Attachment 4 - Pricing Schedule.pdf

PDF 196 KB Posted

Attached to
Levee Repair at P. L. 84-99 Site 0561-31
Solicitation number
W91238-20-R-0056
Issued by

About this file

This pricing schedule attachment outlines costs for a levee repair project at PL 84-99 Site 0561-31. The repair work includes constructing a new 2,000 foot long setback levee to tie into the existing levee on the northern and southern ends of the site. Unit pricing and estimated quantities are provided for various tasks including mobilization, SWPPP design and implementation, fencing and traffic control installation, clearing and grubbing, excavation, levee and aggregate surfacing material fill, hydroseeding, and an optional item for underground irrigation pipe demolition. The total estimated cost will be calculated based on the unit prices for each line item for both the base work and optional items. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Sacramento for repair of the levee under solicitation number W91238-20-R-0056.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91238-20-R-0056 PL 84‐99 Site 0561‐31

Pricing Schedule

CLIN # Description Quantity/Unit Unit Price Total Price

0001.1 Mobilization and Demobilization 1 JA $ $

0001.2 SWPPP Design and Implementation 1 JA $ $

0001.3 Temporary Fencing, Signage, and Traffic Control 1 JA $ $

0001.4 Ditch Removal 450 LF $ $

0001.6 Clearing and Grubbing 9.1 AC $ $

0001.7 Stripping 7,280 CY $ $

0001.8 Excavation 86,100 BYC $ $

0001.9 Levee Fill 175,100 BYC $ $

0001.10 Hydroseeding 7.7 AC $ $

0001.11 Aggregate Surfacing 2,070 TON $ $

Option Item

1001 Demolition – Underground Irrigation Pipe 100 LF $__________ $___________

GRAND TOTAL (BASE + OPTION) $

File details come from the government source that posted it. Updated .