicitation is issued by the U.S. Army Corps of Engineers Sacramento District with an estimated value between $25-100 million. Responses are due under solicitation number W9123822B0003 using PSC code Y1LC and NAICS code 237990. This will be an unrestricted solicitation using a pre-qualified sources list, and a subcontracting plan will be required from the apparent low offeror if a large business.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUE DATE:
US Army Corps of Engineers
SOLICITATION NO.:
CONTRACT NO.:
SACRAMENTO DISTRICT
W91238-22-B-0003
W91238-XX-X-XXXX
SEPTEMBER 2021
SACRAMENTO COUNTY, CALIFORNIA
AMERICAN RIVER COMMON FEATURES (ARCF)
EROSION - LOWER AMERICAN RIVER
SITE 2-1, CONTRACT 1
PREPARED UNDER THE DIRECTION OF:
USACE SACRAMENTO SIGNATURE BLOCK
Col. Corps of Engineers, Sacramento District
Chief, Engineering Division
Chief, Design Branch
APPROVED BY:
APPROVED FUNCTIONAL ADEQUACY:
PREPARED UNDER THE DIRECTION OF:
USACE SACRAMENTO SIGNATURE BLOCK
Col. Corps of Engineers, Sacramento District
Chief, Engineering Division
Chief, Design Branch
APPROVED BY:
APPROVED FUNCTIONAL ADEQUACY:
U S
L O
W
E
R
A
M
E
R
I C
N
I V
E
R
H O
W
V E
W A
T
E
Site 2-1
Location
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I L
SIERRA OAKS
ARDEN TOWN
FAIR OAKS BLVD
BELL ARDEN
CAL EXPO
SACRAMENTO
MIDTOWN
EAST SACRAMENTO
H
J
MED
CENTER
H
S
T
MANLOVE
ESTATES
G-001
C O
V E
R
S
H E
E T
J
L A
M M
E R
S
J
L A
M M
E R
S
B
W A
R D
M A
N
B
W A
R D
M A
N
SACRAMENTO
STATE UNIVERSITY
F I N
A L
P
L A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s a p i t o l
A v e n u e
S u i t e
S a c r a m e n t o
C a l i f o r n i
S A
C R
A M
E N
D
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
THIS PROJECT WAS DESIGNED BY THE SACRAMENTO DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS. THE
INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT
DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
BUSINESS
LOOP
CALIFORNIA
AutoCAD SHX Text
NORTH
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
GENERAL NOTES
1. THE STONE PROTECTION DESIGN SHALL BE CONSTRUCTED BASED ON ELEVATIONS AND OFFSETS
MEASURED FROM A SPECIFIED CONSTRUCTION LINE.
2. CONSTRUCTION OFFSETS ARE MEASURED PERPENDICULAR TO THE CONSTRUCTION LINE
SEGMENT UNLESS OTHERWISE NOTED.
3. OFFSETS SHOWN ON CROSS SECTIONS ARE FOR THE STATION AND ALIGNMENTS SHOWN AND
ARE SUBJECT TO REVISIONS TO CONFORM TO CHANGED SITE CONDITIONS.
SURVEY NOTES
1. GRID COORDINATES REFER TO THE CALIFORNIA STATE PLANE COORDINATE SYSTEM ZONE 2, NAD83
(2007.00) US SURVEY FEET.
2. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET.
3. TOPOGRAPHY AND BATHYMETRY WAS DEVELOPED FROM TOPOBATHYMETRIC LIDAR ON OCTOBER
22-23, 2017 WHEN FLOWS WERE AT APPROXIMATELY 2,000 CUBIC FEET PER SECOND.
4. SINGLE BEAM BATHYMETRIC SURVEY COMPLETED IN DECEMBER 2017 THROUGH FEBRUARY 2018
SUPPLEMENTS THE TOPOBATHYMETRIC LIDAR SURVEY WHERE DEPTHS EXCEEDED 12 FEET DURING
THE TOPOBATHYMETRIC SURVEY.
5. JULY 2019 FIELD SURVEY IDENTIFIED INFRASTRUCTURE COMPONENTS IDENTIFIED IN THE PLANS.
6. FINISHED CONTOURS ON SITE PLAN AND TOPOGRAPHY SHEETS ARE SHOWN AT ONE-FOOT VERTICAL
INTERVALS BASED ON THE DESIGN ELEVATIONS WITHIN THE PROJECT FOOTPRINT, AND TWO-FOOT
VERTICAL INTERVALS BASED ON EXISTING CONDITIONS.
7. CONTROL POINTS FOR THE SITE ARE SHOWN ON THE INDEX SHEET ALONG WITH CONTROL COORDINATE
TABULATIONS, ELEVATIONS, AND DESCRIPTIONS.
8. TEMPORARY CONSTRUCTION REFERENCE LINES, TO BE SET BY THE CONTRACTOR, ARE SHOWN ON THE
PLAN AND TOPOGRAPHY SHEETS.
ABBREVIATIONS
1:1
SLOPE REFERENCE (HORIZONTAL:VERTICAL SLOPE RATIO)
APPROX. APPROXIMATE
CFS CUBIC FEET PER SECOND
CP CONTROL POINT
CVFPB CENTRAL VALLEY FLOOD PROTECTION BOARD
DBH DIAMETER AT BREAST HEIGHT
DIA DIAMETER
E.C. EROSION CONTROL
EL. ELEVATION
EX EXISTING
FG FINISH GRADE
FT FEET
GB GRADE BREAK
H HORIZONTAL
IN INCH
IWM INSTREAM WOODY MATERIAL
L LEFT BANK LOOKING DOWNSTREAM
LAR LOWER AMERICAN RIVER
MIN. MINIMUM
NTS NOT TO SCALE
O.C. ON CENTER
PLS PURE LIVE SEED
R RIGHT BANK LOOKING DOWNSTREAM
RS REPAIR SITE
R/W RIGHT OF WAY
RM RIVER MILE
SPEC. NO. SPECIFICATION NUMBER
SF
SQUARE FEET
STA. STATION
TYP. TYPICAL
V VERTICAL
SCHEDULE OF DRAWINGS
DISCIPLINE SHEET REF SHEET TITLE
GENERAL
G-001
COVER SHEET
G-002 SCHEDULE OF DRAWINGS, LAR FLOW DATA, NOTES, & ABBREVIATIONS
G-003 INDEX SHEET, CONTROL POINTS, & ALIGNMENTS
G-101
ACCESS PLAN
G-102
ACCESS PLAN
G-103
EXTERNAL HAUL ROUTES
CIVIL
C-101 CLEARING, GRUBBING, & VEGETATION PROTECTION
C-102 CLEARING, GRUBBING, & VEGETATION PROTECTION
C-103 CLEARING, GRUBBING, & VEGETATION PROTECTION
C-104
PLAN AND PROFILE - STA 289+00 TO 298+00
C-105
PLAN AND PROFILE - STA 298+00 TO 307+00
C-106
PLAN AND PROFILE - STA 307+00 TO 316+00
C-107
PLAN AND PROFILE - STA 316+00 TO 325+00
C-108
PLAN AND PROFILE - STA 325+00 TO 334+00
C-109
PLAN AND PROFILE - STA 334+00 TO 343+00
C-110
PLAN AND PROFILE - STA 343+00 TO 346+00
C-301
TYPICAL SECTIONS - SOIL-FILLED ROCK SLOPE PROTECTION WITH ROCK
TOE PROTECTION
C-302
TYPICAL SECTIONS - SOIL FILLED ROCK SLOPE PROTECTION WITH
PLANTING BENCH / ROCK TOE PROTECTION
C-303
TYPICAL SECTIONS - SOIL FILLED ROCK SLOPE PORTECTION OVER
EXISTING 6.4L ROCK REVETMENT
C-304
TYPICAL SECTIONS - SOIL FILLED ROCK SLOPE PROTECTION UPSTREAM OF
H STREET BRIDGE
C-501
DETAILS - INSTREAM WOODY MATERIAL
C-502
DETAILS - PLANTING BENCH
C-503 DETAILS - TRANSITIONS, BIKE TRAIL, & SLOPE STABILIZATION
C-504
DETAILS - TRANSITIONS
C-505
DETAILS - EROSION CONTROL SEEDING AND PLANTING
C-506
DETAILS - TEMPORARY EROSION & SEDIMENT CONTROL
MONTHLY AVERAGE RIVER STAGE (FEET) FOR THE LOWER AMERICAN RIVER AT THE H STREET BRIDGE
***FOR INFORMATIONAL PURPOSES ONLY***
MONTH 95% EXCEEDANCE 75% EXCEEDANCE 50% EXCEEDANCE 25% EXCEEDANCE 5% EXCEEDANCE
JANUARY 15.9 16.5 17.1 18.5 28.9
FEBRUARY 16.1 16.7 17.3 22.5 29.7
MARCH 15.9 16.5 17.8 22 26.3
APRIL 15.8 16.8 17.9 19 26.4
MAY 16.2 17 18.1 19 22.4
JUNE 17 17.4 17.8 18.7 21.1
JULY 17 17.4 17.9 18.2 18.7
AUGUST 16.7 17 17.3 17.7 18.3
SEPTEMBER 16.1 16.7 16.9 17.4 18.3
OCTOBER 15.7 16.5 16.8 17.3 17.9
NOVEMBER 15.8 16.5 17 17.3 17.9
DECEMBER 16.1 16.6 17.2 17.7 25.3
LOWER AMERICAN RIVER STAGE DATA
1. THE STAGE (WATER SURFACE ELEVATION) DATA TABLE (SHOWN ON THIS SHEET) IS PROVIDED FOR
INFORMATION ONLY.
2. THE STAGE DATA TABLE PROVIDES MONTHLY EXCEEDANCE STATISTICS FOR STAGE AT THE H
STREET BRIDGE. THE EXCEEDANCE DATA IS FROM HOURLY STAGE ELEVATIONS AT THE H STREET
BRIDGE BETWEEN JULY 1995 AND JULY 2020 AT THE STATE OF CALIFORNIA GAGE STATION.
3. WATER SURFACE ELEVATIONS VARY THROUGH THE SITE. THE H-STREET GAGE IS LOCATED AT
H-STREET NEAR THE UPSTREAM EXTENT OF THE PROJECT. WATER LEVELS AT THE DOWNSTREAM
EXTENT ARE TYPICALLY BETWEEN 1.0 TO 1.5 FEET LOWER THAN OBSERVED VALUES AT H-STREET
GAGE. BACKWATER CONDITIONS FROM HIGH SACRAMENTO RIVER WATER LEVELS MAY REDUCE
THIS DIFFERENCE.
4. THE LOWER AMERICAN RIVER EXPERIENCES WIDE VARIATIONS IN FLOW AND RIVER STAGE THAT
SHOULD BE EXPECTED DURING THE PROJECT CONSTRUCTION PERIOD. THE CONTRACTOR SHOULD
CONSULT RIVER FLOW AND STAGE INFORMATION DURING THE BIDDING, PLANNING, AND
EXECUTION OF THE WORK.
5. THE STAGE AT H STREET CAN BE AFFECTED BY HIGH FLOW CONDITIONS IN THE SACRAMENTO
RIVER AS WELL AS FLOW ON THE AMERICAN RIVER.
6. THE FOLLOWING LINK CAN BE USED TO ACCESS CURRENT FLOW AND STAGE DATA FOR THE
LOWER AMERICAN RIVER AT USGS GAGE NO. 11446500 (AMERICAN RIVER AT FAIR OAKS, CA):
HTTPS://WATERDATA.USGS.GOV/USA/NWIS/UV?SITE_NO=11446500
7. THE FOLLOWING LINK CAN BE USED TO ACCESS UP TO 5 DAYS OF FORECASTED STAGE DATA FOR
THE LOWER AMERICAN RIVER AT THE H STREET BRIDGE FROM THE CALIFORNIA NEVADA RIVER
FORECAST CENTER (SAMC1): HTTPS://WWW.CNRFC.NOAA.GOV/GRAPHICALRVF.PHP?ID=SAMC1
8. CONTRACTOR OPERATIONS DURING THE CONSTRUCTION PERIOD MAY BE IMPACTED BY EXTREME
HIGH OR LOW RIVER LEVELS DUE TO FLOODING, DROUGHT, AND/OR OPERATION OF UPSTREAM
DAM RELEASES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MONITOR LOWER AMERICAN RIVER
FLOW CONDITIONS ON A DAILY BASIS AND TO IMPLEMENT PROCEDURES TO PROTECT THE WORK, EQUIPMENT, AND MATERIALS.
9. THE DATA TABLE PROVIDED ON THIS SHEET AND THE REFERENCED WEBSITES ARE SOLELY FOR
THE INFORMATION OF THE CONTRACTOR IN TIMING CONSTRUCTION OPERATIONS TO PREPARE
FOR FLOOD EVENTS AND IN MAKING PROVISIONS FOR PROTECTING THE WORK. USACE DOES NOT
GUARANTEE THE RELIABILITY OR ACCURACY OF ANY OF THE DATA AND ASSUMES NO
RESPONSIBILITY FOR ANY DEDUCTIONS, INTERPRETATIONS, OR CONCLUSIONS WHICH MAY BE
DERIVED FROM THE DATA.
G-002
S C
H E
D U
D
R A
W I N
G S
L A
R
F
L O
W
D
A T
A
N
O T
E S
B B
R E
V I A
T I O
N S
T
S H
I N
K L E
T
S H
I N
K L E
B
W O
L F
E
B
W A
R D
M A
N
F I N
A L
P
L A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I
A
M
E
R
I
C
V
E
R
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
G-003
I N
D E
X
S
H E
E T
C O
N T
R O
L
P
O I N
I G
N M
E N
T
T
S
H I N
K L E
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
456852-C-INDX.dwg
C-104
C
C
C
C
SITE 2-1 PROJECT ALIGNMENT
No. Length Radius Direction Start Station End Station Delta angle Chord length Chord Direction Start Point (Easting, Northing) End Point (Easting, Northing)
L1 205.9 N22° 32' 57"W 346+00.00 343+94.07 6726661.4817,1968469.4927 6726582.5131,1968659.6793
C1 205.7 750.0 343+94.07 341+88.33 15.7172 (d) 205.1 N14° 41' 26"W 6726582.5131,1968659.6793 6726530.5021,1968858.0681
L2 833.9 N6° 49' 55"W 341+88.33 333+54.43 6726530.5021,1968858.0681 6726431.3053,1969686.0449
C2 666.5 2500.0 333+54.43 326+87.92 15.2754 (d) 664.5 N0° 48' 21"E 6726431.3053,1969686.0449 6726440.6518,1970350.5220
L3 368.9 N8° 26' 37"E 326+87.92 323+19.01 6726440.6518,1970350.5220 6726494.8204,1970715.4310
C3 140.2 4000.0 323+19.01 321+78.77 2.0088 (d) 140.2 N9° 26' 53"E 6726494.8204,1970715.4310 6726517.8396,1970853.7603
L4 341.9 N10° 27' 08"E 321+78.77 318+36.91 6726517.8396,1970853.7603 6726579.8597,1971189.9512
C4 103.2 1000.0 318+36.91 317+33.73 5.9120 (d) 103.1 N13° 24' 30"E 6726579.8597,1971189.9512 6726603.7764,1971290.2783
L5 273.8 N16° 21' 52"E 317+33.73 314+59.92 6726603.7764,1971290.2783 6726680.9208,1971552.9955
C5 184.8 1000.0 314+59.92 312+75.14 10.5868 (d) 184.5 N11° 04' 15"E 6726680.9208,1971552.9955 6726716.3515,1971734.0732
L6 104.5 N5° 46' 39"E 312+75.14 311+70.62 6726716.3515,1971734.0732 6726726.8737,1971838.0672
C6 56.1 750.0 311+70.62 311+14.54 4.2837 (d) 56.1 N3° 38' 09"E 6726726.8737,1971838.0672 6726730.4287,1971894.0152
L7 142.1 N1° 29' 38"E 311+14.54 309+72.40 6726730.4287,1971894.0152 6726734.1342,1972036.1075
C7 48.2 1000.0 309+72.40 309+24.25 2.7588 (d) 48.1 N0° 06' 52"E 6726734.1342,1972036.1075 6726734.2303,1972084.2536
L8 172.3 N1° 15' 54"W 309+24.25 307+51.96 6726734.2303,1972084.2536 6726730.4268,1972256.4999
C8 125.7 1500.0 307+51.96 306+26.29 4.8002 (d) 125.6 N3° 39' 54"W 6726730.4268,1972256.4999 6726722.3958,1972381.8756
L9 109.4 N6° 03' 55"W 306+26.29 305+16.93 6726722.3958,1972381.8756 6726710.8403,1972490.6276
C9 34.1 50.0 305+16.93 304+82.85 39.0539 (d) 33.4 N25° 35' 32"W 6726710.8403,1972490.6276 6726696.4019,1972520.7733
C10 30.8 50.0 304+82.85 304+52.04 35.3047 (d) 30.3 N27° 28' 00"W 6726696.4019,1972520.7733 6726682.4154,1972547.6793
L10 164.3 N9° 48' 52"W 304+52.04 302+87.74 6726682.4154,1972547.6793 6726654.4088,1972709.5781
C11 448.4 1500.0 302+87.74 298+39.38 17.1260 (d) 446.7 N18° 22' 39"W 6726654.4088,1972709.5781 6726513.5789,1973133.4870
L11 33.0 N26° 56' 25"W 298+39.38 298+06.42 6726513.5789,1973133.4870 6726498.6479,1973162.8662
C12 75.3 200.0 298+06.42 297+31.17 21.5580 (d) 74.8 N37° 43' 10"W 6726498.6479,1973162.8662 6726452.8805,1973222.0409
L12 1131.2 N48° 29' 54"W 297+31.17 286+00.00 6726452.8805,1973222.0409 6725605.7043,1973971.6024
Site 2-1 Control Points Number Easting Northing Elevation Description
117 6725231.762 1972759.059 34.2 CP/ ARS-17 FD/ 3.5
321 6725862.572 1973405.383 37.9 CP
408 6726297.069 1969977.478 51.9 CP/ 60D
409 6726347.191 1969516.012 43.9 CP/ 60D
C
C
R
E
I
D
G
E
RIGHT BANK
LEFT BANK
PROJECT ALIGNMENT
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
%%UGRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 200 FEET
A
T
U
F
E
A
T
U
C
L
S
H
E
P
A
E
C
A
L
L
I
S
T
E
S
A
N
D
B
U
R
G
D
R
IV
E
M
E
S
S
I
C
A
M
IL
L
IA
A
V
E
B
A
L
B
R
C
L
E
S
E
W
A
U
R
T
C
A
R
L
S
H
A
U
R
T
C
I
S
R
C
L
E
S
A
N
D
B
U
G
I V
E
S
A
N
D
B
U
I
V
E
C
A
M
P
U
M
M
O
C
A
D
I
L
L
C
A
D
I
L
L
A
M
E
R
I
C
V
E
R
F
A
K
V
D
S
A
N
D
B
U
R
G
D
R
IV
E
S
P
A
N
U
R
T
F
E
A
T
U
I V
E
F
E
A
T
U
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
L
E
V
E
E
R
IG
H
T
O
F
W
A
Y
F
L
O
W
A
G
E
E
S
M
T
F
A
V
D
F
E
A
T
U
F
E
A
T
U
C
L
S
H
E
P
A
E
C
A
L
L
I
S
T
E
S
A
N
D
B
U
R
G
D
R
IV
E
M
E
S
S
I
C
A
M
IL
L
IA
A
V
E
B
A
L
B
R
C
L
E
S
E
W
A
U
R
T
C
A
R
L
S
H
A
U
R
T
C
I
S
R
C
L
E
S
A
N
D
B
U
I V
E
S
A
N
D
B
U
I
V
E
C
A
M
P
M
M
O
C
A
D
I
L
L
C
A
D
I
L
L
A
M
E
R
I
C
V
E
R
F
A
V
D
S
A
N
D
B
U
R
G
D
R
IV
E
S
P
A
N
U
R
T
F
E
A
T
U
I V
E
F
E
A
T
U
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
C
A
D
I
L
L
I
V
E
L
E
V
E
E
R
IG
H
T
O
F
W
A
Y
F
L
O
W
A
G
E
E
S
M
T
F
A
V
D
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
456852-C-ACCS.dwg
A
M
E
R
I
C
V
E
R
NORTH
NOTES:
1. THE CONTRACTOR SHALL MAINTAIN CONTINUOUS
ACCESS FOR ROUTINE OPERATION AND MAINTENANCE
BY AMERICAN FLOOD CONTROL DISTRICT, CITY OF
SACRAMENTO, AND CALIFORNIA STATE UNIVERSITY
STAFF.
2. CONTRACTOR SHALL CONDUCT A WALKING VIDEO
SURVEY OF THE LEVEE CREST AT THE START OF
CONSTRUCTION TO DOCUMENT PRE-CONSTRUCTION
CONDITION. ADDITIONALLY, PRE AND POST PROJECT
SURVEY SHOTS ACCURATE TO THE NEAREST TENTH OF
A FOOT SHALL BE TAKEN AT 10 FOOT INTERVALS IN
EACH WHEEL TRACK ON THE LEVEE CREST FROM THE
ACCESS POINT AT GLENN HALL PARK UPSTREAM TO
EGRESS POINT ONTO THE SACRAMENTO STATE
CAMPUS. ANY DAMAGE SHALL BE REPAIRED
IMMEDIATELY BY FILLING AND COMPACTING RUTS.
BLADING IS NOT ALLOWED.
3. CONSTRUCTION TRAFFIC IS RESTRICTED TO EXISTING
ROADS AND ACCESS ROUTES AS INDICATED. DRIVING,
PARKING, OR STORING MATERIALS ON THE LEVEE AND
BANK SLOPE DURING ACTIVITIES NOT PART OF ACTIVE
CONSTRUCTION IS PROHIBITED. CONSTRUCTION
EQUIPMENT MAY ONLY BE PARKED WITHIN THE WORK
LIMITS AND STAGING AREAS.
4. CONSTRUCTION ACTIVITY IS LIMITED TO THE WORK
LIMITS AS SHOWN. THE WORK LIMITS EXTEND FROM THE
LANDSIDE EDGE OF THE LEVEE ROAD DEFINED BY THE
EDGE OF THE EXPOSED AGGREGATE BASE, TO THE
EDGE OF THE IN-WATER WORK (OFFSET 'W' ON SHEETS
C-302, C-303, AND C-304). WHERE THE EDGE OF WORK IS
NOT LOCATED IN-WATER, BEGINNING AT STATION
306+55, THE WORK LIMITS ARE SET 40 FEET FROM THE
EXPECTED EDGE OF EXCAVATION AS SHOWN ON SHEET
C-301.
5. SPEED LIMIT ON THE TOP OF LEVEE IS LIMITED TO 10
MPH. DUST MUST BE CONTROLLED PER THE APPROVED
DIRT AND DUST CONTROL PLAN.
6. TWO FLAGGERS SHALL BE PRESENT FOR TRAFFIC
CONTROL AT EACH INTERSECTION ON THE PARK
PROPERTY IN THE ACCESS ROUTE TO CONTROL
TRAFFIC WHEN EQUIPMENT OR TRUCKS ARE PRESENT.
7. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL
PLAN TO THE CONTRACTING OFFICER PRIOR TO
COMMENCEMENT OF WORK. REFER TO THE PROJECT
SPECIFICATIONS FOR REQUIREMENTS.
8. THE CONTRACTOR SHALL INSTALL TEMPORARY ORANGE
CONSTRUCTION WORK LIMIT FENCING AROUND THE
PROJECT LOCATION (DETAIL 1, SHEET C-506).
TEMPORARY CHAIN-LINK SECURITY FENCING AT LEAST 6
FEET TALL SHALL BE PLACED AROUND PROJECT
STAGING AREAS AND ALONG THE ACCESS ROUTE.
9. FOUR SEPARATE STAGING AREAS ARE IDENTIFIED. THE
7TH DAY ADVENTIST AND SCOTTISH RITE STAGING
AREAS ARE LOCATED ON PRIVATE PROPERTY. SEE
SPECIFICATION SECTION 01 50 00 FOR RESTRICTIONS.
10.THREE SEPARATE ACCESS AGREEMENTS WERE
PROVIDED FOR ACCESS TO STAGING AREAS AND HAUL
ROUTES. SEE SPECIFICATION 01 50 00 FOR
RESTRICTIONS WITH USE OF THESE ROUTES.
11.USE OF GLENN HALL PARK FOR SITE ACCESS WILL
REQUIRE THE CONTRACTOR TO ATTAIN A CITY OF
SACRAMENTO ENCROACHMENT PERMIT PRIOR TO USE.
12.INSTALL AND MAINTAIN A TURBIDITY CURTAIN FOR ALL
IN-WATER WORK MEETING ALL REQUIREMENTS OF
PARAGRAPH WATER RESOURCES IN SPECIFICATION 01
57 19 AND ALL REQUIREMENTS OF PROJECT PERMITS.
G-101
A C
C E
L A
M M
E R
S
T
S H
I N
K L E
B
W O
L F
E
B
W A
R D
M A
N
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
PROJECT LIMITS (US FT)
CORNER # NORTHING EASTING
1 1969555.96 6725152.46
2 1969651.09 6725403.91
3 1969773.32 6725743.07
4 1969519.42 6725800.72
5 1969399.30 6725827.99
6 1969390.78 6725775.62
7 1969357.78 6725781.97
8 1969332.44 6725697.44
9 1969462.39 6725666.25
10 1969480.62 6725700.10
11 1969491.04 6725697.50
12 1969511.46 6725771.76
13 1969682.79 6725732.86
14 1969731.65 6725686.45
15 1969630.88 6725406.84
PROJECT LIMITS (US FT)
CORNER # NORTHING EASTING
16 1969594.16 6725412.17
17 1969519.50 6725159.57
18 1969722.50 6725816.14
19 1969803.02 6726169.71
20 1969816.08 6726231.68
21 1969616.49 6726243.68
22 1969486.48 6726262.18
23 1969474.85 6726211.06
24 1969783.19 6726172.08
25 1969703.00 6725820.56
26 1973721.23 6725817.77
27 1973968.60 6725494.46
28 1974107.47 6725603.00
29 1973870.51 6725937.64
PRESERVATION FENCE
WITH SEDIMENT BARRIER
ON DOWNHILL SIDE OF WORK LIMIT
SEE DETAIL 2, SHEET C-506
INTERNAL HAUL ROUTE
TURBIDITY CURTAIN AT IN-WATER
WORK/GRADING LIMITS, SEE NOTE 12
ACCESS TO TOE OF SLOPE
SEE DETAIL 6, SHEET C-506
ACCESS TO TOE OF SLOPE
SEE DETAIL 6, SHEET C-506
GATE
CONSTRUCTION
ACCESS/EGRESS
7th DAY ADVENTIST
STAGING AREA
0.413 ACRES
7th DAY ADVENTIST
TEMPORARY ACCESS
EASEMENT 0.166 ACRES
SCOTTISH RITE STAGING AREA 1
0.448 ACRES
SCOTTISH RITE TEMPORARY
ACCESS EASEMENT
0.355 ACRES
C
A
M
E
L
L
E
SCOTTISH RITE STAGING AREA 2
0.265 ACRES
WORK LIMIT FENCE ON UPHILL
SIDE OF WORK LIMIT,
SEE DETAIL 1, SHEET C-506
INTERNAL HAUL ROUTE
STAGING AREA
1.7 ACRES
RAMP ACCESS ROUTE FROM
PARKING STALLS ONTO LAWN TO
AVOID UTILITY ENCLOSURE
CONSTRUCT TEMPORARY
CONSTRUCTION ACCESS
SEE GLENN HALL PARK ACCESS NOTES
EXISTING GATE AND LIGHTPOST
(PROTECT IN PLACE)
UTILITY ENCLOSURE AND
OVERHEAD POWERLINE
(PROTECT IN PLACE)
S
E
X
T
E
R
N
U
T
E
S
GLENN HALL PARK ACCESS NOTES:
1. CONSTRUCT TEMPORARY CONSTRUCTION ACCESS
EAST OF CURRENT ENTRANCE TO GLENN HALL PARK BY
RAMPING OVER EXISTING CURB. PROVIDE TRAFFIC
CONTROL AT THIS ENTRANCE AT ALL TIMES WHEN
EQUIPMENT OR TRUCKS ARE PRESENT.
2. REMOVE EXISTING BOLLARDS AND SIGNAGE ALONG
SANDBURG DRIVE TO THE EXTENT NECESSARY TO
FACILITATE CONSTRUCTION ACCESS. PROVIDE
TEMPORARY SIGNAGE FOR SIGNS REMOVED.
3. PROTECT IN PLACE EXISTING IRRIGATION FACILITIES
ALONG TEMPORARY CONSTRUCTION ACCESS ROUTE.
4. MAINTAIN PUBLIC ACCESS TO GLENN HALL PARKING LOT
AT ALL TIMES USING THE EXISTING CIRCULAR TRAFFIC
PATTERN.
5. ON THE EAST SIDE OF THE PARKING LOT, CLOSE ALL
PARKING STALLS. .
6. REPLACE ALL FACILITIES, STRUCTURES, AND
LANDSCAPING TO PRE-PROJECT CONDITIONS AFTER
CONSTRUCTION
MAINTAIN PUBLIC
ACCESS TO LEVEE
ROAD RUNNING WEST
AutoCAD SHX Text
8' PT&T UNDERGROUND CABLE EASEMENT.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
15' DRAIN LINE ESMT.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
10' S.M.U.D. EASEMENT
AutoCAD SHX Text
5' S.M.U.D. EASEMENT
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
WEST LINE 5' S.M.U.D. LEVEE EASEMENT.
AutoCAD SHX Text
WEST LINE 5' S.M.U.D. LEVEE EASEMENT.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
8' PT&T UNDERGROUND CABLE EASEMENT.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
15' DRAIN LINE ESMT.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
10' S.M.U.D. EASEMENT
AutoCAD SHX Text
5' S.M.U.D. EASEMENT
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text 10' P.U.E.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
WEST LINE 5' S.M.U.D. LEVEE EASEMENT.
AutoCAD SHX Text
WEST LINE 5' S.M.U.D. LEVEE EASEMENT.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
EASTERLY LINE OF LEVEE EASEMENT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 200 FEET
%%UGRAPHIC SCALE
T R
E E
T
U
N
IV
E
R
S
IT
Y
A
V
E
AMERICAN RIVER
F
A
V
D
J
S
T R
E E
T
U
N
IV
E
R
S
IT
Y
A
V
E
AMERICAN RIVER
F
A
V
D
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
G-102
A C
C E
A
N
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
456852-C-ACCS.dwg
M
E
R
I C
V
E
R
S
A
D
E
S
T
R
I
I
D
G
E
NORTH
H
S
T R
E E
T
B
R I D
G E
NOTES (CONTINUED FROM SHEET G-004):
13. CONTRACTOR SHALL CLOSE PUBLIC ACCESS AT IDENTIFIED
LOCATIONS. CONTRACTOR MUST MAINTAIN SAFE
PEDESTRIAN ACCESS TO GUY WEST PEDESTRIAN BRIDGE.
14. CONTRACTOR SHALL FULLY CLOSE THE BIKE TRAIL AT
LOCATIONS SHOWN WITH ORANGE REFLECTIVE BARRIERS
WHICH FULLY SPAN THE PAVED PATHWAY AND EXTEND 6
FEET PAST EACH SIDE OF THE TRAIL. THE BARRIERS SHALL
INCLUDE TRAIL CLOSURE SIGNS AND TRUCK CROSSING
WARNINGS.
15. CONTRACTOR SHALL LOCATE TRAIL CLOSURE WARNING
AND DETOUR SIGNS ON THE BIKE TRAIL 200 FT AND 100 FT
UP THE TRAIL FROM THE CLOSURE.
16. CONTRACTOR SHALL INSTALL AND MAINTAIN THE BIKE
DETOUR ROUTE SHOWN ON THESE DRAWINGS AND IN
ACCORDANCE WITH ALL REQUIREMENTS OF SPECIFICATION
01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS.
17. THE BIKE TRAIL DETOUR ROUTE SHALL BE KEPT CLEAR OF
DEBRIS AND OBSTRUCTIONS, AND THE INTEGRITY OF THE
PAVEMENT SHALL BE MAINTAINED AS TO NOT INHIBIT THE
SAFE PASSAGE OF PEDESTRIANS AND BIKE TRAFFIC.
18. THE BIKE TRAIL DETOUR WILL ROUTE CYCLISTS FROM THE
CAMELLIA DRIVE BIKE TRAIL ENTRANCE TO GUY WEST
BRIDGE USING H-STREET BIKE LANE, CARLSON DRIVE BIKE
LANE, SACRAMENTO STATE BIKE TRAIL, ARBORETUM
WAY/COLLEGE TOWN DR, SINCLAIR RD, RAMP TO GUY WEST
BRIDGE. THE BIKE TRAIL DETOUR WILL NEED TO RETURN
BIKE TRAFFIC FROM GUY WEST BRIDGE TO J-STREET VIA
SINCLAIR RD, COLLEGE TOWN DR/ARBORETUM WAY,
SACRAMENTO STATE BIKE TRAIL.
19. CONTRACTOR'S USE OF THE MAINTENANCE ROAD
UNDERNEATH THE H STREET BRIDGE SHALL BE RESTRICTED
TO EQUIPMENT AND TRUCKS THAT PROVIDE A MINIMUM OF 3
FEET OF CLEARANCE FROM THE LOW CHORD OF THE
BRIDGE, ANY UTILITIES ATTACHED TO THE BRIDGE, AND ANY
ANCILLARY FACILITIES OF THE BRIDGE. LOWERING OF THE
MAINTENANCE ROAD TO ACCOMMODATE TALLER VEHICLES
UNDER THE BRIDGE IS PROHIBITED. PROTECT IN PLACE ALL
COMPONENTS AND FACILITIES OF THE H STREET BRIDGE.
PROTECT IN PLACE ALL OVERHEAD POWER LINES AND
ASSOCIATED POWER POLES.
20. THE CITY OF SACRAMENTO SUMP 101 OUTFALL PIPE IS A
66-INCH DIAMETER STEEL WELDED A-36 STEEL PIPE
DESIGNED WITH A MINIMUM OF 1.5 FEET OF COVER. THE
CONTRACTOR MUST VERIFY PIPE COVER BELOW HAUL
ROUTES AND EQUIPMENT ACCESS IS AT LEAST 1.5 FEET.
10-FEET X 6-FEET X 1-INCH STEEL PLATE MUST BE PLACED
OVER THE PIPE IF COVER OVER THE PIPE IS LESS THAN 2.5
FEET. NO ADDITIONAL PIPE PROTECTION IS NEEDED IF 2.5
FEET OF COVER IS PROVIDED OVER THE PIPE.
21. THE CSUS OUTFALL IS A 16-INCH WELDED STEEL PIPE A-36
WITH A MINIMUM DESIGN COVER OF 1 FOOT. THE
CONTRACTOR MUST VERIFY PIPE OVER BELOW HAUL
ROUTES AND EQUIPMENT ACCESS IS AT LEAST 1 FOOT.
10-FEET X 6-FEET X 1-INCH STEEL PLATE MUST BE PLACED
OVER THE PIPE IF THE COVER OVER THE PIPE IS LESS THAN
2 FEET. NO ADDITIONAL PIPE PROTECTION IS NEEDED IF 2
FEET OF COVER IS PROVIDED AT THE PIPE.
22. IF OPTIONAL H STREET BRIDGE INGRESS ROUTE IS USED,
CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING CITY
OF SACRAMENTO ENCROACHMENT PERMIT, OVERHEAD
UTILITY COORDINATION, AND TREE TRIMMING. SEE
SPECIFICATION SECTION 31 11 00 FOR TREE TRIMMING
REQUIREMENTS.
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
ACCESS TO TOE OF SLOPE
SEE DETAIL 6, SHEET C-506
TURBIDITY CURTAIN AT IN-WATER WORK/GRADING
LIMITS, SEE NOTE 12 SHEET G-004
ONE-WAY BIKE TRAIL DETOUR
TWO-WAY BIKE TRAIL DETOUR
J-STREET TO GUY WEST BRIDGE
ONE WAY BIKE TRAIL DETOUR
TO GUY WEST BRIDGE
SCOTTISH RITE
STAGING AREA
0.448 ACRES
OPTIONAL ONE-WAY INGRESS
TO WORK AREA UPSTREAM OF
H STREET BRIDGE,
TRAFFIC CONTROLS REQUIRED
SEE NOTE 22
CLOSE TRAIL ACCESS
CLOSE TRAIL ACCESS
RESTRICTED ACCESS, SEE NOTE 19
ACCESS TO TOE OF SLOPE
SEE DETAIL 6, SHEET C-506
END LIMITS OF WORK
WORK LIMIT FENCING
PRESERVATION FENCE
WITH SEDIMENT BARRIER
ON DOWNHILL SIDE OF WORK LIMIT
SEE DETAIL 2, SHEET C-506
INTERNAL HAUL ROUTE
EGRESS OF EMPTY HAUL TRUCKS
AND LIGHT PASSENGER VEHICLES ONLY
EGRESS FROM
STATE UNIVERSITY DRIVE TO
COLLEGE TOWN DRIVE
EGRESS FROM SITE AT THIS
LOCATION PROHIBITED 8/26/22
AND 8/29/22 THROUGH 9/9/22
TWO WAY
BIKE TRAIL DETOUR
PROVIDE TRAFFIC CONTROL
AT PEDESTRIAN BRIDGE
PROVIDE TRAFFIC CONTROL
AT TRAIL CLOSURE
TO ALLOW ACCESS TO
PEDESTRIAN BRIDGE
CLOSE TRAIL ACCESS
S
T
A
I V
E
R
S
I
Y
I V
E
EGRESS ROUTE TO COLLEGE
TOWN DRIVE ROUTE ONLY
TO BE USED ON DATES
8/26/22 AND 8/29/22 THROUGH
9/9/22
TEMPORARY LOAD
MITIGATION REQUIRED
FOR CROSSING BURIED
WATER LINES
7th DAY
ADVENTIST
STAGING AREA
0.413 ACRES
EXISTING CITY OF
SACRAMENTO OUTFALL
S-101 BURIED PIPE
CROSSING
SEE NOTE 20
CSUS PUMP OUTFALL PIPE
CROSSING SEE NOTE 21
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 200 FEET
%%UGRAPHIC SCALE
E R
IC
A
N R
IV
E
R
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
G-103
E X
T E
R N
U
L
R
O U
T E
S
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
456852-C-TP21.dwg
NOT FOR
CONSTRUCTION
H
O
CARLSON D
R
C
A
R
L
S
F
A
S A
N D
B U
CAMELLIA AVE
H
O
NOTES
1. CONTRACTOR'S INGRESS/EGRESS ROUTES TO SITE 2-1 FOR
HAULING MATERIALS, EQUIPMENT DELIVERY, AND ALL LARGE
TRANSPORTS SHALL BE LIMITED TO THE ROUTES SHOWN ON
THIS SHEET.
2. SUBMIT A TRAFFIC CONTROL PLAN THAT DEFINES
INGRESS/EGRESS ROUTES USED TO ACCESS THE SITE.
TRAFFIC CONTROL PLAN SHALL INCLUDE CONTRACTOR'S
APPROACH TO MEETING THE TRAVEL REQUIREMENTS
LISTED BELOW AND SHALL DEMONSTRATE CONFORMANCE
WITH ALL REQUIREMENTS OF PARAGRAPH TRAFFIC
PROVISIONS IN SECTION 01 50 00, TEMPORARY
CONSTRUCTION FACILITIES AND CONTROLS.
3. INGRESS/EGRESS FROM HIGHWAY 50 / INTERSTATE 80 TO
SITE 2-1 SHALL BE VIA HOWE AVENUE TO FAIR OAKS
BOULEVARD.
4. 75 PERCENT OF HAUL TRUCKS ENTERING/EXITING THE SITE
2-1 ACCESS POINT AT GLENN HALL PARK SHALL USE THE
CARLSON DRIVE ROUTE.
5. 25 PERCENT OF HAUL TRUCKS ENTERING THE SITE 2-1
ACCESS POINT AT GLENN HALL PARK SHALL USE THE
REGIONAL TRANSIT ROUTE (CARLSON DRIVE TO MESSINA
DRIVE TO SPILMAN AVENUE).
6. 25 PERCENT OF HAUL TRUCKS EXITING THE SITE 2-1 ACCESS
POINT AT GLENN HALL PARK SHALL USE THE REGIONAL
TRANSIT ROUTE (SPILMAN AVENUE TO MINERVA AVENUE TO
SANDBURG DRIVE TO MODDISON AVENUE).
7. USE OF THE OPTIONAL EGRESS ROUTE THROUGH THE 7TH
DAY ADVENTIST CHURCH PARKING LOT IS PROHIBITED FROM
4 PM ON FRIDAY THROUGH 9 AM ON SUNDAY.
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
U S
GLENN HALL PARK
INGRESS/EGRESS POINT
S
P
I
L
L
M
E
M E
S S
I N
A
D
R
S
T
E
OPTIONAL EGRESS
SEE NOTE 7
SITE 2-1
S
M
I
N
E
R
E
S
A
N
D
B
U
M
O
D
D
I
S
E
OPTIONAL INGRESS FOR
SOME HAUL TRUCKS
SACRAMENTO STATE UNIVERSITY
H ST BRIDGE
OPTIONAL EGRESS FOR HAUL TRUCKS
E
A
F
A
I
R
B
A
I
R
N
S
T
A
I V
E
R
S
I
Y
S
T
C
O
L
L
E
U S
OPTIONAL EGRESS FOR HAUL TRUCKS
AutoCAD SHX Text
%%UGRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 500 FEET
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
456852-C-XD21.dwg
NORTH
M A
T C
H L I N
E
S
H E
PRESERVATION FENCE WITH
SEDIMENT BARRIER ON DOWNHILL
SIDE OF WORK LIMIT
SEE DETAIL 2, SHEET C-506
C-101
C L
E A
R I N
G
G
R U
B B
I N
G
V
E G
E T
A T
I O
N
P
R O
T E
C T
I O
N
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
NOTES:
1. GOVERNMENT WILL CLEAR THE WORK LIMITS OF TREES, SHRUBS, AND OTHER
VEGETATION IN THE WINTER PRIOR TO THE CONTRACTOR TAKING POSSESSION OF THE
SITE. SOME VEGETATION AND REGROWTH MAY OCCUR BETWEEN VEGETATION
CLEARING AND WHEN THE CONTRACTOR TAKES CONTROL OF THE SITE.
2. TREES WILL BE LEFT WITH A 4-FOOT STUMP TO FACILITATE GRUBBING BY THE
CONTRACTOR. SHRUBS, TREES UNDER 6 INCHES IN DIAMETER, AND OTHER
VEGETATION WILL BE CUT ROUGHLY 6 INCHES FROM THE GROUND SURFACE. SEE
DETAIL 5 SHEET C-503 FOR STUMP REMOVAL.
3. VEGETATION NOT CLEARED BY THE GOVERNMENT THAT CONFLICTS WITH THE WORK
SHOWN IN THE DRAWINGS, SHALL BE CLEARED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE GOVERNMENT IN ACCORDANCE WITH SPECIFICATION 31 11
00, CLEARING AND GRUBBING AND THE REQUIREMENTS AND SCHEDULE CONSTRAINTS
INCLUDED IN SPECIFICATION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
4. STRIPPING MAY REQUIRE THE REMOVAL OF SOME EXISTING COBBLE GROUND COVER
WITH VEGETATION.
STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION
4214 11" BLACK LOCUST 1276 69" FREMONT COTTONWOOD 1302 18" FREMONT COTTONWOOD 2843 14" FREMONT COTTONWOOD 4219 8" COAST LIVE OAK 4245 10" GOODDING'S WILLOW 4274 11" OREGON ASH
4215 13" BLACK LOCUST 1277 6" SNAG 1303 33" FREMONT COTTONWOOD 2844 13" FREMONT COTTONWOOD 4220 61" FREMONT COTTONWOOD 4253 11" OREGON ASH 4277 17" GOODDING'S WILLOW
4216 7" BLACK LOCUST 1278 6" COAST LIVE OAK 1304 20" FREMONT COTTONWOOD 2845 28" FREMONT COTTONWOOD 4223 6" SILVER MAPLE 4254 6" OREGON ASH 4278 13" NORTHERN CALIFORNIA BLACK WALNUT
4217 7" BLACK LOCUST 1279 11" ARROYO WILLOW 1305 16" FREMONT COTTONWOOD 2846 8" OREGON ASH 4224 10" NORTHERN CALIFORNIA BLACK WALNUT 4255 9" OREGON ASH 4279 11" NORTHERN CALIFORNIA BLACK WALNUT
4218 10" BLACK LOCUST 1280 6" COAST LIVE OAK 1306 8" FREMONT COTTONWOOD 2847 12" OREGON ASH 4225 12" BOX ELDER 4256 10" OREGON ASH 4280 7" NORTHERN CALIFORNIA BLACK WALNUT
4222 28" RED GUM 1281 22" FREMONT COTTONWOOD 1307 6" GOODDING'S WILLOW 2848 10" OREGON ASH 4226 6" OREGON ASH 4257 12" OREGON ASH 4281 11" SOUTHERN CALIFORNIA BLACK WALNUT
4227 7" BLACK LOCUST 1282 13" FREMONT COTTONWOOD 1308 7" FREMONT COTTONWOOD 2849 22" FREMONT COTTONWOOD 4228 35" FREMONT COTTONWOOD 4258 17" OREGON ASH 4286 17" RED WILLOW
1283 7" GOODDING'S WILLOW 1309 18" FREMONT COTTONWOOD 2850 10" BOX ELDER 4229 10" GOODDING'S WILLOW 4259 9" FREMONT COTTONWOOD 4287 8" RED WILLOW
1284 17" FREMONT COTTONWOOD 1310 8" FREMONT COTTONWOOD 2851 16" OREGON ASH 4230 9" GOODDING'S WILLOW 4260 7" OREGON ASH 4288 8" RED WILLOW
1285 6" FREMONT COTTONWOOD 1311 19" FREMONT COTTONWOOD 2852 18" SILVER MAPLE 4231 14" GOODDING'S WILLOW 4261 9" OREGON ASH 4289 7" OREGON ASH
1286 26" FREMONT COTTONWOOD 2831 6" NARROW LEAVED WILLOW 2853 30" FREMONT COTTONWOOD 4232 10" GOODDING'S WILLOW 4262 6" OREGON ASH
1287 24" FREMONT COTTONWOOD 2832 24" OREGON ASH 2854 7" OREGON ASH 4233 22" FREMONT COTTONWOOD 4263 9" OREGON ASH
1289 27" FREMONT COTTONWOOD 2833 6" NARROW LEAVED WILLOW 2855 10" AMERICAN ELM 4234 13" AMERICAN ELM 4264 9" OREGON ASH
1293 26" FREMONT COTTONWOOD 2834 6" NARROW LEAVED WILLOW 2856 8" OREGON ASH 4235 29" FREMONT COTTONWOOD 4265 7" NORTHERN CALIFORNIA BLACK WALNUT
1294 17" FREMONT COTTONWOOD 2835 11" GOODDING'S WILLOW 2857 36" FREMONT COTTONWOOD 4236 7" AMERICAN ELM 4266 6" OREGON ASH
1295 12" FREMONT COTTONWOOD 2836 7" GOODDING'S WILLOW 2858 9" OREGON ASH 4237 12" AMERICAN ELM 4267 47" FREMONT COTTONWOOD
1296 32" FREMONT COTTONWOOD 2837 11" GOODDING'S WILLOW 2860 9" NORTHERN CALIFORNIA BLACK WALNUT 4239 46" FREMONT COTTONWOOD 4268 18" OREGON ASH
1297 18" FREMONT COTTONWOOD 2838 26" FREMONT COTTONWOOD 2861 17" FREMONT COTTONWOOD 4240 6" GOODDING'S WILLOW 4269 28" FREMONT COTTONWOOD
1298 10" FREMONT COTTONWOOD 2839 10" OREGON ASH 2864 12" OREGON ASH 4241 6" GOODDING'S WILLOW 4270 8" NORTHERN CALIFORNIA BLACK WALNUT
1299 9" BOX ELDER 2840 12" OREGON ASH 2865 9" SOUTHERN CALIFORNIA BLACK WALNUT 4242 8" GOODDING'S WILLOW 4271 6" OREGON ASH
1300 8" SNAG 2841 10" OREGON ASH 2866 41" FREMONT COTTONWOOD 4243 7" GOODDING'S WILLOW 4272 9" OREGON ASH
1301 19" FREMONT COTTONWOOD 2842 7" OREGON ASH 2867 8" OREGON ASH 4244 12" AMERICAN ELM 4273 18" AMERICAN ELM
STAGING AREA BOUNDARY,
SEE SHEET C-506
GRADING LIMIT
WORK LIMIT FENCE ON UPHILL
SIDE OF WORK LIMIT,
SEE DETAIL 1, SHEET C-506
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
%%UGRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 80 FEET
AutoCAD SHX Text
TREE TO BE PROTECTED
STUMP TO BE REMOVED
E
R
I
C
V
E
R
EXISTING ROCK AT SITE 6.4L
PROTECT IN PLACE
SEE SHEETS C-007, C-013,
AND C-016 FOR DETAILS
NORTH
M A
T C
H L I N
E
S
H E
M A
T C
H L I N
E
S
H E
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
C-102
C L
E A
R I N
G
G
R U
B B
I N
G
V
E G
E T
A T
I O
N
P
R O
T E
C T
I O
N
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
GRADING LIMIT
456852-C-XD21.dwg
GRADING LIMIT
NOTES:
1. GOVERNMENT WILL CLEAR THE WORK LIMITS OF TREES, SHRUBS, AND OTHER
VEGETATION IN THE WINTER PRIOR TO THE CONTRACTOR TAKING POSSESSION OF THE
SITE. SOME VEGETATION AND REGROWTH MAY OCCUR BETWEEN VEGETATION
CLEARING AND WHEN THE CONTRACTOR TAKES CONTROL OF THE SITE.
2. TREES WILL BE LEFT WITH A 4-FOOT STUMP TO FACILITATE GRUBBING BY THE
CONTRACTOR. SHRUBS, TREES UNDER 6 INCHES IN DIAMETER, AND OTHER
VEGETATION WILL BE CUT ROUGHLY 6 INCHES FROM THE GROUND SURFACE. SEE
DETAIL 5 SHEET C-503 FOR STUMP REMOVAL.
3. VEGETATION NOT CLEARED BY THE GOVERNMENT THAT CONFLICTS WITH THE WORK
SHOWN IN THE DRAWINGS, SHALL BE CLEARED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE GOVERNMENT IN ACCORDANCE WITH SPECIFICATION 31 11
00, CLEARING AND GRUBBING AND THE REQUIREMENTS AND SCHEDULE CONSTRAINTS
INCLUDED IN SPECIFICATION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
4. STRIPPING MAY REQUIRE THE REMOVAL OF SOME EXISTING COBBLE GROUND COVER
WITH VEGETATION.
WORK LIMIT
GRADING LIMIT
WORK LIMIT FENCE ON UPHILL
SIDE OF WORK LIMIT, SEE
DETAIL 1, SHEET C-506
STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION TREE# DESCRIPTION
1320 11" TREE OF HEAVEN 1312 19" FREMONT COTTONWOOD 2859 34" FREMONT COTTONWOOD 2891 23" FREMONT COTTONWOOD 2917 9" BOX ELDER 2945 18" FREMONT COTTONWOOD 2971 32" FREMONT COTTONWOOD
2925 16" RED GUM 1313 15" FREMONT COTTONWOOD 2862 12" OREGON ASH 2892 10" OREGON ASH 2918 8" RED WILLOW 2946 12" FREMONT COTTONWOOD 2972 9" WHITE ALDER
2932 14" BLACK LOCUST 1314 12" COAST LIVE OAK 2863 19" AMERICAN ELM 2893 14" BOX ELDER 2919 7" OREGON ASH 2947 9" WHITE ALDER 2973 6" OREGON ASH
4285 9" BLACK LOCUST 1315 10" COAST LIVE OAK 2868 15" BOX ELDER 2894 8" OREGON ASH 2920 8" OREGON ASH 2948 18" WHITE ALDER 2974 13" OREGON ASH
1316 21" OREGON ASH 2869 13" OREGON ASH 2895 7" OREGON ASH 2921 6" OREGON ASH 2949 13" OREGON ASH 2975 25" WHITE ALDER
1317 21" CANYON LIVE OAK 2870 9" OREGON ASH 2896 10" FREMONT COTTONWOOD 2922 11" OREGON ASH 2950 16" WHITE ALDER 2976 13" WHITE ALDER
1318 8" NORTHERN CALIFORNIA BLACK WALNUT 2871 10" FREMONT COTTONWOOD 2897 7" GOODDING'S WILLOW 2923 21" OREGON ASH 2951 14" WHITE ALDER 2977 18" FREMONT COTTONWOOD
1319 7" BOX ELDER 2872 11" BOX ELDER 2898 14" FREMONT COTTONWOOD 2924 8" AMERICAN ELM 2952 19" WHITE ALDER 2978 8" OREGON ASH
1321 26" NORTHERN CALIFORNIA BLACK WALNUT 2873 15" OREGON ASH 2899 8" FREMONT COTTONWOOD 2926 8" WHITE ALDER 2953 21" WHITE ALDER 2979 12" FREMONT COTTONWOOD
1322 6" NORTHERN CALIFORNIA BLACK WALNUT 2874 16" FREMONT COTTONWOOD 2900 14" SILVER MAPLE 2927 14" WHITE ALDER 2954 9" CALIFORNIA SYCAMORE 2980 9" WHITE ALDER
1323 10" NORTHERN CALIFORNIA BLACK WALNUT 2875 17" FREMONT COTTONWOOD 2901 8" OREGON ASH 2928 12" CHINESE ELM 2955 15" WHITE ALDER 2981 13" WHITE ALDER
1324 6" BOX ELDER 2876 6" BOX ELDER 2902 16" CHINESE ELM 2929 10" BOX ELDER 2956 21" FREMONT COTTONWOOD 2982 17" WHITE ALDER
1325 38" NORTHERN CALIFORNIA BLACK WALNUT 2877 17" BOX ELDER 2903 30" FREMONT COTTONWOOD 2930 13" CHINESE ELM 2957 16" FREMONT COTTONWOOD 2983 8" BOX ELDER
1326 51" NORTHERN CALIFORNIA BLACK WALNUT 2878 11" OREGON ASH 2904 14" SILVER MAPLE 2931 28" NORTHERN CALIFORNIA BLACK WALNUT 2958 7" WHITE ALDER 2984 11" OREGON ASH
1327 8" SNAG 2879 8" BOX ELDER 2905 14" GOODDING'S WILLOW 2933 12" BOX ELDER 2959 12" WHITE ALDER 2987 17" WHITE ALDER
1328 11" OREGON ASH 2880 18" OREGON ASH 2906 26" GOODDING'S WILLOW 2934 13" SILVER MAPLE 2960 11" PACIFIC WILLOW 4282 9" OREGON ASH
1330 7" CANYON LIVE OAK 2881 8" BOX ELDER 2907 8" OREGON ASH 2935 19" FREMONT COTTONWOOD 2961 11" RED WILLOW 4283 8" PACIFIC WILLOW
1331 8" NORTHERN CALIFORNIA BLACK WALNUT 2882 20" CHINESE ELM 2908 9" OREGON ASH 2936 6" SILVER MAPLE 2962 8" CALIFORNIA SYCAMORE 4284 6" OREGON ASH
1332 36" HOLLY OAK 2883 8" RED WILLOW 2909 13" OREGON ASH 2937 9" FREMONT COTTONWOOD 2963 21" WHITE ALDER 4290 7" OREGON ASH
1333 29" NORTHERN CALIFORNIA BLACK WALNUT 2884 7" OREGON ASH 2910 11" OREGON ASH 2938 6" BOX ELDER 2964 11" SNAG 4291 6" OREGON ASH
1334 19" BOX ELDER 2885 12" CHINESE ELM 2911 35" FREMONT COTTONWOOD 2939 12" PACIFIC WILLOW 2965 28" WHITE ALDER 4292 20" AMERICAN ELM
1335 12" OREGON ASH 2886 6" OREGON ASH 2912 8" VALLEY OAK 2940 7" GOODDING'S WILLOW 2966 15" WHITE ALDER 4293 10" OREGON ASH
1336 20" NORTHERN CALIFORNIA BLACK WALNUT 2887 8" RED WILLOW 2913 9" AMERICAN ELM 2941 28" FREMONT COTTONWOOD 2967 12" WHITE ALDER 4294 14" SILVER MAPLE
1337 10" CHINESE PISTACHIO 2888 6" OREGON ASH 2914 7" AMERICAN ELM 2942 20" GOODDING'S WILLOW 2968 10" SNAG 4295 7" OREGON ASH
1338 9" CANYON LIVE OAK 2889 13" BOX ELDER 2915 6" OREGON ASH 2943 15" FREMONT COTTONWOOD 2969 18" WHITE ALDER 4296 12" FREMONT COTTONWOOD
1340 15" OREGON ASH 2890 12" FREMONT COTTONWOOD 2916 11" OREGON ASH 2944 10" CHINESE ELM 2970 9" RED WILLOW 4297 7" OREGON ASH
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
%%UGRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 80 FEET
AutoCAD SHX Text
TREE TO BE PROTECTED
STUMP TO BE REMOVED
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
A M
E R
IC
A
N R
IV
E
R
H
S
T R
E E
T
B
R I D
G E
NORTH
M A
T C
H L I N
E
S
H E
REMOVE AND REPLACE
EXISTING GATE
ELDERBERRY SHRUB, PROTECT
IN PLACE, SEE NOTE 5
C-103
C L
E A
R I N
G
G
R U
B B
I N
G
V
E G
E T
A T
I O
N
P
R O
T E
C T
I O
N
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
ELDERBERRY SHRUB
TRANSPLANTED BY
OTHERS, SEE NOTE 6
GRADING LIMIT
456852-C-XD21.dwg
REMOVE PAVED PORTION OF
BIKE TRAIL WITHIN WORK LIMITS,
SEE NOTE 7
FENCE (PROTECT IN PLACE)
NOTES:
1. GOVERNMENT WILL CLEAR THE WORK LIMITS OF TREES, SHRUBS, AND OTHER VEGETATION
IN THE WINTER PRIOR TO THE CONTRACTOR TAKING POSSESSION OF THE SITE. SOME
VEGETATION AND REGROWTH MAY OCCUR BETWEEN VEGETATION CLEARING AND WHEN
THE CONTRACTOR TAKES CONTROL OF THE SITE.
2. TREES WILL BE LEFT WITH A 4-FOOT STUMP TO FACILITATE GRUBBING BY THE
CONTRACTOR. SHRUBS, TREES UNDER 6 INCHES IN DIAMETER, AND OTHER VEGETATION
WILL BE CUT ROUGHLY 6 INCHES FROM THE GROUND SURFACE. SEE DETAIL 5 SHEET C-503
FOR STUMP REMOVAL.
3. VEGETATION NOT CLEARED BY THE GOVERNMENT THAT CONFLICTS WITH THE WORK
SHOWN IN THE DRAWINGS, SHALL BE CLEARED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE GOVERNMENT IN ACCORDANCE WITH SPECIFICATION 31 11 00, CLEARING AND
GRUBBING AND THE REQUIREMENTS AND SCHEDULE CONSTRAINTS INCLUDED IN
SPECIFICATION 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
4. ROCK REVETMENT IDENTIFIED FOR REMOVAL ON THIS SHEET MAY BE SALVAGED BY THE
CONTRACTOR AND INCORPORATED INTO THE WORK PROVIDED SALVAGED ROCK MEETS
THE REQUIREMENTS OF SPECIFICATION SECTION 35 42 38 STONE PROTECTION. EXTENTS
OF ROCK ON THE PLANSET ARE APPROXIMATE AND MAY VARY IN FIELD.
5. ELDERBERRY SHRUBS IDENTIFIED AS PROTECTED-IN-PLACE SHALL BE PROTECTED AT ALL
TIMES. CONTRACTOR SHALL FENCE A MINIMUM 20-FOOT SETBACK AVOIDANCE AREA FROM
THE DRIPLINE OF THE ELDERBERRY SHRUBS. SEE PARAGRAPH VALLEY ELDERBERRY
LONGHORN BEETLE (VELB) IN SPECIFICATION 01 57 19 TEMPORARY ENVIRONMENTAL
CONTROLS FOR ADDITIONAL REQUIREMENTS.
6. ELDERBERRY SHRUBS IDENTIFIED AS TRANSPLANTED SHALL BE RELOCATED BY THE
GOVERNMENT PRIOR TO THE CONTRACTOR TAKING POSSESSION OF THE SITE.
7. CONTRACTOR TO REMOVE AND REPLACE THE PAVED BIKE TRAIL WITHIN THE WORK LIMITS
AFTER COMPLETION OF GRADING. CONTRACTOR TO SURVEY ALIGNMENT OF BIKE TRAIL
PRIOR TO REMOVAL AND REPLACE ALONG SURVEYED ALIGNMENT PER DETAIL 6 SHEET
C-504 AND THE REQUIREMENTS OF SPECIFICATION 32 11 23 AGGREGATE BASE COURSES
AND 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS.
8. STRIPPING MAY REQUIRE THE REMOVAL OF SOME EXISTING COBBLE GROUND COVER WITH
VEGETATION.
CLOSE TRAIL ACCESS,
SEE NOTE 7
STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION STUMP# DESCRIPTION
1343 52" RED GUM 1339 20" NORTHERN CALIFORNIA BLACK WALNUT 3006 20" BOX ELDER 3041 10" CALIFORNIA SYCAMORE 4152 16" OREGON ASH
3017 7" CHINESE TALLOW 1341 26" BLUE OAK 3007 11" PACIFIC WILLOW 3042 30" WHITE ALDER 4153 6" OREGON ASH
1342 9" BLUE OAK 3008 9" CALIFORNIA SYCAMORE 3043 17" CALIFORNIA SYCAMORE 4154 13" BOX ELDER
10" NORTHERN CALIFORNIA BLACK
WALNUT 3009 23" BOX ELDER 3044 17" CHINESE ELM 4155 8" BOX ELDER
1345 16" BLACK OAK 3010 8" SILVER MAPLE 3045 10" WHITE ALDER 4156 17" OREGON ASH
1346 6" BOX ELDER 3011 6" BOX ELDER 3046 33" WHITE ALDER 4157 9" BOX ELDER
1348 6" ARROYO WILLOW 3012 6" CALIFORNIA SYCAMORE 3047 10" BOX ELDER 4158 11" OREGON ASH
1350 14" BOX ELDER 3013 17" RED WILLOW 3048 22" OREGON ASH 4159 31" WHITE ALDER
1351 11" BOX ELDER 3014 20" FREMONT COTTONWOOD 3049 12" BOX ELDER 4160 9" BOX ELDER
1352 10" BOX ELDER 3015 6" OREGON ASH 3050 10" SWEETGUM 4161 9" BOX ELDER
1353 14" BOX ELDER 3016 17" RED WILLOW 3051 24" BOX ELDER 4162 27" SILVER MAPLE
1355 9" BOX ELDER 3018 10" FREMONT COTTONWOOD 3052 27" WHITE ALDER 4163 10" HOLLY OAK
1356 9" VALLEY OAK 3019 17" WHITE ALDER 3053 6" ENGLISH ELM 4164 7" AUSTRALIAN PINE
1357 8" VALLEY OAK 3020 29" FREMONT COTTONWOOD 3054 28" WHITE ALDER 4165 17" VALLEY OAK
2985 12" OREGON ASH 3021 14" WHITE ALDER 3055 14" WHITE ALDER
2986 6" SNAG 3022 12" WHITE ALDER 3056 11" BOX ELDER
2988 12" WHITE ALDER 3023 14" WHITE ALDER 3057 10" BOX ELDER
2989 13" BOX ELDER 3024 13" WHITE ALDER 3058 15" CALIFORNIA SYCAMORE
2990 15" WHITE ALDER 3025 6" PACIFIC WILLOW 4136 8" BOX ELDER
2991 12" WHITE ALDER 3026 12" BOX ELDER 4137 6" BOX ELDER
2992 7" OREGON ASH 3027 6" BOX ELDER 4138 12" AMERICAN ELM
2993 11" WHITE ALDER 3028 8" BOX ELDER 4139 13" BOX ELDER
2994 7" BOX ELDER 3029 17" WHITE ALDER 4140 6" FREMONT COTTONWOOD
2995 19" WHITE ALDER 3030 13" WHITE ALDER 4141 26" WHITE ALDER
2996 10" WHITE ALDER 3031 10" WHITE ALDER 4142 18" WHITE ALDER
2997 6" BOX ELDER 3032 6" CALIFORNIA SYCAMORE 4143 24" SOUTHERN CALIFORNIA BLACK WALNUT
2998 10" BOX ELDER 3033 8" SOUTHERN CATALPA 4144 12" CHINESE ELM
2999 28" FREMONT COTTONWOOD 3034 7" BOX ELDER 4145 14" CHINESE ELM
3000 7" BOX ELDER 3035 9" SWEETGUM 4146 6" OREGON ASH
3001 9" WHITE ALDER 3036 9" BOX ELDER 4147 23" WHITE ALDER
3002 8" OREGON ASH 3037 8" CALIFORNIA SYCAMORE 4148 28" WHITE ALDER
3003 14" CHINESE ELM 3038 9" BOX ELDER 4149 12" WHITE ALDER
3004 9" SNAG 3039 23" WHITE ALDER 4150 24" WHITE ALDER
3005 11" SNAG 3040 8" BOX ELDER 4151 18" BOX ELDER
REMOVE EXISTING ROCK REVETMENT,
SEE NOTE 4
GRADING LIMIT
WORK LIMIT FENCE ON UPHILL
SIDE OF WORK LIMIT, SEE
DETAIL 1, SHEET C-506
WORK LIMIT
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
%%UGRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 INCH = 80 FEET
AutoCAD SHX Text
TREE TO BE PROTECTED
AutoCAD SHX Text
STUMP TO BE REMOVED
AutoCAD SHX Text
TRANSPLANTED ELDERBERRY SHRUBS (BY OTHERS)
PROTECTED ELDERBERRY SHRUBS (SEE SPECIFICATIONS)
E L E
V A
T I O
N
E L E
V A
T I O
N
298+00297+50297+00296+50296+00295+50295+00294+50294+00293+50293+00292+50292+00291+50291+00290+50290+00289+50289+00
STA. 296+95
EL. 27.0
S T
A
E L
STA. 297+96
EL. 11.0
STA. 296+96
EL. 19.0
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
L E
V E
E
E X
IS
T
IN
G
O
M R
O A
D
C-104
P L
O
F I L
E
S T
A
T
O
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
456852C-104.dwg
A M
E R
IC
A N
R
IV
E
R
NORTH
M A
T C
H L I N
E
S
H E
TOP SOIL-FILLED ROCK SLOPE
PROTECTION (A)
NOTES:
1. LETTERS SHOWN IN CALLOUTS ON THIS SHEET REFERENCE
TYPICAL SECTION SHOWN ON SHEET C-301.
2. SLOPES NOT CALLED OUT IN PLAN VIEW VARY AND SHALL
BE CONSTRUCTED USING GRADE BREAKS FROM
APPLICABLE OFFSET/ELEVATION TABLE, SEE TYPICAL
SECTION SHEETS C-301 THROUGH C-304.
STATION 289+76
BEGIN SOIL-FILLED ROCK SLOPE PROTECTION
TOP OF LEVEE
H: 1"=40' V: 1"=10'
PROFILE - STA 289+00 TO 298+00
GB BURIED ROCK TOE PROTECTION (B)
TOE BURIED ROCK TOE PROTECTION (F & G)
TOP & GB BURIED ROCK
TOE PROTECTION (D & E)
TOP BURIED ROCK TOE PROTECTION (D)
GB BURIED ROCK TOE PROTECTION (E)
TOE BURIED ROCK TOE PROTECTION (G)
EXCAVATION LIMITS
EXISTING FOOTPATHS
TO BE REMOVED AND REGRADED
DURING CONSTRUCTION (TYP)
TOP SOIL-FILLED ROCK SLOPE PROTECTION (A)
TOP OF LEVEE
C
GB SOIL FILL (K)
GB BURIED ROCK TOE PROTECTION (B)
GB SOIL FILL (H)
C -5
LEGEND
ROCK TOE PROTECTION
PLANTING BENCH
SOIL-FILLED ROCK SLOPE PROTECTION
EXISTING O&M ROAD (AGGREGATE BASE)
SOIL-FILLED ROCK TIE-BACK
S L O
P E
V A
R
IE
S
T Y
P
S E
E N
O T
E
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGRAPHIC SCALE
1 INCH = 40 FEET
304+00
303+00
302+00
E L
E V
A T
I O
N
E L
E V
A T
I O
N
307+00306+50306+00305+50305+00304+50304+00303+50303+00302+50302+00301+50301+00300+50300+00299+50299+00298+50298+00
S T
A
E L
S T
A
E L
STA. 304+44
EL. 10.0
STA. 305+16
EL. 5.0
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
TOP SOIL-FILLED ROCK SLOPE
PROTECTION (A)
LEVEE
E
X
I S
T
I
A
D
C-105
P L
O
F I L
E
S T
A
T
O
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
NORTH
M A
T C
H L I N
E
S
H E
M A
T C
H L I N
E
S
H E
A M
E R
IC
A
N R
IV
E
R
TOE BURIED ROCK TOE PROTECTION (G)
GB BURIED ROCK TOE PROTECTION (E)
TOP BURIED ROCK TOE PROTECTION (D)
TOP OF LEVEE
H: 1"=40' V: 1"=10'
PROFILE - STA 298+00 TO 307+00
GB SOIL FILL (K)
TOE BURIED ROCK TOE
PROTECTION (F & G)
TOP & GB BURIED ROCK
TOE PROTECTION (D & E)
C
EXCAVATION LIMITS
TOP SOIL-FILLED ROCK SLOPE PROTECTION (A)
NOTES:
1. LETTERS SHOWN IN CALLOUTS ON THIS SHEET REFERENCE
TYPICAL SECTION SHOWN ON SHEET C-301.
2. SLOPES NOT CALLED OUT IN PLAN VIEW VARY AND SHALL
BE CONSTRUCTED USING GRADE BREAKS FROM
APPLICABLE OFFSET/ELEVATION TABLE, SEE TYPICAL
SECTION SHEETS.
TOP OF LEVEE
GB BURIED ROCK TOE PROTECTION (B)
GB BURIED ROCK TOE
PROTECTION (B)
GB SOIL FILL (H)
LEGEND
ROCK TOE PROTECTION
PLANTING BENCH
SOIL-FILLED ROCK SLOPE PROTECTION
EXISTING O&M ROAD (AGGREGATE BASE)
SOIL-FILLED ROCK TIE-BACK
S L O
P E
V A
R
IE
S
T Y
P
S E
E N
O T
E
456852C-104.dwg
F I N
A
N S
S A
C R
A M
E N
U
N T
Y
C
A L I F
O R
N I A
A M
E R
I C
V
M
M O
N
F
E A
T U
R E
S
A
R C
F
E R
O S
I O
N
L O
W E
R
A
M E
R I C
V
E R
S I T
E
C
O N
T R
A C
T n o r t h w e s t h y d r a u l i c c o n s u l t a n t s p i t o l
A v e n u e
S u i
S a c r a m e n t o
C a l i f o r n
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A L
I F
O R
N
S E
P T
E M
B E
R
W
X
X X
X
X X
X
W
X
X X
X
X X
X
A
N S
I D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UGRAPHIC SCALE
314+00
E L E
V A
T I O
N
E L E
V A
T I O
N
316+00315+50315+00314+50314+00313+50313+00312+50312+00311+50311+00310+50310+00309+50309+00308+50308+00307+50307+00
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
P
S
T A
E L
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S P
D E
S I G
N
F
I
L E
V E
E
EXISTING O&M ROAD
TOP SOIL-FILLED ROCK SLOPE
PROTECTION (A)
C-106
P L
O
F I L
E
S T
A
T
O
J
L A
M M
E R
S
T
S
H I N
K L E
B
W
O L F
E
B
W
A R
D M
A N
NORTH
M A
T C
H L I N
E
S
H E
M A
T C
H L I N
E
S
H E
A M
E R
IC
A
N R
IV
E
R
TOE LAUNCHABLE ROCK
TOE PROTECTION (W)
TOP PLANTING BENCH (D)
PROJECT ALIGNMENT STATION 310+00
END PLANTING BENCH
TOP OF LEVEE
TOP PLANTING
BENCH (D)
TOE LAUNCHABLE ROCK
TOE PROTECTION (W)
TOE PLANTING
BENCH / TOP ROCK
TOE PROTECTION (E)
H: 1"=40' V: 1"=10'
PROFILE - STA 307+00 TO 316+00
GB SOIL FILL (K)
TOE BURIED ROCK
TOE PROTECTION
(F& G)
TOP & GB BURIED ROCK
TOE…