About this file

Revised Exhibit A Pricing Schedule

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 B-1 (A)

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for CLIN 0001 - B-1: Reach B (STA 650+50 to 716+50)
11.001Mobilization and Demobilization1JOB
11.002Traffic Control1JOB
11.003Storm Water Pollution Control1JOB
11.004Project Fencing9396LF
11.005Clearing and Grubbing46.5AC
11.006Topsoil Stripping46.5AC
11.007Stump and Root Ball Removal1JOB
11.008General Excavation41500CY
11.009Sawcut493LF
11.010Demolition – Pump Station1JOB
11.011Demolition – Outfall Structure1JOB
11.012Demolition – APN 225-0090-0641JOB
11.013Demolition – APN 225-0090-0651JOB
11.014Demolition – APN 225-0090-0661JOB
11.015Demolition – APN 225-0110-0361JOB
11.016Electrical at Pumping Plant 31JOB
11.017Pump No. 1001JOB
11.018Pump No. 2001JOB
11.019Pump No. 3001JOB
11.020Pump No. 4001JOB
11.02112-inch HDPE2500LF
11.02230-inch Welded Steel Pipe880LF
11.02336-inch Welded Steel Pipe880LF
11.02442-inch Welded Steel Pipe150LF
11.02548-inch Welded Steel Pipe160LF
11.0261-inch Schedule 80 PVC Conduit100LF
11.0276-inch Schedule 80 PVC Pipe1LF
11.02848-inch X 42-inch Eccentric Reducer1EA
11.02930-inch Butterfly Valve2EA
11.03036-inch Butterfly Valve2EA
11.03142-inch Butterfly Valve1EA
11.032Siphon Breaker and Air Relief Valve5EA
11.0336-inch Cast Iron Floor Drain1EA
11.034Precast Concrete Siphon Vault, 4-ft X 3-ft5EA
11.03512-inch Flap Gate1EA
11.03632-inch Flap Gate2EA
11.03736-inch Flap Gate2EA
11.03848-inch Flap Gate1EA
11.039Grout Pad5EA
11.0401/4-inch Thick Plate Wall Flange20EA
11.041Positive Closure Vault Foundation30CY
11.042Sheet Pile6400SF
11.043Temporary Sheet Pile1JOB
11.044Removable HDG Grating and Beams220SF
11.045Post and Cable Guardrail60LF
11.046Cathodic Protection System1JOB
11.047Concrete Stairs and Guardrail1JOB
11.048Non-shrink Flowable Grout233CY
11.049Soil Type 1125528CY
11.050Soil Type 221000CY
11.051Soil Type 4238054CY
11.052Lime-Stabilized Soil10725CY
11.053Lime-Modified Soil1100CY
11.054Granular Structural Fill1200CY
11.055Drained Seepage Berm STA 686+00 to 694+00800LF
11.056Class 2 Aggregate Base17226TON
11.057HMA Surface Course1458TON
11.058HMA Intermediate Course2862TON
11.059Rock Slope Protection Type A420TON
11.060Rock Slope Protection Type B210TON
11.061PP3 Outfall Structure1JOB
11.062Cold Plane Asphalt Concrete4409SY
11.063Concrete365CY
11.064Relief Wells10EA
11.065Drain Manhole4EA
11.066Drop Inlet (Type F)7EA
11.067Relocate Existing Power Pole1JOB
11.068SMUD Upgrades1JOB
11.069Pavement Marking150SF
11.070Thermoplastic Traffic Stripe4850LF
11.071Delineators (Class 1) Type E6EA
11.072Delineators (Class 1) Type F41EA
11.073Remove Roadside Sign1EA
11.074Relocate and Reset Roadside Sign8EA
11.075Roadside Sign11EA
11.076Furnish Sign Panel14EA
11.078Install Mailbox14EA
11.079Reset Mirror5EA
11.080Reset Fence105LF
11.081Reset Gate1EA
11.082Pipe Gate Type 14EA
11.083Pipe Gate Type 212EA
11.0848-FT Chain Link Fence815LF
11.0858-FT Double Lead Swing Gate4EA
11.086Post and Cable Fencing135LF
11.087Access Control Posts1JOB
11.088Erosion Control Seeding39.2AC
CLIN 0001 B-1: Subtotal Estimated Price

American River Common Features (ARCF) Natomas Basin - Reach B - Final Solicitation No.: W9123819B0020

Pricing Schedule Spec No. 2122

CLIN 0001 B-2 (B)

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for CLIN 0001 - B-2: Riverside Canal Relocation (STA 143+00 to 235+46)
2.01Mobilization and Demobilization1LS
2.02Exclusionary Silt Fencing7764LF
2.03Traffic Control1LS
2.04Storm Water Pollution Control1LS
2.05Demolition1LS
2.06Clearing and Grubbing1AC
2.07Site Stripping20AC
2.08Excavation1315CY
2.09Compacted Embankment104479CY
2.1Rock Slope Protection628TON
2.11Rock Slope Protection Bedding Material332TON
2.1242-Inch Corrugated HDPP Pipe150LF
2.1312-Inch Solid Wall HDPE Pipe835LF
2.1418-Inch Solid Wall HDPE Pipe280LF
2.1524-Inch Solid Wall HDPE Pipe100LF
2.1632-Inch Solid Wall HDPE Pipe95LF
2.1736-Inch Solid Wall HDPE Pipe105LF
2.1848-Inch Solid Wall HDPE Pipe6540LF
2.1918-Inch Corrugated Metal Pipe (CMP)385LF
2.224-Inch Corrugated Metal Pipe (CMP)205LF
2.2136" Welded Steel Pipe343LF
2.22Dirt Rd Lateral Canal Turnout1EA
2.23Dirt Rd Field Canal Turnout1EA
2.24Radio Road Lateral Turnout1EA
2.25Lateral 12 Turnout1EA
2.26Lateral 13 Turnout1EA
2.29Field Irrigation Turnout9EA
2.31Concrete Canal Lining140CY
2.32Riverside Pumping Plant Outfall Structure1LS
2.33Concrete Weir1LS
2.34Lift Station1LS
2.36Class 2 Aggregate Base4993TON
2.37Erosion Control Seeding9AC
2.3814-foot Multi-Lock Pipe Gate5EA
2.3950 HP Pump and Motor1EA
2.460 HP Pump and Motor1EA
2.41Lift Station - Miscellaneous Electrical1LS
Lift Station - MCC1LS
Lift Station - Utility Transformer Pad1LS
Lift Station - Lights, light poles, and foundation1LS
Lift Station - Flow Transmitters1LS
Lift Station - Pressure Transmitters1LS
Lift Station - Pressure Switch High1LS
Lift Station - Antenna Tower1LS
Lift Station - Radio Survey1LS
Lift Station - RTU Enclosure1LS
Lift Station - PLC Equipment1LS
2.42Chain-Link Fence and Gates285LF
2.43Barbed Wire Fence995LF
2.44Farm Road Lateral Turnout1LS
2.45Bryte Bend Road Lateral Turnout1LS
2.46Unsuitable Material50CY
CLIN 0001 B-2: Subtotal Estimated Price
Note: CLIN 0001 B-2 includes the construction of the Riverside Canal and Pipeline Relocation as shown in the Vol. 4 Drawings from Station 143+00 at the north end of the project to the gate valve at Station 235+46 at the south end of the project. CLIN 0001 O-3 would continue the construction downstream (south) of the gate valve at Station 235+46.

American River Common Features (ARCF) Natomas Basin - Reach B - Final

Pricing Schedule Spec No. 2122

CLIN 0001 B-3 (C)

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for CLIN 0001 - B-3: Borrow
11.089Mobilization and Demobilization1LS
11.09Exclusionary Silt Fencing9666LF
11.091Storm Water Pollution Control1LS
11.092Demolition1LS
11.093Surface Layer Removal, Stockpile and Respread115AC
11.094Borrow Site Excavation564179CY
11.095Deep Water Channel Excavation47631CY
11.096Rock Slope Protection2632TON
11.097Rock Slope Protection Bedding Material962TON
11.098Hibernacula22EA
11.099Positive Closure Vault w/Gate1EA
11.112-Inch Solid Wall HDPE Pipe60LF
11.10112-Inch Corrugated HDPE Pipe96LF
11.10224-Inch Corrugated HDPE Pipe190LF
11.10330-Inch Corrugated HDPE Pipe487LF
11.104Canal Turnout3EA
11.10514-Foot Multi Lock Pipe Gate1EA
11.10624-Foot Multi Lock Pipe Gate1EA
11.107Barbed Wire Fence1820LF
11.108Class 2 Aggregate Base4000TON
11.109Vertical turbine pump1LS
11.11Production Borehole Drilling420LF
11.111Geophysical Logging1LS
11.112Blank Well Casing150LF
11.113Well Screen250LF
11.114Sounding Pipe149LF
11.115Gravel Fill Pipe100LF
11.116Gravel Envelope345LF
11.117Annular Seal75LF
11.118Well Standby Time3HR
11.119Unsuitable Material1000CY
Bid Schedule B-3: Subtotal Estimated Price

American River Common Features (ARCF) Natomas Basin - Reach B - Final

Pricing Schedule Spec No. 2122

Option 1001 O-1

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for Option CLIN 1001 - O-1: Reach B (STA 716+50 to 768+00)
11.001Mobilization and Demobilization1JOB
11.002Traffic Control1JOB
11.003Storm Water Pollution Control1JOB
11.004Project Fencing7482LF
11.005Clearing and Grubbing37AC
11.006Topsoil Stripping37AC
11.007Stump and Root Ball Removal1JOB
11.008General Excavation43700CY
11.009Sawcut491LF
11.049Soil Type 199958CY
11.051Soil Type 4189561CY
11.052Lime-Stabilized Soil8775CY
11.053Lime-Modified Soil1600CY
11.056Class 2 Aggregate Base13717TON
11.057HMA Surface Course1161TON
11.058HMA Intermediate Course2279TON
11.062Cold Plane Asphalt Concrete3511SY
11.069Pavement Marking75SF
11.070Thermoplastic Traffic Stripe2425LF
11.071Delineators (Class 1) Type E5EA
11.072Delineators (Class 1) Type F32EA
11.073Remove Roadside Sign1EA
11.074Relocate and Reset Roadside Sign6EA
11.075Roadside Sign8EA
11.076Furnish Sign Panel11EA
11.077Flashing Beacon1EA
11.078Install Mailbox26EA
11.079Reset Mirror4EA
11.082Pipe Gate Type 12EA
11.083Pipe Gate Type 27EA
11.087Access Control Posts1JOB
11.088Erosion Control Seeding31.2AC
Pay Items for Option CLIN - O-1: Borrow
11.089Mobilization and Demobilization1LS
11.090Exclusionary Silt Fencing1467LF
11.091Storm Water Pollution Control1LS
11.093Surface Layer Removal, Stockpile and Respread84AC
11.094Borrow Site Excavation287881CY
Bid Schedule O-1: Subtotal Estimated Price
Note: If Option CLIN 1002 - O-2 is not executed, CLIN 1001 - O-1 work (adjacent levee and seepage berm) shall daylight at or prior to STA 768+00.

American River Common Features (ARCF) Natomas Basin - Reach B - Final

Pricing Schedule Spec No. 2122

Option 1002 O-2

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for Option CLIN 1002 - O-2: Reach B (STA 768+00 to 772+50)
11.001Mobilization and Demobilization1JOB
11.002Traffic Control1JOB
11.003Storm Water Pollution Control1JOB
11.004Project Fencing522LF
11.005Clearing and Grubbing2.6AC
11.006Topsoil Stripping2.6AC
11.007Stump and Root Ball Removal1JOB
11.008General Excavation5200CY
11.009Sawcut316LF
11.049Soil Type 16974CY
11.051Soil Type 413225CY
11.053Lime-Modified Soil700CY
11.056Class 2 Aggregate Base957TON
11.057HMA Surface Course81TON
11.058HMA Intermediate Course159TON
11.062Cold Plane Asphalt Concrete245SY
11.069Pavement Marking75SF
11.070Thermoplastic Traffic Stripe2425LF
11.071Delineators (Class 1) Type E1EA
11.072Delineators (Class 1) Type F2EA
11.078Install Mailbox2EA
11.083Pipe Gate Type 22EA
11.087Access Control Posts1JOB
11.088Erosion Control Seeding2.2AC
Pay Items for Option CLIN 1002 - O-2: Borrow
11.089Mobilization and Demobilization1LS
11.090Exclusionary Silt Fencing3079LF
11.091Storm Water Pollution Control1LS
11.093Surface Layer Removal, Stockpile and Respread8AC
11.094Borrow Site Excavation23342CY
Option CLIN 1002 O-2: Subtotal Estimated Price

American River Common Features (ARCF) Natomas Basin - Reach B - Final

Pricing Schedule Spec No. 2122

Option 1003 O-3

CLIN NO.DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Pay Items for Option CLIN 1003 - O-3: Riverside Canal Relocation (STA 235+46 to 303+56)
2.01Mobilization and Demobilization1LS
2.02Exclusionary Silt Fencing14843LF
2.03Traffic Control1LS
2.04Storm Water Pollution Control1LS
2.05Demolition1LS
2.06Clearing and Grubbing1AC
2.07Site Stripping4AC
2.08Excavation2136CY
2.09Compacted Embankment9530CY
2.1Rock Slope Protection221TON
2.11Rock Slope Protection Bedding Material158TON
2.1312-Inch Solid Wall HDPE Pipe310LF
2.1418-Inch Solid Wall HDPE Pipe155LF
2.1524-Inch Solid Wall HDPE Pipe405LF
2.1632-Inch Solid Wall HDPE Pipe3865LF
2.1736-Inch Solid Wall HDPE Pipe2825LF
2.1918-Inch Corrugated Metal Pipe (CMP)115LF
2.224-Inch Corrugated Metal Pipe (CMP)120LF
2.27Parker Road Lateral Turnout1EA
2.28Tree Road Lateral Turnout1EA
2.29Field Irrigation Turnout10EA
2.3Ranchette Turnout7EA
2.35Discharge Box1LS
2.37Erosion Control Seeding3AC
Pay Items for Option CLIN 1003 - O-3: Borrow
11.089Mobilization and Demobilization1LS
11.091Storm Water Pollution Control1LS
11.093Surface Layer Removal, Stockpile and Respread2AC
11.094Borrow Site Excavation10103CY
Option CLIN 1003 O-3: Subtotal Estimated Price
Note: Option CLIN 1003 - O-3 includes the construction of the remainder of the Riverside Pipeline Relocation as shown in the Vol. 4 Drawings from immediately downstream (south) of the gate valve at Station 235+46 constructed as part of the CLIN 0001 B-2 to the Tree Road Lateral Turnout at Station 303+36 at the south end of the project. If exercised, the Option CLIN 1003 O-3 would also eliminate construction of the Farm Road Lateral Turnout as shown on Vol. 4 Sheet C-322, and the associated CLIN 0001 B-2 Item 02.44.

American River Common Features (ARCF) Natomas Basin - Reach B - Final

Pricing Schedule Spec No. 2122

Summary

DescriptionEstimated
QuantityUnit of
MeasureUnit PriceTotal Price
Summary
CLIN 0001 B-1: Subtotal Estimated Price
CLIN 0001 B-2: Subtotal Estimated Price
CLIN 0001 B-3: Subtotal Estimated Price
Sub-Total Estimated Base Price CLIN 0001: (B1+B2+B3):
Option 1001 - O-1: Subtotal Estimated Price
Option 1002 - O-2: Subtotal Estimated Price
Option 1003 - O-3: Subtotal Estimated Price

Total Estimated Price (CLIN 0001 and Options 1001, 1002 and 1003):

American River Common Features (ARCF) Natomas Basin - Reach B - Final