This document contains a pricing schedule and description for a federal contract opportunity for construction services. The scope of work involves design-bid-build construction to provide approximately 5,500 feet of stream bank protection and stabilization of an existing levee to protect critical infrastructure along the Lower American River in Sacramento, California. The pricing schedule lists various construction line items such as mobilization, storm water control, clearing and grubbing, engineered fill, stone protection, aggregate base course, soil fill, seeding and erosion control with estimated quantities and unit pricing. The related federal contract opportunity is issued by the U.S. Army Corps of Engineers Sacramento District for this Lower American River Site 2-1 project with an estimated value between $25-100 million. The solicitation will use NAICS code 237990 and is an unrestricted solicitation seeking bids from a pre-qualified sources list, with subcontracting plans required from large business offerors.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule
| Pricing Schedule - American River Common Features 2016 - Lower American River Site 2-1 | |||||
| Contract Line Item Number (CLIN) | Description | Estimated Quantity | Unit of Measure | Unit Price | Total Price |
| 1.1 | Mobilization and Demobilization | 1 | Job | $ | $ |
| 1.2 | Temporary Storm Water Pollution Control | 1 | Job | $ | $ |
| 1.3 | Remove and Replace Existing Pedestrian Pathways | 1 | Job | $ | $ |
| 1.4 | Clearing and Grubbing | 1 | Job | $ | $ |
| 1.5 | Preparation of Subgrade | 1 | Job | $ | $ |
| 1.6 | Engineered Fill as Backfill Over Buried Rock Toe Protection | 1 | Job | $ | $ |
| 1.7 | Bedding Material for Stone Protection * | 38,400 | Ton | $ | $ |
| 1.8 | Soil-Filled Rock Slope Protection * | 45000 | Cubic Yard | $ | $ |
| 1.9 | Rock Toe Protection and Soil-Filled Rock Tie-Backs * | 72,600 | Ton | $ | $ |
| 1.10 | Aggregate Base Course for O&M Road Repair * | 2500 | Ton | $ | $ |
| 1.11 | Topsoil, Soil Fill, and Other Backfill in Planting Benches * | 15,000 | Cubic Yard | $ | $ |
| 1.12 | Topsoil over Soil Filled Rock Slope Protection * | 80,200 | Cubic Yard | $ | $ |
| 1.13 | In-Stream Wood Material * | 60 | Each | $ | $ |
| 1.14 | Grass Seeding and Erosion Control * | 22 | Acre | $ | $ |
| 1.15 | Live Cuttings * | 956 | Each | $ | $ |
| *Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity. Bold Italic font signifies revised or newly added information |
| Price Schedule Roll-up | |||||||
| Contract | |||||||
| Line Item No. | Item Description | Estimated Quantity | Unit | Unit Price | Total Price | ||
| 0001 | Lower American River Site 2-1 | 1 | JOB | $ | $ |