AMD 0004 - Amendment Summary.pdf
PDF 84 KB Posted
- Solicitation number
- W91238-21-R-0069
About this file
This document contains an amendment summary and related federal contract opportunity solicitation. The amendment summary outlines 22 revisions made to drawings and specifications for a project to construct a new 10,000 barrel jet fuel tank, transfer pump house with 600 GPM pumps and filter separators, two tank truck off-loading stations, and modifications to an existing truck fill stand at Beale Air Force Base. Revisions include changes to submittal timelines, equipment details, and piping materials.
The related solicitation is for the construction project described above, with an estimated value between $10-25 million. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The new transfer pump house will include pump and control rooms to provide a 1,200 GPM transfer flow rate. The pump station will also include filtration for off-loading receipt and for issue to the truck fill stand. Site visits for interested offerors are scheduled for July 7, 2021 from 1-3 PM.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA MILCON Project DESC2101 Bulk Fuel Tank – Beale AFB Base
W91238-21-R-0069 Bid Inquiry Items (Continuation Page)
1) {Reference Bid Inquiry N/A}
Specification Section 33 08 55, Paragraph 1.3.3, text revised to require submittal 90 days prior to connecting to existing system.
Paragraph 1.3.5, text revised to require submittal 90 days prior to system startup.
Paragraph 1.3.6, text revised to require submittal 90 days prior to system startup.
Paragraph 2.1.1, text revised to require submittal 90 days prior to system startup.
Paragraph 3.10, text revised to require notification 90 days in advance of the testing.
Paragraph 3.10.3. text revised to require submittal of plans 90 days prior to performance testing.
2) {Reference Bid Inquiry 9308081}
Specification Section 33 52 43.11, Paragraph 2.12, Deleted text which contained proprietary information.
Specification Section 28 31 64.00 10, Paragraph 2.11.1, Deleted text which contained proprietary information.
3) {Reference Bid Inquiry 9314479}
Drawing EI-609, Control System Block Diagram, Delete “GRAPHIC DISPLAY LED
SCREEN” (drawing grid B3).
4) {Reference Bid Inquiry 9315537}
Drawing M-604, Update the Pump Motor Data for Pump P-401.
5) {Reference Bid Inquiry 9315488}
Drawing M-604, Update the Pump Data for Pump P-402.
6) Reference Bid Inquiry 9316413}
Drawing M-510, Update Detail B1 to include the size of the TRV Test Connection Port.
7) {Reference Bid Inquiry 9331228}
Drawing D-101, Leader Note “DEMOLISH CANOPY AND CONCRETE EQUIPMENT” has been adjusted to point to the Canopy (drawing grid B2).
8) {Reference Bid Inquiry 9331233}
Drawing D-101, Note #1, Note adjusted to remove reference to Bid Option.
9) {Reference Bid Inquiry 9331236}
Drawing D-101, Note #6, Note adjusted to remove reference to Bid Option.
10) {Reference Bid Inquiry 9331289}
Drawing E-101, Manhole Types have been corrected at various locations on this drawing.
11) {Reference Bid Inquiry 9313405}
Drawing MI-601, Extraneous valve and piping appurtenances have been removed (drawing grid
B6).
12) {Reference Bid Inquiry 9331289}
Drawing M-407, Section A1 and A3 updated to indicate Stainless Steel TRV piping.
Drawing M-502, Details A1 and A4 updated to indicate Stainless Steel piping for the water draw-system.
Drawing M-505, Details A1 and A3 have been updated to indicate Stainless Steel piping for the level sensor and float pilot chambers.
13) {Reference Bid Inquiry 9313840}
Specification 33 52 43.14, Paragraph 2.3.4 and 2.3.5, test has been updated to indicate limit the water slug feature to only FSI-201
Specification 33 42 43.28, Paragraph 4.5 has been added to specify the water probe level sensor.
14) {Reference Bid Inquiry 9314371}
Drawing M-604, Equipment Schedule, under “FUEL STORAGE TANK” correct HLCV-301 to reflect 6” valve size.
15) {Reference Bid Inquiry 9314380}
Specification 33 52 43.14, Paragraph 2.3.2, text has been updated to include FCV-402.
Drawing MI-601, FCV-402 has been added to the diagram adjacent to Pump P-402 (drawing grid A3)
Drawing M-604, “Equipment Schedule – Product Recovery Tank”, line item has been added for
FCV-402
16) {Reference Bid Inquiry 9316311}
Specification 33 57 55, Paragraph 2.7.1, Pressure rating has been changed from “285” to “275” .
17) {Reference Bid Inquiry 9316404}
Specification Section 33 52 40, Add new Paragraph 2.3.3 for “Swing Check” Valves
18) {Reference Bid Inquiry 9316452}
Drawing M-403, Detail C1 and Section A2, replace 4-inch ball valve with 4-inch DBB (drawing grid C2 and A2, respectively)
Drawing M-601, Off-Loading Stations #1 and #2, replace 4-inch ball valve with 4-inch DBB valve at both locations (drawing grid D3 and D4, respectively)
19) {Reference Bid Inquiry 9317370}
Drawing M-511, Detail A4, Suppressor vessel size and connection size has been added to the detail.
20) {Reference Bid Inquiry 9331300}
Specification 02 41 00, Paragraph 3.1, Delete text referring to “Reuse of Structures”.
21) {Reference Bid Inquiry 9331341}
Specification 33 01 50.60, Paragraph 3.4 Tank History Table, Tank History Table and associated paragraph will be deleted.