This document is an amendment to a solicitation for the repair of Levee 0561-31. The amendment extends the period of performance from 330 to 482 days to allow for construction from April 15 to October 15, 2021. It also increases the quantity for CLIN 1001 from 100 to 500 units and adjusts the delivery schedule and specifications accordingly. The repair work will include constructing approximately 2,000 feet of new setback levee to tie into the existing levee. The solicitation was issued by the Department of the Army Corps of Engineers Sacramento District for repair of the levee located in Sacramento, California.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Issue revised specifications for sections 01 00 00, 01 22 00, 01 71 10, 31 05 19, and 32 92 19.
2. Issue revised pricing schedule.
3. Issue revised period of performance.
No other changes are made or implied.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123820R0056
X 9B. DATED (SEE ITEM 11)
02-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jul-2020
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123820R0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 152 days from 330 days to 482 days.
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
330 dys. ANP 1 VALLEY RESIDENT OFFICE
BRIAN C POOLE
2021 JEFFERSON BLVD
WEST SACRAMENTO CA 95691
916-373-1617 X320 FOB: Destination
W91238
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
482 dys. ANP 1 VALLEY RESIDENT OFFICE
BRIAN C POOLE
2021 JEFFERSON BLVD
WEST SACRAMENTO CA 95691
916-373-1617 X320
The following Delivery Schedule item for CLIN 1001 has been changed from:
CAGE
330 dys. ANP 100 VALLEY RESIDENT OFFICE
BRIAN C POOLE
2021 JEFFERSON BLVD
WEST SACRAMENTO CA 95691
916-373-1617 X320
To:
CAGE
W9123820R0056
482 dys. ANP 100 VALLEY RESIDENT OFFICE
BRIAN C POOLE
2021 JEFFERSON BLVD
WEST SACRAMENTO CA 95691
916-373-1617 X320
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
PERIOD OF PERFORMANCE
PERIOD OF PERFORMANCE
Sites 0561-31
3 Phases of Work:
Phase 1 – Submittals: 90 days Phase 2 – Construction: 183 days Phase 3 – Demobilization, As-Builts, Resolution to Modifications: 120 days
Note: Phase 1 can begin upon notice to proceed (NTP).
Phase 2 Construction timeline is calculated as the time between April 15 (earliest construction start) and October 15, 2021 (latest construction end date).
The Phase 3 must be completed by December 15, 2021.