This pricing schedule attachment outlines costs for a levee repair project at PL 84-99 Site 0561-31. The repair work includes constructing a new 2,000 foot long setback levee to tie into the existing levee on the northern and southern ends of the site. Unit pricing and estimated quantities are provided for various tasks including mobilization, SWPPP design and implementation, fencing and traffic control installation, clearing and grubbing, excavation, levee and aggregate surfacing material fill, hydroseeding, and an optional item for underground irrigation pipe demolition. The total estimated cost will be calculated based on the unit prices for each line item for both the base work and optional items. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Sacramento for repair of the levee under solicitation number W91238-20-R-0056.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91238-20-R-0056 PL 84‐99 Site 0561‐31
Pricing Schedule
CLIN # Description Quantity/Unit Unit Price Total Price
0001.1 Mobilization and Demobilization 1 JA $ $
0001.2 SWPPP Design and Implementation 1 JA $ $
0001.3 Temporary Fencing, Signage, and Traffic Control 1 JA $ $
0001.4 Ditch Removal 450 LF $ $
0001.6 Clearing and Grubbing 9.1 AC $ $
0001.7 Stripping 7,280 CY $ $
0001.8 Excavation 86,100 BYC $ $
0001.9 Levee Fill 175,100 BYC $ $
0001.10 Hydroseeding 7.7 AC $ $
0001.11 Aggregate Surfacing 2,070 TON $ $
Option Item
1001 Demolition – Underground Irrigation Pipe 100 LF $__________ $___________
GRAND TOTAL (BASE + OPTION) $