This set of construction drawings and specifications is for a levee repair project along the Sacramento River in Yolo County, California. The project will reconstruct approximately 2,000 feet of an existing levee to create a new setback levee. Work will include excavating the existing levee, placing geotextile and compacting fill to build the new setback levee to required grades. The drawings provide plans, profiles, cross-sections and details of the levee repair as well as requirements for staging areas, haul routes and stockpile locations. The U.S. Army Corps of Engineers is the contracting agency overseeing the project to be conducted under Solicitation Number W91238-20-R-0056.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
SACRAMENTO DISTRICT
YOLO COUNTY, CALIFORNIA
SACRAMENTO RIVER RIGHT BANK
PL 84-99 EMERGENCY LEVEE REPAIRS
SITE 0561-31
XXXXXX-XX-X-XXXX
XXXXXX-XX-X-XXXX
MARCH 2020
US Army Corps of Engineers
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
D
I S
T R
I C
T
J
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
R
G
H
B
A N
K
Y O
L
U
N T
Y
C
A L
I F
O R
N I A
P
E
M E
R G
E N
Y
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: SHAYAAN.QAZI(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-001.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C O
V E
R
S
H E
E T
G-001
USACE SACRAMENTO
SIGNATURE BLOCK
PREPARED UNDER THE DIRECTION OF:
JAMES J. HANDURA /S/
COL U.S. ARMY, COMMANDER AND DISTRICT ENGINEER
APPROVED BY:
RICK POEPPELMAN /S/
CHIEF, ENGINEERING DIVISION
APPROVED FUNCTIONAL ADEQUACY:
WILLIAM HALL /S/
CHIEF, CIVIL WORKS DESIGN BRANCH
12/31 /2020
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-002.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
A B
B R
E V
I A
T I O
N S
A
E
D E
X
G E
N E
R A
L
N
O T
E S
L
E G
E N
D
G-002
GENERAL NOTES
SECTION LINE
DETAIL
NORTH ARROW
LEGEND
NORTH
PLAN
X#
X-5##
ABC
APN
AVE
CO
CY
E
EA
EG
EL
FG
FT
HWY
IN
LS
MAX
MIN
NGS
N
CUBIC YARD
EAST, EASTING
EACH
EXISTING GROUND
ELEVATION
FINISH GRADE
FEET
HIGHWAY
INCH
LANDSIDE
MAXIMUM
MINIMUM
MSWSE
NATIONAL GEODETIC SURVEY
NORTH, NORTHING
AGGREGATE BASE COURSE
ASSESSOR PARCEL NUMBER
AVENUE
COUNTY
NAD 83
RD
S
SF
ST
TYP
W
WS
YD
NORTH AMERICAN DATUM OF 1983
ROAD
SOUTH
SQUARE FEET
STREET
TYPICAL
WEST
WATERSIDE
YARD
MEAN SUMMER WATER SURFACE
ABBREVIATIONS
FD FOUND
DWR DEPARTMENT OF WATER RESOURCES
IP IRON PIPE
NTS NOT TO SCALE
NAVD 88 NORTH AMERICAN VERTICAL DATUM OF 1988
PVI POINT OF VERTICAL INTERSECTION
PROPOSED
EXISTING
EXISTING MAJOR CONTOURS
EXISTING MINOR CONTOURS
GAS LINE
PROPERTY LINE
TEMPORARY PROTECTIVE FENCE
CONSTRUCTION LIMITS
CENTER LINE
BORING SYMBOL
G
X#
X-3##
GS GROUND SURFACE
APPROX APPROXIMATELY
BLVD. BOULEVARD
CP CATCH POINT
(E) EXISTING
SHEET INDEX
SHEET ID SHEET ID
G-001 COVER SHEET
G-002
GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SHEET INDEX
G-003 PROJECT LOCATION AND VICINITY MAP
G-004 STAGING AREA AND HAUL ROUTES
G-005 KEY MAP AND CONTROL LINE LINE AND CURVE TABLES
G-006 CONSTRUCTION LIMITS
V-001 PROJECT SURVEY CONTROL
C-101 EXCAVATION PLAN
C-111
PLAN AND PROFILE, STA 30+20 TO 20+00
C-112
PLAN AND PROFILE, STA 20+00 TO 10+00
C-201 WATERSIDE RAMP PLAN AND PROFILE
C-301 TYPICAL CROSS SECTIONS
C-311
CROSS SECTIONS, STA 10+50 TO 13+25
C-312
CROSS SECTIONS, STA 13+50 TO 16+00
C-313
CROSS SECTIONS, STA 17+00 TO 25+25
C-314
CROSS SECTIONS, STA 25+50 TO 28+00
C-315
CROSS SECTIONS, STA 29+00 TO 30+20
C-501 DETAILS
1. DIMENSIONS, REPAIR LENGTHS AND QUANTITIES SHOWN ARE APPROXIMATE AND
ONLY INDICATE THE GENERAL SCOPE OF REPAIR.
2. GENERAL NOTES ARE APPLICABLE TO ALL WORK, UNLESS NOTED OTHERWISE.
3. ACCESS TO THE PROJECT IS LIMITED TO THE ACCESS POINTS SHOWN ON THE
DRAWINGS.
4. THE LOCATIONS OF EXISTING UTILITIES, IF ANY, ARE APPROXIMATE AND HAVE
NOT BEEN INDEPENDENTLY VERIFIED BY THE CONTRACTING OFFICER OR THEIR
REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION
AND ELEVATION OF ALL UTILITIES WITHIN THE CONSTRUCTION ZONE, ALONG THE
CONSTRUCTION ACCESS ROUTE AND IN THE STAGING AREAS BEFORE
COMMENCING WORK. THE CONTRACTOR SHALL PROTECT ALL UTILITIES,
INCLUDING STEEL PLATING, AND SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL
DAMAGES WHICH MIGHT BE CAUSED BY THE CONTRACTOR'S FAILURE TO LOCATE
AND PRESERVE ANY AND ALL UTILITIES. CONTRACTOR TO NOTIFY
UNDERGROUND SERVICE ALERT TWO DAYS MINIMUM PRIOR TO ANY EXCAVATION
FOR CONSTRUCTION. CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO
WORK AROUND EXISTING UTILITIES.
5. CONTRACTOR MUST KEEP ROADWAYS CLEAR OF MUD AND DEBRIS AT ALL TIMES.
6. ANY TEMPORARY EARTHWORK ASSOCIATED WITH CONSTRUCTION MUST BE
APPROVED IN ADVANCE BY THE CONTRACTING OFFICER.
7. UNLESS OTHERWISE NOTED, NO TEMPORARY OR PERMANENT EXCAVATIONS ARE
ALLOWED.
8. LEVEE SLOPES MAY NOT BE CUT TO PROVIDE CONSTRUCTION ACCESS RAMPS.
9. WHEN REMOVING TEMPORARY FILL, CONTRACTOR MUST EXERCISE CAUTION TO
AVOID DISTURBING THE EXISTING GROUND SURFACE BELOW THE TEMPORARY
FILL. UPON COMPLETION OF THE WORK, CONTRACTOR IS TO REMOVE AND
DISPOSE OF TEMPORARY FILL, RESTORE GROUND SURFACE BELOW TO ORIGINAL
CONDITION, AND HYDROSEED DISTURBED AREAS.
10. ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING THE DAMAGE CAUSED
TO EXISTING FACILITIES TO PRE-CONSTRUCTION CONDITIONS. ANY ROADS,
CURBS, GUARDRAILS, SIGNS, FENCES, UTILITIES, FLOOD CONTROL STRUCTURES
STAGING AND LAYDOWN AREAS WILL BE REPLACED OR REPAIRED TO APPLICABLE
STANDARDS AT THE CONTRACTORS EXPENSE TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
12. DRAWING SCALES DEPICTED ARE BASED ON UNITED STATES ARMY CORPS OF
ENGINEERS (USACE) PROJECT CAD STANDARDS SUMMARY. PLOTTING AREA FOR
22"X34" (D SIZE). CONFIRM SCALE FOR DRAWINGS PLOTTED AT ALL OTHER
DIMENSIONS.
13. DRAWINGS SHOWN WITH AERIAL PHOTOS ARE PROVIDED FOR REFERENCE ONLY.
ALL FACILITIES MAY NOT BE SHOWN ON PHOTOS. THE CONTRACTOR SHALL
SATISFY THEMSELVES AS TO THE LOCATION OF EXISTING FACILITIES THAT MAY BE
AFFECTED BY CONSTRUCTION.
14. TOPOGRAPHIC SURVEY PROVIDED BY MHM, INC. ON DECEMBER 21, 2018.
15. AN EXISTING GAS LINE IS LOCATED AT THE UPSTREAM END OF THE PROPOSED
SETBACK LEVEE. THE DEPTH OF THE LINE IS BETWEEN APPROXIMATELY 8 AND 15
FEET BELOW GROUND SURFACE WITHIN THE LIMITS OF THE PROPOSED SETBACK
LEVEE AND SEEPAGE BERM BASED ON INFORMATION OBTAINED FROM CALPINE
GAS. ALL WORK WITHIN 50 FEET OF THE GAS LINE SHALL BE COORDINATED WITH
THE CONTRACTING OFFICER AND CALPINE GAS (CHRIS DELANEY AT 707-374-1516).
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXACT LOCATION
OF THE GAS LINE AS REQUIRED TO PERFORM THE WORK.
CONC CONCRETE
USACE U.S. ARMY CORPS OF ENGINEERS
Profile View of ALGN-LEVEE-CONTROL LINE (1) (1)
Profile View of CENTER CREST (1) (1)Profile View of CENTER CREST (1) (1)
SEYMOUR RD
DELMONTE
RIGGINS RD
MADDOCK RD
VARNEY RD
W E
S T
A T
E
R
A N
B A
K E
R
R
D
J E
W E
K N
I G
H T
S
R O
A D
HACKERT RD
K
N
I G
H
LEISER RD
G
E
O
R
G
W
S
H
I N
G
T
V
D
R D
O
C
E
A
N
SACRAMENTO
SAN FRANCISCO
N
E
V
A
D
A
C
A
L
I
F
O
R
N
I
A
P
A
C
I
F
I
C
OREGON
ARIZONA
MEXICO
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-003.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
P R
O J E
C
A T
I O
N
A
V
C
I N
I T
Y
M
A P
G-003
A1
SITE MAP
SCALE: 1" = 300'
600'0 300'
NORTH
PLAN
F
L
O
W
YOLO COUNTY
SUTTER COUNTY
SITE MAP
A1
A7
VICINITY MAP
SCALE: 1" = 4000'
8000'0 4000'
A
C
R
A
N
M
O
S
A
C
R
A
M
E
N
V
E
R
DONAHUE RD
E7
PROJECT LOCATION MAP
SCALE: NOT TO SCALE
VICINITY
MAP
A7
RD 109A
(E) EMERGENCY
BERM
SETBACK LEVEE
CONTROL LINE
KNIGHTS LANDING
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
VV
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: SHAYAAN.QAZI(2020-03-19) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-004.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
A N
D
H
A U
L
R
O U
T E
S
S T
A G
I N
G
A
R E
A
G-004
A1
HAUL ROUTES
SCALE: 1" = 300'
600'0 300'
NORTH
PLAN
A6
STOCKPILE AREA 2
SCALE: 1" = 100'
200'0 100'
1. PROTECT EXISTING TREES WITHIN AND ADJCENT TO
TEMPORARY WORK AREAS AND HAUL ROUTES DURING
CONSTRUCTION IN ACCORDANCE WITH SPECIFICATION
01 50 00.
2. ALL ACCESS POINTS TO PUBLIC ROADS MUST BE
CONTROLLED IN ACCORDANCE WITH SPECIFICATION
01 50 00.
3. ALL TRUCKS SHALL TRAVEL AT SPEEDS LESS THAN 15
MPH ON NON-PUBLIC ACCESS ROADS. ALL TRUCKS
SHALL OBEY POSTED SPEED LIMITS ON PUBLIC ROADS.
4. ONLY MINIMUM CLEARING, STRIPPING, AND GRUBBING
AS REQUIRED FOR EQUIPMENT SET UP SHALL BE
CONDUCTED IN THE STAGING AREAS.
5. STAGING/LAYDOWN AREAS AND SITE OFFICE LOCATION
AREA TO BE RETURNED TO THEIR ORIGINAL CONDITIONS
AT THE END OF THE WORK PRIOR TO DEMOBILIZATION.
6. CONTRACTOR SHALL PROVIDE TEMPORARY SECURITY
FENCING AROUND VULNERABLE PORTIONS OF THE
STAGING AREAS IN ACCORDANCE WITH SPECIFICATION
01 50 00.
7. CONTRACTOR SHALL NOT HAVE ACCESS TO LEVEE
DOWNSTREAM OF END OF PROJECT (STA 10+00).
8. CONTRACTOR SHALL IMPROVE EXISTING AGGREGATE
RAMP FOR USE IN ACCESSING STAGING AREA 2.
TEMPORARY ACCESS RAMPS ARE TO BE CONSTRUCTED
WITH IMPORT FILL ONLY. NO CUTTING INTO EXISTING
GROUND, INCLUDING FILL, SHALL BE PERMITTED EXCEPT
AS SHOWN ON THE PLANS.
9. CONTRACTOR SHALL PERFORM EXISTING CONDITION
VIDEO AND PHOTOGRAPHIC SURVEY OF RD 109A
BETWEEN HWY 45 AND THE ACCESS POINT SHOWN ON
THIS SHEET PRIOR TO CONSTRUCTION IN ACCORDANCE
WITH SPECIFICATION 01 00 00.
10. LANDSIDE TOE OF LEVEE WILL BE AVAILABLE FOR USE
BY THE CONTRACTOR FOR HAULING OF EQUIPMENT AND
MATERIALS PROVIDED WORK IS COORDINATED WITH
CONTRACTING OFFICER. ALL COSTS ASSOCIATED WITH
IMPROVING ACCESS ALONG TOE WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
11. STOCKPILE AREA 2 SHALL ONLY BE USED ONCE
STOCKPILE AREA 1S IS COMPLETE. SEE SHEET C-501
FOR TYPICAL SECTIONS OF STOCKPILES
GENERAL SHEET NOTES
STAGING AREA
HAUL ROUTE
STOCKPILE AREA
LEGEND
F L O
W
S
A
C
R
A
M
E
N
V
E
R
A
C
R
A
N
M
O
A
F
L
O
W
HAUL ROUTE AND
ACCESS TO HWY 45
(1.4 MILES)
DONAHUE RD
E6
V
VV
ACCESS POINT
SETBACK LEVEE
CONTROL LINE
STAGING AREA 1
(APPROX 3.5 ACRES)
STA. 10+00
END OF PROJECT
SEE NOTE 7
STOCKPILE AREA 2
(APPROX 11.2 ACRES)
SEE NOTE 11
A6
S
A
C
R
A
M
E
N
V
E
R
E6
STAGING AREA 1 AND STOCKPILE AREA 1S
SCALE: 1" = 200'
400'0 200'
SETBACK LEVEE
CONTROL LINE
N: 2074780.742
E: 6637652.925
N: 2074876.418
E: 6637826.315
N: 2074935.642
E: 6637517.036
N: 2074926.315
E: 6637183.228
N: 2074710.294
E: 6637483.968
N: 2074509.211
E: 6637638.353
N: 2072275.143
E: 6638936.368
N: 2072203.419
E: 6669040.003
N: 2072142.273
E: 6639280.782
N: 2072188.830
E: 6639732.818
N: 2072082.580
E: 6639835.547
N: 2071874.569
E: 6639835.547
N: 207169.673
E: 6639754.273
N: 2071425.720
E: 6639195.086
N: 2071330.370
E: 6639087.645
N: 2071523.600
E: 6639337.413
F
L
O
W
ACCESS RAMP
SEE NOTE 8
N: 2074725.567
E: 6637949.647
N: 2073929.102
E: 6638226.958
N: 2073950.656
E: 6638116.127
N: 2074458.690
E: 6637649.062
STOCKPILE AREA 1S
(APPROX 4.3 ACRES)
SEE NOTE 11
N: 2074679.230
E: 6637988.166
C
C
C
SETBACK LEVEE
CONTROL LINE
S
A
C
R
A
M
E
N
V
E
R
N 2070870.51
E 6638816.75
N 2072773.70
E 6638685.79
L2
L1
C1
C2
L3
L4
C1
C2
L
L
L
L
15+00
LINE TABLE: CONTROL LINE
LINE #
L1
L2
L3
L4
LENGTH
100.09'
1070.64'
122.89'
70.00'
BEARINGS
N43° 55' 25.71"E
N09° 21' 03.14"W
N28° 11' 11.72"W
N31° 09' 36.06"W
CURVE TABLE: CONTROL LINE
CURVE #
C1
C2
LENGTH
465.49'
190.89'
RADIUS
500.00'
500.00'
DELTA
53°20'28"
21°52'28"
CHORD LENGTH
448.86'
189.73'
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-005.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
FLOW
FLOW
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
L I N
E
A
R
B
L E
K E
Y
M
N
T R
N
E
G-005
B1
KEY MAP
SCALE: 1" = 100'
200'0 100'
N O
R T
H
P L
A N
F
L
O
W
SETBACK LEVEE
CONTROL LINE
S
A
C
R
A
M
E
N
V
E
R
N 2071011.94
E 6638757.00
L
C1
L
L
L
L
C2
C3
C4
C5
C6
C7
L
L
L14
L
L
L
L
L
L
L
L
L
L
L
LINE TABLE: CONSTRUCTION LIMITS
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
LENGTH
76.80'
1075.50'
169.85'
31.45'
121.33'
68.22'
139.00'
223.25'
118.00'
52.00'
203.60'
711.80'
90.50'
74.75'
398.38'
32.44'
46.86'
126.69'
39.05'
BEARINGS
N35° 17' 21.87"E
N09° 17' 19.50"W
N28° 31' 32.74"W
N03° 31' 56.11"E
N55° 52' 35.28"E
S75° 45' 38.02"E
S28° 14' 05.03"E
S34° 24' 03.21"E
S45° 14' 57.85"E
S05° 23' 58.02"E
N79° 54' 48.27"E
S57° 28' 55.18"W
S45° 17' 29.32"W
S01° 50' 38.49"W
S44° 52' 58.86"W
S69° 41' 08.34"W
S85° 43' 44.06"W
N48° 20' 42.17"W
N10° 33' 01.29"E
CURVE #
C1
C2
C3
C4
C5
C6
C7
LENGTH
312.86'
96.08'
383.22'
379.13'
144.50'
188.14'
279.60'
RADIUS
402.12'
375.19'
519.54'
486.57'
348.34'
174.38'
571.95'
DELTA
44°34'41"
14°40'23"
42°15'44"
44°38'40"
23°46'04"
61°48'55"
28°00'33"
CHORD LENGTH
305.03'
95.82'
374.59'
369.61'
143.47'
179.15'
276.82'
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-G-006.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
G
F I L
E
N
A M
E
FLOW
FLOW
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C O
N S
T R
U C
T I O
N
L
I M
I T
S
G-006
B1
CONSTRUCTION LIMITS
SCALE: 1" = 100'
200'0 100'
N O
R T
H
P L
A N
F
L
O
W
CURVE TABLE: CONSTRUCTION LIMITS
CONTROL LISTING
POINT #
NORTHING
2084618.710
2067336.280
2050270.840
2072908.520
2070215.916
2070572.278
2071264.015
2072255.454
2072392.988
2072817.432
2073754.169
2070757.985
2072924.883
EASTING
6646510.960
6632368.210
6625872.810
6639187.300
6638523.278
6638845.200
6639172.776
6639805.779
6639870.221
6638849.068
6638381.974
6638155.709
6639163.014
DESCRIPTION
NGS_DH6494-VARNEY
NGS_AI5071-SYCAMORE
NGS_AI5056-CODY
NGS-JS4530-BEND (HISTORIC)
FD 3" DSK DWR SR17(1002)
REBAR -MHM CONTROL CAP (2301)
FD 1" IP PSOMAS CAP(1003)
FD 1" IP PSOMAS CAP(1006)
REBAR -MHM CONTROL CAP (1007)
REBAR -MHM CONTROL CAP(2030)
REBAR -MHM CONTROL CAP (1008)
REBAR -MHM CONTROL CAP(1009)
NGS-JS4530-BEND (MEASURED)
(NOT SHOWN)
(NOT SHOWN)
(NOT SHOWN)
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
ISSUED FOR BID
US Army Corps of Engineers
Last saved by: SHAYAAN.QAZI(2020-03-19) Last Plotted: 2020-05-01
Filename: \\SACDATA01\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-V-001.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
V
F I L
E
N
A M
E
FLOW
FLOW
M
H
U G
H E
S
K
L
E E
T
Q
U I N
T R
A L
L
J
S
O R
E N
S
O J E
R
V E
Y
C
O N
T R
O L
V-001
A1
PROJECT SURVEY CONTROL POINTS
SCALE: 1" = 300'
600'0 300'
NORTH
PLAN
1. SURVEY CONTROL DATA SHOWN HEREON PROVIDED
BY MHM, INC.
2. HORIZONTAL CONTROL STATEMENT: COORDINATE
VALUES AND BEARINGS SHOWN FOR THIS SURVEY ARE
REFERENCED TO THE NORTH AMERICAN DATUM OF
1983 (NAD83) AND ORIGINATE FROM FOUND
MONUMENTS A15071 "SYCAMORE" AND DH6494
"VARNEY" ESTABLISHED BY THE NATIONAL GEODETIC
SURVEY AND ADJUSTED IN JUNE 2012. THE DATUM
REFERENCE FOR THIS SURVEY IS BASED UPON THE
CALIFORNIA COORDINATE SYSTEM, ZONE 2 (NAD83)
2011 EPOCH. ALL MEASURMENTS ARE GRID VALUES IN
U.S. SURVEY FEET. TO OBTAIN GROUND VALUES DIVIDE
DISTANCES BY THE MEAN COMBINATION FACTOR
0.99992225.
3. VERTICAL CONTROL STATEMENT: ELEVATION VALUES
FOR THIS SURVEY ARE REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD88) AND
ORIGINATE FROM FOUND AND MEASURED MONUMENTS
A15071 "SYCAMORE" ASSIGNED THE ELEVATION 25.10
FEET, NAVD88 AND DH6494 "VARNEY" ASSIGNED THE
ELEVATION 23.80 FEET NAVD88.
4. CONTRACTOR SHALL PRESERVE AND PROTECT ALL
CONTROL POINTS AND EXISTING MONUMENTS.
MONUMENTS AND SURVEY MARKERS DESTROYED
DURING CONSTRUCTION SHALL BE REPLACED BY A
LICENSED SURVEY AT THE CONTRACTORS EXPENSE.
GENERAL SHEET NOTES
LEGEND
- SURVEY CONTROL POINT '10'
12/31 /2020
AutoCAD SHX Text
F
L
O
W
S
A
C
R
A
M
E
N
V
E
R
G
G
G
G
49.53
CP-1
N 2072757.83
E 6638694.65
49.48
CP-2
N 2072750.71
E 6638683.19
29.08
CP-3
N 2072663.69
E 6638657.65
28.76
CP-4
N 2072622.61
E 6638671.37
29.11
CP-5
N 2072205.50
E 6638952.29
29.12
CP-6
N 2072211.03
E 6638948.72
29.74
CP-7
N 2072294.56
E 6638936.23
42.00
CP-8
N 2072294.93
E 6638982.48
49.25
CP-9
N 2072297.10
E 6639011.42
49.25
CP-10
N 2072312.10
E 6639022.80
38.00
CP-11
N 2072362.34
E 6639018.55
38.25
CP-12
N 2072445.75
E 6638932.88
38.00
CP-13
N 2072538.17
E 6638866.99
38.00
CP-14
N 2072748.10
E 6638745.33
20+0021+0022+0023+0024+0025+0026+00
F
L
O
W
LANDSIDE
F
L
O
W
S
A
C
R
A
M
E
N
V
E
R
49.15
CP-15
N 2071262.18
E 6639195.73
49.15
CP-16
N 2071274.74
E 6639183.37
30.00
CP-17
N 2071284.20
E 6639093.55
29.25
CP-18
N 2071378.35
E 6639088.66
28.59
CP-19
N 2071348.28
E 6638881.04
30.00
CP-20
N 2071007.02
E 6638819.45
49.19
CP-21
N 2070910.79
E 6638836.32
49.18
CP-22
N 2070900.57
E 6638846.96
38.71
CP-23
N 2070903.32
E 6638889.38
34.00
CP-24
N 2070913.86
E 6638916.14
34.00
CP-25
N 2071198.65
E 6639194.54
16+0017+0018+0019+0020+00
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-101.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
E X
C A
V A
T I O
N
P
L A
N
C-101
D1
NORTH TIE-IN EXCAVATION PLAN
SCALE: 1" = 40'
A1
SOUTH TIE-IN EXCAVATION PLAN
SCALE: 1" = 40'
80'0 40'
80'0 40'
1. CONTRACTOR SHALL PERFORM EXISTING CONDITION
SURVEY OF EXISTING LEVEE TO PROVIDE FINAL GRADE
IN ACCORDANCE WITH SPECIFICATION 31 00 00.
2. EXISTING CONCRETE DITCH OUTSIDE LIMITS OF
CONSTRUCTION TO BE REMOVED BY OTHERS.
IRRIGATION PIPING SHALL BE CAPPED AT THE
CONSTRUCTION LIMIT BY OTHERS. CONTRACTOR
SHALL REMOVE ALL PIPING WITHIN THE LIMITS OF
WORK.
3. CONTRACTOR SHALL PLACE TEMPORARY PROTECTIVE
FENCING ALONG WATERSIDE BOUNDARY OF
EXCAVATION TO PROTECT TREES TO REMAIN IN PLACE.
4. EXCAVATION WITHIN 50 FEET OF CALPINE GAS LINE
SHALL NOT PROCEED WITHOUT CONTRACTING
OFFICER AND CALPINE REPRESENTATIVE ON SITE.
5. CONTRACTOR SHALL REMOVE ALL EXISTING
AGGREGATE SURFACING FROM THE CROWN OF THE
LEVEE WITHIN THE LIMITS OF EXCAVATION.
6. SEE C-301 FOR TYPICAL SECTIONS.
GENERAL SHEET NOTES
N
O
R
T
H
P
L
A
N
M A
T C
H
L
I N
E
S
L
O W
N
O
R
T
H
P
L
A
N
M A
T C
H
L
I N
E
S
O
V E
SETBACK LEVEE
CONTROL LINE
EL 26.50
INSPECTION TRENCH
BOTTOM EL 22.75
EL 26.50
TOP OF CUT
SLOPE
TOE OF CUT
SLOPE
(E) CONC DITCH,
SEE NOTE 2
INSPECTION TRENCH
BOTTOM EL 22.75
SETBACK LEVEE
CONTROL LINE
EL 26.50
EL 26.50
TOP OF CUT
SLOPE
TOE OF CUT SLOPE
EL 29.0
PROTECT-IN-PLACE
(E) 10" GAS, SEE NOTE 4
REMOVE (E) CONC
DITCH. SEE
A1
C-501
TEMPORARY PROTECTIVE
FENCING, SEE NOTE 3
BEGIN CONC.
DITCH REMOVAL
N 2071297.48
E 6639119.72
END CONC.
DITCH REMOVAL
N 2070968.00
E 6638813.41
LIMITS OF
FOUNDATION
EXCAVATION
LIMITS OF
FOUNDATION
EXCAVATION
LIMITS OF
FOUNDATION
EXCAVATION
LIMITS OF
FOUNDATION
EXCAVATION
E V
A T
I O
N
20+0021+0022+0023+0024+0025+0026+0027+0028+0029+0030+0030+20
P V
I
S
T A
E L
P V
I
S
T A
E L
P V
I
S
T A
E L
F
L
O
W
CONTROL LINE
S
A
C
R
A
M
E
N
V
E
R
PROPOSED
TOE OF BERM
PROPOSED
WATERSIDE TOE
3H:1V
5H:1V
3H:1V
PROPOSED
TOP OF BERM
G
G
G
G
G
PROPOSED ACCESS RAMP,
SEE C-201
LIMITS OF FOUNDATION
EXCAVATION
LIMITS OF FOUNDATION
EXCAVATION
C2
L
L
20+0021+0022+0023+0024+0025+0026+00
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-111.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
P L
O
F I
C-111
D1
PLAN
SCALE: 1" = 40'
80'0 40'
N
O
R
T
H
P
L
A
N
M A
T C
H
L
I N
E
C
C
A1
LONGITUDINAL PROFILE
SCALE: 1" = 40' HORIZONTAL
PROPOSED TOP
OF LEVEE ALONG
CONTROL LINE
(E) 10" GAS
SEE NOTE 2
(E) 10" GAS
1. CONTRACTOR SHALL RECONSTRUCT EXISTING LEVEE
TO CURRENT GRADE WITH LEVEE FILL IN ACCORDANCE
WITH SPECIFICATION 31 00 00.
2. DEPTH OF 10 INCH GAS LINE IS APPROXIMATE.
EXCAVATION WITHIN 50 FEET OF CALPINE GAS LINE
SHALL NOT PROCEED WITHOUT CONTRACTING
OFFICER AND CALPINE REPRESENTATIVE ON SITE.
3. SEE C-301 FOR TYPICAL SECTIONS.
GENERAL SHEET NOTES
80'0 40'
M A
T C
H
L
I N
E
C
C
LIMITS OF
EXCAVATION
(E) GRADE
H
V
H
V
H
V
H
V
H
V
H
V
SCALE: 1" = 8' VERTICAL
16'0 8'
MATCH (E)
GRADE
(E) LANDSIDE TOE
LANDSIDE TOE OF
SETBACK LEVEE
(PROJECTED)
LIMITS OF FOUNDATION
EXCAVATION EL 26.5
STA. 29+43.2
EL. 29.00
MATCH (E) LEVEE
30 30
H
V
BOTTOM OF INSPECTION
TRENCH EL 22.75
S
A
C
R
A
M
E
N
V
E
R
PROPOSED TOE
OF BERM
PROPOSED
WATERSIDE TOE
F
L
O
W
SETBACK LEVEE
CONTROL LINE
TEMPORARY PROTECTIVE
FENCING
3H:1V
5:1
PROPOSED TOP
OF BERM
LIMITS OF FOUNDATION
EXCAVATION
LIMITS OF FOUNDATION
EXCAVATION
16+0017+0018+0019+0020+00
E L E
V A
T I O
N
10+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+00
P V
I
S
T A
E L
P V
I
S
T A
E L
P V
I
S
T A
E L
P V
I
S
T A
E L
P V
I
S
T A
E L
P V
I
S
T A
E L
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
ISSUED FOR BID
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-05-01
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-112.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
M
H
U G
H E
S
K
L
E E
T
Q
U I N
T R
A L
L
J
S
O R
E N
S
O
F I L
E S
C-112
C1
PLAN
SCALE: 1" = 40'
80'0 40'
N
O
R
T
H
P
L
A
N
C
M A
T C
H
L
I N
E
C
A1
LONGITUDINAL PROFILE
SCALE: 1" = 40' HORIZONTAL
PROPOSED TOP
OF LEVEE ALONG
CONTROL LINE
1. CONTRACTOR SHALL RECONSTRUCT EXISTING LEVEE
TO CURRENT GRADE WITH LEVEE FILL IN ACCORDANCE
WITH SPECIFICATION 31 00 00.
2. SEE C-301 FOR TYPICAL SECTIONS.
GENERAL SHEET NOTES
C
M A
T C
H
L
I N
E
C
H
V
H
V
H
V
H
V
80'0 40'
SCALE: 1" = 8' VERTICAL
10'0 8'
MATCH (E)
GRADE
LIMITS OF
EXCAVATION
LANDSIDE TOE OF
SETBACK LEVEE
(PROJECTED)
(E) GRADE
STA. 11+00
EL. 30.00
LIMITS OF FOUNDATION
EXCAVATION EL. 26.50
BOTTOM OF INSPECTION
TRENCH EL. 22.75
H
V
H
V
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 1+00 2+00 3+00 4+00 4+50
0+00 1+00
2+00 3+00
4+00 4+50
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: SHAYAAN.QAZI(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-201.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
W A
T E
R S
I D
E
R
A M
P
P
L A
N
A
O
F I L
E
C-201
D1
PLAN
SCALE: 1" = 20'
40'0 20'
N
O
R
T
H
P
L
A
N
A1
LONGITUDINAL PROFILE
SCALE: 1" = 20' HORIZONTAL
1. SEE SPECIFICATION 32 15 00 FOR AGGREGATE
SURFACING REQUIREMENTS.
GENERAL SHEET NOTES
40'0 20'
H
V
H
V
SCALE: 1" = 4' VERTICAL
8'0 4'
(E) LANDSIDE TOE
H
V
H
V
H
V
H
V
H
V
H
V
H
V
ACCESS RAMP
ACCESS RAMP
EG
EL 50.44
SETBACK LEVEE CONTROL LINE
STA 22+76.85
END RAMP
ALIGNMENT
N 2072003.14
E 6639017.33
BEGIN RAMP
ALIGNMENT
N 2072414.67
E 6638835.27
STA 1+00
EL 50.00
STA 4+00
EL 29.24
STA 1+25
EL 48.41
STA 3+50
EL 30+96
STA 3+00
EL 34+23
STA 4+00
L OFFSET 7'-0"
STA 4+00
R OFFSET 7'-0"
STA 1+00
L OFFSET 6'-0"
STA 1+00
R OFFSET 6'-0"
WATERSIDE
LANDSIDE
LEVEE FILL
(E) GRADE
MATCH (E) GRADE
SETBACK LEVEE
CONTROL LINE
2 % SLOPE
(NOTE 1)
2 % SLOPE
5%
INSPECTION TRENCH
BOTTOM EL 22.75 FT
PROJECTED
WATERSIDE
LEVEE TOE
LANDSIDE LEVEE TOE
LIMITS OF EXCAVATION
OF EXISTING LEVEE, EL 26.50
TOP OF BERM
WATERSIDE
LANDSIDE
SETBACK LEVEE
CONTROL LINE
2 % SLOPE
(E) GRADE
LIMITS OF FOUNDATION
EXCAVATION EL 26.50
LEVEE FILL
5%
INSPECTION TRENCH
BOTTOM EL 22.75 FT
WATERSIDE
LEVEE TOE
LANDSIDE LEVEE TOE
TOP OF BERM
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-06) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-301.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
M
H U
G H
E S
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
T Y
P I C
O
C
T I O
N S
C-301
A1
TYPICAL CROSS SECTION AT TIE-IN - STA 29+40 TO 24+90 AND STA 14+90 TO 11+00
SCALE: NOT TO SCALE
20' VARIES
LIMITS OF STRIPPING, CLEARING AND GRUBBING
C1
C-501
E1
C-501
20'
10'
5'
LIMITS OF STRIPPING, CLEARING AND GRUBBING
C1
C-501
D1
TYPICAL CROSS SECTION - SETBACK LEVEE STA 24+90 TO 14+90
SCALE: NOT TO SCALE
5'
C1
C-501
1. EXISTING LEVEE TO BE RECONSTRUCTED TO EXISTING
GRADE WITH LEVEE FILL
2. EXISTING LEVEE CROWN WIDTH VARIES. SETBACK
LEVEE CROWN WILL TAPER AS REQUIRED TO MATCH
EXISTING CROWN WIDTH AT TIE-IN LOCATIONS.
3. CONTRACTOR SHALL NOT PLACE FILL PRIOR TO REVIEW
AND APPROVAL OF SUBGRADE MATERIALS BY THE
CONTRACTING OFFICER IN ACCORDANCE WITH
SPECIFICATION 31 00 00.
4. COMPLETED SLOPES AND ALL AREAS DISTURBED
DURING CONSTRUCTION SHALL BE SEEDED IN
ACCORDANCE WITH SPECIFICATION 32 92 19.
GENERAL SHEET NOTES
VARIES
SEE NOTE 2
140'
CONSTRUCTION LIMIT VARIES, SEE SHEET G-006
M
I N
10'
140'
CONSTRUCTION LIMIT
M
I N
5'
5'
M
I N
M
I N
12'
TOE OF BERM
TOE OF BERM
M
I N
M
I N
12'
2 %
5%
SETBACK LEVEE
CONTROL LINE
MATCH
(E) GRADE
VARIES
2 %
LIMITS OF FOUNDATION
EXCAVATION
(E) LEVEE
INSPECTION
TRENCH
11+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
11+25
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
11+50
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
11+75
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
12+25
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
12+50
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
12+75
0 10 20 30 40 50 60 70 80 900-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
13+00
0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
13+25
0 10 20 30 40 50 60 70 80 90 100 110 1200-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
10+80
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDE
12+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
10+50
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDELANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDELANDSIDE WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE LANDSIDE WATERSIDE
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-311.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
R
M I L
L E
T
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C R
O S
S
S
E C
T I O
N S
S
C-311
A1
CROSS SECTIONS
SCALE: 1" = 30'
1. SEE SHEET C-301 FOR TYPICAL CROSS SECTIONS.
GENERAL SHEET NOTES
12/31 /2020
5%
SETBACK LEVEE
CONTROL LINE
LIMITS OF FOUNDATION
EXCAVATION
INSPECTION TRENCH
13+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 1400-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
13+75
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
14+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 1700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
14+25
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 1800-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
14+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 1700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
14+75
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
15+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
15+25
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
15+50
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
16+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDE LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDELANDSIDE WATERSIDELANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-312.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
R
M I L
L E
T
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C R
O S
S
S
E C
T I O
N S
S
C-312
A1
CROSS SECTIONS
SCALE: 1" = 30' H
1. SEE SHEET C-301 FOR TYPICAL CROSS SECTIONS.
GENERAL SHEET NOTES
5%
SETBACK LEVEE
CONTROL LINE
VARIES
2 %
(E) LEVEE
INSPECTION
TRENCH
LIMIT OF FOUNDATION
EXCAVATION
ACCESS RAMP
17+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
18+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
19+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
20+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
21+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
23+00
0 10 20 30 40 50 60 70 80 900-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
24+00
0 10 20 30 40 50 60 70 80 900-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
25+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 1600-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDE
22+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
25+25
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 1700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDELANDSIDE WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDELANDSIDE WATERSIDE
LANDSIDE WATERSIDE
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: SHAYAAN.QAZI(2020-03-19) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-313.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
R
M I L
L E
T
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C R
O S
S
S
E C
T I O
N S
S
C-313
A1
CROSS SECTIONS
SCALE: 1" = 30' H
1. SEE SHEET C-301 FOR TYPICAL CROSS SECTIONS.
GENERAL SHEET NOTES
5%
SETBACK LEVEE
CONTROL LINE
INSPECTION
TRENCH
LIMITS OF FOUNDATION
EXCAVATION
(E) LEVEE
26+50
0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
26+75
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
27+00
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
27+25
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
27+50
0 10 20 30 40 50 600-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
27+75
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
28+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
26+00
0 10 20 30 40 50 60 70 80 90 100 110 1200-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
25+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 1700-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
26+25
0 10 20 30 40 50 60 70 80 90 100 1100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
LANDSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDE LANDSIDE WATERSIDE
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-314.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
R
M I L
L E
T
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C R
O S
S
S
E C
T I O
N S
S
C-314
A1
CROSS SECTIONS
SCALE: 1" = 30' H
1. SEE SHEET C-301 FOR TYPICAL CROSS SECTIONS.
GENERAL SHEET NOTES
12/31 /2020
5%
SETBACK LEVEE
CONTROL LINE
INSPECTION
TRENCH
LIMITS OF FOUNDATION
EXCAVATION
(E) LEVEE
29+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
29+50
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140
30+20
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
LANDSIDE WATERSIDE LANDSIDE WATERSIDE
LANDSIDE WATERSIDE
DETAIL INDICATOR
SECTION SYMBOL
NORTH
PLAN
X#
DRAWING AREA TITLE
SCALE: 1/2" = 1'-0"
0 2' 4'1'
USE "ONE SCALE BAR FOR ENTIRE
SHEET (IF THE ENTIRE SHEET IS THE
SAME SCALE), OR 1 PER DETAIL."
PLACE IN LOWER
RIGHT CORNER AND
OR ON EACH DETAIL
X#
X-5##
X#
X-3##
SAMPLE TEXT
MATCH LINE
XX/X-XXX
X#
X-5##
X#
X-5##
X
MATCH LINE
X-XXX
USE 1 OF THESE
OPTIONS
0.87"
SAMPLE
TEXT
SHEET KEYNOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
1. NOTE 1
2. NOTE 2
3. NOTE 3
GENERAL SHEET NOTES
1. NOTE 1
2. NOTE 2
3. NOTE 3
LEGEND
1. THESE ARE GENERAL NOTES:
2. THEY ARE LOCATED NEAR THE BEGINNING OF A SET OF DRAWINGS ON A
G-00# SHEET.
3. GENERAL NOTES START IN THE UPPER LEFT CORNER AND CONTINUE DOWN
AND TO THE RIGHT AS NEEDED.
4. GENERAL NOTES APPLY TO ALL SHEETS IN THE SET.
GENERAL NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS ON
A X-00# SHEET.
3. GENERAL (DISCIPLINE) NOTES APPLY TO ALL (DISCIPLINE) SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES
1. THESE ARE GENERAL (DISCIPLINE) NOTES:
2. THEY ARE LOCATED AT THE BEGINNING OF THE (DISCIPLINE) DRAWINGS.
3. THESE GENERAL (DISCIPLINE) NOTES APPLY TO SPECIFIC SHEETS IN THE
SET.
GENERAL (DISCIPLINE) NOTES: SHEETS X-102 THRU X-109
LOCATE IN UPPER RIGHT
CORNER OF SHEET
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SHEET ID
S A
C R
A M
E N
S
T R
I C
T
T R
E E
T
S A
C R
A M
E N
T O
C
A
X X
X X
X X
X
X X
X
X X
X
M A
R C
H
D E
S I G
N
F
I L
E
N
O
S P
E C
I F
I C
A T
I O
N
N
O
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
S A
C R
A M
E N
G
N
K
Y O
U
N T
Y
C
A L
I F
O R
N I A
E
M E
R G
E N
V
P
A I R
S
S I T
E
US Army Corps of Engineers
Last saved by: KEVIN.M.LEE(2020-01-30) Last Plotted: 2020-03-19
Filename: \\SACDATA01.US.IE.URS\PROJECTS6\US ARMY CORPS\W91238-16-D-0018.PL84-99\900_CAD_GIS\950_CAD\0561-31_SAC RIVER\20-SHEETS\0561-31-C-315.DWG
A E
C O
M
T
E C
H N
I C
R
V I C
C
R
E E
T
S
U I T
E
S A
C R
A M
E N
T O
C
A
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
C
F I L
E
N
A M
E
FLOW
FLOW
R
M I L
L E
T
K
L E
E
T
Q U
I N
T R
A L
L
J
S O
R E
N S
E N
C R
O S
S
S
E C
T I O
N S
S
C-315
F1
CROSS SECTIONS
SCALE: 1" = 30' H
1. SEE SHEET C-301 FOR…