Attachment_08_-_Site_Walk_Instructions.pdf

PDF 2 MB Posted

Attached to
FHR 1. 0L Bank Protection
Solicitation number
W9123819R0047
Issued by

About this file

Attachment 08 - Site Walk Instructions

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Erosion repair, Feather River, River Mile 1.0L

Sacramento River Bank Protection Project

Solicitation No. W9123819R0047

SITE VISIT MEETING INFORMATION

Potential offerors will be provided an opportunity to visit and observe conditions at the erosion site and to speak with the project sponsors. Offerors are encouraged but not required to attend, and do so at their own risk. To facilitate safe conduct of the site visit, please notify the contract specialist of your plans to attend, the number of vehicles and persons you expect to be present at the site, and any special assistance or accommodation required by any member of your party. Please carpool with any other attending members of your team in order to minimize the number of vehicles present at the site. See

Site Visit Updates and Inquiries, below, for contact details.

DATE AND TIME

Wednesday, 12 June 2019, 9:30am‐10:30am Pacific Daylight Time.

SITE VISIT UPDATES AND INQUIRIES

Updates to information about the site visit may be posted via an amendment to the solicitation on the

Federal Business Opportunities website. It is the responsibility of interested parties to check for updated information prior to the meeting. For details on accessing such information or to submit an inquiry regarding the site visit meeting, see the Inquiries subsection of Section 00 21 16 – Instructions to

Proposers in the solicitation.

For any sensitive questions or concerns about the meeting that a potential offeror wishes to communicate outside of the bid inquiry system, please contact in advance:

Deanna C. Zemovich, Contract Specialist Telephone: (916) 557-7027 E-M AIL: Deanna.C.Zemovich@usace.army.mil

SAFETY PRECAUTIONS

Participation of potential offerors in the site meeting is voluntary. You are encouraged to attend but you do so at your own risk. Field conditions present safety risks typical of a sloped levee with limited access and vegetated, eroded river bank in Northern California. Risks include but are not limited to the potential to trip or fall, exposure to sun, and hazards associated with biological resources such as plants

(e.g. poison oak), biting or stinging insects, and reptiles.

We encourage you to take a four wheel drive vehicle to the site visit as the shoulders of the levee road can consist of soft soils.

Wear:

sturdy shoes long pants light weight long sleeve shirt sunscreen

Bring:

hat with brim sunglasses water to drink

Be aware of other vehicles and persons while parking on levee road and getting in and out of vehicle.

Do not touch vegetation unless you know that is safe to do so.

Watch where you step ‐ choose the placement of your feet thoughtfully. Do not step where you cannot see the ground, e.g. due to thick vegetation or a break in the ground surface.

No smoking. Absolutely no use of matches or other sources of flame.

After your visit:

If you contact poison oak with your clothing or shoes, handle and clean them very carefully to minimize spread of the plant oils.

If you walk through wild vegetation, check for ticks on your body.

DRIVING DIRECTIONS

The site location is shown in the attached Map. To assist with the navigation to the site, we provide the following geographic coordinates of the center of the construction site:

Latitude 38°47'58.15"N (or N 38.799508) Longitude 121°37'55.78"W (or W-121.632582)

From USACE Sacramento Office at 1325 J Street, Sacramento, CA 95814 to the site (38°47'58.15"N, 121°37'55.78"W) is approximately 20 miles and may take 25 minutes.

Turn left onto 14th St

Turn left onto I St

Turn right onto the I‐5 North/State Hwy 99 ramp to Redding/Yuba City

Merge onto I‐5 North (5.78 mi)

Keep right to continue on CA‐99 North, follow signs for Yuba City/Marysville (5.54 mi)

Take the Riego Road exit (0.361 mi)

Turn left onto West Riego Road (853 ft)

Keep left to stay on West Riego Rd (2.84 mi)

Turn right onto Garden Highway

Destination will be on the left (4.43 mi)

Service Layer Credits : Sources: Esr i , HERE,Serv ice Layer Credits : Sources: Esr i , HERE, Garmin, USGS, Intermap, INCREMENT P,Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esr i ChinaNRCan, Esri Japan, METI, Esr i China (Hong Kong), Esr i Korea , Esri (Thai land),(Hong Kong), Esr i Korea , Esri (Thai land), NGCC, © OpenStreetMap contribu tors, andNGCC, © OpenStreetMap contribu tors, and the GIS User Communi tythe GIS User Communi ty Source : Esri , Digi ta lG lobe, GeoEye,Source : Esri , Digi ta lG lobe, GeoEye, !A

0 500 1,000 Feet

Background Imagery: ESRI Base Map, World Imagery

Map Prepared by Christy Cox

38°47'58.15"N 121°37'55.78"W

Garden Highway

Drive 20 mi, 25 minutes

From 1325 J St, Sacramento, CA 95814, USA

To: 38°47'58.15"N, 121°37'55.78"W

Turn left onto 14th St Turn left onto I St Turn right onto the I-5 N/State Hwy 99 ramp to Redding/Yuba City Merge onto I-5 N (5.78 mi) Keep right to continue on CA-99 N, follow signs for Yuba City/Marysville (5.54 mi) Take the Riego Rd exit (0.361 mi) Turn left onto W Riego Rd (853 ft) Keep left to stay on W Riego Rd (2.84 mi) Turn right onto Garden HwyDestination will be on the left (4.43 mi)

FEATHER

RIVER

SACRAMENTO RIVER BANK

PROTECTION PROJECT

U .S. ARMY CORPS OF ENGINEERS

SACRAMENTO DISTRICT

DRIVING DIRECTIONS

TO FHR 1.0L EROSION REPAIR SITE

FROM U SACE – SACRAMENTO DISTRICT

(Take Garden HWY

4.43 miles to site)

Site Visit Information_6_Jun_2019_FINAL_CHOWDHORY_31MAY2019.PDF
Site Visit Information_6_Jun_2019_ChristyCox
Pages from Site Visit Information6Jun2019_v2

File details come from the government source that posted it.