Map Site Visit_DESC2004 DESC2101 (reduced).pdf

PDF 2 MB Posted

Attached to
Beale AFB - Fuels Receipt Area and Storage Tank Solicitation
Solicitation number
W91238-21-R-0069
Issued by

About this file

This document includes a site visit agenda and map for a pre-bid meeting, as well as details of a related federal contract solicitation. The pre-bid site visit agenda outlines three stops to view existing fuel infrastructure assets at Beale Air Force Base, including a type II pumphouse, hydrant outlet pits, and inactive fuel lines. The meeting is scheduled for July 7th from 0900 to 1200.

The federal contract solicitation seeks a contractor to construct a new 10,000 gallon jet fuel tank, 600 GPM transfer pump house, two truck off-loading stations, and modifications to an existing truck fill stand at Beale AFB. The estimated value is between $10-25 million. The new pump house will include pump and control rooms to transfer fuel at 1,200 GPM. Two off-loading stations will receive tank trucks at 600 GPM each for a total of 1,200 GPM simultaneous off-loading. A site visit for the solicitation is scheduled concurrently with the pre-bid meeting on July 7th from 1300 to 1435. The solicitation is issued by the Department of the Army Corps of Engineers Sacramento District.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ostrom Rd

S Beale Rd

Bradshaw Rd

CA-65

Beale AFB Commercial Vehicle Inspection Area

Wheatland Gate

Beale AFB Commercial Vehicle Inspection Area

Bulk Fuel Storage Area

(DESC2101)

Wheatland Gate

South Beale Road

J Street

Doolittle Drive l2pmmmf9 Text Box

0830-0900: OBTAIN BASE PASSES AND VEHICLE INSPECTION;

0900-0915: PASS AROUND SIGN-IN SHEET / PROJECT OVERVIEW BRIEF

0915-0930: DRIVE TO FLIGHTLINE

0930-0945: DESC 2004 MEETING LOCATION (SEE MAP) - TAKE SHUTTLE RESERVED BY AIR FORCE

0945-1030: STOP 1

1030-1100: STOP 2

1030-1115: STOP 3

1115 - 1130: WRAP UP

1130: DEPART

LUNCH

Doolittle Drive

Bensing Ave

Curtis Street

Arnold Ave

Arnold Ave

DESC2004

Meeting Location

Access Gate

M

M

M M

MM

M

M M M M

M

MM

M M

M M

M M

M M

MMM

M M M M M M M M

M M M

M

M M

M

M

MMM

MMM MMMMMM

M

MMM

M

MMM

M

MM

M

M M M M M M M M M M M

MMMMMMM

M

M M

MM MM

M M

M M

M

M

M M

M M

M

MM

M

M M M M

MM

M M

M

MM

M M

M

M

MM

MMMM

MM

MMMM

M M

M M

M M M M

M

MM

MMM

M

M M

M

M

M

M MMMM

MM

M M

M

M

M M

M

M M M

M M M

MM

M

MMM

M M

M

MM

M

MMM

M M MM

M

MM

M M

M

MM MMMM

M

M

M

M

M M

M M M M M M

M

MMM

M

M

M M

MM

M M M M M M M

MMMMMMM

M M M M

M M

M M

M M

M M

Î Î

I

TAXILANE J

D1 D2 D3 D4 D5

H-SOUTH

ECP

JET BLAST DEFLECTORS

U T S R Q P O N M L K

GH13

GH14

GH1

TRANSIENT ALERT

AIRFIELD MANAGEMENT

HYDRAZINE

RACK

J

TA3

JET BLAST DEFLECTORS

MAINTENANCE

WASH

POGO SHACK

DOCK-2

DOCK-1

DOCK-3

H

TA

X

IW

A

Y C

TAXIWAY F

TA

X

IW

A

Y L

TA

X

IW

A

Y K

DOCK-4

DOCK-5

DOCK-6

TA

X

IW

A

Y H

TA

X

IW

A

Y H

TAXILANE G

TAXIWAY F

TA

X

IW

AY

B

N O

R T

H H

A M

M E

R H

E A

D

DOCK-7

DOCK-8 DV1

TA2

TA1

C3

C1

C2

FUELLIGHTING

VAULT

CONTROL TOWER

GH2

GH3

GH4

GH5

GH6

GH7

GH8

ECP

T6

GH9

GH10

GH11

GH12

P1012

H 3A 3B 3C

2D 2C 2B 2A

1D 1C 1B 1A

T7T8

T5T4T3T2T1

TA4

TA5

TA6

TA7

10761029

11200

11606

10431042 10681044 10671045

1024 1060

10581057

11177

11603

11703

11587 11589

1083 1232

10461041 1064

11600

11604

12261004 μLegend Precision Obstacle Free Zone (POFZ)

Control Tower Blind Spot

Glideslope Critical Area

Î Engine Run Anchor Points

Runway Lateral Clearance Zone

Clear Zone

Restricted Area Line

OPR: SSgt Julian Sears

9 OSS/OSAA

DATE: 4 January 2016

REF: AFI 13-204V3

Document Path: I:\WORK REQUESTS\Proferes open WO's\(2016-206) Airfield Parking Apron.mxd

1460596080C Polygon

1460596080C Text Box

DESC2004 PRE-BID SITE WALK -- REPLACE FUEL HYDRANT SYSTEM

WEDNESDAY, 7 JULY, 0900-1200

1460596080C Polygon

1460596080C Callout STOP 1 (30-45 minutes): TYPE II PUMPHOUSE & INACTIVE JP-8 FUEL LINE

1460596080C Callout STOP 2 (15-30 minutes): TYPICAL HYDRANT OUTLET PIT & NORTH PARKING APRON

1460596080C Callout

DESC2004 MEETING LOCATION (ESTIMATING 30 ATENDEES)

1460596080C Polygon

1460596080C Callout STOP 3 (30-45 minutes): INACTIVE JP-8 FUEL LINE TERMINATION & FUTURE FUEL FARM AREA (NORTH OF DOCK 7)

DESC2101

Meeting Location

F Street

9th Street l2pmmmf9 Text Box

1300: MEET AT WHEATLAND GATE

1300 - 1320: PASS AROUND SIGN-IN SHEET / BRIEF PROJECT OVERVIEW

1320 - 1330: MEET AT DESC 2101 (BY POVs)

1330 - 1430: SITE VISIT

1430 - 1435: WRAP UP

1435: DEPART

File details come from the government source that posted it. Updated .